CN106761851B - A kind of tunnel water proofing subregion construction and its implementation using spraying waterproof technique - Google Patents

A kind of tunnel water proofing subregion construction and its implementation using spraying waterproof technique Download PDF

Info

Publication number
CN106761851B
CN106761851B CN201710019534.2A CN201710019534A CN106761851B CN 106761851 B CN106761851 B CN 106761851B CN 201710019534 A CN201710019534 A CN 201710019534A CN 106761851 B CN106761851 B CN 106761851B
Authority
CN
China
Prior art keywords
waterproof
subregion
tunnel
section
spraying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710019534.2A
Other languages
Chinese (zh)
Other versions
CN106761851A (en
Inventor
蒋雅君
李彬
杨其新
赵菊梅
李国庆
邱品茗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201710019534.2A priority Critical patent/CN106761851B/en
Publication of CN106761851A publication Critical patent/CN106761851A/en
Application granted granted Critical
Publication of CN106761851B publication Critical patent/CN106761851B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Abstract

The invention discloses a kind of tunnel water proofing subregion constructions and its implementation using spraying waterproof technique, non-woven fabrics and waterproof layer including being laid on preliminary bracing surface successively, non-woven fabrics and waterproof layer disconnect forming waterproof subregion position at the construction joint of secondary lining;The preliminary bracing surface at waterproof subregion position is equipped on waterproof mortar screed-coat, waterproof mortar screed-coat and the non-woven fabrics to connect with it and waterproof layer edge and is covered with spraying waterproof layer;Waterproof section is divided according to the reserved location of Second Lining Construction seam, waterproof mortar screed-coat is sprayed in waterproof subregion portion faces, it is laid with non-woven fabrics and waterproof layer in waterproof section, then applies the spraying waterproof layer at waterproof subregion position, finally pours the secondary lining of waterproof section.The waterproof subregion of composite lining tunnel can be achieved in the present invention, has separated underground water along non-woven fabrics of the tunnel head fall after waterproof layer and the channelling in gap so that the improvement after tunnel leaks is more effective, economical.

