CN103758208B - 装配整体式叠合框架结构 - Google Patents
装配整体式叠合框架结构 Download PDFInfo
- Publication number
- CN103758208B CN103758208B CN201410053993.9A CN201410053993A CN103758208B CN 103758208 B CN103758208 B CN 103758208B CN 201410053993 A CN201410053993 A CN 201410053993A CN 103758208 B CN103758208 B CN 103758208B
- Authority
- CN
- China
- Prior art keywords
- prefabricated components
- connecting piece
- detachable connecting
- boss
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002131 composite material Substances 0.000 title claims abstract description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 11
- 239000010959 steel Substances 0.000 claims description 11
- 238000010276 construction Methods 0.000 abstract description 17
- 238000000034 method Methods 0.000 abstract description 14
- 239000004567 concrete Substances 0.000 abstract description 13
- 239000007787 solid Substances 0.000 abstract description 4
- 239000003643 water by type Substances 0.000 abstract 1
- 238000013461 design Methods 0.000 description 5
- 238000011161 development Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 239000011178 precast concrete Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 239000003822 epoxy resin Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 229920000647 polyepoxide Polymers 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410053993.9A CN103758208B (zh) | 2014-02-18 | 2014-02-18 | 装配整体式叠合框架结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410053993.9A CN103758208B (zh) | 2014-02-18 | 2014-02-18 | 装配整体式叠合框架结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103758208A CN103758208A (zh) | 2014-04-30 |
CN103758208B true CN103758208B (zh) | 2016-07-06 |
Family
ID=50525517
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410053993.9A Expired - Fee Related CN103758208B (zh) | 2014-02-18 | 2014-02-18 | 装配整体式叠合框架结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103758208B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107152097B (zh) * | 2017-05-12 | 2022-08-26 | 东南大学 | 带悬挑板框架外附预应力装配式耗能框架加固的结构 |
CN109138151B (zh) * | 2018-09-30 | 2024-05-17 | 华南理工大学 | 一种装配式建筑全干法施工混凝土框架结构 |
CN109944392A (zh) * | 2019-03-25 | 2019-06-28 | 广东蕉岭建筑工程集团有限公司 | 一种钢筋分离器、混凝土结构及其施工方法 |
CN113123214A (zh) * | 2020-01-10 | 2021-07-16 | 中国国家铁路集团有限公司 | 一种大横梁和高立柱预制拼装框架墩及施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09158333A (ja) * | 1995-12-11 | 1997-06-17 | Daishiyuu Kensetsu:Kk | 木材同士の継手部分の気密保持方法 |
JP2004257111A (ja) * | 2003-02-26 | 2004-09-16 | Fuji Heavy Ind Ltd | ユニットハウス構造 |
CN101503889A (zh) * | 2009-02-04 | 2009-08-12 | 南通建筑工程总承包有限公司 | 钢筋混凝土全预制装配结构梁t型连接节点 |
WO2013019089A2 (ko) * | 2011-08-04 | 2013-02-07 | Tak Seung-Ho | 조립식 건물 |
CN103104040A (zh) * | 2013-03-08 | 2013-05-15 | 郑州大学 | 一种采用竖向连接的装配式框架梁柱节点及施工方法 |
CN103104039A (zh) * | 2013-03-08 | 2013-05-15 | 郑州大学 | 一种采用盖板连接的装配式框架梁柱节点及施工方法 |
CN203755443U (zh) * | 2014-02-18 | 2014-08-06 | 沈阳远大科技创业园有限公司 | 装配整体式叠合框架结构 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050055922A1 (en) * | 2003-09-05 | 2005-03-17 | Mohammad Shamsai | Prefabricated cage system for reinforcing concrete members |
