CN203939036U - A kind of steel sheet pile cofferdam structure that is applicable to river course - Google Patents

A kind of steel sheet pile cofferdam structure that is applicable to river course Download PDF

Info

Publication number
CN203939036U
CN203939036U CN201420296661.9U CN201420296661U CN203939036U CN 203939036 U CN203939036 U CN 203939036U CN 201420296661 U CN201420296661 U CN 201420296661U CN 203939036 U CN203939036 U CN 203939036U
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
pile
row
interior row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420296661.9U
Other languages
Chinese (zh)
Inventor
李伟
鲁颖
伊颖锋
付冬平
王志刚
梁智岳
王祥林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Municipal Engineering Design & Research Institute
Original Assignee
Grand Project Contracting Co Ltd In Guangzhou
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Grand Project Contracting Co Ltd In Guangzhou filed Critical Grand Project Contracting Co Ltd In Guangzhou
Priority to CN201420296661.9U priority Critical patent/CN203939036U/en
Application granted granted Critical
Publication of CN203939036U publication Critical patent/CN203939036U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of steel sheet pile cofferdam structure that is applicable to river course, comprise the outer row's steel sheet pile arranging near water, the single steel sheet pile that interior row's steel sheet pile and backwater arrange, arrange outside between steel sheet pile and interior row's steel sheet pile and fill packed clay, outer row's steel sheet pile is embedded in riverbed, interior row's steel sheet pile is embedded in ground consisting of hard rock through riverbed, single steel sheet pile is embedded in ground consisting of hard rock through existing embankment stratum, single steel sheet pile, the end face that interior row's steel sheet pile contacts with ground consisting of hard rock is provided with argillic horizon, by double steel sheet pile is set, effectively solve cofferdam side and land side pressure imbalance problem near water, improve the resistance to overturning of steel sheet-pile cofferdam, auger is dug in advance auxiliary equipment and first the ground consisting of hard rock of bottom, riverbed is carried out to fragmentation backfill clay, while being pressed into steel sheet pile, clay covers in steel sheet pile bottom and gos deep into, to ground consisting of hard rock, forming an argillic horizon in steel sheet pile lower surface, stop current from the infiltration of steel sheet pile bottom, sealing performance is good.