Description

A kind of tunnel water proofing subregion construction and its implementation using spraying waterproof technique
Technical field
The present invention relates to tunnel water proofing technical field, specially a kind of tunnel water proofing subregion structures using spraying waterproof technique It makes and its implementation.
Background technology
At present in Tunnel Engineering field(In particular by the composite lining tunnel of drill bursting construction), common waterproof Measure is that the splash guard and non-woven fabrics buffer layer of full-enclosed or half-packaging is arranged between supporting and secondary lining in the early stage.Due to Splash guard is not bonded with secondary lining concrete usually, although playing the role of isolation and lubrication to a certain extent, is avoided Cracking caused by concrete shrinkage, but but also underground water can be formed between secondary lining and " be altered after waterproof layer local damage Water " is so that leakage range expands, and searches leak source and leak stopping repairing difficulty.To avoid problem above, in recent years in tunnel again Tectonic type and the measure for taking the tunnel partitioning waterproofing suitable for splash guard, at present gradually in highway, railway, subway Etc. be applied in Tunnel Engineering.
Document disclosed in Rui Yan outstanding person et al.(《Tunnel partitioning waterproofing model test and engineering Application Research》,《Modern tunnel skill Art》, the 1st phase of volume 42, the 30-37 pages, 2 months 2005), describe a kind of waterproofing by zoning of composite lining tunnel. The technology circumferential closely knit welding back-adhering waterstop, tooth of back-adhering waterstop on the splash guard that Second Lining Construction stitches position Grouting Pipe is laid in slot, the gap at position is stitched by slip casting seal construction, to form the waterproof between splash guard and secondary lining Subregion.Once leak occurs for some position in waterproof subregion, will not channelling and influence other subregions, can be directed to independent partitions into Row watertightness treatment, to improve regulation effect and reduce improvement cost.Based on the principle that carrying out the combined type lining of waterproof guard Block tunnel is relatively conventional at present, and main sides focus on the waterproof subregion at construction joint position, subway sectional tunnel in railway, vcehicular tunnel The splash guard surface programming Grouting Pipe in waterproof subregion is then usually also needed to, leak stopping is carried out to facilitate after leaking and controls Reason.Tunnel water proofing subregion way more than, due to being only to form subregion, subregion between splash guard and secondary lining Facility(Back-adhering waterstop)There is no bonding is formed with preliminary bracing, underground water still can be between splash guard and preliminary bracing Gap in channelling, consequently, it is possible to the breakage or weakness from other waterproof subregions enter tunnel, therefore partitioning waterproofing effect Still limited.
With current spraying waterproof material(Such as spray polyurea, acrylates spraying film materials, spraying rapid hardening rubber asphalt) And technology is promoted in Tunnel Engineering, starts gradually to replace the splash guard in tunnel.Such spraying waterproof material is compound In application, water proof structure pattern is consistent with splash guard system under normal conditions in formula trimmed tunnel(Supporting surface is laid in the early stage Spraying waterproof layer is applied after non-woven fabrics), there is also the demands of tunnel water proofing subregion.But due to the back sticking type for splash guard system Waterstop material is incompatible with all kinds of spraying waterproof materials, therefore can not coordinate the use of spraying waterproof material and reach effectively anti- The effect in moisture area, at present also there is not yet being suitable for all kinds of spraying waterproof technique dedicated tunnel partitioning waterproofing facilities or structure type Formula.
Invention content
In view of the above-mentioned problems, anti-moisture in composite lining tunnel can be solved the purpose of the invention is to provide one kind A kind of tunnel water proofing subregion construction and its implementation using spraying waterproof technique of the halfway problem in area.
A kind of tunnel water proofing subregion construction using spraying waterproof technique, including it is laid on the nothing on preliminary bracing surface successively Woven fabric and waterproof layer, non-woven fabrics and waterproof layer disconnect forming waterproof subregion position at the construction joint of secondary lining;The waterproof The preliminary bracing surface at subregion position is equipped with waterproof mortar screed-coat, waterproof mortar screed-coat and the non-woven fabrics to connect with it and prevents Spraying waterproof layer is covered on water layer edge.
Further, the preliminary bracing being located at the waterproof subregion position of country rock loose crushing or stratum rich water section With grouting water-tight circle is also had additional in country rock.
Further, the spraying waterproof layer is adopted as acrylates spray film water-proofing material.
Further, the preliminary bracing basal plane is also equipped with annular, longitudinal direction or local sewerage system, the draining system Unite in tunnel lateral sulcus or Central drain be connected to.
A kind of implementation of tunnel water proofing subregion construction using spraying waterproof technique, includes the following steps:
Step 1:After tunnel excavation and preliminary bracing apply, anti-pool is divided according to the reserved location of Second Lining Construction seam Section, and supporting surface reserves the range at the intersegmental waterproof subregion position of adjacent two waterproofs subregion in the early stage;
Step 2:The preliminary bracing basal plane at waterproof subregion position is cleared up, it is levelling in its surface spraying or brushing waterproof mortar Layer;
Step 3:It is laid with non-woven fabrics and waterproof layer in first waterproof section, makes itself and waterproof mortar screed-coat edge phase It connects, and closely connected preliminary bracing basal plane;
Step 4:The spraying waterproof layer at waterproof subregion position is applied, so that it is covered waterproof mortar screed-coat and first anti- The non-woven fabrics and waterproof layer of pool section edge;
Step 5:The secondary lining of first waterproof section is poured, and applies construction joint waterproof measure;
Step 6:The non-woven fabrics and waterproof layer being laid with from waterproof subregion adjacent margins in next waterproof section, non-woven fabrics And waterproof layer;
Step 7:Second time spraying waterproof layer is applied at waterproof subregion position, connects with covering and effectively next anti-pool The non-woven fabrics and waterproof layer of section;
Step 8:The secondary lining in next waterproof section is poured, and applies construction joint waterproof measure;
Step 9:Circulation step 6 to 8 is straight only to complete.
Further, further include after the step 1:Waterproof subregion at country rock loose crushing or stratum rich water section The preliminary bracing surface at position drills along tunnel circumferential direction, squeezes into Grouting Pipe and pours into grouting material, at waterproof subregion position Preliminary bracing or and its behind country rock in form continuous grouting water-tight circle.
The beneficial effects of the invention are as follows:The waterproof subregion of composite lining tunnel can be achieved in the present invention, has separated underground water Along non-woven fabrics of the tunnel head fall after waterproof layer and the channelling in gap so that tunnel leak after improvement more Effectively, economical.
Description of the drawings
Fig. 1 is the schematic diagram without slip casting measure during the tunnel water proofing subregion of the present invention constructs.
Fig. 2 is the schematic diagram for having during the tunnel water proofing subregion of the present invention constructs slip casting measure.
Fig. 3 is the composite lining tunnel water-proof system schematic diagram of the embodiment of the present invention.
Fig. 4 is the section arrangement schematic diagram of the embodiment of the present invention 1(1-1 sections in Fig. 3).
Fig. 5 is the section arrangement schematic diagram of the embodiment of the present invention 2(2-2 sections in Fig. 3).
In figure:1- country rocks;2- preliminary bracings;3- non-woven fabrics;4- waterproof layers;5- secondary linings;6- construction joints;7- construction joints Waterproof measure;8- waterproof mortar courses;9- sprays waterproof layer;10- Grouting Pipes;11- grouting water-tight circles.
Specific implementation mode
The present invention is described in further details in the following with reference to the drawings and specific embodiments.As shown in Figure 1, a kind of using spray The tunnel water proofing subregion construction of waterproof technique is applied, including is laid on the non-woven fabrics 3 and waterproof layer 4 on 2 surface of preliminary bracing, nothing successively Woven fabric 3 and waterproof layer 4 disconnect forming waterproof subregion position at the construction joint 6 of secondary lining 5;At the beginning of waterproof subregion position 2 surface of phase supporting is equipped with waterproof mortar screed-coat 8,4 side of waterproof mortar screed-coat 8 and the non-woven fabrics 3 to connect with it and waterproof layer Spraying waterproof layer 9 is covered on edge.
Namely at 6 position of construction joint of composite lining tunnel secondary lining 5, initial stage branch will be laid in adjacent sections Protect the non-woven fabrics 3 and waterproof layer 4 on 2 surfaces(Splash guard or spraying waterproof material)It disconnects, reserves the waterproof subregion portion of one fixed width Position;There is spraying on the surface of preliminary bracing 2 at the waterproof subregion position or brushes the waterproof mortar screed-coat 8 formed;Anti- The surface of the waterproof mortar screed-coat 8 at moisture area position covers waterproof mortar course 8 and connection adjacent sections with spraying waterproof layer 9 Waterproof layer 4.Wherein, the material for forming tunnel water proofing subregion position spraying waterproof layer 9 can be that acrylates sprays film waterproof material Expect or the material that 2 surface of spraying method supporting in the early stage forms closed, continuous waterproof layer can be used in other.
It, can be in tunnel water proofing subregion in 1 loose crushing of country rock or stratum rich water section to further enhance waterproof effect The continuous grouting seepage-proofing ring 11 of a certain range and depth is formed at position by slip casting measure increase, as shown in Figure 2;Alternatively, Tunnel that 2 basal plane of preliminary bracing is laid with is circumferential, longitudinal direction and local sewerage system, and in tunnel lateral sulcus and Central drain connect It is logical.
Specific implementation method is:After tunnel excavation and preliminary bracing 2 apply, according to the reserved place of 5 construction joint 6 of secondary lining Division waterproof section is set, and the surface of supporting in the early stage 2 reserves waterproof subregion position range;In country rock loose crushing or underground water In the case of development, 2 surface of preliminary bracing at waterproof subregion position is drilled along tunnel circumferential direction with a determining deviation, is squeezed into certain The Grouting Pipe 10 of length simultaneously pours into grouting material, preliminary bracing 2 at waterproof subregion position or and its behind certain depth Continuous grouting water-tight circle 11 is formed in country rock 1;The basal plane for clearing up the preliminary bracing 2 at waterproof subregion position sprays on its surface Painting or brushing waterproof mortar screed-coat 8;2 surface of preliminary bracing in first tunnel water proofing section is laid with non-woven fabrics 3 and prevents Water layer 4, until the edge of the waterproof mortar screed-coat 8 at waterproof subregion position, which disconnects and fixes, keeps closely connected 2 basal plane of preliminary bracing; The spraying waterproof layer 9 at waterproof subregion position is applied, is covered at waterproof mortar screed-coat 8 and first tunnel water proofing section edge Non-woven fabrics 3 and waterproof layer 4, form the connector for effectively connecting and reserving next waterproof section spraying waterproof layer 9;Pour first The secondary lining 5 of a waterproof section, and apply construction joint waterproof measure 7;It is laid with from waterproof subregion adjacent margins next anti- Non-woven fabrics 3 in the section of pool and waterproof layer 4, and keep closely connected 2 basal plane of preliminary bracing in its edge;Is applied at waterproof subregion position Two times spraying waterproof layers 9, to cover and effectively connect the non-woven fabrics 3 and waterproof layer 4 of next waterproof section;It pours next anti- Secondary lining 5 in the section of pool.
Wherein, the preliminary bracing 2 in tunnel, secondary lining 5 can be divided into inverted arch, arch wall position branch applies, corresponding position Non-woven fabrics 3, waterproof layer 4 and waterproof subregion measure(Waterproof mortar screed-coat 8, spraying waterproof layer 9, Grouting Pipe 10, grouting water-tight circle 11)Also it can accordingly branch apply.
Embodiment 1:Such as the left structure form and Fig. 4 in Fig. 3(1-1 sections in Fig. 3)It is shown, it can be in half packet waterproof Waterproof subregion is realized in the tunnel water proofing system of pattern.
Tunnel water proofing subregion tectonic type in the present embodiment is:With the construction joint 6 of composite lining tunnel secondary lining 5 Position divides tunnel water proofing subregion, and there are the ranges of one fixed width so that waterproof subregion measure is arranged between adjacent waterproof subregion;From The vault in tunnel to both sides arch springing range be arranged tunnel water proofing subregion measure, inverted arch position due to being not provided with waterproof layer, Also it is not provided with tunnel water proofing subregion measure;When country rock is preferable or 6 basal plane underground water of preliminary bracing leakage is not serious, using such as figure Without the waterproof subregion measure of grouting water-tight circle shown in 1(Left side waterproof subregion measure in Fig. 4);When country rock is more broken, When layer rich water, using the waterproof subregion measure as shown in Figure 2 with grouting water-tight circle(Right side waterproof subregion measure in Fig. 4).
Its implementation is as follows:
(1)After 2 works are applied in the preliminary bracing in tunnel, according to the 6 location determination tunnel water proofing subregion of construction joint of secondary lining 5 Position and subregion position range;
(2)The case where depending on country rock and underground water, decides whether the Grouting Pipe 10 and grouting water-tight that apply waterproof subregion position Circle 11;
(3)Tunnel vault to both sides arch springing range, apply waterproof subregion position waterproof mortar screed-coat 8;
(4)Tunnel vault to both sides arch springing range, the non-woven fabrics 3 and waterproof layer 4 that are laid in first waterproof section;
(5)Apply the spraying waterproof layer 9 at waterproof subregion position;
(6)It pours the secondary lining 5 of first waterproof section and applies construction joint waterproof measure 7;
(7)Carry out the tunnel water proofing subregion measure of next cycle and applying for lining cutting.
Embodiment 2:Such as the right structure form and Fig. 5 in Fig. 3(2-2 sections in Fig. 3)It is shown, it can be in full packet waterproof Waterproof subregion is realized in the tunnel water proofing system of pattern.
Tunnel water proofing subregion tectonic type in the present embodiment is:With the construction joint 6 of composite lining tunnel secondary lining 5 Position divides tunnel water proofing subregion, and there are the ranges of one fixed width so that waterproof subregion measure is arranged between adjacent waterproof subregion; Tunnel loopful range is respectively provided with tunnel water proofing subregion measure;When country rock is preferable or 6 basal plane underground water of preliminary bracing leakage is not serious When, using as shown in Figure 1 without the waterproof subregion measure of grouting water-tight circle(Left side waterproof subregion measure in Fig. 5);Work as country rock When more broken, stratum rich water, using the waterproof subregion measure as shown in Figure 2 with grouting water-tight circle(The anti-moisture in right side in Fig. 5 Area's measure).
Its implementation is as follows:
(1)After 2 works are applied in the preliminary bracing in tunnel, according to the 6 location determination tunnel water proofing subregion of construction joint of secondary lining 5 Position and subregion position range;
(2)The case where depending on country rock and underground water, decides whether to apply Grouting Pipe 10 and grouting water-tight circle 11;
(3)Apply the waterproof mortar screed-coat 8 at tunnel inverted arch waterproof subregion position;
(4)It is laid with the non-woven fabrics 3 and waterproof layer 4 at inverted arch position in first waterproof section;
(5)Apply the spraying waterproof layer 9 at inverted arch position at waterproof subregion position;
(6)It pours the secondary lining 5 at first waterproof section inverted arch position and applies construction joint waterproof measure 7;
(7)Apply the waterproof mortar screed-coat 8 at tunnel arch wall waterproof subregion position;
(8)It is laid with the non-woven fabrics 3 and waterproof layer 4 at arch wall position in first waterproof section;
(9)Apply the spraying waterproof layer 9 at arch wall position at waterproof subregion position;
(10)It pours the secondary lining 5 at first waterproof section arch wall position and applies construction joint waterproof measure 7;
(12)Carry out the tunnel water proofing subregion measure of next cycle and applying for lining cutting.

Claims (2)

1. a kind of implementation of tunnel water proofing subregion construction using spraying waterproof technique, which is characterized in that including following step Suddenly:
Step 1:Tunnel excavation and preliminary bracing(2)After applying, according to secondary lining(5)Construction joint(6)Reserved location divide Waterproof section, and supporting in the early stage(2)Surface reserves the range at the intersegmental waterproof subregion position of adjacent two waterproofs subregion;
Step 2:Clear up the preliminary bracing at waterproof subregion position(2)Basal plane, it is levelling in its surface spraying or brushing waterproof mortar Layer(8);
Step 3:It is laid with non-woven fabrics in first waterproof section(3)And waterproof layer(4), make itself and waterproof mortar screed-coat(8) Side edge, and closely connected preliminary bracing(2)Basal plane;
Step 4:Apply the spraying waterproof layer at waterproof subregion position(9), it is made to cover waterproof mortar screed-coat(8)And first The non-woven fabrics of waterproof section edge(3)And waterproof layer(4);
Step 5:Pour the secondary lining of first waterproof section(5), and apply construction joint waterproof measure(7);
Step 6:The non-woven fabrics being laid with from waterproof subregion adjacent margins in next waterproof section(3)And waterproof layer(4);
Step 7:Second time spraying waterproof layer is applied at waterproof subregion position(9), connect with covering and effectively next anti-pool The non-woven fabrics of section(3)And waterproof layer(4);
Step 8:Pour the secondary lining in next waterproof section(5), and apply construction joint waterproof measure(7);
Step 9:Circulation step 6 to 8 is straight only to complete.
2. the implementation of the tunnel water proofing subregion construction according to claim 1 using spraying waterproof technique, feature It is, further includes after the step 1:The initial stage branch at the waterproof subregion position at country rock loose crushing or stratum rich water section Shield(2)Surface drills along tunnel circumferential direction, squeezes into Grouting Pipe(10)And grouting material is poured into, the initial stage branch at waterproof subregion position Shield(2)Or and its behind country rock(1)It is middle to form continuous grouting water-tight circle(11).
CN201710019534.2A 2017-01-10 2017-01-10 A kind of tunnel water proofing subregion construction and its implementation using spraying waterproof technique Active CN106761851B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710019534.2A CN106761851B (en) 2017-01-10 2017-01-10 A kind of tunnel water proofing subregion construction and its implementation using spraying waterproof technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710019534.2A CN106761851B (en) 2017-01-10 2017-01-10 A kind of tunnel water proofing subregion construction and its implementation using spraying waterproof technique

Publications (2)

Publication Number Publication Date
CN106761851A CN106761851A (en) 2017-05-31
CN106761851B true CN106761851B (en) 2018-08-17

Family

ID=58947329

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710019534.2A Active CN106761851B (en) 2017-01-10 2017-01-10 A kind of tunnel water proofing subregion construction and its implementation using spraying waterproof technique

Country Status (1)

Country Link
CN (1) CN106761851B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112196590A (en) * 2020-09-18 2021-01-08 中铁隧道集团一处有限公司 Node processing method for enabling anchor rods to penetrate through lining waterproof layer in large-range intensive mode

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107178393B (en) * 2017-07-07 2023-08-25 中铁第四勘察设计院集团有限公司 Tunnel secondary lining water pressure control structure
CN107816361B (en) * 2017-12-08 2024-04-19 四川省公路规划勘察设计研究院有限公司 Tunnel rich water section subregion waterproof system
CN108316347A (en) * 2018-03-09 2018-07-24 中冶京诚工程技术有限公司 The assembled underground pipe gallery and its waterproof method of partitioning waterproofing
CN109026082A (en) * 2018-10-15 2018-12-18 中铁二院成都勘察设计研究院有限责任公司 A kind of lining construction seam waterproof method and waterproof construction
CN109611117B (en) * 2018-11-16 2020-08-25 西北矿冶研究院 Supporting method for mine in acid water environment
CN109667607B (en) * 2018-12-24 2021-06-22 中铁十八局集团有限公司 Tunnel partition waterproof construction process
CN109751080A (en) * 2019-01-15 2019-05-14 西南交通大学 The supporting construction and construction method with guarded drainage function suitable for water rich strata
CN111119927A (en) * 2019-12-25 2020-05-08 中铁二十五局集团第一工程有限公司 Tunnel three-dimensional waterproof and drainage system and construction technology
CN116557005B (en) * 2023-06-26 2023-12-19 山东高速集团有限公司 Tunnel lining waterproof structure and construction method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4108460B2 (en) * 2002-12-04 2008-06-25 前田建設工業株式会社 Construction method of tunnel still water structure
CN201407053Y (en) * 2009-05-22 2010-02-17 中铁第一勘察设计院集团有限公司 Support and waterproof structure for metro tunnel of tunnel boring machine construction
CN106014456A (en) * 2016-07-22 2016-10-12 长安大学 Double-layer lining special quasi-circular sectional mining method tunnel structure and construction method thereof
CN206571506U (en) * 2017-01-10 2017-10-20 西南交通大学 A kind of tunnel water proofing subregion construction using spraying waterproof technique

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112196590A (en) * 2020-09-18 2021-01-08 中铁隧道集团一处有限公司 Node processing method for enabling anchor rods to penetrate through lining waterproof layer in large-range intensive mode

Also Published As

Publication number Publication date
CN106761851A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN106761851B (en) A kind of tunnel water proofing subregion construction and its implementation using spraying waterproof technique
CN206571506U (en) A kind of tunnel water proofing subregion construction using spraying waterproof technique
CN207131424U (en) A kind of lining construction stitches waterproof construction
CN111734457B (en) Construction method of tunnel water-drainage-preventing system
CN106194255A (en) Tunnel waterproof and water drainage system and method for construction thereof
CN204476470U (en) A kind of waterproof and water drainage system of applicable tunnel project seam
CN110878700B (en) Tunnel waterproof structure and construction method thereof
CN106120873A (en) A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
CN109667606A (en) A kind of tunnel multiple waterproof construction method
CN207093104U (en) A kind of Tunnel Lining Deformation stitches waterproof construction
RU2060319C1 (en) Method for sealing hydraulic construction
CN107489167A (en) A kind of underground pipe gallery socket joint deformation joint structure and its construction method
CN108842817A (en) A kind of subway station overlays waterproof roll structure and its construction technology
CN105421497B (en) The waterproof construction method of sole plate and ground wall connecting node in combined fender construction system
CN109488371B (en) Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method
CN109751080A (en) The supporting construction and construction method with guarded drainage function suitable for water rich strata
CN107268638A (en) Water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction and its construction method
CN109208651A (en) Underground engineering super-long structural body deformation joint waterproof/drainage structure construction method and structure
CN104847382A (en) Self-adhesive composite waterproof layer for tunnel and paving method of self-adhesive composite waterproof layer
CN107386298A (en) A kind of depth hole composite supporting construction and its construction method with water-proof function
CN109667607A (en) A kind of tunnel partitioning waterproofing construction technology
CN210238573U (en) A waterproof construction that is used for open cut station main part and attached junction
CN108361049A (en) A kind of tunnel waterproofing construction construction method
CN209277909U (en) A kind of large section rectangular top pipe originates portal dynamic water-proof device
CN103628506B (en) Construction method for waterproof positions of foundation platform and pile head

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant