CN106815794A - A kind of comprehensive sponge urban ecological planning managing device - Google Patents

A kind of comprehensive sponge urban ecological planning managing device Download PDF

Info

Publication number
CN106815794A
CN106815794A CN201710031623.9A CN201710031623A CN106815794A CN 106815794 A CN106815794 A CN 106815794A CN 201710031623 A CN201710031623 A CN 201710031623A CN 106815794 A CN106815794 A CN 106815794A
Authority
CN
China
Prior art keywords
purification
irrigation
greenbelt
water
irrigated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710031623.9A
Other languages
Chinese (zh)
Inventor
靳泓
张红茶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710031623.9A priority Critical patent/CN106815794A/en
Publication of CN106815794A publication Critical patent/CN106815794A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G25/00Watering gardens, fields, sports grounds or the like
    • A01G25/02Watering arrangements located above the soil which make use of perforated pipe-lines or pipe-lines with dispensing fittings, e.g. for drip irrigation
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G25/00Watering gardens, fields, sports grounds or the like
    • A01G25/16Control of watering
    • A01G25/165Cyclic operations, timing systems, timing valves, impulse operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2221/00Applications of separation devices
    • B01D2221/16Separation devices for cleaning ambient air, e.g. air along roads or air in cities

Abstract

The invention discloses a kind of comprehensive sponge urban ecological planning managing device, rural and urban construction plan device field is related generally to.Assembly is irrigated including conveyance conduit, purification of air underground pipes road, backflow underground piping and greenbelt purification under Region control room, greenbelt irrigated land, suction pump is provided with the Region control room, the suction pump is respectively arranged at two ends with drinking-water pipe and water outlet main pipe, the water outlet main pipe is connected with conveyance conduit, purification of air underground pipes road under greenbelt irrigated land respectively, assembly is irrigated in the greenbelt purification to be included irrigating guardrail and purification watering device, and the purification watering device includes stacked gondola water faucet and water leg.The beneficial effects of the present invention are:The present apparatus timely, regular can be irrigated thoroughly subdistrict greening band, urban and suburban roads both sides greenbelt, and can increase air humidity, purify air, improves air quality, alleviates social contradications, promotes the Process of Urbanization Construction of China.