Description

A kind of steel sheet pile cofferdam structure that is applicable to river course
Technical field
the utility model relates to steel sheet pile cofferdam structure technical field, particularly a kind of steel sheet pile cofferdam structure that is applicable to river course.
Background technology
For excavation of foundation pit in water, specifically should there is the protection of safe foundation ditch, around foundation ditch, build cofferdam, to draining, dig base and build foundation construction by laying bricks or stones.River channel sewage intercepting engineering often need to flow away wastewater interception pipe to being embedded in riverbed along the river, constructs at present in river course, mostly adopts steel sheet-pile cofferdam, for foundation excavation in water provides supporting, carries out safety work to realize constructor and equipment in anhydrous cofferdam.
But, for having firm hard formation and jackstone, boulder bed situation under riverbed, in the time building steel sheet-pile cofferdam, steel sheet pile bottom is difficult to through jackstone, boulder bed and is embedded in firm hard formation be fixed, thereby be difficult to ensure stability and the safety of steel sheet-pile cofferdam entirety, have construction safety hidden danger, easily there is seepage flow in steel sheet pile bottom and firm hard formation junction simultaneously, is difficult to the stagnant water effect that reaches good; In addition, when closing on bank in river course and building steel sheet-pile cofferdam, there is the problem of pressure imbalance in back side steel sheet pile and upstream face steel sheet pile, easily causes steel sheet-pile cofferdam unstability, affects the stability of steel sheet-pile cofferdam.
Utility model content
Technical problem to be solved in the utility model is to provide the steel sheet pile cofferdam structure that is applicable to river course that a kind of structural safety is stable, stagnant water effect is good.
For solving the problems of the technologies described above adopted technical scheme: a kind of steel sheet pile cofferdam structure that is applicable to river course, comprise the double steel sheet pile of setting near water and the single steel sheet pile that backwater arranges, described double steel sheet pile comprises outer row's steel sheet pile and the interior row's steel sheet pile that spaced and parallel arranges, between described outer row's steel sheet pile and interior row's steel sheet pile, fill packed clay and form operation platform, between described outer row's steel sheet pile and interior row's steel sheet pile, top is connected by a pull bar, described outer row's steel sheet pile is embedded in riverbed, described interior row's steel sheet pile is embedded in ground consisting of hard rock through riverbed, described single steel sheet pile is embedded in ground consisting of hard rock through existing embankment stratum, described single steel sheet pile, the end face that interior row's steel sheet pile contacts with ground consisting of hard rock is provided with argillic horizon, between described single steel sheet pile and interior row's steel sheet pile, be laterally provided with multiple tracks horizontal shore, the foundation ditch bottom surrounding at described single steel sheet pile and interior row's steel sheet pile is provided with cement mixing pile, build and be formed with a concrete strengthening layer at described cement mixing pile top.
Beneficial effect: this steel sheet pile cofferdam structure by cofferdam near water a side double steel sheet pile is set and fills packed clay between the two, effectively solve cofferdam side and land side pressure imbalance problem near water, resistance to overturning and the safety of steel sheet-pile cofferdam are improved, the platform that simultaneously fills clay formation can be used as operation platform, makes construction more convenient; Meanwhile, double steel sheet pile, by pull bar is set, is connected to form entirety by double steel sheet pile, when being subject under extraneous load action, double steel sheet pile forms cooperative transformation, solves the larger problem of steel sheet pile malformation, further strengthens the structural stability of steel sheet-pile cofferdam.Wherein, being pressed into before single steel sheet pile and interior row's steel sheet pile, auger is dug in advance auxiliary equipment and first the ground consisting of hard rock of bottom, riverbed is carried out to fragmentation backfill clay, because clay has the strong and features such as bad hydraulic permeability of viscosity, steel sheet pile is when being pressed into the broken region of ground consisting of hard rock, and clay covers in steel sheet pile bottom deeply to ground consisting of hard rock, and then clay and ground consisting of hard rock are combined closely, form an argillic horizon in steel sheet pile lower surface, stop current from the infiltration of steel sheet pile bottom, sealing performance is good.
Brief description of the drawings
Below in conjunction with drawings and Examples, the utility model is described further;
Fig. 1 is the structural representation of the utility model embodiment.
Detailed description of the invention
With reference to Fig. 1, a kind of steel sheet pile cofferdam structure that is applicable to river course of the utility model, comprise the double steel sheet pile of setting near water and the single steel sheet pile 1 that backwater arranges, double steel sheet pile comprises outer row's steel sheet pile 2 and the interior row's steel sheet pile 3 that spaced and parallel arranges, arrange outside and between steel sheet pile 2 and interior row's steel sheet pile 3, fill packed clay 4 and form operation platform, between outer row's steel sheet pile 2 and interior row's steel sheet pile 3, top is connected by a pull bar 5, outer row's steel sheet pile 2 is embedded in riverbed, single steel sheet pile 1 is through existing embankment and jackstone, boulder bed and interior row's steel sheet pile 3 are embedded in ground consisting of hard rock through riverbed, single steel sheet pile 1, the end face that interior row's steel sheet pile 3 contacts with ground consisting of hard rock is provided with argillic horizon 6, between single steel sheet pile 1 and interior row's steel sheet pile 3, be laterally provided with multiple tracks horizontal shore 7, the foundation ditch bottom surrounding at single steel sheet pile 1 and interior row's steel sheet pile 3 is provided with cement mixing pile 8, build and be formed with a concrete strengthening layer 9 at cement mixing pile 8 tops.
Compared with prior art Steel Sheet Pile cofferdam, this steel sheet-pile cofferdam is to adopt static-pressure pile planting machine to carry out steel sheet pile construction by static pressure engineering method, pile driver rides on the steel sheet pile of having constructed and walks, realize under next-door neighbour's river course building and narrow inland river river surface and bridge and constructing, overcome and abolish existing embankment and jackstone, boulder bed difficulty and urban waterway bridge along the line is numerous, under-clearance higher primary school, the problem that difficulty of construction is large, thereby, realize river course periphery building without injury, to surrounding enviroment noiselessness, friction, pollution-free, compared with conventional concrete support pattern economy, environmental protection, green, low-carbon (LC), meet sustainable development idea.Particularly, being pressed into before single steel sheet pile 1 and interior row's steel sheet pile 3, first dig in advance auxiliary equipment by auger and first the ground consisting of hard rock of bottom, riverbed is carried out to fragmentation backfill clay, simultaneously static-pressure pile planting machine is pressed into steel sheet pile ground consisting of hard rock and has the broken region of clay, steel sheet pile bottom is embedded in ground consisting of hard rock, and so construction forms and is embedded in single steel sheet pile 1 and the interior row's steel sheet pile 3 in ground consisting of hard rock through existing embankment and jackstone, boulder bed and riverbed.
Due to interior row's steel sheet pile 3 near water and single steel sheet pile 1 faces soil, the pressure imbalance that single steel sheet pile 1 and interior row's steel sheet pile 3 both sides are suffered, easily cause steel sheet-pile cofferdam unstability, therefore be also provided with outer row's steel sheet pile 2 outside interior row's steel sheet pile 3, make a side near water form double steel sheet pile, and arrange outside between steel sheet pile 2 and interior row's steel sheet pile 3 and also fill packed clay 4, make interior row's steel sheet pile 3 and single steel sheet pile 1 both sides pressure keep balance, to improve resistance to overturning and the safety of steel sheet-pile cofferdam.Simultaneously, between outer row's steel sheet pile 2 and interior row's steel sheet pile 3 also by pull bar 5 is set, outer row's steel sheet pile 2 is connected to form to entirety with interior row's steel sheet pile 3, when being subject under extraneous load action, outer row's steel sheet pile 2 forms cooperative transformation with interior row's steel sheet pile 3, solve the larger problem of steel sheet pile malformation, further strengthen the structural stability of steel sheet-pile cofferdam.
The foundation ditch bottom surrounding at single steel sheet pile 1 and interior row's steel sheet pile 3 is provided with cement mixing pile 8, wherein cement mixing pile 8 is close to and is abutted against single steel sheet pile 1 and arrange with interior row's steel sheet pile 3, the Main Function of cement mixing pile stake 8 is displacements of the single steel sheet pile 1 of constraint and interior row's steel sheet pile 3, reduce steel sheet-pile deformation, further increase the structural stability of steel sheet-pile cofferdam.Build and be formed with a concrete strengthening layer 9 at cement mixing pile 8 tops, wastewater interception pipe or the canal case placed in order to carrying.
By reference to the accompanying drawings embodiment of the present utility model is explained in detail above, but the utility model is not limited to above-mentioned embodiment, in the ken possessing at described technical field those of ordinary skill, can also under the prerequisite that does not depart from the utility model aim, make various variations.

