CN106825845B - 一种钢管束的生产方法 - Google Patents
一种钢管束的生产方法 Download PDFInfo
- Publication number
- CN106825845B CN106825845B CN201710176719.4A CN201710176719A CN106825845B CN 106825845 B CN106825845 B CN 106825845B CN 201710176719 A CN201710176719 A CN 201710176719A CN 106825845 B CN106825845 B CN 106825845B
- Authority
- CN
- China
- Prior art keywords
- square tube
- steel pipe
- shaped steel
- pipe bundle
- pedestal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K7/00—Cutting, scarfing, or desurfacing by applying flames
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K11/00—Resistance welding; Severing by resistance heating
- B23K11/10—Spot welding; Stitch welding
- B23K11/11—Spot welding
Abstract
一种钢管束的生产方法,提供一个点焊组立底座,将单根的U型钢或方矩管输送至点焊组立底座上,然后将其拎起或抬起,然后再将一根U型钢或方矩管输送至上一根U型钢或方矩管的下方,两根U型钢或方矩管组拼后在两U型钢或方矩管的对接处进行点焊从而使两根U型钢或方矩管连成一体;之后再将连成一体的两根U型钢或方矩管拎起或抬起,再次输送一根U型钢或方矩管至其下方,重复上述步骤从而将若干根U型钢或方矩管组立成钢管束。本发明提供的生产方法简单有序,可实现对钢管束的有效生产。
Description
技术领域
本发明涉及一种钢管束的生产方法。
背景技术
钢管束是由多根U型钢和少许方矩管组拼并相互焊接而成的一种新的建材。在现有技术中,钢管束的生产方法步骤繁杂,非常麻烦。
发明内容
为了克服现有钢管束的生产方法的上述不足,本发明提供一种钢管束的生产方法,其步骤简单有序。
本发明解决其技术问题的技术方案是:一种钢管束的生产方法,提供一个点焊组立底座,其组立方法如下:
将单根的U型钢或方矩管输送至点焊组立底座上,然后将其拎起或抬起,然后再将一根U型钢或方矩管输送至上一根U型钢或方矩管的下方,两根U型钢或方矩管组拼后在两U型钢或方矩管的对接处进行点焊从而使两根U型钢或方矩管连成一体;
之后再将连成一体的两根U型钢或方矩管拎起或抬起,再次输送一根U型钢或方矩管至其下方,重复上述步骤从而将若干根U型钢或方矩管组立成钢管束。
进一步,再提供一个连续焊底座,将经过点焊的已组立好的钢管束组件侧立输送至连续焊底座上,对各U型钢或方矩管的对接处再次进行连续焊接,以达到各钢管束上所有焊缝的的满焊。
进一步,再提供一个割孔底座,将经过连续焊的钢管束侧立输送至割孔底座上,从侧立的钢管束组件的侧面采用割炬对其进行割孔。
进一步,在对钢管束组件进行割孔时,在侧立的钢管束组件的两侧同时布置割炬进行割孔,且布置在钢管束组件两侧的割炬正对。
本发明的有益效果在于: 本发明提供的生产方法简单有序,可实现对钢管束的有效生产。
具体实施方式
下面结合具体实施方式对本发明作进一步详细说明。
一种钢管束的组立方法,提供一个点焊组立底座,其组立方法如下:
将单根的U型钢或方矩管输送至点焊组立底座上,然后将其拎起或抬起,然后再将一根U型钢或方矩管输送至上一根U型钢或方矩管的下方,两根U型钢或方矩管组拼后在两U型钢或方矩管的对接处进行点焊从而使两根U型钢或方矩管连成一体;
之后再将连成一体的两根U型钢或方矩管拎起或抬起,再次输送一根U型钢或方矩管至其下方,重复上述步骤从而将若干根U型钢或方矩管组立成钢管束。
上述步骤实现了钢管束的初步组立,为了进一步提高拼缝的焊接强度,本发明再提供一个连续焊底座,将经过点焊的已组立好的钢管束组件侧立输送至连续焊底座上,对各U型钢或方矩管的对接处再次进行连续焊接,以达到各钢管束上所有焊缝的的满焊。
上述步骤实现了钢管束的牢固焊接,为了达到最终使用效果,本发明再提供一个割孔底座,将经过连续焊的钢管束侧立输送至割孔底座上,从侧立的钢管束组件的侧面采用割炬对其进行割孔。在对钢管束组件进行割孔时,尤其可采用如下方法:在侧立的钢管束组件的两侧同时布置割炬进行割孔,且布置在钢管束组件两侧的割炬正对,提高割孔效率和贯穿精度。
Claims (4)
1.一种钢管束的生产方法,提供一个点焊组立底座,其特征在于其组立方法如下:
将单根的U型钢或方矩管输送至点焊组立底座上,然后将其拎起或抬起,然后再将一根U型钢或方矩管输送至上一根U型钢或方矩管的下方,两根U型钢或方矩管组拼后在两U型钢或方矩管的对接处进行点焊从而使两根U型钢或方矩管连成一体;
之后再将连成一体的两根U型钢或方矩管拎起或抬起,再次输送一根U型钢或方矩管至其下方,重复上述步骤从而将若干根U型钢或方矩管组立成钢管束。
2.如权利要求1所述的钢管束的生产方法,其特征在于:再提供一个连续焊底座,将经过点焊的已组立好的钢管束组件侧立输送至连续焊底座上,对各U型钢或方矩管的对接处再次进行连续焊接,以达到钢管束上所有焊缝的满焊。
3.如权利要求2所述的钢管束的生产方法,其特征在于:再提供一个割孔底座,将经过连续焊的钢管束侧立输送至割孔底座上,从侧立的钢管束组件的侧面采用割炬对其进行割孔。
4.如权利要求3所述的钢管束的生产方法,其特征在于:在对钢管束组件进行割孔时,在侧立的钢管束组件的两侧同时布置割炬进行割孔,且布置在钢管束组件两侧的割炬正对。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710176719.4A CN106825845B (zh) | 2017-03-23 | 2017-03-23 | 一种钢管束的生产方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710176719.4A CN106825845B (zh) | 2017-03-23 | 2017-03-23 | 一种钢管束的生产方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106825845A CN106825845A (zh) | 2017-06-13 |
CN106825845B true CN106825845B (zh) | 2019-01-15 |
Family
ID=59131057
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710176719.4A Active CN106825845B (zh) | 2017-03-23 | 2017-03-23 | 一种钢管束的生产方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106825845B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107283082A (zh) * | 2017-08-07 | 2017-10-24 | 宁波金凤焊割机械制造有限公司 | 一种钢管束附件组装方法 |
CN110745700B (zh) * | 2019-10-30 | 2020-12-01 | 江苏山河机电技术有限公司 | 一种用于起重机底盘气制动系统的集成管束工艺方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204997233U (zh) * | 2015-04-09 | 2016-01-27 | 杭萧钢构股份有限公司 | 钢管束总装焊接设备 |
CN204673172U (zh) * | 2015-04-29 | 2015-09-30 | 杭萧钢构股份有限公司 | 钢管束组立点焊设备 |
CN204747794U (zh) * | 2015-05-04 | 2015-11-11 | 杭萧钢构股份有限公司 | 钢管束自动焊接设备 |
CN205927572U (zh) * | 2016-08-22 | 2017-02-08 | 杭萧钢构股份有限公司 | 异形钢管束现场总装焊接设备 |
CN106363272A (zh) * | 2016-11-07 | 2017-02-01 | 宁波金凤焊割机械制造有限公司 | 一种钢管束割孔装置 |
-
2017
- 2017-03-23 CN CN201710176719.4A patent/CN106825845B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN106825845A (zh) | 2017-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103056610A (zh) | 一种h型钢在线连续生产方法 | |
CN204524692U (zh) | 精度控制工装 | |
CN106825845B (zh) | 一种钢管束的生产方法 | |
CN202825222U (zh) | H型钢构件自动化生产线 | |
CN204122954U (zh) | 一种液压支架结构件机器人自动焊接流水生产线 | |
CN205057353U (zh) | 一种焊枪调节机构 | |
CN208825803U (zh) | 一种压力钢管加劲环角焊缝焊接装置 | |
CN204487084U (zh) | 管道法兰对焊支架 | |
CN103317211A (zh) | 构架侧横梁圆管全位置tig自动焊工艺方法 | |
CN207723673U (zh) | 立式横焊堆焊固定装置 | |
CN206105273U (zh) | 多功能焊接工件夹持装置 | |
CN104998982B (zh) | 一种高精度可调节扩径机 | |
CN203664902U (zh) | 一种自动加工t型钢构件的生产线 | |
CN206898673U (zh) | 一种电流互感器一次导杆焊接胎具 | |
CN205371887U (zh) | 拼接式法兰 | |
CN205021031U (zh) | 一种t型钢结构焊接装置 | |
CN202200547U (zh) | 一种塑料薄壁管锥口热熔焊接装置 | |
CN102632329B (zh) | 一种双绳槽滑轮的焊接方法和焊接设备 | |
CN205805105U (zh) | 一种用于角钢塔收口横担与塔身变坡连接的连接板 | |
CN105081659A (zh) | 滚轮式焊接变位机 | |
CN204571903U (zh) | 一种井口对接装置 | |
CN203003409U (zh) | 全位置管管焊机工装 | |
CN203817113U (zh) | 一种四柱龙门式数控制管机 | |
CN202655766U (zh) | 引熄弧板延长夹具装置 | |
CN203888209U (zh) | 一种塑料接头焊接设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |