CN107035000A - 方管柱与h型钢的边梁柱节点、装配式连接件及施工方法 - Google Patents
方管柱与h型钢的边梁柱节点、装配式连接件及施工方法 Download PDFInfo
- Publication number
- CN107035000A CN107035000A CN201710249218.4A CN201710249218A CN107035000A CN 107035000 A CN107035000 A CN 107035000A CN 201710249218 A CN201710249218 A CN 201710249218A CN 107035000 A CN107035000 A CN 107035000A
- Authority
- CN
- China
- Prior art keywords
- connection component
- steel pipe
- pipe column
- wedge
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 132
- 239000010959 steel Substances 0.000 title claims abstract description 132
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 238000003780 insertion Methods 0.000 claims abstract description 7
- 230000037431 insertion Effects 0.000 claims abstract description 7
- 238000012545 processing Methods 0.000 claims abstract description 5
- 238000013461 design Methods 0.000 claims description 6
- 239000000203 mixture Substances 0.000 claims description 6
- 238000009417 prefabrication Methods 0.000 claims description 5
- 230000002687 intercalation Effects 0.000 claims description 2
- 238000009830 intercalation Methods 0.000 claims description 2
- 238000010923 batch production Methods 0.000 abstract description 2
- 238000003466 welding Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- 235000010627 Phaseolus vulgaris Nutrition 0.000 description 1
- 244000046052 Phaseolus vulgaris Species 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2406—Connection nodes
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2409—Hooks, dovetails or other interlocking connections
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2448—Connections between open section profiles
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710249218.4A CN107035000A (zh) | 2017-04-17 | 2017-04-17 | 方管柱与h型钢的边梁柱节点、装配式连接件及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710249218.4A CN107035000A (zh) | 2017-04-17 | 2017-04-17 | 方管柱与h型钢的边梁柱节点、装配式连接件及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107035000A true CN107035000A (zh) | 2017-08-11 |
Family
ID=59536336
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710249218.4A Pending CN107035000A (zh) | 2017-04-17 | 2017-04-17 | 方管柱与h型钢的边梁柱节点、装配式连接件及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107035000A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108571074A (zh) * | 2018-05-25 | 2018-09-25 | 夏念涛 | 一种装配式钢结构矩形组合柱框架体系及其装配方法 |
CN110016992A (zh) * | 2019-01-15 | 2019-07-16 | 深圳市现代城市建筑设计有限公司 | 一种装配式主次梁安装结构及安装方法 |
CN110485944A (zh) * | 2019-07-30 | 2019-11-22 | 中海油能源发展股份有限公司 | 导入式锤击隔水管接头 |
CN113550432A (zh) * | 2021-07-27 | 2021-10-26 | 中铁广州工程局集团深圳工程有限公司 | T型连接件及h型钢梁组合框架结构节点施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0813624A (ja) * | 1994-06-28 | 1996-01-16 | Toto Ltd | フレーム接合方法 |
CN201933618U (zh) * | 2011-03-07 | 2011-08-17 | 厦门市国安特机械工程有限公司 | 钢结构梁与柱的连接节点 |
CN204609000U (zh) * | 2015-04-07 | 2015-09-02 | 长沙有色冶金设计研究院有限公司 | 一种用于建筑结构的装配式节点及其装配式框架 |
CN205100375U (zh) * | 2015-11-11 | 2016-03-23 | 西安建筑科技大学 | 一种预制装配式梁柱节点 |
CN106400957A (zh) * | 2016-06-07 | 2017-02-15 | 西安建筑科技大学 | 一种全预制装配式梁柱节点 |
