CN207079638U - The waterproof construction of gravity dam retaining wall retaining design high-low bay sole plate - Google Patents
The waterproof construction of gravity dam retaining wall retaining design high-low bay sole plate Download PDFInfo
- Publication number
- CN207079638U CN207079638U CN201720972513.8U CN201720972513U CN207079638U CN 207079638 U CN207079638 U CN 207079638U CN 201720972513 U CN201720972513 U CN 201720972513U CN 207079638 U CN207079638 U CN 207079638U
- Authority
- CN
- China
- Prior art keywords
- low
- waterproof
- side wall
- sole plate
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 75
- 230000005484 gravity Effects 0.000 title claims abstract description 65
- 239000011248 coating agent Substances 0.000 claims abstract description 41
- 238000000576 coating method Methods 0.000 claims abstract description 41
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 33
- 239000010959 steel Substances 0.000 claims abstract description 33
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 28
- 238000007789 sealing Methods 0.000 claims abstract description 17
- 239000011378 shotcrete Substances 0.000 claims abstract description 16
- 239000004567 concrete Substances 0.000 claims description 32
- 239000002689 soil Substances 0.000 claims description 23
- 239000010410 layer Substances 0.000 claims description 19
- 239000000463 material Substances 0.000 claims description 14
- 239000011241 protective layer Substances 0.000 claims description 11
- 239000007924 injection Substances 0.000 claims description 3
- 238000002347 injection Methods 0.000 claims description 3
- 230000015271 coagulation Effects 0.000 claims 1
- 238000005345 coagulation Methods 0.000 claims 1
- 230000010485 coping Effects 0.000 claims 1
- 238000005325 percolation Methods 0.000 abstract description 6
- 230000000694 effects Effects 0.000 description 4
- 230000004888 barrier function Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 230000001680 brushing effect Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000005507 spraying Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001815 facial effect Effects 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 239000005871 repellent Substances 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model discloses a kind of waterproof construction of gravity dam retaining wall retaining design high-low bay sole plate, including height across waterproof construction, low across waterproof construction and gravity dam retaining wall side wall waterproof construction, wherein, it is high across waterproof coating, low once brush to form integrative-structure across waterproof coating and side wall waterproof coating, it is high across waterproof roll, low be structure as a whole across waterproof roll and side wall waterproof roll or mutually overlap, so as to effectively separate the percolation path of sole plate, basement leaking is efficiently solved the problems, such as;In addition, in gravity dam retaining wall side wall construction steel wire, shotcrete layer and side wall screed-coat, gravity dam retaining wall side wall is possessed certain water resistance, can effectively block the seepage of gravity dam retaining wall, and make arcuate side walls that there is smooth-going surface, facilitate subsequent construction;Moreover, the low construction joint between sole plate and high-low bay foundation beam is arranged to zigzag and sets steel plate for sealing water, percolation path at construction joint can be blocked.
Description
Technical field
It the utility model is related to a kind of waterproof construction of sole plate, more particularly to a kind of gravity dam retaining wall retaining design
The waterproof construction of high-low bay sole plate.
Background technology
As population constantly pours in city, limited city space requires that building is constantly expanded space to underground.On ground
In lower engineering, the structure of basement becomes increasingly complex variation.Some sole plates are due to different in the presence of high low using function
Difference, when this sole plate high-low bay uses gravity dam retaining wall building enclosure, brought to basement sole plate waterproof construction
Puzzlement.When the concreting of sole plate high-low bay it is generally low across with height across need to construct at twice, the waterproof constructed twice
Easily there is seepage in linking;Second, the vertical building enclosure that gravity dam retaining wall sheet forms as the circular arc of surface irregularity, waterproof
Coiled material is difficult to be brought into close contact therewith, once there is seepage that the easy seepage action of ground water path that formed is caused into basement leaking.
It can be seen that in the high-low bay sole plate waterproof construction that gravity dam retaining wall is gone along with sb. to guard him, how to it is low across with height across anti-
Water is connected, how in gravity dam retaining wall side wall to carry out waterproof construction, is ability to ensure sole plate waterproof quality
Field technique personnel need the technical barrier solved.
Utility model content
It is high that seepage flow road is easily formed between across low when being gone along with sb. to guard him for using in the prior art using gravity dam retaining wall
Footpath and the not easy working problem of gravity dam retaining wall arcuate side walls, the utility model provide a kind of gravity dam retaining wall and gone along with sb. to guard him
The waterproof construction of system high-low bay sole plate, including height is across waterproof construction, low across waterproof construction and gravity dam retaining wall side wall
Waterproof construction, wherein, it is high across waterproof coating, it is low once brush to form integrative-structure across waterproof coating and side wall waterproof coating, it is high
Across waterproof roll, it is low be structure as a whole across waterproof roll and side wall waterproof roll or mutually overlap, so as to effectively separate basis
The percolation path of bottom plate, efficiently solves the problems, such as basement leaking, in addition, gravity dam retaining wall arcuate side walls are through leveling,
Be advantageous to follow-up waterproof construction.
To solve above technical problem, the utility model includes following technical scheme:
A kind of waterproof construction of gravity dam retaining wall retaining design high-low bay sole plate, including:
Height across waterproof construction, including from bottom to top set gradually it is high across concrete cushion, it is high across waterproof coating, it is high across anti-
Water coiled material and height are across sole plate;It is described high high across on the soil body, the top of the gravity dam retaining wall to be arranged on across concrete cushion
Portion is concordant with across the soil body top of the height;
It is low across waterproof construction, including from bottom to top set gradually it is low across concrete cushion, it is low across waterproof coating, it is low across anti-
Water coiled material and low across sole plate;It is described it is low be arranged on across concrete cushion it is low across on the soil body;And
Gravity dam retaining wall side wall waterproof construction, including set gradually from inside to outside side wall screed-coat, side wall waterproof apply
Layer, side wall waterproof roll, and it is low across sole plate or high-low bay foundation beam;
Wherein, it is described it is high across waterproof coating, it is low be structure as a whole across waterproof coating and side wall waterproof coating, it is described high across anti-
Water coiled material, low it is structure as a whole across waterproof roll and side wall waterproof roll or mutually close overlap joint.
Preferably, the height is additionally provided with high across pea gravel concreten protection across waterproof roll and height between sole plate
Layer, it is described low described low to be provided with across waterproof roll and between sole plate low across pea gravel concreten protective layer.
Preferably, the gravity dam retaining wall side wall waterproof construction, in addition to steel wire and shotcrete layer, the steel
Silk screen is fixed in the side wall of the gravity dam retaining wall, and the shotcrete layer is injected on the steel wire, the side
Wall screed-coat is located at the gunite concrete layer surface.
Preferably, the high-low bay foundation beam and the low formation zigzag construction joint between sole plate.
Preferably, the high-low bay foundation beam and described low steel plate for sealing water, the sealing are provided between sole plate
Steel plate is laid perpendicular to the construction joint direction, and the steel plate for sealing water bottom embedment is described low across in sole plate, and top is embedded to
In the high-low bay foundation beam.
Preferably, the steel plate for sealing water embedment low depth across in sole plate is not less than 10cm.
The utility model is allowed to compared with prior art, have the following advantages that and accumulate due to using above technical scheme
Pole effect:
(1) it is high across waterproof coating, it is low once brush to form integrative-structure across waterproof coating and side wall waterproof coating, it is high across anti-
Water coiled material, it is low be structure as a whole across waterproof roll and side wall waterproof roll or mutually overlap, so as to effectively separated height across basis
It is bottom plate, low across sole plate and the percolation path of gravity dam retaining wall side wall, basement leaking is efficiently solved the problems, such as, in addition,
Gravity dam retaining wall arcuate side walls are advantageous to side wall waterproof coating and the fitting of side wall waterproof roll through leveling;
(2) in gravity dam retaining wall side wall construction steel wire, shotcrete layer and side wall screed-coat, gravity dam earth-retaining is made
Wall side wall possesses certain water resistance, can effectively block the seepage of gravity dam retaining wall;
(3) it is low between sole plate and high-low bay foundation beam, zigzag construction joint is set, and along vertical construction joints direction
Steel plate for sealing water, the percolation path that barrier passes through construction joint seepage are set.