Description

A kind of comprehensive sponge urban ecological planning managing device
Technical field
The present invention relates to rural and urban construction plan device field, specifically a kind of comprehensive sponge urban ecological planning management dress Put.
Background technology
Current China is in the peak period of rural and urban construction plan, and rural and urban construction plan will be leaned on to sponge Process of Urbanization Construction Hold together, sponge city refers to that city there can be good elasticity, it then follows Ecology Precedence etc. as sponge in terms of environment is adapted to Principle, natural way is combined with artificial measures urban ecological environment is protected.It is civic that rural and urban construction plan is The construction that work, life are created a favorable environment, especially it is noted that ecological planning management and construction in rural and urban construction plan.
At present, there are serious problems in rural and urban construction plan during being drawn close to sponge Process of Urbanization Construction, residential quarter Ecological afforestation is irrigated construction, urban and suburban roads both sides ecological afforestation and irrigates the important problem that all suffers from of building, and ecological afforestation is irrigated Not in time, ecological afforestation irrigation is irregular, irrigate the reasons such as responsible organization without special ecological afforestation, makes ecological afforestation vegetation withered Dead phenomenon can be found everywhere.It is relatively light because being spilt with special ecological afforestation that this phenomenon occurs in the ecological afforestation of urban and suburban roads both sides Waterwheel carries out ecological afforestation management, but watering process is very cumbersome, and the water diverting place for first having to regulation stores to the water tank on car Water, then leaves for required location pistol spray irrigation again.So not only water resource waste is serious, and for crowded city City, undoubtedly increases traffic burden, and is easily sprayed onto with passerby during water spray, attracts a piece of complaint, the reflection of this phenomenon Go out during rural and urban construction plan is drawn close to sponge Process of Urbanization Construction and there are serious problems.And use this kind of Ecosystem Irrigation pipe Reason mode, waters very not thorough, uneven, is only capable of moistening earth's surface, and the root system of vegetation cannot get good moisturizing.Current is small Area's ecological afforestation is irrigated construction, urban and suburban roads both sides ecological afforestation and irrigates to build has so many irrigation inconvenience, it is therefore desirable to A kind of novel sponge urban ecological planning managing device solves this problem.
Further, since private car is more and more at present, the dust in urban and suburban roads is also more and more, especially for sweltering heat Summer, air humidity is low, and road air Quality Down, urban ecological environment is very poor.Government department is again without good ecology Planning management policy and equipment.It is described to need a kind of air cleaning unit to improve urban ecological environment.By rational raw The construction of state green area irrigation and the construction of ecological afforestation purification of air improve the environment in sponge Process of Urbanization Construction, alleviate social lance Shield, promotes China's rural and urban construction plan constantly to be drawn close to sponge Process of Urbanization Construction.
The content of the invention
It is an object of the invention to provide a kind of comprehensive sponge urban ecological planning managing device, it can in time, have The carry out irrigation of cell ecological afforestation, urban and suburban roads both sides ecological afforestation of rule are irrigated, and method, process very simple are irrigated thorough Bottom, and the waste of water resource is avoided, traffic burden is alleviated for the irrigation of urban and suburban roads both sides ecological afforestation;And The construction of ecological afforestation purification of air can increase air humidity, and purify air improves air quality;By rational ecological afforestation Irrigate construction and the construction of ecological afforestation purification of air to improve the environment in sponge Process of Urbanization Construction, alleviate social contradications, promote Enter China's rural and urban construction plan constantly to be drawn close to sponge Process of Urbanization Construction.
The present invention to achieve the above object, is achieved through the following technical solutions:
A kind of comprehensive sponge urban ecological planning managing device, including conveyed under Region control room, greenbelt irrigated land Assembly is irrigated in pipeline, purification of air underground pipes road, backflow underground piping and greenbelt purification, is set in the Region control room There is suction pump, the suction pump is provided with time control switch, and the suction pump is respectively arranged at two ends with drinking-water pipe and water outlet main pipe, Irrigation conduit joint and purge pipe joint are connected with the water outlet main pipe, the irrigation conduit joint is provided with irrigation valve With irrigation time master controller, the irrigation time main controller controls irrigate the opening and closing of valve, on the purge pipe joint It is provided with purification valve and clarification time controller, the opening and closing of the clarification time controller control purification valve, the irrigation pipe Road joint is connected with conveyance conduit under greenbelt irrigated land, and the purge pipe joint connects with purification of air underground pipes road Connect, assembly is irrigated in the greenbelt purification to be included irrigating guardrail and purification watering device, and irrigation is provided with inside the irrigation guardrail Passage, the irrigation guardrail is provided near greenbelt side and irrigates the Irrigation shower head that passage is connected, the irrigation guardrail bottom Portion is communicated with connecting tube under irrigated land, and connecting tube is connected with conveyance conduit under greenbelt irrigated land under the irrigated land, described net Changing watering device includes stacked gondola water faucet and water leg, and the stacked gondola water faucet is connected with purification of air underground pipes road, described Groove bottom of catchmenting is provided with return port, and the return port is connected with backflow underground piping.
The irrigation guardrail is provided with current inductive switch with connecting tube junction under irrigated land, and the current inductive switch connects It is connected to irrigation time sub-controller.
The stacked gondola water faucet bottom is provided with connecting seat, and the water leg center is provided with connected unit, the connecting seat with Connected unit is bolted, and the connecting seat is provided with shunting water cavity, and purification underground connecting tube, institute are provided with the connected unit State purification underground connecting tube one end to be connected with shunting water cavity, the purification underground connecting tube other end is defeated with purification of air underground Pipeline is sent to be connected.
The connecting seat is provided with sealing gasket with connected unit junction.
The stacked gondola water faucet is divided into three layers, and the stacked gondola water faucet is shaped as annular gondola water faucet, and the stacked gondola water faucet includes spilling Water ring and water delivery support tube, the watering ring bottom are provided with water sprayering hole, and described water delivery support tube one end is connected with watering ring, institute The water delivery support tube other end is stated to be connected with shunting water cavity.
The return port is distributed along water leg ground center annular array.
The return port bottom is provided with backflow branch pipe, and the backflow branch pipe is provided with chamber of confluxing away from return port one end, described Bottom of chamber portion of confluxing is connected with backflow connecting pipe, and the backflow connecting pipe is connected with backflow underground piping.
The purification watering device top is provided with publicity mark plate.
Contrast prior art, the beneficial effects of the present invention are:
, it is necessary to dig a well for retaining when the 1, using the present apparatus, in the case where underground is buried and puts greenbelt irrigated land conveyance conduit, Purification of air underground pipes road, backflow underground piping, set greenbelt purification and irrigate assembly, suction pump in the position of greenbelt Time control switch is provided with, the drinking-water pipe of suction pump one end is extend into well, the water outlet main pipe connection of the suction pump other end Irrigation valve and irrigation time master is set on connection irrigation conduit joint and purge pipe joint, and irrigation conduit joint respectively Controller, sets purification valve and clarification time controller, irrigation time master controller and clarification time on purge pipe joint The time of the time control switch setting on time and the suction pump of controller setting is adapted, irrigation conduit joint and greenbelt Conveyance conduit connection under irrigated land, purge pipe joint is connected with purification of air underground pipes road, and greenbelt purification irrigates total Into including irrigating guardrail and purification watering device, irrigate guardrail and connected for greenbelt with conveyance conduit under greenbelt irrigated land Irrigated, purification watering device includes stacked gondola water faucet and water leg, and stacked gondola water faucet is connected with purification of air underground pipes road For purify air, increase air humidity, water leg is connected with backflow underground piping, the water for stacked gondola water faucet to be spilt is received Collection, and be back in well by the underground piping that flows back, it is easy to reuse.After time control switch opens suction pump, irrigate The time of time master controller and the setting of clarification time controller is adapted with the time of time control switch setting, and then controls The irrigation time of device and clarification time.Therefore the present apparatus timely, regular can carry out the irrigation of cell ecological afforestation, town and country Both sides of the road ecological afforestation is irrigated, method, process very simple, irrigates thorough, and avoids the waste of water resource, for city Township both sides of the road ecological afforestation alleviates traffic burden for irrigating;And the construction of ecological afforestation purification of air can increase air Humidity, purify air improves air quality;Irrigated by rational ecological afforestation and built and the construction of ecological afforestation purification of air To improve the environment in sponge Process of Urbanization Construction, alleviate social contradications, promote China's rural and urban construction plan constantly to sponge city Change construction to draw close.
2nd, connecting tube junction is provided with current inductive switch under irrigating guardrail and irrigated land, and current inductive switch is connected with filling Irrigate time sub-controller.One well can be used in multiple greenbelt purifications and irrigate assembly, and suction pump is net to greenbelt nearby Change irrigate assembly supply water when, due to current flow to distant place greenbelt purification irrigate assembly need the regular hour, distant place it is green When change band purification irrigation assembly receives water, greenbelt purification irrigation assembly nearby has irrigated a period of time.Such as Fruit is not irrigating guardrail and setting current inductive switch in connecting tube junction under irrigated land, when current inductive switch is connected with irrigation Between sub-controller, and irrigation time is controlled only by irrigation time master controller, it may appear that serious irrigation inequality problem, That is the greenbelt purification of distant place is irrigated assembly and also greenbelt is not irrigated fully, and assembly pair is irrigated in greenbelt purification nearby The irrigation of greenbelt is excessive, causes water to provide and wastes, and the water that greenbelt purification nearby is irrigated in assembly can spill into On road, inconvenience is brought.By setting current inductive switch, current inductive switch connects irrigation time sub-controller, When current are not exposed to, current inductive switch is nature off-state, irrigation time sub-controller will not start;Only When touching current, the electronic component closure inside water impact current inductive switch, current inductive switch is connected, irrigation time Sub-controller can just start, and irrigation time sub-controller can set appropriate irrigation time length according to the area of greenbelt, fill After irrigating the startup of time sub-controller, irrigation time sub-controller enters to the irrigation time that assembly is irrigated in the greenbelt purification for being controlled Row countdown, when the irrigation time length set by irrigation time reaches irrigation time sub-controller, irrigation time sub-control system Device will control current inductive switch to irrigate path blockade to current, stop irrigating.So, each greenbelt purification is irrigated There are respective current inductive switch and irrigation time sub-controller in total Chengdu, it is ensured that assembly is irrigated in the purification of each greenbelt can Accurate irrigation time control is carried out to corresponding greenbelt, corresponding greenbelt can be sufficiently irrigated, it is to avoid water resource Overflow and waste.
