CN103422511B - A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation - Google Patents

A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation Download PDF

Info

Publication number
CN103422511B
CN103422511B CN201310365797.0A CN201310365797A CN103422511B CN 103422511 B CN103422511 B CN 103422511B CN 201310365797 A CN201310365797 A CN 201310365797A CN 103422511 B CN103422511 B CN 103422511B
Authority
CN
China
Prior art keywords
foundation
stake
pile
dowel
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310365797.0A
Other languages
Chinese (zh)
Other versions
CN103422511A (en
Inventor
丁荣林
梁浩
王小丽
沈彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI URBAN POWER SUPPLY DESIGN Co Ltd
State Grid Corp of China SGCC
State Grid Shanghai Electric Power Co Ltd
Original Assignee
SHANGHAI URBAN POWER SUPPLY DESIGN Co Ltd
State Grid Corp of China SGCC
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI URBAN POWER SUPPLY DESIGN Co Ltd, State Grid Corp of China SGCC, State Grid Shanghai Electric Power Co Ltd filed Critical SHANGHAI URBAN POWER SUPPLY DESIGN Co Ltd
Priority to CN201310365797.0A priority Critical patent/CN103422511B/en
Publication of CN103422511A publication Critical patent/CN103422511A/en
Application granted granted Critical
Publication of CN103422511B publication Critical patent/CN103422511B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation, cement mixing method composite foundation is adopted to reinforce, the method comprises the following steps: (1) lays stake position on soft foundation, Pile arrangement is that square lays out pile or quincunxly to lay out pile, and determines the long and pilespacing of a footpath, stake; (2) on basic foundation, brill excavates stake holes, and grout injection, form concrete stake, and after concrete stake completes in 2h, dowel is set in concrete stake; (3) mattress layer laid by ground after treatment, dowel is stretched out mattress layer; (4) on mattress layer, install flexible slab foundation, and welded with the main muscle of flexible slab foundation by the dowel in concrete stake, flexible slab foundation is as bearing stratum.Compared with reinforcing with board-like underpin flexible in prior art or bored pile, the present invention not only can meet design requirement, expand the scope of application of shallow foundation, and overall expenses there will be the larger range of decrease, has obvious economic benefit.