Brief description of the drawings
Fig. 1 is the waterproof for the gravity dam retaining wall retaining design high-low bay sole plate that the embodiment of the utility model one provides
Structure structural representation;
Fig. 2 is the sectional view of A-A sections in Fig. 1;
Fig. 3 is the sectional view of B-B sections in Fig. 1;
Fig. 4 is the sectional view of C-C sections in Fig. 1.
Label is as follows in figure:
Gravity dam retaining wall 100;Steel wire 101;Shotcrete layer 102;Side wall screed-coat 110;Side wall waterproof coating
120;Side wall waterproof roll 130;
Height is across sole plate 200;Height is across the soil body 201;Height is across concrete cushion 210;Height is across waterproof coating 220;Height is across anti-
Water coiled material 230;High across pea gravel concreten protective layer 240;
It is low across sole plate 300;It is low across the soil body 301;It is low across concrete cushion 310;It is low across waterproof coating 320;It is low across anti-
Water coiled material 330;Low across pea gravel concreten protective layer 340;
High-low bay foundation beam 400;Construction joint 401;Steel plate for sealing water 410.
Embodiment
Below in conjunction with the drawings and specific embodiments to gravity dam retaining wall retaining design high-low bay provided by the utility model
The waterproof construction of sole plate is described in further detail.With reference to following explanation and claims, the advantages of the utility model
It will be become apparent from feature.It should be noted that accompanying drawing uses using very simplified form and non-accurately ratio, only to
Purpose that is convenient, lucidly aiding in illustrating the utility model embodiment.
Fig. 1 to Fig. 4 is referred to, wherein Fig. 1 is the gravity dam retaining wall retaining design high-low bay basis bottom in the present embodiment
The waterproof construction of plate, Fig. 2 to Fig. 4 are respectively A-A sections in Fig. 1, B-B sections, the sectional view of C-C sections.Below in conjunction with Fig. 1
Main points of the present utility model are described further to Fig. 4.
In the construction of underground structure, due to the difference using function, the formation difference of height between each functional areas, often need
Using the retaining design of the form of gravity dam retaining wall 100, by function distinguishing for it is high across with it is low across.In order that it is high across, it is low between
And gravity dam retaining wall side wall has good waterproof effect, the utility model provides a kind of gravity dam retaining wall and goes along with sb. to guard him height
The low waterproof construction across sole plate, waterproof construction include:It is high across waterproof construction, it is low across waterproof construction and gravity dam retaining wall
100 side wall waterproof constructions.
Wherein, it is high across waterproof construction include from bottom to top setting gradually it is high across concrete cushion 210, height across waterproof coating
220th, it is high to be arranged on height across the soil body 201 across concrete cushion 210 across sole plate 200, the height across waterproof roll 230 and height
On, the top of the gravity dam retaining wall 100 is concordant across the top of the soil body 201 with the height.
Wherein, it is low across waterproof construction include from bottom to top set gradually it is low across concrete cushion 310, it is low across waterproof coating
320th, it is low across waterproof roll 330 and low across sole plate 300, it is described it is low be arranged on across concrete cushion 310 it is low across the soil body 301
On.
Wherein, the side wall waterproof construction of gravity dam retaining wall 100, including set gradually from inside to outside side wall screed-coat 110,
Side wall waterproof coating 120, side wall waterproof roll 130, and it is low across concrete cushion 310 or high-low bay foundation beam 400.Need
It is bright, it is high to be located at height above the soil body 201 and above gravity dam retaining wall 100 across sole plate 200, it is low across sole plate
300 positioned at low across the soil body 301 above, and high-low bay foundation beam 400 across sole plate 300 above and is located at gravity dam gear positioned at low
Height is integral knot by the side of cob wall 100, high-low bay foundation beam 400 across sole plate 200 and low connected across sole plate 300
Structure.Therefore, outside the waterproof roll 130 of gravity dam retaining wall 100, by bottom to be low across sole plate 300, top portion is height
Across foundation beam 400.In addition, when gravity dam retaining wall 100 is higher, high-low bay foundation beam 400 or be high-low bay foot wall.
Wherein, it is described it is high across waterproof coating 220, it is low across waterproof coating 320 and side wall waterproof coating 120 to pour simultaneously,
The integrative-structure that one-time-concreting is formed, it is described it is high across waterproof roll 230, low be across waterproof roll 330 and side wall waterproof roll 130
Integrative-structure or mutually close overlap joint.
It is high across waterproof roll 230, side wall waterproof roll 130, low be chosen as modified-high polymer waterproof volume across waterproof roll 230
Material or synthetic polymeric waterproofing material, such as the waterproof roll such as PVC, EVA, PE, ECB.
In the present embodiment, make the elevation of top of gravity dam retaining wall 100 with high consistent across the excavation absolute altitude of the soil body 201, it is convenient
High pouring across concrete cushion 210, in height across concrete cushion 210, side wall screed-coat 110, low across on concrete cushion 310
Once brushing waterproof coating, make it is high across waterproof coating 220, low form integral knot across waterproof coating 320 and side wall waterproof coating 120
Structure, and it is high across waterproof roll 230, low be structure as a whole across waterproof roll 330 and side wall waterproof roll 130 or mutually closely take
Connect, then pour again it is low across sole plate 300, height across sole plate 200 and high-low bay foundation beam 400, there is preferable waterproof
Effect.
Preferred embodiment is, it is described it is high across waterproof roll 230 and height be additionally provided between sole plate 200 it is high across
Pea gravel concreten protective layer 240, it is described it is low across waterproof roll 330 and it is described it is low be provided between sole plate 300 it is low across thin
Stone concrete protective layer 340.Wherein, high across pea gravel concreten protective layer 240 and low across pea gravel concreten protective layer 340, in height
Across sole plate 200 and it is low across the reinforcing bar colligation and concreting of sole plate 300 when, waterproof roll can be protected, prevented
It is damaged.
Preferred embodiment is the side wall waterproof construction of gravity dam retaining wall 100, in addition to steel wire 101 and spray
Concrete layer 102 is penetrated, the steel wire 101 is fixed in the side wall of the gravity dam retaining wall 100, the shotcrete layer
102 are injected on the steel wire 101, and the side wall screed-coat 110 is located at the gunite concrete surface.In gravity dam earth-retaining
Steel wire 101 is fixed in the side wall of wall 100, and in the mesh of steel wire 101 and in the side wall depression of gravity dam retaining wall 100
Gunite concrete forms shotcrete layer 102, makes between shotcrete layer 102 and the arcuate side walls of gravity dam retaining wall 100
It is sticked together.Meanwhile the arcuate side walls of gravity dam retaining wall 100, in construction shotcrete layer 102 and side wall screed-coat
After 110, the surface of smooth-going is formed, is easy to subsequent construction.
Preferred embodiment is, the high-low bay foundation beam 400 and described low forms sawtooth between sole plate 300
Shape construction joint 401.It is low first to be poured across sole plate 300, low after sole plate 300 reaches design strength, then construct it is high across
Sole plate 200 and high-low bay foundation beam 400.Preferably bonded in order to which the concrete at construction surface that ensures to construct twice has
Property, construction joint 401 is designed as zigzag, while the percolation path of underground water is also increased, it can strengthen anti-at construction joint 401
Ooze effect.
Preferred embodiment is, as shown in figure 1, the high-low bay foundation beam 400 with it is described it is low across sole plate 300 it
Between be provided with steel plate for sealing water 410, the steel plate for sealing water 410 is laid perpendicular to the direction of construction joint 401, and the bottom of steel plate for sealing water 410 is buried
Enter described low across in sole plate 300, top is embedded in the high-low bay foundation beam 400.Construction joint 401 is the occurred frequently of infiltration
Ground, make steel plate for sealing water 410 parallel to gravity dam retaining wall 100 in the present embodiment and laid perpendicular to the direction of construction joint 401, can
Seeped water with effectively blocking by construction joint 401.
The construction of the waterproof construction of the retaining design high-low bay sole plate of gravity dam retaining wall 100 provided by the utility model
Method, comprise the following steps:
The first step, soil mass of foundation pit excavation is paramount to excavate absolute altitude across the soil body 201, in height across the soil body 201 and gravity dam retaining wall
100 top pour it is high across concrete cushion 210, it is high across concrete cushion 210 and gravity dam retaining wall 100 together as it is low across
The retaining design that the soil body 301 excavates, it is ensured that the low deep pit monitor when soil body 301 excavates is stable.
Second step, soil mass of foundation pit be excavated to it is low across the soil body 301 excavate absolute altitude, pour low across concrete cushion 310.
3rd step, the sidewall surfaces of gravity dam retaining wall 100 are flattened.First, in the side wall of gravity dam retaining wall 100
Upper progress steel wire 101 is constructed, and can be fixed with steel nail.Then, sprayed in the side wall of gravity dam retaining wall 100 using wet-spraying machine
Concrete, form shotcrete layer 102.Spraying operation using segmentation, burst, be layered and carry out successively, injection order from lower and
On, low-lying place is first substantially sprayed to flat, then sequence from low to uper part layering, reciprocal injection, concrete is injected gravity dam retaining wall 100
Gap, fill facial pocket, glue concrete and gravity dam retaining wall 100 and be linked togather.Afterwards, in shotcrete layer
102 surface is done one of cement mortar and plastered again, forms side wall screed-coat 110, and side wall screed-coat 110 has smooth-going surface, just
In subsequent construction.
4th step, carry out waterproof coating and waterproof coiled material construction.First, it is low across sole plate 300, height across sole plate
200 and the side wall of gravity dam retaining wall 100 on, while carry out the brushing construction of water-repellent paint, formed integral low across waterproof coating
320th, height is across waterproof coating 220 and side wall waterproof coating 120.Then, paving is low successively rolls up across waterproof roll 330, side wall waterproof
Material 130 and high across waterproof roll 230, make low from bottom to top to take in the side wall bottom of gravity dam retaining wall 100 across waterproof roll 330
Certain altitude is connect, lap segment one is formed with the side wall waterproof roll 130 of rear construction;It is high across the horizontal laying of waterproof roll 230 and by
It is above lower to lay to certain altitude in the side wall of gravity dam retaining wall 100, lap segment two is formed with side wall waterproof roll 130, so as to
It is high across waterproof coating 220, it is side wall waterproof coating 120, low across the completely paving of waterproof coating 320 and mutually close overlap joint, formed effectively anti-
Water layer.
5th step, pour high across pea gravel concreten protective layer 240 and low across pea gravel concreten protective layer 340.
6th step, carry out low across sole plate 300, the high reinforcing bar colligation across sole plate 200, high-low bay foundation beam 400
Operation, and high-low bay foundation beam 400 with the low construction joint 401 across sole plate 300 fix together with elongated steel plate for sealing water
410, then pour the low concrete across sole plate 300, and low at construction joint 401 is mixed across the top layer of sole plate 300
Solidifying soil is arranged to zigzag.In construction, it should ensure that steel plate for sealing water 410 is embedded to and low be not less than across depth in sole plate 300
10cm。
7th step, it is low after sole plate 300 reaches strength of mould stripping, the side form that mould installs high-low bay foundation beam 400 is hung, is poured
High-low bay foundation beam 400 and height are built across sole plate 200.