-
2014
- 2014-02-18 CN CN201410053993.9A patent/CN103758208B/zh not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09158333A (ja) * | 1995-12-11 | 1997-06-17 | Daishiyuu Kensetsu:Kk | 木材同士の継手部分の気密保持方法 |
JP2004257111A (ja) * | 2003-02-26 | 2004-09-16 | Fuji Heavy Ind Ltd | ユニットハウス構造 |
CN101503889A (zh) * | 2009-02-04 | 2009-08-12 | 南通建筑工程总承包有限公司 | 钢筋混凝土全预制装配结构梁t型连接节点 |
WO2013019089A2 (ko) * | 2011-08-04 | 2013-02-07 | Tak Seung-Ho | 조립식 건물 |
CN103104040A (zh) * | 2013-03-08 | 2013-05-15 | 郑州大学 | 一种采用竖向连接的装配式框架梁柱节点及施工方法 |
CN103104039A (zh) * | 2013-03-08 | 2013-05-15 | 郑州大学 | 一种采用盖板连接的装配式框架梁柱节点及施工方法 |
CN203755443U (zh) * | 2014-02-18 | 2014-08-06 | 沈阳远大科技创业园有限公司 | 装配整体式叠合框架结构 |
Also Published As
Publication number | Publication date |
---|---|
CN103758208A (zh) | 2014-04-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109457597B (zh) | 一种平板式模块化预制装配空心桥墩拼接构造及其作法 | |
CN104195950A (zh) | 一种钢混组合梁斜拉桥胶接缝连接方法 | |
CN104912190A (zh) | 一种干式榫接框架结构 | |
CN203755443U (zh) | 装配整体式叠合框架结构 | |
CN101768916A (zh) | 下翼缘改进型波形钢腹板组合箱梁及其施工方法 | |
CN103243838A (zh) | 一种装配整体式混凝土框架-剪力墙连接结构 | |
CN110725455A (zh) | 一种装配式叠合楼板横向连接方法 | |
CN108661221A (zh) | 一种预制楼板及其连接结构及其施工方法 | |
CN104818775A (zh) | 一种新型预制装配式框架结构 | |
CN103758208B (zh) | 装配整体式叠合框架结构 | |
CN208618627U (zh) | 一种预制楼板及其连接结构 | |
CN104929287A (zh) | 一种新型模数化装配式低层冷弯薄壁型钢楼盖模块 | |
CN103741970A (zh) | 建筑施工用组装式加工棚及其制作安装方法 | |
CN104895231B (zh) | 一种装配式组合楼板及其制造方法 | |
CN111335464A (zh) | 一种装配式混凝土结构梁柱连接节点及其施工方法 | |
CN103397700A (zh) | 建筑物叠合楼板与钢管剪力墙的连接结构 | |
CN206053079U (zh) | 一种装配式梁板集成组合楼盖 | |
CN203475609U (zh) | 建筑物叠合楼板与钢管剪力墙的连接结构 | |
CN203475649U (zh) | 建筑物竖向上段钢管剪力墙与下段钢管剪力墙的连接结构 | |
CN204703350U (zh) | 一种装配式组合楼板 | |
CN110016992A (zh) | 一种装配式主次梁安装结构及安装方法 | |
CN211735744U (zh) | 一种装配式钢筋混凝土梁柱节连接结构 | |
CN204590261U (zh) | 一种新型预制装配式框架结构 | |
CN106088398A (zh) | 一种复合墙板 | |
CN109594717B (zh) | 基于预制标准拼装片的装配式钢筋混凝土柱施工工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB02 | Change of applicant information |
Address after: 110027, No. 27, development road, Shenyang economic and Technological Development Zone, Liaoning Applicant after: SHENYANG YUANDA TECHNOLOGY PARK CO., LTD. Address before: 110027 No. 27, sixteen street, economic and Technological Development Zone, Liaoning, Shenyang Applicant before: SHENYANG YUANDA SCIENCE & TECHNOLOGY PIONEERING PARK CO., LTD. |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: SHENYANG YUANDA SCIENCE + TECHNOLOGY PIONEERING PARK CO., LTD. TO: SHENYANG YUANDA SCIENCE PARK CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170906 Address after: 110027 No. 16, 6-2 street, Shenyang economic and Technological Development Zone, Liaoning, China Co-patentee after: SHENYANG YUANDA TECHNOLOGY PARK CO., LTD. Patentee after: Shenyang Yuanda Equipment Technology Co., Ltd. Address before: 110027, No. 27, development road, Shenyang economic and Technological Development Zone, Liaoning Patentee before: SHENYANG YUANDA TECHNOLOGY PARK CO., LTD. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160706 Termination date: 20170218 |