Description

A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation
Technical field
The present invention relates to a kind of method of reinforcing soft ground, especially relate to a kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation.
Background technology
Along with power grid construction develop rapidly, the basic engineering of transmission line of electricity, is related to the safe operation of circuit, is more related to investment and the comprehensive benefit of engineering.Foundation pattern conventional is at present: 1. slab foundation; 2. this two profiles formula of bored pile foundation.Wherein to be generally used for geological condition regional preferably on straight column type basis, and bored concrete pile foundation is generally used for the geology such as river embankment, weak soil unfavorable area.
In soft soil areas, because the design of its pole and tower foundation not only will meet general pole and tower foundation designing requirement, also should meet the requirements such as column foot sedimentation amount, gradient, therefore soft soil areas pole and tower foundation is designed with its particularity.Because the research of China in the past in soft soil areas basement process and pole and tower foundation thereof exists many weak points, cause soft soil areas pole and tower foundation design level lower, the gap that existence is larger compared with international most advanced level, the ratio of the cost of its foundation the line is busy road overall investment is generally about 25%, what have is even higher, and the research carrying out ground stabilization and process of non-system, therefore soft soil areas pole and tower foundation has become link very weak in transmission line construction, basement process and design optimization are then soft soil areas work transmission line key subjects in the urgent need to address.
At present, board-like shallow foundation is used to have following problem in soft clay area:
(1) bearing capacity of foundation soil of bearing stratum is lower, the overburden layer of shallow-layer is thicker, cause and general steel tower shallow foundation (slab foundation) is needed to take larger area, darker embedded depth of foundation compared with other areas, the excavated volume of the cubic metre of earth and stone is large, and concrete and amount of reinforcement are also large.
(2) slab foundation baseplate width is large, and basis is large by external disturbance, the stability of basic foundation all can be caused to be damaged as having uneven preloading or excavation fish pond, ditch etc. near tower position.
(3) for the steel tower that the foundation bearing capacities such as same tower four loop, 500kV circuit are larger, according to slab foundation, then baseplate width can be very large, and even slab foundation cannot meet design requirement, and therefore all needs completely to adopt bored pile foundation.And pile foundation belongs to deep foundation, investment cost is large, and its cost is 2 ~ 4 times of slab foundation, and this makes the foundation cost of whole piece circuit very high.
Therefore, in the present context, how to expand the scope of application of shallow foundation, how the ground of shallow foundation is taked to the foundation treatment mode be suitable for, the usage ratio reducing shallow foundation floor space, reduce the material usage on basis, reduce bored pile in circuit, make shallow foundation in floor space, comprehensive cost etc., have more reasonability and economy, will key one ring of control engineering cost be become.
Summary of the invention
Object of the present invention be exactly provide to overcome defect that above-mentioned prior art exists a kind of construct simple, cost of production is little, the reinforcement method for transmission tower shallow base foundation under composite soft soil foundation of reliable construction quality.
Object of the present invention can be achieved through the following technical solutions:
A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation, adopt cement mixing method composite foundation to reinforce, the method comprises the following steps:
(1) on soft foundation, lay stake position, Pile arrangement is that square lays out pile or quincunxly to lay out pile, and determines the long and pilespacing of a footpath, stake;
(2) on basic foundation, brill excavates stake holes, and grout injection, form concrete stake, and after concrete stake completes in 2h, dowel is set in concrete stake;
(3) mattress layer laid by ground after treatment, dowel is stretched out mattress layer;
(4) on mattress layer, install flexible slab foundation, and welded with the main muscle of flexible slab foundation by the dowel in concrete stake, flexible slab foundation is as bearing stratum.
When laying stake position, open in conjunction with steel tower root, the factor such as sole plate size, basic role power size.When basis root is opened little, concrete stake can extend out 1 ~ 2 campshed position in four leg sole plate scopes and arrange, basis root is opened greatly, single leg sole plate size is relatively little, can extend out 1 ~ 2 row's pile layout for single leg sole plate scope, described stake footpath is 0.4 ~ 0.7mm, and stake is long is 6.0m ~ 8.0m, pilespacing when square lays out pile is 1.0 ~ 1.5m, and quincunx pilespacing when laying out pile is 1.2 ~ 1.4m.
The method that grout injection described in step (2) adopts is Pressure Revolving Blast-Grout, concrete steps are as follows: inserted by rotary jet grouting pipe in stake holes, when rotary jet grouting pipe is inserted into projected depth, rotate and promote rotary jet grouting pipe, start whitewashing, when the churning of rotary jet grouting pipe rises to design elevation, churning terminates.The shaping requirement of concrete stake is: evenly, continuously, without tightening and tomography, forbidding at lifting whitewashing process interrupt slurry, special circumstances cause disconnected slurry should bore forming again.
Cement paste described in step (2) adopts P32.5 or P42.5 Portland cement, water/binder ratio is 0.5 ~ 0.6, cement mixed ratio is 10% ~ 15%, the efficient retarding and water reducing agent simultaneously adding 0.5% of cement weight in cement paste, to improve soil cement intensity, requires that cement-soil 7d age strength is not less than 0.8MPa.
The thickness of described mattress layer is 0.2 ~ 0.4m.
The foundation width of described flexible slab foundation is 8 ~ 12m, and foundation columns width is 1 ~ 3m, embedded depth of foundation 2 ~ 4m.
The vertical missing of described concrete stake is less than or equal to 0.5%.
After adopting concrete stake to carry out basement process, bearing capacity of foundation soil can reach 125kPa, ground after treatment adopts flexible slab foundation, for solving uplift force and the horizontal component of steel tower, dowel is provided with in concrete stake, dowel is connected with the board-like foundation main reinforcement of flexibility, utilize dowel and concrete stake frictional force, concrete stake own wt and the frictional force with mud, synergy is enough to opposing steel tower column foot uplift force, resist horizontal tilting force with the board-like based Joint of flexibility simultaneously, also skirt piles can be established to bear pile foundation lateral pressure in surrounding if needed, such anchoring pile, concrete stake, flexible slab foundation all gives full play to respective, the advantage of associating.