3rd, stacked gondola water faucet bottom sets connecting seat, and water leg center sets connected unit, and connecting seat passes through with connected unit Bolt connection, can according to actual needs select appropriately sized stacked gondola water faucet to be laid, and be easy to the dismounting to stacked gondola water faucet And installation.Connecting seat is provided with shunting water cavity, shunting water cavity being diverted to uniform fluid flow in water delivery support tube, for stacked Gondola water faucet is sprinkled water, purify air, increases air humidity.Purification underground connecting tube is provided with connected unit, underground connecting tube is purified One end is connected with shunting water cavity, and the purification underground connecting tube other end is connected with purification of air underground pipes road.Purification ground Lower connecting tube is used to for the current in purification of air underground pipes road to flow backward to stacked gondola water faucet.
4th, sealing gasket is set by connecting seat and connected unit junction, is prevented from current and connects from connecting seat and connected unit The gap outflow at place is connect, causes to waste.
5th, stacked gondola water faucet is divided into three layers, and three layers are divided into by stacked gondola water faucet, not only seems attractive in appearance, and can be sufficient Increase air humidity.Stacked gondola water faucet is shaped as annular gondola water faucet, and stacked gondola water faucet includes watering ring and water delivery support tube, watering ring bottom Water sprayering hole is provided with, the water sprayering hole on watering ring is used to sprinkle water.Water delivery support tube one end is connected with watering ring, and water delivery support tube is another One end is connected with shunting water cavity.Water delivery support tube is used to connect watering ring and shunting water cavity, will shunt the water supply in water cavity Onto watering ring.
6th, it is distributed along water leg ground center annular array by setting return port, return port is multiple, when one When return port is blocked, can be back to the water that stacked gondola water faucet spills in backflow underground piping by other return ports.
7th, return port bottom is provided with backflow branch pipe, and backflow branch pipe is provided with chamber of confluxing, the chamber of confluxing away from return port one end Bottom is connected with backflow connecting pipe, and backflow connecting pipe is connected with backflow underground piping.Backflow branch pipe, conflux chamber and backflow The setting of connecting pipe, facilitates the water in water leg and is back in backflow underground piping.
8th, purification watering device top sets publicity mark plate, and publicity mark plate can be used to set traffic sign or wide Accuse publicity.
Brief description of the drawings
Accompanying drawing 1 is concrete structure schematic diagram of the present invention.
Accompanying drawing 2 is I portions enlarged drawing in accompanying drawing of the present invention 1.
Accompanying drawing 3 is greenbelt purification irrigation assembly structure schematic diagram in the present invention.
Accompanying drawing 4 is irrigation guard bar structure schematic diagram in the present invention.
Accompanying drawing 5 is purification watering device structural representation in the present invention.
Accompanying drawing 6 is purification watering device side view in the present invention.
Label shown in accompanying drawing:
1st, Region control room;2nd, conveyance conduit under greenbelt irrigated land;3rd, purification of air underground pipes road;4th, backflow ground Lower pipeline;5th, suction pump;6th, time control switch;7th, drinking-water pipe;8th, water outlet main pipe;9th, irrigation conduit joint;10th, purge pipe Joint;11st, valve is irrigated;12nd, irrigation time master controller;13rd, valve is purified;14th, clarification time controller;15th, shield is irrigated Column;16th, passage is irrigated;17th, Irrigation shower head;18th, connecting tube under irrigated land;19th, stacked gondola water faucet;20th, water leg;21st, return port; 22nd, current inductive switch;23rd, irrigation time sub-controller;24th, connecting seat;25th, connected unit;26th, water cavity is shunted;27th, purification ground Lower connecting tube;28th, sealing gasket;29th, watering ring;30th, water delivery support tube;31st, water sprayering hole;32nd, flow back branch pipe;33rd, conflux chamber; 34th, flow back connecting pipe;35th, mark plate is publicized;36th, well.
Specific embodiment
With reference to specific embodiment, the present invention is expanded on further.It should be understood that these embodiments are merely to illustrate the present invention Rather than limitation the scope of the present invention.In addition, it is to be understood that after the content for having read instruction of the present invention, people in the art Member can make various changes or modifications to the present invention, and these equivalent form of values equally fall within scope defined herein.
Of the present invention is a kind of comprehensive sponge urban ecological planning managing device, and agent structure includes Region control room 1st, conveyance conduit 2, purification of air underground pipes road 3, backflow underground piping 4 and greenbelt purification are irrigated under greenbelt irrigated land Assembly, Region control room 1 is used to place the core master controls such as suction pump 5, irrigation time master controller 12, clarification time controller 14 Part, and it is protected, conveyance conduit 2, purification of air underground pipes road 3, backflow buried pipe under greenbelt irrigated land Road 4 is metal tube, if using plastic tube, easily destroyed by vegetation root system, and service life is very low.The Region control It is provided with suction pump 5 in room 1, the water that well 36 is put aside can be extracted into conveyance conduit 2, air under greenbelt irrigated land by suction pump 5 In purification underground pipes road 3, irrigation and air humidification for greenbelt, purification.The suction pump 5 is provided with time control System switch 6, time control switch 6 can open and close suction pump 5 according to the time of setting.Distinguish at the two ends of the suction pump 5 Drinking-water pipe 7 and water outlet main pipe 8 are provided with, irrigation conduit joint 9 and purge pipe joint 10 are connected with the water outlet main pipe 8, led to Cross and connect irrigation conduit joint 9 and purge pipe joint 10 respectively in water outlet main pipe 8, separate irrigation system and cleaning system Control, the open and-shut mode of irrigation system and cleaning system is controlled this makes it possible to as needed, can both be individually used for greening Band is irrigated, and can also be individually used for air humidification, purification, can also be used simultaneously.The irrigation conduit joint 9 is provided with irrigation valve The opening and closing of valve 11, the purification are irrigated in door 11 and irrigation time master controller 12, the control of irrigation time master controller 12 Pipe joint 10 is provided with purification valve 13 and clarification time controller 14, the control of the clarification time controller 14 purification valve 13 opening and closing, irrigation time master controller 12, clarification time controller 14 be used for setting every time when being irrigated or being purified when Between be spaced, such as once irrigated every month, carry out within every three days primary air humidification, purification, can by set irrigate when Between master controller 12, clarification time controller 14 complete.The irrigation conduit joint 9 and conveyance conduit under greenbelt irrigated land 2 connections, the purge pipe joint 10 is connected with purification of air underground pipes road 3, and assembly bag is irrigated in the greenbelt purification Irrigation guardrail 15 and purification watering device are included, irrigation passage 16 is provided with inside the irrigation guardrail 15, the irrigation guardrail 15 is leaned on Nearly greenbelt side is provided with and irrigates the Irrigation shower head 17 that passage 16 is connected, and irrigation guardrail 15 bottom is communicated with irrigated land Lower connecting tube 18, connecting tube 18 is connected with conveyance conduit 2 under greenbelt irrigated land under the irrigated land, irrigates guardrail 15 with greening Conveyance conduit 2 is connected for irrigating greenbelt under band irrigated land.The purification watering device includes the He of stacked gondola water faucet 19 Water leg 20, the stacked gondola water faucet 19 is connected with purification of air underground pipes road 3, stacked gondola water faucet 19 and purification of air underground Conveyance conduit 3 is connected for purify air, increases air humidity.The bottom surface of the water leg 20 is provided with return port 21, the backflow Hole 21 is connected with backflow underground piping 4.Water leg 20 is connected with backflow underground piping 4, for spill stacked gondola water faucet 19 Water is collected, and is back in well 36 by the underground piping 4 that flows back, and is easy to reuse.Time control switch 6 opens suction pump After 5, irrigation time master controller 12 and clarification time controller 14 can control to irrigate time and the time control switch 6 for setting Time of setting is adapted, so control device irrigation time and clarification time.Therefore the present apparatus can be timely, regular Carry out the irrigation of cell ecological afforestation, urban and suburban roads both sides ecological afforestation to irrigate, method, process very simple irrigate thorough, and The waste of water resource is avoided, traffic burden is alleviated for the irrigation of urban and suburban roads both sides ecological afforestation;And ecological green Changing purification of air construction can increase air humidity, and purify air improves air quality;Irrigated by rational ecological afforestation and built And if the construction of ecological afforestation purification of air improves the environment in sponge Process of Urbanization Construction, alleviating social contradications, promote China Rural and urban construction plan is constantly drawn close to sponge Process of Urbanization Construction.
In order to better control over irrigation, it is to avoid water resource waste, the irrigation guardrail 15 connects with connecting tube under irrigated land 18 The place of connecing is provided with current inductive switch 22, and the current inductive switch 22 is connected with irrigation time sub-controller 23.One well 36 Can be used in all greenbelts purification in the range of hundreds of meters and irrigate assembly, suction pump 5 irrigates total to greenbelt purification nearby When supplying water, irrigating assembly due to the greenbelt purification that current flow to distant place needs the regular hour, the greenbelt purification of distant place When irrigation assembly receives water, greenbelt purification irrigation assembly nearby has irrigated a period of time.If do not filled Irrigate guardrail 15 and current inductive switch 22 is set with the junction of connecting tube 18 under irrigated land, when current inductive switch 22 is connected with irrigation Between sub-controller 23, and irrigation time is controlled only by irrigation time master controller 12, it may appear that serious irrigation is uneven The greenbelt purification of problem, i.e. distant place is irrigated assembly and also greenbelt is not irrigated fully, and greenbelt purification nearby is irrigated Assembly is excessive to the irrigation of greenbelt, causes water to provide and wastes, and the water meeting that greenbelt purification nearby is irrigated in assembly Spill on road, bring inconvenience.By setting current inductive switch 22, the connection irrigation time of current inductive switch 22 Sub-controller 23, when when current are not exposed to, current inductive switch 22 is nature off-state, irrigation time sub-controller 23 will not start;When only touching current, the electronic component closure of the inside of water impact current inductive switch 22, current sensing Switch 22 is connected, and irrigation time sub-controller 23 can just start, and irrigation time sub-controller 23 can set according to the area of greenbelt Fixed appropriate irrigation time length, after irrigation time sub-controller 23 starts, it is green that irrigation time sub-controller 23 pairs is controlled Changing the irrigation time for irrigating assembly with purification carries out countdown, when irrigation time is reached set by irrigation time sub-controller 23 During irrigation time length, irrigation time sub-controller 23 will control current inductive switch 22 to irrigate path blockade to current, stop Only irrigate.So, total Chengdu is irrigated in the purification of each greenbelt respective current inductive switch 22 and irrigation time sub-control Device processed 23, it is ensured that the purification of each greenbelt is irrigated assembly and accurate irrigation time control can be carried out to corresponding greenbelt, Corresponding greenbelt is set can sufficiently to irrigate, it is to avoid water resource is overflowed and wasted.
For the ease of the dismounting and installation of stacked gondola water faucet 19, the bottom of stacked gondola water faucet 19 is provided with connecting seat 24, the collection The center of tank 20 is provided with connected unit 25, and the connecting seat 24 is bolted with connected unit 25, on the connecting seat 24 Be provided with shunting water cavity 26, be provided with purification underground connecting tube 27 in the connected unit 25, the one end of purification underground connecting tube 27 with Shunting water cavity 26 is connected, and the other end of purification underground connecting tube 27 is connected with purification of air underground pipes road 3.Connection Seat 24 be provided with shunting water cavity 26, shunting water cavity 26 being diverted to uniform fluid flow in water delivery support tube 30, for stacked flower Spill 19 to be sprinkled water, purify air, increase air humidity.Purification underground connecting tube 27 is provided with connected unit 25, purification underground connects The one end of adapter 27 is connected with shunting water cavity 26, purifies the other end of underground connecting tube 27 and the phase of purification of air underground pipes road 3 Connection.Purification underground connecting tube 27 is used to for the current in purification of air underground pipes road 3 to flow backward to stacked gondola water faucet 19.
