CN107268638A - Water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction and its construction method - Google Patents

Water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction and its construction method Download PDF

Info

Publication number
CN107268638A
CN107268638A CN201710686787.5A CN201710686787A CN107268638A CN 107268638 A CN107268638 A CN 107268638A CN 201710686787 A CN201710686787 A CN 201710686787A CN 107268638 A CN107268638 A CN 107268638A
Authority
CN
China
Prior art keywords
waterproof
side wall
foundation pit
construction
waterproof roll
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710686787.5A
Other languages
Chinese (zh)
Inventor
吴波
赵勇博
吴冬
李静
黄惟
王汪洋
卢福聪
刘宁
刘宗辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi University
Original Assignee
Guangxi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi University filed Critical Guangxi University
Priority to CN201710686787.5A priority Critical patent/CN107268638A/en
Publication of CN107268638A publication Critical patent/CN107268638A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明公开了一种富水地层地铁车站深基坑侧墙防水结构,从外至内依次包括围护结构层、回填土层、防水卷材层和主体结构侧墙层。本发明还公开了一种富水地层地铁车站深基坑侧墙防水结构的施工方法,首先,基坑设计轮廓线向外侧平移,其次施工准备,再次开始施作围护结构,开挖基坑,然后浇筑主体结构,最后进行侧墙防水施工。本发明中的富水地层地铁车站深基坑侧墙防水结构及其施工方法适用于各种地质条件下的基坑防水施工,在富水地层地质条件下的地铁车站深基坑防水效果尤为明显,避免了在施作主体结构时绑扎钢筋、浇筑混凝土对已铺设好的防水卷材造成的伤害,本发明施工难度低,减少了人员、机械以及施工方法调整的繁琐性,降低了施工成本。

The invention discloses a waterproof structure for a side wall of a deep foundation pit of a subway station in a water-rich stratum. The invention also discloses a construction method for the waterproof structure of the side wall of the deep foundation pit of the subway station in the water-rich stratum. First, the design outline of the foundation pit is translated to the outside; , and then the main structure is poured, and finally the side wall is waterproofed. The waterproof structure of the side wall of the deep foundation pit of the subway station in the water-rich stratum and the construction method thereof in the present invention are applicable to the waterproof construction of the foundation pit under various geological conditions, and the waterproof effect of the deep foundation pit of the subway station under the geological conditions of the water-rich stratum is particularly obvious , avoiding the damage caused by binding steel bars and pouring concrete to the laid waterproof membrane when constructing the main structure, the invention has low construction difficulty, reduces the cumbersome adjustment of personnel, machinery and construction methods, and reduces construction costs.

Description

富水地层地铁车站深基坑侧墙防水结构及其施工方法Waterproof structure and construction method of side wall of deep foundation pit of subway station in water-rich stratum

技术领域technical field

本发明涉及地下工程设计与施工技术领域,具体涉及一种富水地层地铁车站深基坑侧墙防水施工技术。The invention relates to the technical field of underground engineering design and construction, in particular to a waterproof construction technology for a side wall of a deep foundation pit of a subway station in a water-rich stratum.

背景技术Background technique

富水地层的地铁车站深基坑工程,往往地下水埋深较浅且水量较为丰富,基坑的防水体系一旦出现渗漏将严重影响基坑的稳定性和周边建筑的安全。现有地铁车站深基坑防水施工技术仍不十分成熟,在防水施工技术中还存在一些问题和不足。For deep foundation pit projects of subway stations in water-rich strata, the groundwater depth is often shallow and the water volume is relatively abundant. Once the waterproof system of the foundation pit leaks, it will seriously affect the stability of the foundation pit and the safety of surrounding buildings. The existing deep foundation pit waterproof construction technology of subway stations is still not very mature, and there are still some problems and deficiencies in the waterproof construction technology.

现有的地铁车站深基坑侧墙防水施工技术是在地下连续墙内侧首先施作20cm厚水泥砂浆找平层,然后在找平层上铺设防水卷材,最后施作主体结构。但在施工缝和诱导缝的施工技术上,止水卷材往往与混凝土接触不密实,导致气泡或缝隙的形成;在地下连续墙上铺设防水卷材时,由于地连墙鼓包或凹陷处理不当导致防水卷材与混凝土接触不密实,导致气泡的形成。The existing waterproof construction technology for the side wall of the deep foundation pit of the subway station is to first apply a 20cm thick cement mortar screed on the inner side of the underground diaphragm wall, then lay a waterproof membrane on the screed, and finally construct the main structure. However, in the construction technology of construction joints and induced joints, the waterproof membrane is often not in close contact with the concrete, resulting in the formation of air bubbles or gaps; As a result, the contact between the waterproof membrane and the concrete is not dense, resulting in the formation of air bubbles.