Compared with prior art, the present invention has the following advantages and beneficial effect:
(1) reinforcement method for transmission tower shallow base foundation under composite soft soil foundation of the present invention, compare the board-like underpin method of independent flexibility, body expense of the present invention can reduce 30% ~ 3%, compare independent bored pile reinforcement means, body expense of the present invention can reduce 66% ~ 70%, and the minimizing of this basic expense will be considerable.
(2) for the iron tower foundation (as double loop four type corner, four-loop steel tower) that load is larger, sole plate is large, construction and excavation face is large, ground should produce the problems such as differential settlement to adopt flexible slab foundation to cause, in four-loop steel tower large corner situation, even there will be the situation that flexible slab foundation cannot meet design requirement; And adopt bored pile, although can meet design requirement, more flexible slab foundation is increased more than 2-3 times by foundation cost; And after adopting method of the present invention, the scope of application of the shallow foundation that not only can meet design requirement, expand, and overall expenses there will be the larger range of decrease, has obvious economy, technical benefits.
Accompanying drawing explanation
When Fig. 1 is for adopting method of the present invention to carry out ground stabilization, the layout schematic diagram of concrete stake and section and flexible slab foundation.
In figure, 1 is concrete stake, and 2 is mattress layer, and 3 is flexible slab foundation, and 4 is ground.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
Embodiment
A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation, adopt cement mixing method composite foundation to reinforce, the method comprises the following steps:
(1) on soft foundation, lay stake position, Pile arrangement is that square lays out pile or quincunxly to lay out pile, and determines the long and pilespacing of a footpath, stake; When laying stake position, open in conjunction with steel tower root, the factor such as sole plate size, basic role power size.When basis root is opened little, concrete stake can extend out 1 ~ 2 campshed position in four leg sole plate scopes and arrange, basis root is opened greatly, single leg sole plate size is relatively little, can extend out 1 ~ 2 row's pile layout for single leg sole plate scope, stake footpath is 0.4 ~ 0.7mm, and stake is long is 6.0m ~ 8.0m, pilespacing when square lays out pile is 1.0 ~ 1.5m, and quincunx pilespacing when laying out pile is 1.2 ~ 1.4m.
(2) on basic foundation, brill excavates stake holes, and grout injection, form concrete stake, and after concrete stake completes in 2h, dowel is set in concrete stake; The method that step (2) grout injection adopts is Pressure Revolving Blast-Grout, concrete steps are as follows: inserted by rotary jet grouting pipe in stake holes, when rotary jet grouting pipe is inserted into projected depth, rotate and promote rotary jet grouting pipe, start whitewashing, when the churning of rotary jet grouting pipe rises to design elevation, churning terminates.The shaping requirement of concrete stake is: evenly, continuously, without tightening and tomography, forbidding at lifting whitewashing process interrupt slurry, special circumstances cause disconnected slurry should bore forming again.Step (2) cement paste adopts P32.5 or P42.5 Portland cement, water/binder ratio is 0.5 ~ 0.6, cement mixed ratio is 10% ~ 15%, the efficient retarding and water reducing agent simultaneously adding 0.5% of cement weight in cement paste, to improve soil cement intensity, requires that cement-soil 7d age strength is not less than 0.8MPa.The vertical missing of concrete stake is less than or equal to 0.5%.
(3) mattress layer laid by ground after treatment, dowel is stretched out mattress layer; The thickness of mattress layer is 0.2 ~ 0.4m.
(4) on mattress layer, install flexible slab foundation, and welded with the main muscle of flexible slab foundation by the dowel in concrete stake, flexible slab foundation is as bearing stratum.
When adopting method of the present invention to carry out ground stabilization, the layout schematic diagram of concrete stake and section and flexible slab foundation as shown in Figure 1,
In the present embodiment, the stake footpath d=600mm of concrete stake 1, the long l=7.0m of stake, gets pilespacing 1.2m, takes square to lay out pile, and stake end drops on soil layer farinose argillic horizon, the thickness d '=300mm of mattress layer 2.The foundation width of flexible slab foundation 3 is 8 ~ 12m, and foundation columns width is 1 ~ 3m, and flexible slab foundation 3 degree of depth be embedded in ground 4 is 2 ~ 4m.
Determine stake soil area replacement ratio m
Then d e=1.13s=1.13 × 1.2=1.356
m=(d/d e) 2=(0.6/1.356) 2=0.1958
Determine bearing capacity of single pile
1) by R a=η f cua pdetermine
Get η=0.3, f cu=1.1MPa
Then R α=η f cua p=0.3 × 1100 × π × 0.6 2/ 4=93.3kN
2) press R a = u Σ i = 1 n q si l i + α q p A p Determine
Get α=0.4
R a = u Σ i = 1 n q si l i + α q p A p = 0.6 × π × ( 5 × 4.4 + 11 × 2.6 ) + 0.4 × 95 × π × 0.6 2 / 4 = 106.1 kN
Get R α=93.3kN
Determine Bearing Capacity of Composite Foundation
f spk = m R a A p + β ( 1 - m ) f sk = 0.1958 93.3 π × 0.6 2 / 4 + 0.8 × ( 1 - 0.1958 ) × 95 = 125.73 kpa
Pass through computational analysis, after adopting concrete stake to carry out basement process, bearing capacity of foundation soil can reach 125kPa, ground after treatment adopts flexible slab foundation, for solving uplift force and the horizontal component of steel tower, dowel is provided with in concrete stake, dowel is connected with the board-like foundation main reinforcement of flexibility, utilize dowel and concrete stake frictional force, concrete stake own wt and the frictional force with mud, synergy is enough to opposing steel tower column foot uplift force, resist horizontal tilting force with the board-like based Joint of flexibility simultaneously, also skirt piles can be established to bear pile foundation lateral pressure in surrounding if needed, such anchoring pile, concrete stake, flexible slab foundation all gives full play to respective, the advantage of associating.
In the present embodiment, reinforcement method for transmission tower shallow base foundation under composite soft soil foundation, compare the board-like underpin method of independent flexibility, body expense of the present invention can reduce 30% ~ 3%, compare independent bored pile reinforcement means, body expense of the present invention can reduce 66% ~ 70%, and the minimizing of this basic expense will be considerable.