In order to prevent current from being flowed out from the gap of connecting seat 24 Yu the junction of connected unit 25, cause to waste, the connecting seat 24 are provided with sealing gasket 28 with the junction of connected unit 25.
In order that stacked gondola water faucet 19 seems more attractive in appearance, 19 points of the stacked gondola water faucet is three layers, and the stacked gondola water faucet 19 are shaped as annular gondola water faucet, and the stacked gondola water faucet 19 includes watering ring 29 and water delivery support tube 30, and watering ring 29 bottom sets There is a water sprayering hole 31, described one end of water delivery support tube 30 is connected with watering ring 29, the other end of water delivery support tube 30 and shunting Water cavity 26 is connected.
For the ease of the water that stacked gondola water faucet 19 spills is back in backflow underground piping 4, the return port 21 is along catchmenting The ground center annular array distribution of groove 20.
For the ease of the water that stacked gondola water faucet 19 spills is back in backflow underground piping 4, the bottom of the return port 21 sets There is backflow branch pipe 32, the backflow branch pipe 32 is provided with chamber 33 of confluxing, the bottom of chamber 33 connection of confluxing away from the one end of return port 21 There is backflow connecting pipe 34, the backflow connecting pipe 34 is connected with backflow underground piping 4.
The purification watering device top is provided with publicity mark plate 35.Publicity mark plate 35 can be used to set traffic sign Or advertising.
Application method:
, it is necessary to dig a well for retaining 36 during using the present apparatus, a well 36 can be used in the range of hundreds of meters Assembly is irrigated in all greenbelt purifications, conveyance conduit 2, purification of air underground pipes road 3, backflow underground under greenbelt irrigated land Pipeline 4 is metallic conduit, and buries and be placed on underground, and setting greenbelt purification in the position of greenbelt irrigates assembly, on suction pump 5 Time control switch 6 be used for controlling the time opening of suction pump 5, the drinking-water pipe 7 of the one end of suction pump 5 to extend into well 36, The water outlet main pipe 8 of the other end of suction pump 5 connects connection irrigation conduit joint 9 and purge pipe joint 10 respectively, and irrigation pipe Set on road joint 9 and irrigate valve 11 and irrigation time master controller 12, the purification He of valve 13 is set on purge pipe joint 10 On the time and suction pump 5 of clarification time controller 14, irrigation time master controller 12 and the setting of clarification time controller 14 The time of the setting of time control switch 6 is adapted, and irrigation time master controller 12, clarification time controller 14 are used for setting every time Time interval when being irrigated or being purified, such as every month are once irrigated, and carry out within every three days primary air humidification, net Change, can be completed by setting irrigation time master controller 12, clarification time controller 14, irrigation time master controller 12, The time of the setting of clarification time controller 14 is adapted with the individual time of the setting of time control switch 6.Irrigation conduit joint 9 with it is green Conveyance conduit 2 is connected under changing band irrigated land, and purge pipe joint 10 is connected with purification of air underground pipes road 3, and greenbelt is net Change and irrigate assembly including irrigating guardrail 15 and purification watering device, irrigate guardrail 15 and connect with conveyance conduit 2 under greenbelt irrigated land It is common to and greenbelt is irrigated, purification watering device includes stacked gondola water faucet 19 and water leg 20, stacked gondola water faucet 19 and air Purification underground pipes road 3 is connected for purify air, increases air humidity, and water leg 20 is connected with backflow underground piping 4, is used Collected in the water for spilling stacked gondola water faucet 19, and be back in well 36 by the underground piping 4 that flows back, be easy to reuse.When Between after controlling switch 6 opens suction pump 5, the time set due to irrigation time master controller 12 and clarification time controller 14 with Time control switch 6 setting time be adapted, and then can control device irrigation time and the clarification time.
Additionally, irrigate guardrail 15 is provided with current inductive switch 22 with the junction of connecting tube 18 under irrigated land, by setting water Influenza inductive switch 22, the connection of current inductive switch 22 irrigation time sub-controller 23, when when current are not exposed to, current sense Inductive switch 22 is nature off-state, and irrigation time sub-controller 23 will not start;When only touching current, water impact water The electronic component closure of the inside of influenza inductive switch 22, current inductive switch 22 is connected, and irrigation time sub-controller 23 can just start, Irrigation time sub-controller 23 can set appropriate irrigation time length, irrigation time sub-controller 23 according to the area of greenbelt After startup, the irrigation time that assembly is irrigated in the greenbelt purification that irrigation time sub-controller 23 pairs is controlled carries out countdown, when When irrigation time reaches the irrigation time length set by irrigation time sub-controller 23, irrigation time sub-controller 23 will be controlled Current inductive switch 22 processed irrigates path blockade to current, stops irrigating.So, total Chengdu is irrigated in each greenbelt purification There are respective current inductive switch 22 and irrigation time sub-controller 23, it is ensured that assembly is irrigated in the purification of each greenbelt can be right Corresponding greenbelt carries out accurate irrigation time control, corresponding greenbelt can be sufficiently irrigated, it is to avoid water resource is overflow Go out to waste.
Therefore the present apparatus timely, regular can carry out the irrigation of cell ecological afforestation, urban and suburban roads both sides ecological afforestation Irrigate, method, process very simple, irrigate thorough, and avoid the waste of water resource, for urban and suburban roads both sides ecological green Change and traffic burden is alleviated for irrigating;And the construction of ecological afforestation purification of air can increase air humidity, purify air is carried Air quality high;Construction and the construction of ecological afforestation purification of air are irrigated by rational ecological afforestation to improve sponge urbanization Environment in construction, alleviates social contradications, promotes China's rural and urban construction plan constantly to be drawn close to sponge Process of Urbanization Construction.