CN206873640U (zh) * | 2017-04-17 | 2018-01-12 | 天元建设集团有限公司 | 一种方钢管柱与h型钢的边梁柱节点及装配式连接件 |
-
2017
- 2017-04-17 CN CN201710249218.4A patent/CN107035000A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0813624A (ja) * | 1994-06-28 | 1996-01-16 | Toto Ltd | フレーム接合方法 |
CN201933618U (zh) * | 2011-03-07 | 2011-08-17 | 厦门市国安特机械工程有限公司 | 钢结构梁与柱的连接节点 |
CN204609000U (zh) * | 2015-04-07 | 2015-09-02 | 长沙有色冶金设计研究院有限公司 | 一种用于建筑结构的装配式节点及其装配式框架 |
CN205100375U (zh) * | 2015-11-11 | 2016-03-23 | 西安建筑科技大学 | 一种预制装配式梁柱节点 |
CN106400957A (zh) * | 2016-06-07 | 2017-02-15 | 西安建筑科技大学 | 一种全预制装配式梁柱节点 |
CN206873640U (zh) * | 2017-04-17 | 2018-01-12 | 天元建设集团有限公司 | 一种方钢管柱与h型钢的边梁柱节点及装配式连接件 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108571074A (zh) * | 2018-05-25 | 2018-09-25 | 夏念涛 | 一种装配式钢结构矩形组合柱框架体系及其装配方法 |
CN110016992A (zh) * | 2019-01-15 | 2019-07-16 | 深圳市现代城市建筑设计有限公司 | 一种装配式主次梁安装结构及安装方法 |
CN110016992B (zh) * | 2019-01-15 | 2021-04-02 | 深圳市现代城市建筑设计有限公司 | 一种装配式主次梁安装结构及安装方法 |
CN110485944A (zh) * | 2019-07-30 | 2019-11-22 | 中海油能源发展股份有限公司 | 导入式锤击隔水管接头 |
CN113550432A (zh) * | 2021-07-27 | 2021-10-26 | 中铁广州工程局集团深圳工程有限公司 | T型连接件及h型钢梁组合框架结构节点施工方法 |
CN113550432B (zh) * | 2021-07-27 | 2022-12-20 | 中铁广州工程局集团深圳工程有限公司 | T型连接件及h型钢梁组合框架结构节点施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107060089A (zh) | 方钢管与h型钢的四梁柱节点、装配式连接件及施工方法 | |
CN107035000A (zh) | 方管柱与h型钢的边梁柱节点、装配式连接件及施工方法 | |
CN107023077A (zh) | 方管柱与h型钢的角梁柱节点、装配式连接件及施工方法 | |
JP5050228B2 (ja) | 方杖部材付きラーメン橋施工方法 | |
CN106930407A (zh) | Y型双耳式方管柱与h型钢梁柱节点、连接件及施工方法 | |
CN206873640U (zh) | 一种方钢管柱与h型钢的边梁柱节点及装配式连接件 | |
CN108517962A (zh) | 一种榫卯与螺栓混合装配式钢结构梁柱节点 | |
CN108951847B (zh) | 一种基于uhpc的预制混凝土框架结构体系及其施工方法 | |
CN206873642U (zh) | 一种方钢管柱与h型钢的四梁柱节点及装配式连接件 | |
CN206873641U (zh) | 一种方钢管柱与h型钢的角梁柱节点及装配式连接件 | |
CN206873624U (zh) | 一种y型双耳式方管柱与h型钢梁柱节点及连接件 | |
CN110761487A (zh) | 一种横梁结构 | |
CN212317182U (zh) | 一种钢梁与预制混凝土柱刚接连接节点 | |
CN214739017U (zh) | 钢管束组合剪力墙与钢梁连接装置 | |
CN211114415U (zh) | 一种建筑工程用横梁 | |
CN212336299U (zh) | 一种预制混凝土梁柱节点结构 | |
CN209989954U (zh) | 上层钢管柱与下层钢筋混凝土柱的转换节点 | |
CN109281402B (zh) | 工字钢梁与方钢管柱连接节点结构及其施工方法 | |
CN113136950A (zh) | 一种新型装配式钢结构梁柱节点及其施工方法 | |
CN217871842U (zh) | 转角墙体模板固定体系 | |
CN217998414U (zh) | 一种用于多腔钢管水平缝快捷拼装的连接装置 | |
CN219992207U (zh) | 一种有斜杆的贝雷片竖杆加强装置 | |
CN220666474U (zh) | 一种狗骨式梁柱连接节点的加固结构 | |
CN218521945U (zh) | 一种伞形的悬挑工字钢组件 | |
CN109295992B (zh) | 一种装配式方形钢筋混凝土柱与钢筋混凝土基础连接节点结构及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Country or region after: China Address after: No.63, Yinqueshan Road, Lanshan District, Linyi City, Shandong Province Applicant after: TIANYUAN CONSTRUCTION GROUP Co.,Ltd. Applicant after: Veterans (Shandong) Construction Group Co.,Ltd. Applicant after: LINYI TIANFANG CONSTRUCTION RESEARCH TESTING CO.,LTD. Address before: No.63, Yinqueshan Road, Lanshan District, Linyi City, Shandong Province Applicant before: TIANYUAN CONSTRUCTION GROUP Co.,Ltd. Country or region before: China Applicant before: SHANDONG HONGDA REAL ESTATE Co.,Ltd. Applicant before: LINYI TIANFANG CONSTRUCTION RESEARCH TESTING CO.,LTD. |