Claims (2)

1. a reinforcement method for transmission tower shallow base foundation under composite soft soil foundation, adopt cement mixing method composite foundation to reinforce, it is characterized in that, the method comprises the following steps:
(1) on soft foundation, lay stake position, Pile arrangement is that square lays out pile or quincunxly to lay out pile, and determines the long and pilespacing of a footpath, stake;
(2) on basic foundation, brill excavates stake holes, and grout injection, form concrete stake, and after concrete stake completes in 2h, dowel is set in concrete stake;
(3) mattress layer laid by ground after treatment, dowel is stretched out mattress layer;
(4) on mattress layer, install flexible slab foundation, and welded with the main muscle of flexible slab foundation by the dowel in concrete stake, flexible slab foundation is as bearing stratum;
The method that grout injection described in step (2) adopts is Pressure Revolving Blast-Grout, concrete steps are as follows: inserted by rotary jet grouting pipe in stake holes, when rotary jet grouting pipe is inserted into projected depth, rotate and promote rotary jet grouting pipe, start whitewashing, when the churning of rotary jet grouting pipe rises to design elevation, churning terminates;
The thickness of described mattress layer is 0.2 ~ 0.4m;
Described stake footpath is 0.4 ~ 0.7mm, and stake is long is 6.0m ~ 8.0m, and pilespacing when square lays out pile is 1.0 ~ 1.5m, and quincunx pilespacing when laying out pile is 1.2 ~ 1.4m;
Cement paste described in step (2) adopts P32.5 or P42.5 Portland cement, water/binder ratio is 0.5 ~ 0.6, cement mixed ratio is 10% ~ 15%, adds the efficient retarding and water reducing agent of 0.5% of cement weight to improve soil cement intensity in cement paste simultaneously;
The foundation width of described flexible slab foundation is 8 ~ 12m, and foundation columns width is 1 ~ 3m, embedded depth of foundation 2 ~ 4m.
2. a kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation according to claim 1, is characterized in that, the vertical missing of described concrete stake is less than or equal to 0.5%.
CN201310365797.0A 2013-08-21 2013-08-21 A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation Active CN103422511B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310365797.0A CN103422511B (en) 2013-08-21 2013-08-21 A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310365797.0A CN103422511B (en) 2013-08-21 2013-08-21 A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation

Publications (2)

Publication Number Publication Date
CN103422511A CN103422511A (en) 2013-12-04
CN103422511B true CN103422511B (en) 2015-11-25

Family

ID=49647860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310365797.0A Active CN103422511B (en) 2013-08-21 2013-08-21 A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation

Country Status (1)

