CN108361049A - A kind of tunnel waterproofing construction construction method - Google Patents

A kind of tunnel waterproofing construction construction method Download PDF

Info

Publication number
CN108361049A
CN108361049A CN201810093464.XA CN201810093464A CN108361049A CN 108361049 A CN108361049 A CN 108361049A CN 201810093464 A CN201810093464 A CN 201810093464A CN 108361049 A CN108361049 A CN 108361049A
Authority
CN
China
Prior art keywords
tunnel
construction
lining
construction method
waterproofing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810093464.XA
Other languages
Chinese (zh)
Inventor
陈德国
经莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Original Assignee
Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd filed Critical Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Priority to CN201810093464.XA priority Critical patent/CN108361049A/en
Publication of CN108361049A publication Critical patent/CN108361049A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of tunnel waterproofing construction construction method, includes the following steps:The outer curtain-grouting of S1, Tunnel;S2, Tunnel;S3, Tunnel Second Lining;S4, tunnel waterproofing layer;The lining cutting three times of S5, tunnel;The present invention has many advantages, such as that construction cost is low, the period is short, security risk is low, good water-proof effect, can promote the use of tunnel water proofing construction field.

Description

A kind of tunnel waterproofing construction construction method
Technical field
The invention belongs to technical field of tunnel construction, and in particular to arrive a kind of tunnel waterproofing construction construction method.
Background technology
In city underground engineering construction, the design of shallow buried covered excavation waterproof construction uses full packet waterproof construction substantially at present, i.e., Waterproof layer is set along tunnel support lining cutting tunneling boring, does not consider tunnel internal drainage.Since level of ground water is generally shallower, construction period Using dewatering measure, structural percolating water is in confused situation aobvious, terminates after constructing tunnel, after dewatering well closing, full packet waterproof construction oozes Water leakage situation is more universal, and especially in water rich strata, such case becomes apparent.It is generally being tied after encountering percolating water situation Structure is administered before testing friendship using slip casting close measure, and overall construction processing is of high cost, and the period is long, and effect is ideal not to the utmost sometimes, Later stage security risk is big.
Invention content
Technical problem to be solved by the present invention lies in above-mentioned the deficiencies in the prior art are overcome, a kind of construction cost is provided Tunnel waterproofing construction construction method low, the period is short, security risk is low.
Above-mentioned technical problem is solved the technical solution adopted is that including the following steps:The outer curtain note of S1, Tunnel Slurry;S2, Tunnel;S3, Tunnel Second Lining;S4, tunnel waterproofing layer;The lining cutting three times of S5, tunnel.
The outer curtain-grouting of the Tunnel of the present invention is included in before tunnel excavation carries out advanced curtain to tunnel tunnel face Curtain slip casting forms 3~5m ejection for water plugging fixing collars behind in Tunnel.
The Tunnel of the present invention includes loopful setting steel arch-shelf, is laid with bar-mat reinforcement, it is early that C25 is sprayed in tunneling boring supporting Reinforced concrete adds micro-expanding agent in the concrete.
The Tunnel Second Lining of the present invention is included in mixed using impervious reinforcing bar after the completion of supplement slip casting outside Tunnel Solidifying clay model building lining construction.
After the tunnel waterproofing layer of the present invention is included in completion Tunnel Second Lining and form removal, repairing leveling Tunnel Second Lining Concrete surface, installs waterproof layer after smooth, cleaning, the waterproof layer is to overlay waterproof roll.
The present invention's overlays waterproof roll using asphaltic base polyester blank or resinae homogeneous polymer membranes or resin Class composite high-molecular waterproof roll;The asphaltic base polyester blank overlays waterproof roll thickness and is at least 4mm, and resinae homogeneous is high Molecule waterproof sheet or resinae composite high-molecular waterproof sheet overlay waterproof roll thickness and are at least 1.5mm.
The tunnel of the present invention is constructed after the completion of lining cutting is included in waterproof layer using reinforced concrete lining layer three times, seepage-resistant grade For P10.