Claims (1)

1. one kind is applicable to the steel sheet pile cofferdam structure in river course, it is characterized in that: comprise the double steel sheet pile of setting near water and the single steel sheet pile that backwater arranges, described double steel sheet pile comprises outer row's steel sheet pile and the interior row's steel sheet pile that spaced and parallel arranges, between described outer row's steel sheet pile and interior row's steel sheet pile, fill packed clay and form operation platform, between described outer row's steel sheet pile and interior row's steel sheet pile, top is connected by a pull bar, described outer row's steel sheet pile is embedded in riverbed, described interior row's steel sheet pile is embedded in ground consisting of hard rock through riverbed, described single steel sheet pile is embedded in ground consisting of hard rock through existing embankment stratum, described single steel sheet pile, the end face that interior row's steel sheet pile contacts with ground consisting of hard rock is provided with argillic horizon, between described single steel sheet pile and interior row's steel sheet pile, be laterally provided with multiple tracks horizontal shore, the foundation ditch bottom surrounding at described single steel sheet pile and interior row's steel sheet pile is provided with cement mixing pile, build and be formed with a concrete strengthening layer at described cement mixing pile top.
CN201420296661.9U 2014-06-05 2014-06-05 A kind of steel sheet pile cofferdam structure that is applicable to river course Expired - Lifetime CN203939036U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420296661.9U CN203939036U (en) 2014-06-05 2014-06-05 A kind of steel sheet pile cofferdam structure that is applicable to river course

