CN103758208A - 装配整体式叠合框架结构 - Google Patents
装配整体式叠合框架结构 Download PDFInfo
- Publication number
- CN103758208A CN103758208A CN201410053993.9A CN201410053993A CN103758208A CN 103758208 A CN103758208 A CN 103758208A CN 201410053993 A CN201410053993 A CN 201410053993A CN 103758208 A CN103758208 A CN 103758208A
- Authority
- CN
- China
- Prior art keywords
- prefabricated units
- frame structure
- prefabricated
- superimposed
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000008878 coupling Effects 0.000 claims description 14
- 238000010168 coupling process Methods 0.000 claims description 14
- 238000005859 coupling reaction Methods 0.000 claims description 14
- 239000002131 composite material Substances 0.000 claims description 13
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 238000010276 construction Methods 0.000 abstract description 19
- 239000004567 concrete Substances 0.000 abstract description 14
- 238000000034 method Methods 0.000 abstract description 12
- 238000013461 design Methods 0.000 description 5
- 238000011161 development Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000004134 energy conservation Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000003822 epoxy resin Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 229920000647 polyepoxide Polymers 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410053993.9A CN103758208B (zh) | 2014-02-18 | 2014-02-18 | 装配整体式叠合框架结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410053993.9A CN103758208B (zh) | 2014-02-18 | 2014-02-18 | 装配整体式叠合框架结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103758208A true CN103758208A (zh) | 2014-04-30 |
CN103758208B CN103758208B (zh) | 2016-07-06 |
Family
ID=50525517
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410053993.9A Expired - Fee Related CN103758208B (zh) | 2014-02-18 | 2014-02-18 | 装配整体式叠合框架结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103758208B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107152097A (zh) * | 2017-05-12 | 2017-09-12 | 东南大学 | 带悬挑板框架外附预应力装配式耗能框架加固的结构 |
CN109138151A (zh) * | 2018-09-30 | 2019-01-04 | 华南理工大学 | 一种装配式建筑全干法施工混凝土框架结构 |
CN109944392A (zh) * | 2019-03-25 | 2019-06-28 | 广东蕉岭建筑工程集团有限公司 | 一种钢筋分离器、混凝土结构及其施工方法 |
CN113123214A (zh) * | 2020-01-10 | 2021-07-16 | 中国国家铁路集团有限公司 | 一种大横梁和高立柱预制拼装框架墩及施工方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09158333A (ja) * | 1995-12-11 | 1997-06-17 | Daishiyuu Kensetsu:Kk | 木材同士の継手部分の気密保持方法 |
JP2004257111A (ja) * | 2003-02-26 | 2004-09-16 | Fuji Heavy Ind Ltd | ユニットハウス構造 |
US20050055922A1 (en) * | 2003-09-05 | 2005-03-17 | Mohammad Shamsai | Prefabricated cage system for reinforcing concrete members |
CN101503889A (zh) * | 2009-02-04 | 2009-08-12 | 南通建筑工程总承包有限公司 | 钢筋混凝土全预制装配结构梁t型连接节点 |
WO2013019089A2 (ko) * | 2011-08-04 | 2013-02-07 | Tak Seung-Ho | 조립식 건물 |
CN103104039A (zh) * | 2013-03-08 | 2013-05-15 | 郑州大学 | 一种采用盖板连接的装配式框架梁柱节点及施工方法 |
CN103104040A (zh) * | 2013-03-08 | 2013-05-15 | 郑州大学 | 一种采用竖向连接的装配式框架梁柱节点及施工方法 |
CN203755443U (zh) * | 2014-02-18 | 2014-08-06 | 沈阳远大科技创业园有限公司 | 装配整体式叠合框架结构 |
-
2014
- 2014-02-18 CN CN201410053993.9A patent/CN103758208B/zh not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09158333A (ja) * | 1995-12-11 | 1997-06-17 | Daishiyuu Kensetsu:Kk | 木材同士の継手部分の気密保持方法 |