The present invention tunnel three times lining cutting when in arch along tunnel radial direction built-in slip casting pipe, the built-in slip casting pipe stretches into Lining cutting three times, the longitudinal pitch between adjacent built-in slip casting pipe are 2~3m.
The present invention tunnel three times lining cutting when circular construction joint in rubber fastening band is installed, the rubber fastening band is Middle rubber fastening band with grouting tube is equipped with 5mm thickness galvanized steel plain sheet waterstops in longitudinal construction joint.
The present invention has the following advantages compared with the prior art:
1, compared to existing two layers of waterproofing design, the outer curtain-grouting of Tunnel of the present invention forms ejection for water plugging and adds Gu Quan, grouting reinforced region are first of waterproof construction in tunnel and main waterproof construction, make tunnel structure not easy to leak, are prevented Water effect is more preferable.
2, waterproof layer is installed after the completion of two lining concreting, reduces later stage structural leakage water process and safeguards risk.
3, longitudinal construction joint is formed between inverted arch and arch wall, and 5mm thickness galvanized steel plain sheet waterstops are installed in longitudinal construction joint 1, enhancing structure waterproof effect.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present invention.
In figure:1, galvanized steel plain sheet waterstop;2, rubber fastening band;3, built-in slip casting pipe;4, Tunnel;5, slip casting Water sealing consolidation circle;6, waterproof roll is overlay;7, tunnel lining cutting three times;8, Tunnel Second Lining.
Specific implementation mode
The present invention is described in further details with reference to the accompanying drawings and examples, but the present invention is not restricted to these implement Example.
Embodiment 1
In Fig. 1, a kind of tunnel waterproofing construction construction method of the present invention, includes the following steps:
The outer curtain-grouting of S1, Tunnel;The outer curtain-grouting of the Tunnel is included in tunnel excavation Before, advanced curtain-grouting is carried out to tunnel tunnel face, forms 3~5m ejections for water plugging fixing collar 5 outside Tunnel 4, Single slurry or dual slurry, injected hole longitudinal direction 0.5m × 0.5m, circumferential direction 1m × 1m, Grouting Pipe can be used according to water flow size cases Using punching mini-valve tube, the tunnel fixing collar 5 is first of waterproof construction in tunnel, and main waterproof knot Structure.
S2, Tunnel;The Tunnel includes loopful setting steel arch-shelf, is laid with bar-mat reinforcement, Quan Duan C25 early strength concretes are sprayed in face supporting, and micro-expanding agent is added in the concrete.
S3, Tunnel Second Lining;The Tunnel Second Lining 8 is included in outside Tunnel after the completion of supplement slip casting Using impervious armored concrete moulded lining construct, be allowed to 4 common stress of Tunnel, and together become tunnel master Stress support construction is wanted, while providing one for waterproof layer and being preferably laid with basal plane.
S4, tunnel waterproofing layer;After the tunnel waterproofing layer is included in completion Tunnel Second Lining 8 and form removal, repairing is whole 8 concrete surface of flat Tunnel Second Lining installs waterproof layer after smooth, cleaning, the waterproof layer is to overlay waterproof roll 6, Described overlays waterproof roll 6 using asphaltic base polyester blank or resinae homogeneous polymer membranes or the compound high score of resinae Sub- waterproof roll;The asphaltic base polyester blank overlays waterproof roll thickness and is at least 4mm, resinae homogeneous macromolecule flashing Material or resinae composite high-molecular waterproof sheet overlay waterproof roll thickness and are at least 1.5mm.
The lining cutting three times of S5, tunnel;The tunnel uses reinforced concrete lining after the completion of lining cutting 7 is included in waterproof layer three times Construction is built, seepage-resistant grade P10, in arch along tunnel radial direction built-in slip casting pipe 3, the built-in slip casting pipe 3 stretches into be served as a contrast three times Build, the longitudinal pitch between adjacent built-in slip casting pipe 3 is 2~3m, tunnel three times lining cutting when circular construction joint in rubber is installed Waterstop 2, the rubber fastening band 2 be the middle rubber fastening band with grouting tube, tunnel three times lining cutting when first perform Inverted arch, then arch wall of constructing form longitudinal construction joint, 5mm thickness galvanized steel plain sheets are equipped in longitudinal construction joint between inverted arch and arch wall Waterstop 1 carries out preformed hole slip casting, filling after waterproof lining concrete strength three times pours completion and reaches design strength Hogback gap is closely knit, enhancing structure waterproof effect.

Claims (9)

1. a kind of tunnel waterproofing construction construction method, it is characterised in that include the following steps:
The outer curtain-grouting of S1, Tunnel;
S2, Tunnel;
S3, Tunnel Second Lining;
S4, tunnel waterproofing layer;
The lining cutting three times of S5, tunnel.
2. a kind of tunnel waterproofing construction construction method according to claim 1, it is characterised in that:The tunnel initial-stage branch The outer curtain-grouting of shield is included in before tunnel excavation carries out advanced curtain-grouting to tunnel tunnel face, in Tunnel behind shape At 3~5m ejection for water plugging fixing collars.
3. a kind of tunnel waterproofing construction construction method according to claim 1, it is characterised in that:The tunnel initial-stage branch Shield includes loopful setting steel arch-shelf, is laid with bar-mat reinforcement, and tunneling boring supporting is sprayed C25 early strength concretes, mixed in the concrete Add micro-expanding agent.
4. a kind of tunnel waterproofing construction construction method according to claim 1, it is characterised in that:The secondary lining in the tunnel Block, which is included in outside Tunnel, supplements slip casting after the completion using the construction of impervious armored concrete moulded lining.
5. a kind of tunnel waterproofing construction construction method according to claim 1, it is characterised in that:The tunnel waterproofing layer It is included in after completing Tunnel Second Lining and form removal, repairing leveling Tunnel Second Lining concrete surface is installed after smooth, cleaning Waterproof layer, the waterproof layer are to overlay waterproof roll.
6. a kind of tunnel waterproofing construction construction method according to claim 5, it is characterised in that:Described overlays waterproof volume Material is using asphaltic base polyester blank or resinae homogeneous polymer membranes or resinae composite high-molecular waterproof roll;Described Asphaltic base polyester blank overlays waterproof roll thickness and is at least 4mm, resinae homogeneous macromolecule water-proof sheet material or the compound height of resinae Molecule waterproof sheet overlays waterproof roll thickness and is at least 1.5mm.
7. a kind of tunnel waterproofing construction construction method according to claim 1, it is characterised in that:The tunnel serves as a contrast three times Block is constructed after the completion of being included in waterproof layer using reinforced concrete lining layer, seepage-resistant grade P10.
8. a kind of tunnel waterproofing construction construction method according to claim 7, it is characterised in that:The tunnel serves as a contrast three times In arch along tunnel radial direction built-in slip casting pipe when block, the built-in slip casting pipe stretches into lining cutting three times, adjacent built-in slip casting pipe it Between longitudinal pitch be 2~3m.
9. a kind of tunnel waterproofing construction construction method according to claim 7, it is characterised in that:The tunnel serves as a contrast three times Rubber fastening band is installed, the rubber fastening band is the middle rubber water-proof with grouting tube when block in circular construction joint Band is equipped with 5mm thickness galvanized steel plain sheet waterstops in longitudinal construction joint.
CN201810093464.XA 2018-01-31 2018-01-31 A kind of tunnel waterproofing construction construction method Pending CN108361049A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810093464.XA CN108361049A (en) 2018-01-31 2018-01-31 A kind of tunnel waterproofing construction construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810093464.XA CN108361049A (en) 2018-01-31 2018-01-31 A kind of tunnel waterproofing construction construction method

Publications (1)

Publication Number Publication Date
CN108361049A true CN108361049A (en) 2018-08-03

Family

ID=63007351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810093464.XA Pending CN108361049A (en) 2018-01-31 2018-01-31 A kind of tunnel waterproofing construction construction method

Country Status (1)

Country Link
CN (1) CN108361049A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206563A (en) * 2019-06-25 2019-09-06 深圳市综合交通设计研究院有限公司 A kind of full packet waterproof composite lining structure resistant to pressure and its construction method
CN111236983A (en) * 2018-11-29 2020-06-05 中国石油天然气集团有限公司 Tunnel primary support method
CN111396077A (en) * 2020-03-10 2020-07-10 北京市政建设集团有限责任公司 Tunnel air duct secondary lining construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202645584U (en) * 2012-06-15 2013-01-02 中铁第四勘察设计院集团有限公司 Combined type tunnel lining structure
CN204098937U (en) * 2014-06-20 2015-01-14 山西省交通科学研究院 Tunnel deformation joint waterproof construction and constructing tunnel structure
CN205154193U (en) * 2015-11-26 2016-04-13 山东科技大学 Novel tunnel water -proof structure
CN205936642U (en) * 2016-07-20 2017-02-08 中铁二院工程集团有限责任公司 Big novel multilayer lining cutting of section tunnel structure
CN106437760A (en) * 2016-07-20 2017-02-22 中铁二院工程集团有限责任公司 Large-section tunnel novel multi-layer lining structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202645584U (en) * 2012-06-15 2013-01-02 中铁第四勘察设计院集团有限公司 Combined type tunnel lining structure
CN204098937U (en) * 2014-06-20 2015-01-14 山西省交通科学研究院 Tunnel deformation joint waterproof construction and constructing tunnel structure
CN205154193U (en) * 2015-11-26 2016-04-13 山东科技大学 Novel tunnel water -proof structure
CN205936642U (en) * 2016-07-20 2017-02-08 中铁二院工程集团有限责任公司 Big novel multilayer lining cutting of section tunnel structure
CN106437760A (en) * 2016-07-20 2017-02-22 中铁二院工程集团有限责任公司 Large-section tunnel novel multi-layer lining structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曹诗定: "防水型隧道主要技术措施和造价分析", 《中国市政工程》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236983A (en) * 2018-11-29 2020-06-05 中国石油天然气集团有限公司 Tunnel primary support method
CN111236983B (en) * 2018-11-29 2021-12-17 中国石油天然气集团有限公司 Tunnel primary support method
CN110206563A (en) * 2019-06-25 2019-09-06 深圳市综合交通设计研究院有限公司 A kind of full packet waterproof composite lining structure resistant to pressure and its construction method
CN111396077A (en) * 2020-03-10 2020-07-10 北京市政建设集团有限责任公司 Tunnel air duct secondary lining construction method

Similar Documents

Publication Publication Date Title
CN105019919B (en) Tunnel and its construction method for transmitting fluid
CN204476470U (en) A kind of waterproof and water drainage system of applicable tunnel project seam
CN206916753U (en) A kind of water sealing structure of diaphram wall and its seam crossing
CN207700220U (en) A kind of waterproof construction of pipe gallery outer wall
CN108361049A (en) A kind of tunnel waterproofing construction construction method
CN103256052A (en) Construction method for integral straight middle wall type double-arch tunnel
CN203161259U (en) Buried-in type rubber water-stop belt of double-layer waterproof structure and construction-joint water drainage structure formed by buried-in type rubber water-stop belt
CN107916945A (en) Using the waterproof spray-up structure and its construction method of impervious gunite concrete
CN109440951A (en) New-old concrete works intersection stitches waterproof construction and construction technology
CN109208651A (en) Underground engineering super-long structural body deformation joint waterproof/drainage structure construction method and structure
CN106869169A (en) Three-dimensional interval construction method for underground comprehensive pipe gallery cabin body
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN209277907U (en) A kind of compatibility of deformation of tunnel expansion joint and discharge structure
CN104846935B (en) Head-tank treating seepage remodeling method
CN208040386U (en) A kind of ground fissure region tunnel lining structure based on shield tunnel
CN112012763B (en) Construction method of double-layer primary support multi-arch tunnel structure
CN204059380U (en) Deep-well precipitation well head well-sealing device in underground garage foundation ditch
CN209397743U (en) New-old concrete works intersection stitches waterproof construction
CN105113513A (en) Anti-seepage foundation pit supporting structure and construction method
CN111472813A (en) Super-large-span anchor-shotcrete support rock tunnel water-proof and drainage system and construction method
CN112012761A (en) Construction method of anti-disturbance double-arch tunnel structure
CN111594184A (en) Main hole excavating method for hole bias tunnel
CN203834477U (en) Waterproof structure of anti-floating anchor bars of basement
CN206655716U (en) A kind of tunnel drainage structure
CN105780818B (en) A kind of the composite water-proof structure and construction method of sidewall of basement aseismatic joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180803

RJ01 Rejection of invention patent application after publication