Claims (8)

1. a kind of comprehensive sponge urban ecological planning managing device, it is characterised in that:Including Region control room (1), greenbelt Conveyance conduit (2), purification of air underground pipes road (3), backflow underground piping (4) and greenbelt purification irrigate total under irrigated land Into, suction pump (5) is provided with the Region control room (1), the suction pump (5) is provided with time control switch (6), described to take out Water pump (5) is respectively arranged at two ends with drinking-water pipe (7) and water outlet main pipe (8), and irrigation conduit joint is connected with the water outlet main pipe (8) (9) and purge pipe joint (10), the irrigation conduit joint (9) is provided with irrigation valve (11) and irrigation time master controller (12) opening and closing of valve (11) is irrigated in, irrigation time master controller (12) control, is set on the purge pipe joint (10) There are purification valve (13) and clarification time controller (14), clarification time controller (14) control purifies opening for valve (13) Close, the irrigation conduit joint (9) is connected with conveyance conduit (2) under greenbelt irrigated land, the purge pipe joint (10) with Purification of air underground pipes road (3) is connected, and assembly is irrigated in the greenbelt purification to be included irrigating guardrail (15) and purification watering Device, is provided with irrigation passage (16) inside the irrigation guardrail (15), irrigation guardrail (15) is provided near greenbelt side The Irrigation shower head (17) being connected with irrigation passage (16), described irrigation guardrail (15) bottom is communicated with connecting tube under irrigated land (18), connecting tube (18) is connected with conveyance conduit (2) under greenbelt irrigated land under the irrigated land, the purification watering device bag Stacked gondola water faucet (19) and water leg (20) are included, the stacked gondola water faucet (19) is connected with purification of air underground pipes road (3), institute State water leg (20) bottom surface and be provided with return port (21), the return port (21) is connected with backflow underground piping (4).
2. a kind of comprehensive sponge urban ecological planning managing device according to claim 1, it is characterised in that:The irrigation Guardrail (15) is provided with current inductive switch (22) with connecting tube (18) junction under irrigated land, and the current inductive switch (22) is even It is connected to irrigation time sub-controller (23).
3. a kind of comprehensive sponge urban ecological planning managing device according to claim 1, it is characterised in that:It is described stacked Gondola water faucet (19) bottom is provided with connecting seat (24), and water leg (20) center is provided with connected unit (25), the connecting seat (24) it is bolted with connected unit (25), the connecting seat (24) is provided with shunting water cavity (26), the connected unit (25) Purification underground connecting tube (27) is inside provided with, purification underground connecting tube (27) one end is connected with shunting water cavity (26), described Purification underground connecting tube (27) other end is connected with purification of air underground pipes road (3).
4. a kind of comprehensive sponge urban ecological planning managing device according to claim 3, it is characterised in that:The connection Seat (24) is provided with sealing gasket (28) with connected unit (25) junction.
5. a kind of comprehensive sponge urban ecological planning managing device according to claim 3, it is characterised in that:It is described stacked Gondola water faucet (19) is divided into three layers, and the stacked gondola water faucet (19) is shaped as annular gondola water faucet, and the stacked gondola water faucet (19) includes watering ring (29) and water delivery support tube (30), described watering ring (29) bottom is provided with water sprayering hole (31), described water delivery support tube (30) one end It is connected with watering ring (29), water delivery support tube (30) other end is connected with shunting water cavity (26).
6. a kind of comprehensive sponge urban ecological planning managing device according to claim 1, it is characterised in that:The backflow Hole (21) is distributed along water leg (20) ground center annular array.
7. a kind of comprehensive sponge urban ecological planning managing device according to claim 6, it is characterised in that:The backflow Hole (21) bottom is provided with backflow branch pipe (32), and backflow branch pipe (32) is provided with chamber of confluxing (33) away from return port (21) one end, Chamber of confluxing (33) bottom is connected with backflow connecting pipe (34), backflow connecting pipe (34) and backflow underground piping (4) it is connected.
8. a kind of comprehensive sponge urban ecological planning managing device according to claim 1, it is characterised in that:The purification Watering device top is provided with publicity mark plate (35).
CN201710031623.9A 2017-01-17 2017-01-17 A kind of comprehensive sponge urban ecological planning managing device Pending CN106815794A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710031623.9A CN106815794A (en) 2017-01-17 2017-01-17 A kind of comprehensive sponge urban ecological planning managing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710031623.9A CN106815794A (en) 2017-01-17 2017-01-17 A kind of comprehensive sponge urban ecological planning managing device