Foregoing description is only the description to the utility model preferred embodiment, not to any limit of the scope of the utility model
Calmly, any change, the modification that the those of ordinary skill in the utility model field does according to the disclosure above content, belonging to right will
Seek the protection domain of book.
Claims (6)
- A kind of 1. waterproof construction of gravity dam retaining wall retaining design high-low bay sole plate, it is characterised in that the waterproof knot Structure includes:Height across waterproof construction, including from bottom to top set gradually it is high across concrete cushion, it is high across waterproof coating, high across waterproof volume Material and height are across sole plate;It is described it is high be arranged on across concrete cushion it is high across on the soil body, the gravity dam earth-retaining coping with Across the soil body top of height is concordant;It is low across waterproof construction, including from bottom to top set gradually it is low across concrete cushion, it is low across waterproof coating, low across waterproof volume Material and low across sole plate;It is described it is low be arranged on across concrete cushion it is low across on the soil body;AndGravity dam retaining wall side wall waterproof construction, including set gradually from inside to outside side wall screed-coat, side wall waterproof coating, side Wall waterproof roll, and it is low across sole plate or high-low bay foundation beam;Wherein, it is described it is high across waterproof coating, it is low be structure as a whole across waterproof coating and side wall waterproof coating, across the waterproof volume of height Material, low it is structure as a whole across waterproof roll and side wall waterproof roll or mutually close overlap joint.
- 2. waterproof construction as claimed in claim 1, it is characterised in that described high across waterproof roll and high between sole plate Be additionally provided with high across pea gravel concreten protective layer, it is described it is low across waterproof roll and it is described it is low be provided between sole plate it is low across Pea gravel concreten protective layer.
- 3. waterproof construction as claimed in claim 1, it is characterised in that the gravity dam retaining wall side wall waterproof construction, also wrap Steel wire and shotcrete layer are included, the steel wire is fixed in the side wall of the gravity dam retaining wall, the injection coagulation Soil layer is injected on the steel wire, and the side wall screed-coat is located at the gunite concrete layer surface.
- 4. waterproof construction as claimed in claim 1, it is characterised in that the high-low bay foundation beam with it is described low across sole plate Between formed zigzag construction joint.
- 5. waterproof construction as claimed in claim 4, it is characterised in that the high-low bay foundation beam with it is described low across sole plate Between be provided with steel plate for sealing water, the steel plate for sealing water is laid perpendicular to the construction joint direction, steel plate for sealing water bottom embedment Described low across in sole plate, top is embedded in the high-low bay foundation beam.
- 6. waterproof construction as claimed in claim 5, it is characterised in that the steel plate for sealing water embedment is described low across in sole plate Depth be not less than 10cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720972513.8U CN207079638U (en) | 2017-08-04 | 2017-08-04 | The waterproof construction of gravity dam retaining wall retaining design high-low bay sole plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720972513.8U CN207079638U (en) | 2017-08-04 | 2017-08-04 | The waterproof construction of gravity dam retaining wall retaining design high-low bay sole plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207079638U true CN207079638U (en) | 2018-03-09 |
Family
ID=61424944
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720972513.8U Expired - Fee Related CN207079638U (en) | 2017-08-04 | 2017-08-04 | The waterproof construction of gravity dam retaining wall retaining design high-low bay sole plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207079638U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110747898A (en) * | 2019-10-23 | 2020-02-04 | 上海东方雨虹防水技术有限责任公司 | Basement waterproof construction method |
CN110761287A (en) * | 2019-10-25 | 2020-02-07 | 北京城建集团有限责任公司 | High-low span structure and construction method thereof |
CN113338294A (en) * | 2021-06-04 | 2021-09-03 | 天津天一建设集团有限公司 | Construction method for vertical excavation of hard foundation |
CN113653104A (en) * | 2021-08-25 | 2021-11-16 | 中国建筑第八工程局有限公司 | Waterproof structure at underground wall and construction method thereof |
CN114525801A (en) * | 2022-01-25 | 2022-05-24 | 北京建工集团有限责任公司 | Multi-span height difference foundation slab structure and construction method thereof |
-
2017
- 2017-08-04 CN CN201720972513.8U patent/CN207079638U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110747898A (en) * | 2019-10-23 | 2020-02-04 | 上海东方雨虹防水技术有限责任公司 | Basement waterproof construction method |
CN110761287A (en) * | 2019-10-25 | 2020-02-07 | 北京城建集团有限责任公司 | High-low span structure and construction method thereof |
CN113338294A (en) * | 2021-06-04 | 2021-09-03 | 天津天一建设集团有限公司 | Construction method for vertical excavation of hard foundation |
CN113653104A (en) * | 2021-08-25 | 2021-11-16 | 中国建筑第八工程局有限公司 | Waterproof structure at underground wall and construction method thereof |
CN114525801A (en) * | 2022-01-25 | 2022-05-24 | 北京建工集团有限责任公司 | Multi-span height difference foundation slab structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207079638U (en) | The waterproof construction of gravity dam retaining wall retaining design high-low bay sole plate | |
CN103741714B (en) | Full-cover excavation top-down construction method for underground engineering | |
CN110080242A (en) | The construction method of basement pile wall interaction structural system | |
CN105569058A (en) | Expansive soil cutting structure and construction method thereof | |
CN104099943B (en) | Diaphram wall and discarded underground civil defense engineering intersection processing method | |
CN107190844A (en) | The waterproof and water drainage system and construction method of a kind of basement bottom board and exterior wall | |
CN106320120B (en) | A kind of peg board formula is without dirt road base construction of the highway technique | |
CN104131575A (en) | Plugging and drainage method for dam foundation on karst highly developed stratum | |
CN107542115A (en) | Underground project waterproof structure and its construction method | |
CN105464056A (en) | Anti-seepage structure capable of adapting to settlement of earth and rockfill dam | |
CN110359957B (en) | Dam body connecting structure and construction method thereof | |
CN104912097A (en) | Novel retaining wall reverse-filtering drainage system and construction method | |
CN107268638A (en) | Water rich strata Deep Foundation Pit of Metro Stations side wall waterproof construction and its construction method | |
CN110374060A (en) | A kind of the reservoir seepage-proofing structure and construction method of rock-fill dams dam facing and earth and stone material backfill bottom storehouse | |
CN107604940A (en) | A kind of steel pipe grid Expansive Soils Retaining Wall and its construction method | |
CN106498959A (en) | Gutter for deep overburden | |
CN107386298A (en) | A kind of depth hole composite supporting construction and its construction method with water-proof function | |
CN205399440U (en) | Inflation dirt road moat structure | |
CN108547260A (en) | Seepage-proofing treatment structure for reservoir full-reservoir basin in karst region and construction method | |
CN203939036U (en) | A kind of steel sheet pile cofferdam structure that is applicable to river course | |
CN113152430A (en) | Uplift pile head node waterproof structure serving as temporary stand column and construction method | |
CN105507348B (en) | The waterproof construction method and structure of basement detached column and Vierendeel girder in junction | |
CN208455573U (en) | Karst area reservoir basin seepage prevention processing structure | |
CN207079637U (en) | A kind of poured band of outer wall of basement water sealing structure | |
CN106013256B (en) | The tenon formula joint waterproofing structure of concrete waist rail embedded structure side wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180309 |
|
CF01 | Termination of patent right due to non-payment of annual fee |