CN101503889A - 钢筋混凝土全预制装配结构梁t型连接节点 - Google Patents
钢筋混凝土全预制装配结构梁t型连接节点 Download PDFInfo
- Publication number
- CN101503889A CN101503889A CNA2009100282488A CN200910028248A CN101503889A CN 101503889 A CN101503889 A CN 101503889A CN A2009100282488 A CNA2009100282488 A CN A2009100282488A CN 200910028248 A CN200910028248 A CN 200910028248A CN 101503889 A CN101503889 A CN 101503889A
- Authority
- CN
- China
- Prior art keywords
- structural beams
- structural
- structural beam
- cast
- reinforced concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100282488A CN101503889B (zh) | 2009-02-04 | 2009-02-04 | 钢筋混凝土全预制装配结构梁t型连接节点 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100282488A CN101503889B (zh) | 2009-02-04 | 2009-02-04 | 钢筋混凝土全预制装配结构梁t型连接节点 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101503889A true CN101503889A (zh) | 2009-08-12 |
CN101503889B CN101503889B (zh) | 2011-02-16 |
Family
ID=40976254
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100282488A Expired - Fee Related CN101503889B (zh) | 2009-02-04 | 2009-02-04 | 钢筋混凝土全预制装配结构梁t型连接节点 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101503889B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101851969A (zh) * | 2010-03-08 | 2010-10-06 | 南通建筑工程总承包有限公司 | T型剪力墙水平连接节点结构 |
CN102888912A (zh) * | 2010-03-19 | 2013-01-23 | 南通建筑工程总承包有限公司 | L型剪力墙水平连接节点 |
CN103758208A (zh) * | 2014-02-18 | 2014-04-30 | 沈阳远大科技创业园有限公司 | 装配整体式叠合框架结构 |
CN104164920A (zh) * | 2014-07-23 | 2014-11-26 | 南京长江都市建筑设计股份有限公司 | 一种键槽节点预制框架梁的底部钢筋连接结构 |
CN105297892A (zh) * | 2015-12-02 | 2016-02-03 | 上海欧本钢结构有限公司 | 一种设有张拉钢筋的混凝土梁交叉连接结构及其施工方法 |
-
2009
- 2009-02-04 CN CN2009100282488A patent/CN101503889B/zh not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101851969A (zh) * | 2010-03-08 | 2010-10-06 | 南通建筑工程总承包有限公司 | T型剪力墙水平连接节点结构 |
CN101851969B (zh) * | 2010-03-08 | 2012-03-07 | 南通建筑工程总承包有限公司 | T型剪力墙水平连接节点结构 |
CN102888912A (zh) * | 2010-03-19 | 2013-01-23 | 南通建筑工程总承包有限公司 | L型剪力墙水平连接节点 |
CN103758208A (zh) * | 2014-02-18 | 2014-04-30 | 沈阳远大科技创业园有限公司 | 装配整体式叠合框架结构 |
CN103758208B (zh) * | 2014-02-18 | 2016-07-06 | 沈阳远大科技园有限公司 | 装配整体式叠合框架结构 |
CN104164920A (zh) * | 2014-07-23 | 2014-11-26 | 南京长江都市建筑设计股份有限公司 | 一种键槽节点预制框架梁的底部钢筋连接结构 |
CN105297892A (zh) * | 2015-12-02 | 2016-02-03 | 上海欧本钢结构有限公司 | 一种设有张拉钢筋的混凝土梁交叉连接结构及其施工方法 |
CN105297892B (zh) * | 2015-12-02 | 2017-09-19 | 上海欧本钢结构有限公司 | 一种设有张拉钢筋的混凝土梁交叉连接结构的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101503889B (zh) | 2011-02-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102127941B (zh) | 一种钢管混凝土柱-双层钢板组合剪力墙及其施工方法 | |
CN101503889B (zh) | 钢筋混凝土全预制装配结构梁t型连接节点 | |
EP2379821B1 (en) | Reinforced concrete slab | |
CN101215855A (zh) | 一种组合梁 | |
EP2666924A2 (en) | Truss structure using a material having a pi-shaped cross-section as an upper chord | |
CN203569698U (zh) | 一种预应力混凝土梁和钢管混凝土柱节点结构 | |
KR20100076576A (ko) | 횡구속력이 향상된 콘크리트 충전 강관 | |
CN101503896B (zh) | 一字型剪力墙垂直连接节点 | |
CN102433938A (zh) | 核心区u形柱箍筋型钢混凝土梁柱节点 | |
CN203452228U (zh) | 框架—剪力墙建筑结构 | |
CN210947142U (zh) | 装配式混凝土结构柱梁连接钢节点 | |
CN101503893A (zh) | L型剪力墙垂直连接节点 | |
CN106836645B (zh) | 一种预制空腔式中薄壁混凝土柱 | |
CN108386051A (zh) | 一种应用于装配式剪力墙竖缝连接的阻尼装置 | |
CN101503894B (zh) | T型剪力墙垂直连接节点 | |
CN103912095A (zh) | 一种预制钢筋混凝土构件 | |
CN101503890B (zh) | 钢筋混凝土全预制装配结构梁l型连接节点 | |
CN203603526U (zh) | 一种钢筋混凝土框架柱的加固结构 | |
KR101547540B1 (ko) | 이형플랜지를 갖는 하이브리드 h형강 빔 | |
CN202850192U (zh) | 一种预制混凝土空心构件 | |
CN201395861Y (zh) | 钢筋混凝土全预制装配结构梁t型连接节点 | |
CN104074293A (zh) | 钢筋混凝土预制密肋薄板与施工方法 | |
CN202543903U (zh) | 一种混凝土预制管桩 | |
CN110747991B (zh) | 一种多腔体的巨型方钢管混凝土构件 | |
CN203795708U (zh) | 一种预制钢筋混凝土构件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: KANNUOC (SHANGHAI ) ENGINEERING TECHNOLOGY ADVICE |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Sam.Sigelman Inventor after: Hou Haiquan Inventor after: Dong Niancai Inventor after: Zhang Jun Inventor before: Sam.Sigman Inventor before: Hou Haiquan Inventor before: Dong Niancai Inventor before: Zhang Jun |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: SAM SIGMAN HOU HAIQUAN DONG NIANCAI ZHANG JUN TO: SAM SAIGMAN HOU HAIQUAN DONG NIANCAI ZHANG JUN |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20100603 Address after: 226124 Jiangsu Province Haimen Changle Town Applicant after: Nantong Construction General Contractor Co., Ltd. Co-applicant after: Nantong Construction General Contractor Co., Ltd. Address before: 226124 Jiangsu Province Haimen Changle Town Applicant before: Nantong Construction General Contractor Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110216 Termination date: 20190204 |