Publications (1)

Publication Number Publication Date
CN106815794A true CN106815794A (en) 2017-06-09

Family

ID=59111903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710031623.9A Pending CN106815794A (en) 2017-01-17 2017-01-17 A kind of comprehensive sponge urban ecological planning managing device

Country Status (1)

Country Link
CN (1) CN106815794A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894298A (en) * 2018-06-20 2018-11-27 山东女子学院 A kind of comprehensive sponge urban ecological planning managing device
CN111528050A (en) * 2020-05-08 2020-08-14 江苏溧阳建设集团有限公司 Irrigation system is collected to municipal administration rainwater

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4267972A (en) * 1979-10-17 1981-05-19 Farmtronics Inc. Pneumatically operated gated irrigation system
CN203340578U (en) * 2013-05-22 2013-12-18 厦门鹭路兴绿化工程建设有限公司 Automatic irrigation management system of urban road green belt
CN103880186A (en) * 2014-03-21 2014-06-25 中国环境科学研究院 Treatment device for recycling mini-invasively excavated multi-medium subsurface infiltrate for irrigation water
CN104521610A (en) * 2014-12-26 2015-04-22 周子靖 Ecological breeding box and application method thereof
CN204753718U (en) * 2015-02-03 2015-11-11 江苏百协精锻机床有限公司 Rainwater collection device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4267972A (en) * 1979-10-17 1981-05-19 Farmtronics Inc. Pneumatically operated gated irrigation system
CN203340578U (en) * 2013-05-22 2013-12-18 厦门鹭路兴绿化工程建设有限公司 Automatic irrigation management system of urban road green belt
CN103880186A (en) * 2014-03-21 2014-06-25 中国环境科学研究院 Treatment device for recycling mini-invasively excavated multi-medium subsurface infiltrate for irrigation water
CN104521610A (en) * 2014-12-26 2015-04-22 周子靖 Ecological breeding box and application method thereof
CN204753718U (en) * 2015-02-03 2015-11-11 江苏百协精锻机床有限公司 Rainwater collection device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894298A (en) * 2018-06-20 2018-11-27 山东女子学院 A kind of comprehensive sponge urban ecological planning managing device
CN108894298B (en) * 2018-06-20 2020-05-15 山东女子学院 Comprehensive sponge city ecological planning management device
CN111528050A (en) * 2020-05-08 2020-08-14 江苏溧阳建设集团有限公司 Irrigation system is collected to municipal administration rainwater
CN111528050B (en) * 2020-05-08 2022-05-27 江苏溧阳建设集团有限公司 Irrigation system is collected to municipal administration rainwater

Similar Documents

Publication Publication Date Title
CN201995408U (en) Farmer-level practical and standard micro-irrigation system
CN203852968U (en) Haze treatment device and system
CN109496796A (en) Plant conservation system and its control method under a kind of bridge
CN202425400U (en) Water-saving structure utilizing rainwater on bridge floor of viaduct bridge to irrigate green space under bridge
CN106638219A (en) Ramped urban road of sponge city
CN106815794A (en) A kind of comprehensive sponge urban ecological planning managing device
CN209693677U (en) A kind of small-sized garden Intelligent rainwater irrigation system
CN205804470U (en) A kind of community rainwater-collecting irrigates blood circulation
CN204929795U (en) A kind of liquid manure automatic irrigation greening wall
CN201226701Y (en) Low pressure water-saving irrigation system
CN206993961U (en) Agriculture irrigation water saving system
CN109555275A (en) A kind of roof garden Intelligent rain Collection utilization system
CN203105240U (en) Automatic irrigation system for green belts on flyover
CN205491988U (en) Irrigate system for irrigation and water conservancy water conservation engineering
CN109629627A (en) A kind of municipal middle water reuse ecology system for facilitating pollution treatment and subtracting haze
CN203537827U (en) Irrigation system
CN206923409U (en) A kind of gardens construction intelligent water-saving irrigation rig
CN109496803A (en) A kind of small-sized garden Intelligent rainwater irrigation system
CN206181995U (en) Embedded automatic irrigation system
CN205847961U (en) The rainwater fertilizer integration of drought and barren mountain region utilizes system
CN205546790U (en) Water -saving irrigation system based on rainwater is collected
CN205266528U (en) Novel gardens water -saving irrigation device
CN204907393U (en) Novel automatic drip irrigation equipment of agricultural
CN206547517U (en) A kind of irrigation system
CN206963534U (en) A kind of multi-functional irrigation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170609