CN108361049A - A kind of tunnel waterproofing construction construction method - Google Patents
A kind of tunnel waterproofing construction construction method Download PDFInfo
- Publication number
- CN108361049A CN108361049A CN201810093464.XA CN201810093464A CN108361049A CN 108361049 A CN108361049 A CN 108361049A CN 201810093464 A CN201810093464 A CN 201810093464A CN 108361049 A CN108361049 A CN 108361049A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- construction
- lining
- construction method
- waterproofing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 56
- 238000004078 waterproofing Methods 0.000 title claims abstract description 24
- 238000005520 cutting process Methods 0.000 claims abstract description 14
- 238000007569 slipcasting Methods 0.000 claims description 17
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 12
- 239000004567 concrete Substances 0.000 claims description 11
- 229920000728 polyester Polymers 0.000 claims description 6
- 229910001335 Galvanized steel Inorganic materials 0.000 claims description 5
- 239000008397 galvanized steel Substances 0.000 claims description 5
- 238000009412 basement excavation Methods 0.000 claims description 4
- 239000002131 composite material Substances 0.000 claims description 4
- 239000011150 reinforced concrete Substances 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000003795 chemical substances by application Substances 0.000 claims description 3
- 238000004140 cleaning Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 229920005597 polymer membrane Polymers 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 239000013589 supplement Substances 0.000 claims description 3
- 230000005641 tunneling Effects 0.000 claims description 3
- 150000001875 compounds Chemical class 0.000 claims description 2
- 229920002521 macromolecule Polymers 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 5
- 238000013461 design Methods 0.000 description 3
- 239000002002 slurry Substances 0.000 description 3
- 230000002708 enhancing effect Effects 0.000 description 2
- 239000004927 clay Substances 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
A kind of tunnel waterproofing construction construction method, includes the following steps:The outer curtain-grouting of S1, Tunnel;S2, Tunnel;S3, Tunnel Second Lining;S4, tunnel waterproofing layer;The lining cutting three times of S5, tunnel;The present invention has many advantages, such as that construction cost is low, the period is short, security risk is low, good water-proof effect, can promote the use of tunnel water proofing construction field.
Description
Technical field
The invention belongs to technical field of tunnel construction, and in particular to arrive a kind of tunnel waterproofing construction construction method.
Background technology
In city underground engineering construction, the design of shallow buried covered excavation waterproof construction uses full packet waterproof construction substantially at present, i.e.,
Waterproof layer is set along tunnel support lining cutting tunneling boring, does not consider tunnel internal drainage.Since level of ground water is generally shallower, construction period
Using dewatering measure, structural percolating water is in confused situation aobvious, terminates after constructing tunnel, after dewatering well closing, full packet waterproof construction oozes
Water leakage situation is more universal, and especially in water rich strata, such case becomes apparent.It is generally being tied after encountering percolating water situation
Structure is administered before testing friendship using slip casting close measure, and overall construction processing is of high cost, and the period is long, and effect is ideal not to the utmost sometimes,
Later stage security risk is big.
Invention content
Technical problem to be solved by the present invention lies in above-mentioned the deficiencies in the prior art are overcome, a kind of construction cost is provided
Tunnel waterproofing construction construction method low, the period is short, security risk is low.
Above-mentioned technical problem is solved the technical solution adopted is that including the following steps:The outer curtain note of S1, Tunnel
Slurry;S2, Tunnel;S3, Tunnel Second Lining;S4, tunnel waterproofing layer;The lining cutting three times of S5, tunnel.
The outer curtain-grouting of the Tunnel of the present invention is included in before tunnel excavation carries out advanced curtain to tunnel tunnel face
Curtain slip casting forms 3~5m ejection for water plugging fixing collars behind in Tunnel.
The Tunnel of the present invention includes loopful setting steel arch-shelf, is laid with bar-mat reinforcement, it is early that C25 is sprayed in tunneling boring supporting
Reinforced concrete adds micro-expanding agent in the concrete.
The Tunnel Second Lining of the present invention is included in mixed using impervious reinforcing bar after the completion of supplement slip casting outside Tunnel
Solidifying clay model building lining construction.
After the tunnel waterproofing layer of the present invention is included in completion Tunnel Second Lining and form removal, repairing leveling Tunnel Second Lining
Concrete surface, installs waterproof layer after smooth, cleaning, the waterproof layer is to overlay waterproof roll.
The present invention's overlays waterproof roll using asphaltic base polyester blank or resinae homogeneous polymer membranes or resin
Class composite high-molecular waterproof roll;The asphaltic base polyester blank overlays waterproof roll thickness and is at least 4mm, and resinae homogeneous is high
Molecule waterproof sheet or resinae composite high-molecular waterproof sheet overlay waterproof roll thickness and are at least 1.5mm.
The tunnel of the present invention is constructed after the completion of lining cutting is included in waterproof layer using reinforced concrete lining layer three times, seepage-resistant grade
For P10.
The present invention tunnel three times lining cutting when in arch along tunnel radial direction built-in slip casting pipe, the built-in slip casting pipe stretches into
Lining cutting three times, the longitudinal pitch between adjacent built-in slip casting pipe are 2~3m.
The present invention tunnel three times lining cutting when circular construction joint in rubber fastening band is installed, the rubber fastening band is
Middle rubber fastening band with grouting tube is equipped with 5mm thickness galvanized steel plain sheet waterstops in longitudinal construction joint.
The present invention has the following advantages compared with the prior art:
1, compared to existing two layers of waterproofing design, the outer curtain-grouting of Tunnel of the present invention forms ejection for water plugging and adds
Gu Quan, grouting reinforced region are first of waterproof construction in tunnel and main waterproof construction, make tunnel structure not easy to leak, are prevented
Water effect is more preferable.
2, waterproof layer is installed after the completion of two lining concreting, reduces later stage structural leakage water process and safeguards risk.
3, longitudinal construction joint is formed between inverted arch and arch wall, and 5mm thickness galvanized steel plain sheet waterstops are installed in longitudinal construction joint
1, enhancing structure waterproof effect.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present invention.
In figure:1, galvanized steel plain sheet waterstop;2, rubber fastening band;3, built-in slip casting pipe;4, Tunnel;5, slip casting
Water sealing consolidation circle;6, waterproof roll is overlay;7, tunnel lining cutting three times;8, Tunnel Second Lining.
Specific implementation mode
The present invention is described in further details with reference to the accompanying drawings and examples, but the present invention is not restricted to these implement
Example.
Embodiment 1
In Fig. 1, a kind of tunnel waterproofing construction construction method of the present invention, includes the following steps:
The outer curtain-grouting of S1, Tunnel;The outer curtain-grouting of the Tunnel is included in tunnel excavation
Before, advanced curtain-grouting is carried out to tunnel tunnel face, forms 3~5m ejections for water plugging fixing collar 5 outside Tunnel 4,
Single slurry or dual slurry, injected hole longitudinal direction 0.5m × 0.5m, circumferential direction 1m × 1m, Grouting Pipe can be used according to water flow size cases
Using punching mini-valve tube, the tunnel fixing collar 5 is first of waterproof construction in tunnel, and main waterproof knot
Structure.
S2, Tunnel;The Tunnel includes loopful setting steel arch-shelf, is laid with bar-mat reinforcement, Quan Duan
C25 early strength concretes are sprayed in face supporting, and micro-expanding agent is added in the concrete.
S3, Tunnel Second Lining;The Tunnel Second Lining 8 is included in outside Tunnel after the completion of supplement slip casting
Using impervious armored concrete moulded lining construct, be allowed to 4 common stress of Tunnel, and together become tunnel master
Stress support construction is wanted, while providing one for waterproof layer and being preferably laid with basal plane.
S4, tunnel waterproofing layer;After the tunnel waterproofing layer is included in completion Tunnel Second Lining 8 and form removal, repairing is whole
8 concrete surface of flat Tunnel Second Lining installs waterproof layer after smooth, cleaning, the waterproof layer is to overlay waterproof roll 6,
Described overlays waterproof roll 6 using asphaltic base polyester blank or resinae homogeneous polymer membranes or the compound high score of resinae
Sub- waterproof roll;The asphaltic base polyester blank overlays waterproof roll thickness and is at least 4mm, resinae homogeneous macromolecule flashing
Material or resinae composite high-molecular waterproof sheet overlay waterproof roll thickness and are at least 1.5mm.
The lining cutting three times of S5, tunnel;The tunnel uses reinforced concrete lining after the completion of lining cutting 7 is included in waterproof layer three times
Construction is built, seepage-resistant grade P10, in arch along tunnel radial direction built-in slip casting pipe 3, the built-in slip casting pipe 3 stretches into be served as a contrast three times
Build, the longitudinal pitch between adjacent built-in slip casting pipe 3 is 2~3m, tunnel three times lining cutting when circular construction joint in rubber is installed
Waterstop 2, the rubber fastening band 2 be the middle rubber fastening band with grouting tube, tunnel three times lining cutting when first perform
Inverted arch, then arch wall of constructing form longitudinal construction joint, 5mm thickness galvanized steel plain sheets are equipped in longitudinal construction joint between inverted arch and arch wall
Waterstop 1 carries out preformed hole slip casting, filling after waterproof lining concrete strength three times pours completion and reaches design strength
Hogback gap is closely knit, enhancing structure waterproof effect.
Claims (9)
1. a kind of tunnel waterproofing construction construction method, it is characterised in that include the following steps:
The outer curtain-grouting of S1, Tunnel;
S2, Tunnel;
S3, Tunnel Second Lining;
S4, tunnel waterproofing layer;
The lining cutting three times of S5, tunnel.
2. a kind of tunnel waterproofing construction construction method according to claim 1, it is characterised in that:The tunnel initial-stage branch
The outer curtain-grouting of shield is included in before tunnel excavation carries out advanced curtain-grouting to tunnel tunnel face, in Tunnel behind shape
At 3~5m ejection for water plugging fixing collars.
3. a kind of tunnel waterproofing construction construction method according to claim 1, it is characterised in that:The tunnel initial-stage branch
Shield includes loopful setting steel arch-shelf, is laid with bar-mat reinforcement, and tunneling boring supporting is sprayed C25 early strength concretes, mixed in the concrete
Add micro-expanding agent.
4. a kind of tunnel waterproofing construction construction method according to claim 1, it is characterised in that:The secondary lining in the tunnel
Block, which is included in outside Tunnel, supplements slip casting after the completion using the construction of impervious armored concrete moulded lining.
5. a kind of tunnel waterproofing construction construction method according to claim 1, it is characterised in that:The tunnel waterproofing layer
It is included in after completing Tunnel Second Lining and form removal, repairing leveling Tunnel Second Lining concrete surface is installed after smooth, cleaning
Waterproof layer, the waterproof layer are to overlay waterproof roll.
6. a kind of tunnel waterproofing construction construction method according to claim 5, it is characterised in that:Described overlays waterproof volume
Material is using asphaltic base polyester blank or resinae homogeneous polymer membranes or resinae composite high-molecular waterproof roll;Described
Asphaltic base polyester blank overlays waterproof roll thickness and is at least 4mm, resinae homogeneous macromolecule water-proof sheet material or the compound height of resinae
Molecule waterproof sheet overlays waterproof roll thickness and is at least 1.5mm.
7. a kind of tunnel waterproofing construction construction method according to claim 1, it is characterised in that:The tunnel serves as a contrast three times
Block is constructed after the completion of being included in waterproof layer using reinforced concrete lining layer, seepage-resistant grade P10.
8. a kind of tunnel waterproofing construction construction method according to claim 7, it is characterised in that:The tunnel serves as a contrast three times
In arch along tunnel radial direction built-in slip casting pipe when block, the built-in slip casting pipe stretches into lining cutting three times, adjacent built-in slip casting pipe it
Between longitudinal pitch be 2~3m.
9. a kind of tunnel waterproofing construction construction method according to claim 7, it is characterised in that:The tunnel serves as a contrast three times
Rubber fastening band is installed, the rubber fastening band is the middle rubber water-proof with grouting tube when block in circular construction joint
Band is equipped with 5mm thickness galvanized steel plain sheet waterstops in longitudinal construction joint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810093464.XA CN108361049A (en) | 2018-01-31 | 2018-01-31 | A kind of tunnel waterproofing construction construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810093464.XA CN108361049A (en) | 2018-01-31 | 2018-01-31 | A kind of tunnel waterproofing construction construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108361049A true CN108361049A (en) | 2018-08-03 |
Family
ID=63007351
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810093464.XA Pending CN108361049A (en) | 2018-01-31 | 2018-01-31 | A kind of tunnel waterproofing construction construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108361049A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110206563A (en) * | 2019-06-25 | 2019-09-06 | 深圳市综合交通设计研究院有限公司 | A kind of full packet waterproof composite lining structure resistant to pressure and its construction method |
CN111236983A (en) * | 2018-11-29 | 2020-06-05 | 中国石油天然气集团有限公司 | Tunnel primary support method |
CN111396077A (en) * | 2020-03-10 | 2020-07-10 | 北京市政建设集团有限责任公司 | Tunnel air duct secondary lining construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202645584U (en) * | 2012-06-15 | 2013-01-02 | 中铁第四勘察设计院集团有限公司 | Combined type tunnel lining structure |
CN204098937U (en) * | 2014-06-20 | 2015-01-14 | 山西省交通科学研究院 | Tunnel deformation joint waterproof construction and constructing tunnel structure |
CN205154193U (en) * | 2015-11-26 | 2016-04-13 | 山东科技大学 | Novel tunnel water -proof structure |
CN205936642U (en) * | 2016-07-20 | 2017-02-08 | 中铁二院工程集团有限责任公司 | Big novel multilayer lining cutting of section tunnel structure |
CN106437760A (en) * | 2016-07-20 | 2017-02-22 | 中铁二院工程集团有限责任公司 | Large-section tunnel novel multi-layer lining structure |
-
2018
- 2018-01-31 CN CN201810093464.XA patent/CN108361049A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202645584U (en) * | 2012-06-15 | 2013-01-02 | 中铁第四勘察设计院集团有限公司 | Combined type tunnel lining structure |
CN204098937U (en) * | 2014-06-20 | 2015-01-14 | 山西省交通科学研究院 | Tunnel deformation joint waterproof construction and constructing tunnel structure |
CN205154193U (en) * | 2015-11-26 | 2016-04-13 | 山东科技大学 | Novel tunnel water -proof structure |
CN205936642U (en) * | 2016-07-20 | 2017-02-08 | 中铁二院工程集团有限责任公司 | Big novel multilayer lining cutting of section tunnel structure |
CN106437760A (en) * | 2016-07-20 | 2017-02-22 | 中铁二院工程集团有限责任公司 | Large-section tunnel novel multi-layer lining structure |
Non-Patent Citations (1)
Title |
---|
曹诗定: "防水型隧道主要技术措施和造价分析", 《中国市政工程》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111236983A (en) * | 2018-11-29 | 2020-06-05 | 中国石油天然气集团有限公司 | Tunnel primary support method |
CN111236983B (en) * | 2018-11-29 | 2021-12-17 | 中国石油天然气集团有限公司 | Tunnel primary support method |
CN110206563A (en) * | 2019-06-25 | 2019-09-06 | 深圳市综合交通设计研究院有限公司 | A kind of full packet waterproof composite lining structure resistant to pressure and its construction method |
CN111396077A (en) * | 2020-03-10 | 2020-07-10 | 北京市政建设集团有限责任公司 | Tunnel air duct secondary lining construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105019919B (en) | Tunnel and its construction method for transmitting fluid | |
CN204476470U (en) | A kind of waterproof and water drainage system of applicable tunnel project seam | |
CN206916753U (en) | A kind of water sealing structure of diaphram wall and its seam crossing | |
CN207700220U (en) | A kind of waterproof construction of pipe gallery outer wall | |
CN108361049A (en) | A kind of tunnel waterproofing construction construction method | |
CN103256052A (en) | Construction method for integral straight middle wall type double-arch tunnel | |
CN203161259U (en) | Buried-in type rubber water-stop belt of double-layer waterproof structure and construction-joint water drainage structure formed by buried-in type rubber water-stop belt | |
CN107916945A (en) | Using the waterproof spray-up structure and its construction method of impervious gunite concrete | |
CN109440951A (en) | New-old concrete works intersection stitches waterproof construction and construction technology | |
CN109208651A (en) | Underground engineering super-long structural body deformation joint waterproof/drainage structure construction method and structure | |
CN106869169A (en) | Three-dimensional interval construction method for underground comprehensive pipe gallery cabin body | |
CN104652495B (en) | Internal support of foundation pit column and base plate node waterproof construction technology | |
CN209277907U (en) | A kind of compatibility of deformation of tunnel expansion joint and discharge structure | |
CN104846935B (en) | Head-tank treating seepage remodeling method | |
CN208040386U (en) | A kind of ground fissure region tunnel lining structure based on shield tunnel | |
CN112012763B (en) | Construction method of double-layer primary support multi-arch tunnel structure | |
CN204059380U (en) | Deep-well precipitation well head well-sealing device in underground garage foundation ditch | |
CN209397743U (en) | New-old concrete works intersection stitches waterproof construction | |
CN105113513A (en) | Anti-seepage foundation pit supporting structure and construction method | |
CN111472813A (en) | Super-large-span anchor-shotcrete support rock tunnel water-proof and drainage system and construction method | |
CN112012761A (en) | Construction method of anti-disturbance double-arch tunnel structure | |
CN111594184A (en) | Main hole excavating method for hole bias tunnel | |
CN203834477U (en) | Waterproof structure of anti-floating anchor bars of basement | |
CN206655716U (en) | A kind of tunnel drainage structure | |
CN105780818B (en) | A kind of the composite water-proof structure and construction method of sidewall of basement aseismatic joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180803 |
|
RJ01 | Rejection of invention patent application after publication |