JP2004257111A (ja) * | 2003-02-26 | 2004-09-16 | Fuji Heavy Ind Ltd | ユニットハウス構造 |
US20050055922A1 (en) * | 2003-09-05 | 2005-03-17 | Mohammad Shamsai | Prefabricated cage system for reinforcing concrete members |
CN101503889A (zh) * | 2009-02-04 | 2009-08-12 | 南通建筑工程总承包有限公司 | 钢筋混凝土全预制装配结构梁t型连接节点 |
WO2013019089A2 (ko) * | 2011-08-04 | 2013-02-07 | Tak Seung-Ho | 조립식 건물 |
CN103104039A (zh) * | 2013-03-08 | 2013-05-15 | 郑州大学 | 一种采用盖板连接的装配式框架梁柱节点及施工方法 |
CN103104040A (zh) * | 2013-03-08 | 2013-05-15 | 郑州大学 | 一种采用竖向连接的装配式框架梁柱节点及施工方法 |
CN203755443U (zh) * | 2014-02-18 | 2014-08-06 | 沈阳远大科技创业园有限公司 | 装配整体式叠合框架结构 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107152097A (zh) * | 2017-05-12 | 2017-09-12 | 东南大学 | 带悬挑板框架外附预应力装配式耗能框架加固的结构 |
CN109138151A (zh) * | 2018-09-30 | 2019-01-04 | 华南理工大学 | 一种装配式建筑全干法施工混凝土框架结构 |
CN109944392A (zh) * | 2019-03-25 | 2019-06-28 | 广东蕉岭建筑工程集团有限公司 | 一种钢筋分离器、混凝土结构及其施工方法 |
CN113123214A (zh) * | 2020-01-10 | 2021-07-16 | 中国国家铁路集团有限公司 | 一种大横梁和高立柱预制拼装框架墩及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103758208B (zh) | 2016-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203755443U (zh) | 装配整体式叠合框架结构 | |
CN109457597B (zh) | 一种平板式模块化预制装配空心桥墩拼接构造及其作法 | |
CN104195950A (zh) | 一种钢混组合梁斜拉桥胶接缝连接方法 | |
CN107152088B (zh) | 一种采用栓钉连接的预制装配双燕尾式钢-混凝土组合梁 | |
CN108661221A (zh) | 一种预制楼板及其连接结构及其施工方法 | |
CN101768916A (zh) | 下翼缘改进型波形钢腹板组合箱梁及其施工方法 | |
CN104818775A (zh) | 一种新型预制装配式框架结构 | |
CN109057004A (zh) | 一种装配式钢-混凝土组合框架及其连接安装方法 | |
CN103758208B (zh) | 装配整体式叠合框架结构 | |
CN103397727A (zh) | 建筑物钢梁与叠合楼板的连接结构 | |
CN112502714B (zh) | 一种装配式竖井筒体结构及设计施工方法 | |
CN104929287A (zh) | 一种新型模数化装配式低层冷弯薄壁型钢楼盖模块 | |
CN113389268A (zh) | 装配式钢筋砼框架免拆模壳组合连接体系及其施工方法 | |
CN103397700A (zh) | 建筑物叠合楼板与钢管剪力墙的连接结构 | |
CN203475665U (zh) | 建筑物钢梁与叠合楼板的连接结构 | |
CN104895231A (zh) | 一种装配式组合楼板及其制造方法 | |
KR101625995B1 (ko) | 프리캐스트 데크 및 그를 구비하는 교량용 슬래브 | |
CN204825945U (zh) | 一种用于固定预埋螺栓的卡具 | |
CN111335464A (zh) | 一种装配式混凝土结构梁柱连接节点及其施工方法 | |
CN208618627U (zh) | 一种预制楼板及其连接结构 | |
CN203475609U (zh) | 建筑物叠合楼板与钢管剪力墙的连接结构 | |
CN203475649U (zh) | 建筑物竖向上段钢管剪力墙与下段钢管剪力墙的连接结构 | |
CN105544744A (zh) | 一种预制混凝土板的连接固定结构 | |
CN204703350U (zh) | 一种装配式组合楼板 | |
CN211735744U (zh) | 一种装配式钢筋混凝土梁柱节连接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 110027, No. 27, development road, Shenyang economic and Technological Development Zone, Liaoning Applicant after: SHENYANG YUANDA TECHNOLOGY PARK CO., LTD. Address before: 110027 No. 27, sixteen street, economic and Technological Development Zone, Liaoning, Shenyang Applicant before: SHENYANG YUANDA SCIENCE & TECHNOLOGY PIONEERING PARK CO., LTD. |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: SHENYANG YUANDA SCIENCE + TECHNOLOGY PIONEERING PARK CO., LTD. TO: SHENYANG YUANDA SCIENCE PARK CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170906 Address after: 110027 No. 16, 6-2 street, Shenyang economic and Technological Development Zone, Liaoning, China Co-patentee after: SHENYANG YUANDA TECHNOLOGY PARK CO., LTD. Patentee after: Shenyang Yuanda Equipment Technology Co., Ltd. Address before: 110027, No. 27, development road, Shenyang economic and Technological Development Zone, Liaoning Patentee before: SHENYANG YUANDA TECHNOLOGY PARK CO., LTD. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160706 Termination date: 20170218 |