现有的基坑防水技术在铺设底板防水卷材后,可施作一定厚度的细石混凝土保护层来保护防水卷材,避免施作底板绑扎钢筋等操作时对防水卷材的损害,而基坑侧墙外侧无法施作保护层,也就是说现有的基坑侧墙防水施工技术不能避免施作主体结构时底板绑扎钢筋等操作对防水卷材的损害。The existing foundation pit waterproofing technology can be applied with a certain thickness of fine stone concrete protective layer to protect the waterproofing membrane after laying the baseboard waterproofing membrane, so as to avoid damage to the waterproofing membrane during operations such as binding the baseplate to steel bars. The protective layer cannot be applied on the outside of the side wall of the pit, that is to say, the existing waterproof construction technology of the side wall of the foundation pit cannot avoid the damage to the waterproof membrane due to operations such as tying steel bars to the bottom plate when constructing the main structure.

发明内容Contents of the invention

为解决以上技术问题,本发明提供一种富水地层地铁车站深基坑侧墙防水结构及其施工方法,有效保证了富水地层的地铁车站深基坑工程在安全、快速、低成本开挖的基础上可以达到有效的止水效果,降低了施工难度,节约了施工成本。In order to solve the above technical problems, the present invention provides a waterproof structure for the side wall of the deep foundation pit of the subway station in the water-rich stratum and its construction method, which effectively ensures the safe, fast and low-cost excavation of the deep foundation pit project of the subway station in the water-rich stratum. Effective water-stop effect can be achieved on the basis of the structure, which reduces the construction difficulty and saves the construction cost.

为实现上述目的,本发明提供了如下技术方案:To achieve the above object, the present invention provides the following technical solutions:

本发明提供一种富水地层地铁车站深基坑侧墙防水结构及其施工方法,从外至内依次包括围护结构层、回填土层、防水卷材层和主体结构侧墙层,所述防水卷材层铺设在所述主体结构侧墙层外侧上;The invention provides a water-rich stratum subway station deep foundation pit side wall waterproof structure and its construction method, which sequentially includes an enclosure structure layer, a backfill soil layer, a waterproof coiled material layer and a main structure side wall layer from outside to inside. The waterproof membrane layer is laid on the outer side of the main structure side wall layer;

所述防水卷材层的防水卷材为自粘性防水卷材;The waterproof membrane of the waterproof membrane layer is a self-adhesive waterproof membrane;

本发明还提供了一种富水地层地铁车站深基坑侧墙防水结构的施工方法,施工步骤如下:The present invention also provides a construction method for the waterproof structure of the side wall of the deep foundation pit of the subway station in the water-rich stratum, and the construction steps are as follows:

步骤一,基坑设计轮廓线向外侧平移,预留侧墙防水卷材施工槽;Step 1, the design outline of the foundation pit is translated to the outside, and the construction groove of the side wall waterproof membrane is reserved;

步骤二,施工准备;Step two, construction preparation;

步骤三,施作围护结构,开挖所述基坑;Step 3, building an enclosure structure, and excavating the foundation pit;

步骤四,浇筑主体结构;Step 4, pouring the main structure;

步骤五,待主体结构侧墙浇筑完成后,在所述侧墙防水卷材施工槽中,自基坑底层在所述主体结构侧墙外侧开始铺设防水卷材,待铺设完成后取土回填并夯实回填土,完成主体结构侧墙的防水施工。Step 5: After the pouring of the side wall of the main structure is completed, in the construction groove of the waterproof coiled material of the side wall, the waterproof coiled material is laid from the bottom layer of the foundation pit on the outer side of the side wall of the main structure, and soil is backfilled after the laying is completed. The backfill soil shall be compacted to complete the waterproof construction of the side walls of the main structure.

所述步骤一中的基坑设计轮廓线向外侧平移80cm~100cm。The design outline of the foundation pit in the first step is shifted outward by 80cm to 100cm.

所述步骤二中的施工准备包括编制详细的防水施工技术方案,进行详细的技术交底。The construction preparation in the second step includes compiling a detailed waterproof construction technical plan and making a detailed technical disclosure.

可选的,所述步骤三中的围护结构为地下连续墙,所述基坑开挖至坑底设计值后进行验槽。Optionally, the enclosure structure in step 3 is an underground continuous wall, and the foundation pit is excavated to the design value of the bottom of the pit to be inspected.

可选的,在进行所述步骤四浇筑主体结构之前进行基坑底板的防水施工,首先在所述基坑的底部施作150cm厚C20混凝土垫层,其次铺设防水卷材,然后施作50cm厚C20细石混凝土保护层,最后施作基坑底板。Optionally, carry out the waterproof construction of the bottom plate of the foundation pit before carrying out the step 4 pouring the main structure, first apply a 150cm thick C20 concrete cushion at the bottom of the foundation pit, secondly lay a waterproof membrane, and then apply a 50cm thick The C20 fine stone concrete protective layer is finally applied as the bottom plate of the foundation pit.

可选的,所述防水卷材为自粘性防水卷材,所述防水卷材铺设时相邻两幅所述防水卷材搭接宽度不小于10cm。Optionally, the waterproof roll is a self-adhesive waterproof roll, and when the waterproof roll is laid, the overlapping width of two adjacent waterproof rolls is not less than 10 cm.

可选的,所述主体结构为一层,在所述步骤五中的所述防水卷材铺设过程中,所述卷防水材直接铺设至基坑顶板,相邻两幅所述防水卷材的搭接宽度不小于10cm,然后取土回填并夯实所述回填土。Optionally, the main structure is one layer. During the laying of the waterproof coiled material in the step five, the coiled waterproof material is directly laid on the roof of the foundation pit, and the two adjacent waterproof coiled materials The overlapping width is not less than 10cm, and then soil is taken for backfilling and the backfilling soil is compacted.

可选的,所述主体结构为两层以上,在所述步骤五中的所述防水卷材铺设过程中,所述防水卷材铺设至所述基坑底层的上一层的底板以下至少10cm处时停止铺设,取土后在所述侧墙防水卷材施工槽中回填至已铺设的所述防水卷材上边缘以下至少10cm处,并夯实回填土,然后在所述主体结构侧墙外侧自已铺设的所述防水卷材上边缘以下至少10cm处继续铺设所述防水卷材,与已铺设的所述防水卷材搭接宽度不小于10cm,且相邻两幅所述防水卷材的搭接宽度也不小于10cm,重复所述步骤五中的所述防水卷材的铺设过程,直至铺设在所述主体结构侧墙上的所述防水卷材铺设至基坑顶板为止。Optionally, the main structure has more than two layers, and during the laying of the waterproof coiled material in the step 5, the waterproof coiled material is laid to at least 10 cm below the upper floor of the bottom layer of the foundation pit Stop laying at any time, take soil and backfill in the side wall waterproof membrane construction groove to at least 10cm below the upper edge of the laid waterproof membrane, and tamp the backfill soil, and then place it on the outside of the main structure side wall Continue to lay the waterproof membrane at least 10cm below the upper edge of the waterproof membrane that has been laid, and the overlapping width of the waterproof membrane that has been laid is not less than 10cm, and the overlapping of two adjacent waterproof membranes The joint width is not less than 10cm, and the laying process of the waterproof coiled material in the step five is repeated until the waterproof coiled material laid on the side wall of the main structure is laid to the roof of the foundation pit.

本发明相对于现有技术取得了以下技术效果:Compared with the prior art, the present invention has achieved the following technical effects:

本发明中的富水地层地铁车站深基坑侧墙防水结构及其施工方法适用于各种地质条件下的基坑防水施工,在富水地层地质条件下的地铁车站深基坑防水效果尤为明显;本发明中的基坑主体结构与维护结构之间预留80cm的距离,为人工铺设自粘性防水卷材提供了空间;本发明将自粘性反水卷材铺设在表面光滑的结构侧墙外侧,避免了防水卷材铺设在围护结构时,由于围护结构鼓包或凹陷处理不当导致防水卷材与混凝土接触不密实的技术问题,同时也避免了在施作主体结构,绑扎钢筋、浇筑混凝土时对已铺设好的防水卷材造成的伤害;本发明施工难度低,减少了人员、机械以及施工方法调整的繁琐性,降低了施工成本。The waterproof structure of the side wall of the deep foundation pit of the subway station in the water-rich stratum and the construction method thereof in the present invention are suitable for the waterproof construction of the foundation pit under various geological conditions, and the waterproof effect of the deep foundation pit of the subway station under the geological conditions of the water-rich stratum is particularly obvious A distance of 80cm is reserved between the main structure of the foundation pit and the maintenance structure in the present invention, which provides space for artificially laying the self-adhesive waterproof coiled material; the present invention lays the self-adhesive anti-water coiled material on the outside of the smooth structure side wall , to avoid the technical problems of the waterproof membrane and the concrete being not densely contacted due to improper handling of the enclosure structure when the waterproof membrane is laid on the enclosure structure, and also to avoid the construction of the main structure, binding steel bars, and pouring concrete The damage caused to the laid waterproof membrane; the construction difficulty of the present invention is low, which reduces the cumbersome adjustment of personnel, machinery and construction methods, and reduces the construction cost.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings required in the embodiments. Obviously, the accompanying drawings in the following description are only some of the present invention. Embodiments, for those of ordinary skill in the art, other drawings can also be obtained according to these drawings without paying creative labor.

图1为本发明基坑侧墙防水施工示意图;Fig. 1 is a schematic diagram of foundation pit side wall waterproof construction of the present invention;

图2为本发明富水地层基坑防水施工技术流程图。Fig. 2 is a flow chart of the waterproofing construction technology for foundation pits in water-rich strata according to the present invention.

附图标记说明:1、主体结构侧墙;2、自粘性防水卷材;3、侧墙防水卷材施工槽;4、围护结构;5、基坑底板;6、50cm厚C20细石混凝土保护层;7、150cm后C20混凝土垫层;8、地下二层底板;9、地下一层底板;10、基坑顶板;11、地下二层底板以下10cm处;12、地下一层底板以下10cm处;13、回填土。Explanation of reference signs: 1. Main structure side wall; 2. Self-adhesive waterproof membrane; 3. Construction groove of side wall waterproof membrane; 4. Enclosure structure; 5. Foundation pit floor; 6. 50cm thick C20 fine stone concrete Protective layer; 7. C20 concrete cushion after 150cm; 8. Floor 2 underground; 9. Floor 1 underground; 10. Foundation pit roof; 11. 10cm below the floor 2 underground; 13. Backfilling.

具体实施方式detailed description

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合附图和具体实施方式对本发明作进一步详细的说明。In order to make the above objects, features and advantages of the present invention more comprehensible, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

本发明提供一种富水地层地铁车站深基坑侧墙防水结构,包括四层结构,如图1所示,从外至内依次为围护结构4、回填土13、自粘性防水卷材2和主体结构侧墙1,防水卷材2铺设于主体结构侧墙1上。The present invention provides a waterproof structure for the side wall of a deep foundation pit of a subway station in a water-rich stratum, including a four-layer structure, as shown in Figure 1, which is an enclosure structure 4, backfill soil 13, and self-adhesive waterproof coiled material 2 in sequence from outside to inside. and the side wall 1 of the main structure, and the waterproof membrane 2 is laid on the side wall 1 of the main structure.

本发明还提供一种富水地层地铁车站深基坑侧墙防水结构的施工方法,如图1-2所示,施工步骤如下:The present invention also provides a construction method for the waterproof structure of the side wall of the deep foundation pit of a subway station in a water-rich stratum, as shown in Figure 1-2, and the construction steps are as follows:

步骤一,基坑设计轮廓线向外侧平移,优选的,平移距离为80~100cm,在基坑主体结构与围护结构4之间预留出80~100cm的距离,为人工铺设自粘性防水卷材提供侧墙防水卷材施工槽3;Step 1, the design outline of the foundation pit is translated to the outside. Preferably, the translation distance is 80-100 cm, and a distance of 80-100 cm is reserved between the main structure of the foundation pit and the enclosure structure 4, which is used for laying self-adhesive waterproof rolls manually. Provide side wall waterproof membrane construction groove 3;

步骤二,施工准备,包括但不限于编制详细的防水施工技术方案,进行详细的技术交底等;Step 2, construction preparations, including but not limited to the preparation of detailed waterproof construction technical plans, detailed technical disclosure, etc.;

步骤三,施作围护结构4,本实施例中的围护结构4为地下连续墙,开挖所述基坑至坑底设计值后进行验槽;Step 3, building the enclosure structure 4, the enclosure structure 4 in the present embodiment is an underground diaphragm wall, and the excavation of the foundation pit to the design value at the bottom of the pit is carried out to check the trench;

步骤四,对基坑底板5进行防水施工,首先在所述基坑的底部施作150cm厚C20混凝土垫层7,其次铺设自粘性防水卷材2,相邻两幅自粘性防水卷材2间的搭接宽度不应小于10cm,以利于自粘性防水卷材2之间的无缝隙搭接,然后施作50cm厚C20细石混凝土保护层6,最后施作基坑底板5。Step 4: Carry out waterproofing construction on the foundation pit bottom plate 5. Firstly, a 150cm thick C20 concrete cushion 7 is applied at the bottom of the foundation pit, and then a self-adhesive waterproof coiled material 2 is laid, and two adjacent self-adhesive waterproof coiled materials 2 are laid. The overlapping width of the joint should not be less than 10cm, so as to facilitate the seamless overlapping between the self-adhesive waterproof membranes 2, and then apply a 50cm thick C20 fine stone concrete protective layer 6, and finally apply the foundation pit floor 5.

步骤五,浇筑主体结构;Step five, pouring the main structure;

步骤六,主体结构侧墙1的防水施工;待主体结构侧墙1浇筑完成后,在侧墙防水卷材施工槽3中,自基坑底层在主体结构侧墙1外侧开始铺设自粘性防水卷材2,相邻两幅自粘性防水卷材2间的搭接宽度不应小于10cm,以利于自粘性防水卷材2之间的无缝隙搭接。Step 6: Waterproof construction of the side wall 1 of the main structure; after the pouring of the side wall 1 of the main structure is completed, a self-adhesive waterproof roll is laid on the outside of the side wall 1 of the main structure from the bottom layer of the foundation pit in the side wall waterproof coil construction groove 3 Material 2, the overlapping width between two adjacent self-adhesive waterproof membranes 2 should not be less than 10cm, so as to facilitate the seamless overlap between the self-adhesive waterproof membranes 2.

于本实施例中,如图1所示,所述主体结构为三层,在所述步骤六中的自粘性防水卷材2的铺设过程中,自粘性防水卷材2铺设至地下二层底板8以下10cm处11时停止铺设,取土后在侧墙防水卷材施工槽3中回填,回填至已铺设的自粘性防水卷材2上边缘以下至少10cm处,并夯实回填土13;然后在主体结构侧墙1的外侧,自已铺设的自粘性防水卷材2的上边缘以下至少10cm处继续铺设自粘性防水卷材2,与已铺设的自粘性防水卷材2的搭接宽度不小于10cm,且相邻两幅自粘性防水卷材2的搭接宽度也不小于10cm,自粘性防水卷材2铺设至地下一层底板9以下10cm处12时停止铺设,取土后在侧墙防水卷材施工槽3中回填,回填至已铺设的防水卷材2上边缘以下至少10cm处,并夯实回填土13;然后在主体结构侧墙1的外侧,自已铺设的自粘性防水卷材2的上边缘以下至少10cm处继续铺设自粘性防水卷材2,与已铺设的自粘性防水卷材2的搭接宽度不小于10cm,且相邻两幅自粘性防水卷材2的搭接宽度也不小于10cm,自粘性防水卷材2铺设至基坑顶板10时停止铺设,取土后在侧墙防水卷材施工槽3中回填,回填至基坑顶板10,并夯实回填土13,完成主体结构侧墙的防水施工。In this embodiment, as shown in Figure 1, the main structure is three layers, and during the laying process of the self-adhesive waterproof roll material 2 in the step six, the self-adhesive waterproof roll material 2 is laid to the bottom floor of the second floor underground Stop laying at 11 o'clock at 10cm below 8, backfill in the side wall waterproof membrane construction groove 3 after taking soil, backfill to at least 10cm below the upper edge of the self-adhesive waterproof membrane 2 that has been laid, and compact the backfill 13; On the outside of the side wall 1 of the main structure, continue to lay the self-adhesive waterproof membrane 2 at least 10cm below the upper edge of the self-laid self-adhesive waterproof membrane 2, and the lap width of the laid self-adhesive waterproof membrane 2 is not less than 10cm , and the overlapping width of two adjacent self-adhesive waterproof rolls 2 is not less than 10cm, and the self-adhesive waterproof rolls 2 are laid to 10cm below the floor 9 of the ground floor. Backfill in the material construction groove 3, backfill to at least 10cm below the upper edge of the laid waterproof membrane 2, and compact the backfill 13; Continue laying the self-adhesive waterproof membrane 2 at least 10cm below the edge, and the lap width of the laid self-adhesive waterproof membrane 2 is not less than 10cm, and the overlap width of two adjacent self-adhesive waterproof membranes 2 is not less than 10cm, the self-adhesive waterproof membrane 2 is laid to the foundation pit roof 10, and the laying is stopped. After the soil is taken, it is backfilled in the side wall waterproof membrane construction groove 3, backfilled to the foundation pit roof 10, and the backfill soil 13 is compacted to complete the side wall of the main structure. Waterproof construction of walls.

需要说明的是,本发明中的防水卷材并不局限于本发明实施例中的自粘性防水卷材,只要能实现侧墙防水的防水卷材均可。本实施例中的基坑设计轮廓线向外侧平移距离只是本发明的优选方案,该距离值只要设置为能够实现为人工铺设自粘性防水卷材提供空间即可。本实施例富水地层地铁车站深基坑侧墙防水结构的施工方法中,虽然包括步骤四对基坑底板的防水施工,但并不代表必须进行该步骤,步骤三之后直接进行步骤五和步骤六也能够完成侧墙防水结构的施工。本发明中的地铁车站深基坑侧墙防水结构的施工方法并不限于实施例中主体结构为三层的情况,主体结构为一层或两层以上时均可以应用本发明中地铁车站深基坑侧墙防水结构的施工方法:如当主体结构为一层时,在自粘性防水卷材2的铺设过程中,自粘性卷防水材2直接铺设至基坑顶板10,相邻两幅自粘性防水卷材2的搭接宽度不小于10cm,然后取土回填并夯实回填土13;当主体结构为两层以上时,在自粘性防水卷材2的铺设过程中,自粘性防水卷材2铺设至基坑底层的上一层的底板以下10cm处时停止铺设,取土后在侧墙防水卷材施工槽3中回填至已铺设的自粘性防水卷材2上边缘以下至少10cm处,并夯实回填土13,然后在主体结构侧墙1外侧自已铺设的自粘性防水卷材2的上边缘以下至少10cm处继续铺设自粘性防水卷材2,与已铺设的自粘性防水卷材2的搭接宽度不小于10cm,且相邻两幅自粘性防水卷材2的搭接宽度也不小于10cm,重复上述自粘性防水卷材2的铺设过程,直至铺设在主体结构侧墙2上的自粘性防水卷材2铺设至基坑顶板10为止,然后取土回填至基坑顶板10并夯实回填土13,完成主体结构侧墙1的防水施工。It should be noted that the waterproof coiled material in the present invention is not limited to the self-adhesive waterproof coiled material in the embodiment of the present invention, as long as it can realize the waterproofing of the side wall. The outward translation distance of the design outline of the foundation pit in this embodiment is only a preferred solution of the present invention, as long as the distance value can be set to provide space for manual laying of the self-adhesive waterproof membrane. In the construction method of the waterproof structure of the deep foundation pit side wall of the subway station in the water-rich stratum of this embodiment, although step 4 is included in the waterproof construction of the bottom plate of the foundation pit, it does not mean that this step must be carried out. After step 3, step 5 and step Sixth, it is also possible to complete the construction of the side wall waterproof structure. The construction method of the waterproof structure of the side wall of the deep foundation pit of the subway station in the present invention is not limited to the case where the main structure is three layers in the embodiment, and the deep foundation of the subway station in the present invention can be applied when the main structure is one or more than two layers The construction method of the waterproof structure of the side wall of the pit: For example, when the main structure is one layer, during the laying process of the self-adhesive waterproof roll 2, the self-adhesive roll waterproof roll 2 is directly laid on the roof 10 of the foundation pit, and two adjacent self-adhesive rolls The lap width of the waterproof membrane 2 is not less than 10cm, and then the soil is backfilled and the backfill soil 13 is compacted; when the main structure is more than two layers, during the laying process of the self-adhesive waterproof membrane 2, the self-adhesive waterproof membrane 2 is laid Stop laying when it reaches 10cm below the upper floor of the bottom layer of the foundation pit, take soil and backfill in the side wall waterproof membrane construction groove 3 to at least 10cm below the upper edge of the laid self-adhesive waterproof membrane 2, and compact it Backfill soil 13, then continue to lay self-adhesive waterproof membrane 2 at least 10cm below the upper edge of the self-adhesive waterproof membrane 2 laid on the outside of the main structure side wall 1, and overlap with the laid self-adhesive waterproof membrane 2 The width is not less than 10cm, and the overlapping width of two adjacent self-adhesive waterproof membranes 2 is not less than 10cm. Repeat the laying process of the self-adhesive waterproof membrane 2 above until the self-adhesive waterproof membrane laid on the side wall 2 of the main structure The coiled material 2 is laid until the roof 10 of the foundation pit, and then soil is taken and backfilled to the roof 10 of the foundation pit and the backfill soil 13 is compacted to complete the waterproof construction of the side wall 1 of the main structure.

本说明书中应用了具体个例对本发明的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本发明的方法及其核心思想;同时,对于本领域的一般技术人员,依据本发明的思想,在具体实施方式及应用范围上均会有改变之处。综上所述,本说明书内容不应理解为对本发明的限制。In this description, specific examples are used to illustrate the principle and implementation of the present invention. The description of the above embodiments is only used to help understand the method and core idea of the present invention; meanwhile, for those of ordinary skill in the art, according to this The idea of the invention will have changes in the specific implementation and scope of application. In summary, the contents of this specification should not be construed as limiting the present invention.

Claims (10)

1. a kind of water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction, it is characterised in that include going along with sb. to guard him from outside to inside successively Structure sheaf, back fill course, waterproof roll layer and agent structure side wall layer, the waterproof roll layer are laid on the agent structure side On on the outside of wall layers.
2. water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction according to claim 1, it is characterised in that described anti- The waterproof roll of water coiled material layer is self-adhesive waterproof roll material.
3. a kind of construction method of water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction, it is characterised in that construction procedure is such as Under:
Step one, design of foundation pit contour line is translated laterally, reserves side wall waterproof coiled material construction groove;
Step 2, preparation of construction;
Step 3, applies building enclosure, excavates the foundation ditch;
Step 4, pours agent structure;
Step 5, after the completion for the treatment of that agent structure side wall is poured, in the side wall waterproof coiled material construction groove, from foundation ditch bottom in institute State and start laying water-proof coiled material on the outside of agent structure side wall, it is to be laid after the completion of fetch earth backfill and compacted backfill, complete main body The waterproof construction of structure side wall.
4. the construction method of water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction according to claim 3, its feature It is, the design of foundation pit contour line in the step one translates 80cm~100cm laterally.
5. the construction method of water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction according to claim 3, its feature It is, the preparation of construction in the step 2 includes working out detailed waterproof construction technology scheme, carries out detailed confide a technological secret.
6. the construction method of water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction according to claim 3, its feature It is, the building enclosure in the step 3 is diaphram wall, the excavation of foundation pit carries out check of foundation subsoil to after cheating bottom design load.
7. the construction method of the water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction according to claim 3, it is special Levy and be, carried out before the step 4 pours agent structure the waterproof construction of base plate of foundation pit, first in the foundation ditch Bottom apply 150cm thickness C20 concrete cushions, secondly laying water-proof coiled material, then apply 50cm thickness C20 pea gravel concretens protect Sheath, finally applies base plate of foundation pit.
8. the construction method of the water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction according to claim 3 or 7, it is special Levy and be, the waterproof roll is self-adhesive waterproof roll material, waterproof roll described in adjacent two width is taken during the waterproof roll laying Width is connect not less than 10cm.
9. the construction method of water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction according to claim 3, its feature It is, the agent structure is one layer, in the waterproof roll process of deployment in the step 5, and the volume waterproof material is straight Laying is connect to foundation ditch top plate, the lap width of waterproof roll described in adjacent two width is not less than 10cm, then fetch earth and backfill and tamp The backfill.
10. the construction method of water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction according to claim 3, its feature It is, the agent structure is more than two layers, in the waterproof roll process of deployment in the step 5, the waterproof volume Stop laying when material is laid to the bottom plate of the last layer of the foundation ditch bottom at least 10cm, in the side wall waterproof roll Fetch earth and be backfilled to below the waterproof roll top edge laid at least 10cm in construction groove, and tamp the backfill, Then controlled oneself on the outside of the agent structure side wall and continue to lay at least 10cm below the waterproof roll top edge of laying The waterproof roll, is not less than 10cm, and waterproof roll described in adjacent two width with the waterproof roll lap width laid Lap width nor less than 10cm, the process of deployment of the waterproof roll in repeating said steps five, until being laid on institute The waterproof roll stated on agent structure side wall is laid untill foundation ditch top plate.
CN201710686787.5A 2017-08-11 2017-08-11 Water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction and its construction method Pending CN107268638A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710686787.5A CN107268638A (en) 2017-08-11 2017-08-11 Water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710686787.5A CN107268638A (en) 2017-08-11 2017-08-11 Water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction and its construction method

Publications (1)

Publication Number Publication Date
CN107268638A true CN107268638A (en) 2017-10-20

Family

ID=60080230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710686787.5A Pending CN107268638A (en) 2017-08-11 2017-08-11 Water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction and its construction method

Country Status (1)

Country Link
CN (1) CN107268638A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978710A (en) * 2018-08-01 2018-12-11 上海隧道工程有限公司 From wall type subway station vibration insulation structure and its construction method
CN109056802A (en) * 2018-09-04 2018-12-21 中国十九冶集团有限公司 Waterproof construction process for side wall of comprehensive pipe rack
CN109403391A (en) * 2018-11-05 2019-03-01 中铁二十二局集团轨道工程有限公司 A kind of method of semi-underground Room station anti-floating under the conditions of rich water
CN111441793A (en) * 2020-03-23 2020-07-24 中交路桥建设有限公司 Construction method for subway station headwall in sandy gravel stratum
CN111827303A (en) * 2020-07-27 2020-10-27 山东建勘集团有限公司 Backfill-free foundation pit permanent support system and construction method thereof
CN113106994A (en) * 2021-03-24 2021-07-13 中铁一局集团有限公司 Wide waterproof plate laying method for cover-excavation top-down subway station

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535520A (en) * 2010-12-13 2012-07-04 五冶集团上海有限公司 Waterproof construction method of large-area civil air defense basement
KR20150054311A (en) * 2013-11-11 2015-05-20 장혁수 Waterproof layer protection pannel and construction method thereof
CN205062857U (en) * 2015-06-29 2016-03-02 广西金雨伞防水装饰有限公司 Side wall water proof structure
CN106436777A (en) * 2016-09-12 2017-02-22 中国建筑第五工程局有限公司 Subway station skin waterproof structure and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535520A (en) * 2010-12-13 2012-07-04 五冶集团上海有限公司 Waterproof construction method of large-area civil air defense basement
KR20150054311A (en) * 2013-11-11 2015-05-20 장혁수 Waterproof layer protection pannel and construction method thereof
CN205062857U (en) * 2015-06-29 2016-03-02 广西金雨伞防水装饰有限公司 Side wall water proof structure
CN106436777A (en) * 2016-09-12 2017-02-22 中国建筑第五工程局有限公司 Subway station skin waterproof structure and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王力健等: ""深圳宏欣豪园地下室防水工程施工"", 《新型建筑材料》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978710A (en) * 2018-08-01 2018-12-11 上海隧道工程有限公司 From wall type subway station vibration insulation structure and its construction method
CN109056802A (en) * 2018-09-04 2018-12-21 中国十九冶集团有限公司 Waterproof construction process for side wall of comprehensive pipe rack
CN109403391A (en) * 2018-11-05 2019-03-01 中铁二十二局集团轨道工程有限公司 A kind of method of semi-underground Room station anti-floating under the conditions of rich water
CN111441793A (en) * 2020-03-23 2020-07-24 中交路桥建设有限公司 Construction method for subway station headwall in sandy gravel stratum
CN111441793B (en) * 2020-03-23 2021-09-28 中交路桥建设有限公司 Construction method for subway station headwall in sandy gravel stratum
CN111827303A (en) * 2020-07-27 2020-10-27 山东建勘集团有限公司 Backfill-free foundation pit permanent support system and construction method thereof
CN113106994A (en) * 2021-03-24 2021-07-13 中铁一局集团有限公司 Wide waterproof plate laying method for cover-excavation top-down subway station

Similar Documents

Publication Publication Date Title
CN107268638A (en) Water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction and its construction method
CN111594181B (en) Construction method for communicating and connecting newly-added underground excavation channel and existing station hall layer
CN104099943B (en) Diaphram wall and discarded underground civil defense engineering intersection processing method
CN106907159B (en) Shallow-buried underground excavation subway station separated open type structure and construction method thereof
CN105464686B (en) Multi-layer underground space curtain posture excavating construction method and supporting construction under existing facility
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN110080242A (en) The construction method of basement pile wall interaction structural system
CN210013697U (en) Construction structure of near-penetrating building of underground excavation section of subway station entrance and exit
CN103981898B (en) A kind of inverse underground engineering construction method done of overall open cut node
CN104846829B (en) Shield-reserved penetration composite type foundation pit support wall and construction method thereof
CN107542115B (en) Underground engineering waterproof structure and construction method thereof
CN108252329A (en) The assembled pipe gallery and its construction method of building enclosure load
CN105756091B (en) A Construction Method of Subway Station Foundation Pit Controlling the Deformation of Adjacent Buildings
CN106400811B (en) Frame is inverse to make foldable assembled foundation pit structure construction method
CN112049115A (en) Anti-seepage treatment method for deep foundation pit excavation of water-rich silt stratum
CN111828056B (en) Shallow-buried underground excavation tunnel waterproof construction method
CN209636826U (en) Water-stop structure of foundation pit in water-rich sand and gravel stratum
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN107386298A (en) A kind of depth hole composite supporting construction and its construction method with water-proof function
CN107012871A (en) A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation ditch fabricated construction
CN213063578U (en) Newly-increased undercut passageway and existing station room layer intercommunication construction structures of plugging into
CN207228173U (en) A kind of underground project waterproof structure
CN205804419U (en) The tenon formula joint waterproofing structure of concrete waist rail embedded structure side wall
CN111560959A (en) Excavation and supporting method for shield starting well foundation pit adjacent to subway
CN110939150A (en) Emergency rescue method for rapidly constructing large-hydraulic-slope-drop-ratio thin-wall structure in confined water inrush accident state

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171020