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420296661.9U CN203939036U (en) 2014-06-05 2014-06-05 A kind of steel sheet pile cofferdam structure that is applicable to river course

Publications (1)

Publication Number Publication Date
CN203939036U true CN203939036U (en) 2014-11-12

Family

ID=51858363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420296661.9U Expired - Lifetime CN203939036U (en) 2014-06-05 2014-06-05 A kind of steel sheet pile cofferdam structure that is applicable to river course

Country Status (1)

Country Link
CN (1) CN203939036U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106168031A (en) * 2016-08-26 2016-11-30 上海市政工程设计研究总院(集团)有限公司 A kind of functional steel sheet-pile cofferdam
CN109898403A (en) * 2019-04-02 2019-06-18 广州市恒盛建设工程有限公司 The underwater canal case steel suspension bridge of urban rives construction method nested with double steel sheet-pile cofferdam
CN111576458A (en) * 2020-06-02 2020-08-25 浙江交工金筑交通建设有限公司 Inner support-free steel pipe pile cofferdam structure and construction method thereof
CN111851540A (en) * 2020-07-07 2020-10-30 广东珠荣工程设计有限公司 High-rigidity anti-seepage combined cofferdam and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106168031A (en) * 2016-08-26 2016-11-30 上海市政工程设计研究总院(集团)有限公司 A kind of functional steel sheet-pile cofferdam
CN109898403A (en) * 2019-04-02 2019-06-18 广州市恒盛建设工程有限公司 The underwater canal case steel suspension bridge of urban rives construction method nested with double steel sheet-pile cofferdam
CN111576458A (en) * 2020-06-02 2020-08-25 浙江交工金筑交通建设有限公司 Inner support-free steel pipe pile cofferdam structure and construction method thereof
CN111851540A (en) * 2020-07-07 2020-10-30 广东珠荣工程设计有限公司 High-rigidity anti-seepage combined cofferdam and construction method thereof

Similar Documents

Publication Publication Date Title
CN1837512B (en) Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same
CN1837511B (en) Double-rowed cofferdam and method for manufacturing the same
CN103422511B (en) A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation
CN104404974B (en) The thick sand-pebble layer deep basal pit of high artesian slip casting back cover structure and construction technology thereof
CN104131575A (en) Plugging and drainage method for dam foundation on karst highly developed stratum
CN103225306B (en) Method of preventing foundation pit leakage during excavation of foundation pit close to water source
CN105464056A (en) Anti-seepage structure capable of adapting to settlement of earth and rockfill dam
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN202626978U (en) Cemented soil secant pile group, diaphragm wall constituted by same and building foundation pit support system constituted by cemented soil secant pile group
CN203213124U (en) Steel sheet pile and cement-mixed pile combined support
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN204530730U (en) The novel closed cutting off water system of a kind of water rich strata foundation ditch
CN102966072A (en) Construction method for treating widened and heightened engineering joint surfaces of dikes on soft clay foundation
CN203729306U (en) Anti-slide pile and soil retaining plate supporting structure
CN109594575A (en) A kind of open caisson periphery grouting and reinforcing soil body construction method
CN104790410A (en) Foundation pit excavation supporting method suitable for watercourse with shallow water and sludge
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN111472326A (en) Method and structure for building gravity dam on deep covering layer
CN208949902U (en) A kind of river channel bridge bearing platform foundation pit antiseepage cofferdam
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN107761668B (en) Coastal shore reservoir land-building type revetment structure and construction method thereof
CN204252148U (en) High artesian thick sand-pebble layer deep foundation ditch slip casting back cover structure
CN207727514U (en) A kind of library basin antiseepage is anti-to lift structure
CN204266164U (en) Concrete veneer and grill-shaped cement soil wall combined type bank protection structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160527

Address after: 510060 Guangzhou City, Yuexiu District Province, East Ring Road, No. 348, No.

Patentee after: GUANGZHOU MUNICIPAL ENGINEERING DESIGN & Research Institute

Address before: 510060 348 East Ring Road, Guangzhou, Guangdong, Yuexiu District

Patentee before: GUANGZHOU HONGWEI PROJECT CONTRACT CO.,LTD.

CX01 Expiry of patent term

Granted publication date: 20141112