Country Link
CN (1) CN103422511B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268656A (en) * 2016-04-09 2017-10-20 河南城建学院 Anchor pole-star member-ball basis and its construction method
CN107268589A (en) * 2016-04-09 2017-10-20 河南城建学院 One bulb-anchor pole-star member basis and its construction method
CN107268595A (en) * 2016-04-09 2017-10-20 河南城建学院 The many rope anti_floating foundations in soil base spider arm end and its construction method
CN107268657A (en) * 2016-04-09 2017-10-20 河南城建学院 Soil base center and many rope anti_floating foundations of plate angle and its construction method
CN107268587A (en) * 2016-04-09 2017-10-20 河南城建学院 Anchor pole-ball-star member basis and its construction method
CN107268593A (en) * 2016-04-09 2017-10-20 河南城建学院 Star member-anchor pole-ball basis and its construction method
CN107268651B (en) * 2016-04-09 2023-09-01 河南城建学院 Anchor rod-star-shaped member-ball foundation and construction method thereof
CN107268592A (en) * 2016-04-09 2017-10-20 河南城建学院 A kind of star member-anchor pole-ball basis and its construction method
CN107268588A (en) * 2016-04-09 2017-10-20 河南城建学院 A kind of anchor pole-ball-star member basis and its construction method
CN107268594A (en) * 2016-04-09 2017-10-20 河南城建学院 The many rope anti_floating foundations of soil base star centre and arm end and its construction method
CN106013204A (en) * 2016-05-30 2016-10-12 上海电力设计院有限公司 Method for applying gravity-type foundation to offshore wind power engineering in sea area with soft-soil seabed
CN106703065B (en) * 2016-11-17 2019-02-12 中国电建集团贵州工程公司 Rock-bolt blower foundation underwater construction engineering method
CN107989063A (en) * 2017-12-01 2018-05-04 绍兴大明电力设计院有限公司 Churning anchor cable composite foundation
CN110820793A (en) * 2019-11-15 2020-02-21 山东建筑大学 Composite foundation for collapsible loess area and construction method
CN113718820A (en) * 2021-08-20 2021-11-30 都城伟业集团有限公司 Offshore wind power steel pipe pile combined reinforcing device and reinforcing method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1011790A1 (en) * 1981-10-13 1983-04-15 Запорожский индустриальный институт Pile foundation
JP2001081791A (en) * 1999-09-13 2001-03-27 Chubu Electric Power Co Inc Foundation structure for building
CN201809777U (en) * 2010-10-13 2011-04-27 河南省电力勘测设计院 Silently-pressed mini-group-pile foundation for transmission line towers
CN201891126U (en) * 2010-11-25 2011-07-06 上海勘测设计研究院 Independent pile foundation structure formed by non-uniform piles and bearing platform
CN202273242U (en) * 2011-09-07 2012-06-13 中国电力科学研究院 Base of union type mini type pile rod tower
CN202500145U (en) * 2012-02-29 2012-10-24 中国电力科学研究院 Pile foundation of micro pile group

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1011790A1 (en) * 1981-10-13 1983-04-15 Запорожский индустриальный институт Pile foundation
JP2001081791A (en) * 1999-09-13 2001-03-27 Chubu Electric Power Co Inc Foundation structure for building
CN201809777U (en) * 2010-10-13 2011-04-27 河南省电力勘测设计院 Silently-pressed mini-group-pile foundation for transmission line towers
CN201891126U (en) * 2010-11-25 2011-07-06 上海勘测设计研究院 Independent pile foundation structure formed by non-uniform piles and bearing platform
CN202273242U (en) * 2011-09-07 2012-06-13 中国电力科学研究院 Base of union type mini type pile rod tower
CN202500145U (en) * 2012-02-29 2012-10-24 中国电力科学研究院 Pile foundation of micro pile group

Also Published As

Publication number Publication date
CN103422511A (en) 2013-12-04

Similar Documents

Publication Publication Date Title
CN103422511B (en) A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation
CN203515597U (en) Tunnel structure applicable to soft stratum
CN101200885B (en) Earth-rock dam deep-base seepage-control water-stopping structure for water conservancy and hydropower project
CN204370373U (en) Seepage proof curtain structure closed by a kind of reservoir
CN204401385U (en) A kind of road structure processing Deep Thick Soft Ground karst foundation
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN201321616Y (en) Deep foundation pit supporting, reinforcing, anti-seepage and waterproof structure
CN101509261A (en) Method for pile plate base for ultra-high voltage electric power line steel tower on soft foundation
CN111472326A (en) Method and structure for building gravity dam on deep covering layer
CN106368176B (en) The high dam structure being built on earth material scarcity area deeply covered layer
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN208934002U (en) A kind of barrier wall structure
CN202644591U (en) A reinforced bridge pile foundation in tunnel construction under the geological condition of water-rich quicksand
CN201771514U (en) Concealed tunneling structure with pile foundation
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN205224011U (en) A dull and stereotyped slip casting device of microorganism for reinforcing ground that can liquefy
CN204898687U (en) Modular excavation supporting pilework
CN104404918B (en) Adopt composite geo-membrane and part to change and fill out the method that clay repairs clay through crack
CN209195412U (en) A kind of tunnel structure suitable for weak Facility-sliding strata
CN207727514U (en) A kind of library basin antiseepage is anti-to lift structure
CN202830994U (en) Protective structure for bedding slope bridge abutments
CN114109394B (en) Method for determining pile length of tunnel shallow-buried weak surrounding rock high-pressure jet grouting pile method ground surface reinforcement
CN201943060U (en) Reinforcing structure for gate dam foundation of deep riverbed covering layer
CN210122735U (en) Underground structure anti-floating system based on outward-protruding wing foot plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant