CN1837512B - Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same - Google Patents

Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same Download PDF

Info

Publication number
CN1837512B
CN1837512B CN200610025535XA CN200610025535A CN1837512B CN 1837512 B CN1837512 B CN 1837512B CN 200610025535X A CN200610025535X A CN 200610025535XA CN 200610025535 A CN200610025535 A CN 200610025535A CN 1837512 B CN1837512 B CN 1837512B
Authority
CN
China
Prior art keywords
pile
steel pipe
steel sheet
steel
sheet pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200610025535XA
Other languages
Chinese (zh)
Other versions
CN1837512A (en
Inventor
王海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN200610025535XA priority Critical patent/CN1837512B/en
Publication of CN1837512A publication Critical patent/CN1837512A/en
Application granted granted Critical
Publication of CN1837512B publication Critical patent/CN1837512B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a steel plate-tube post combined cofferdam and relative method, which is characterized in that: at least one steel plate post is arranged between two steel tube posts; and nearby steel plate and tube posts are connected by grooves; the depths of steel tube and plate posts are the same. The invention can combine the properties of steel plate and tube posts, to solve the waterproof problem. It can reduce the material consumption and the working time, with better economic benefits.

Description

A kind of steel sheet pile and steel pipe pile combined cofferdam and preparation method thereof
Technical field:
The present invention relates to foundation ditch sealing in the subaqueous work process and go along with sb. to guard him the large-scale civil material of aspect, particularly a kind of steel sheet pile and steel pipe pile combined cofferdam.
Background technology:
For excavation of foundation pit in the water, the protection of safe foundation ditch specifically should be arranged, promptly around foundation ditch, build the cofferdam, so that draining, dig base and build foundation construction by laying bricks or stones.Coffering mainly should be considered the requirement of stable and antiseepage.The type in cofferdam commonly used has: earth fill cofferdam, straw bag cofferdam, wood sheet-pile cofferdam, steel cofferdam and steel concrete cofferdam etc.The base pit engineering that the safe class of constructing in deep water is higher, relatively stricter to the stability and the barrier properties requirement in cofferdam.Steel cofferdam since advantage such as self rigidity is bigger, and barrier properties is good, and the scope of application is wider in engineering, be widely used.Steel cofferdam generally comprises forms such as steel sheet pile, steel pipe pile.Steel sheet pile has stable material quality, reliable in quality, speed of application is fast in soft layer, technology is also simpler, and have dash preferably, and can extract repeated use as the steel sheet pile of temporary structure, reduce advantages such as construction costs, but it is less to exist rigidity, is out of shape shortcomings such as very big under the lateral pressure effect.Steel pipe pile rigidity is very big, not yielding, but is difficult to guarantee in the construction of the stagnant water effect of interface between steel pipe pile and the steel pipe pile.
Summary of the invention:
An object of the present invention is to provide a kind of steel sheet pile and steel pipe pile combined cofferdam that can overcome above defective.
To achieve these goals, technical scheme of the present invention is: a kind of steel sheet pile and steel pipe pile combined cofferdam, it is characterized in that being provided with between two steel pipe piles a slice steel sheet pile at least, connect by tongue and groove between adjacent steel sheet pile and the steel pipe pile, the length of steel pipe pile and steel sheet pile is consistent, length is 10~50m, and the pile sinking degree of depth of steel pipe pile and steel sheet pile is consistent, and the pile sinking degree of depth is 5m~40m.Between two steel pipe piles 1~3 steel sheet pile can be set.
Another object of the present invention provides a kind of steel sheet pile and steel pipe pile combined cofferdam preparation method that can overcome above defective.
To achieve these goals, technical scheme of the present invention is: a kind of steel sheet pile and steel pipe pile combined cofferdam preparation method is characterized in that it may further comprise the steps: A, set up workbench, clear up water-bed obstruction, and with the leveling of position, cofferdam, riverbed, leveling back ground inclination degree is not more than 0.5%; B, alternately lift steel pipe pile and steel sheet pile, and connect the location with tongue and groove, 1~3 steel sheet pile is set between two adjacent steel pipe piles, the length of steel pipe pile and steel sheet pile is consistent, and length is 10~50m; C, utilize pile driving equipment that it is sunk to the riverbed, the pile sinking degree of depth of steel pipe pile and steel sheet pile is consistent, and the pile sinking degree of depth is 5m~40m.
The present invention is linked together with steel pipe pile and steel sheet pile, cofferdam structure and foundation pit enclosure structure are combined, both solved the sealing problem in the subaqueous work, the problem of Extra-Deep Foundation Pit under water is provided again, economical with materials, reduced the workload of the cofferdam scope and the cubic metre of earth and stone, easy construction, it is reasonable more economically to add the pattern foundation pit supporting structure form than other cofferdam.
Description of drawings:
Fig. 1 is the floor map of structure according to an embodiment of the invention
Fig. 2 is the floor map of structure according to another embodiment of the present invention
Fig. 3 is the structural representation of steel sheet pile
Fig. 4 is the structural representation of steel pipe pile
The specific embodiment:
Below in conjunction with drawings and Examples the present invention is further described.
A kind of steel sheet pile and steel pipe pile combined cofferdam, it is characterized in that being provided with between two steel pipe piles 1 a slice steel sheet pile 2 at least, connect by tongue and groove between adjacent steel sheet pile 2 and the steel pipe pile 1, steel pipe pile 1 is consistent with the length of steel sheet pile 2, length is 10~50m, the pile sinking degree of depth of steel pipe pile 1 and steel sheet pile 2 is consistent, and the pile sinking degree of depth is 5m~40m.The specification of the steel pipe pile 1 that the present invention adopts is that (diameter/mm), the specification of steel sheet pile 2 is III number (400 * 150 * 13.1) or IV number (400 * 170 * 15.5) steel sheet pile to φ 400~φ 1500, and the structure of steel pipe pile 1 and steel sheet pile 2 as shown in Figure 3 and Figure 4.Between adjacent two steel pipe piles 1 of the present invention 1~3 steel sheet pile 2 can be set, so the center distance of adjacent two steel pipe piles 1 is between 800mm~2700mm.Steel pipe pile 1 both sides are provided with steel pipe pile tongue and groove 4, steel sheet pile 2 both sides are provided with steel sheet pile tongue and groove 3, be connected with steel pipe pile tongue and groove 4 by steel sheet pile tongue and groove 3 between adjacent steel pipe pile 1 and the steel sheet pile 2, the steel sheet pile tongue and groove 3 that passes through between two adjacent steel sheet piles 2 separately connects.Steel sheet pile 2 is consistent with the steel pipe pile 1 pile sinking degree of depth, all to reach the impervious projected depth in cofferdam, require to calculate the impervious projected depth in cofferdam according to the foundation ditch antiseepage, concrete grammar see " basic design specification of the foundation " (DGJ08-11-1999), " base pit engineering design discipline " (DGJ08-61-97).
Steel sheet pile tongue and groove 3 outsides are provided with a connection and collude part, and steel pipe pile tongue and groove 4 outsides also are provided with a connection in steel sheet pile tongue and groove 3 and collude the part that colludes that part matches, so steel sheet pile tongue and groove 3 not only can be connected with steel sheet pile tongue and groove 3, also can be connected with steel pipe pile tongue and groove 4.
A kind of steel sheet pile and steel pipe pile combined cofferdam preparation method is characterized in that it may further comprise the steps: A, set up workbench, clear up water-bed obstruction, with the leveling of position, cofferdam, riverbed, leveling back ground inclination degree is not more than 0.5%; B, alternately lift steel pipe pile 1 and steel sheet pile 2, and connect the location with tongue and groove, 1~3 steel sheet pile 2 is set between two steel pipe piles 1, steel pipe pile 1 is consistent with the length of steel sheet pile 2, and length is 10~50m; C, utilize pile driving equipment that it is sunk to the riverbed, the pile sinking degree of depth of steel pipe pile 1 and steel sheet pile 2 is consistent, and the pile sinking degree of depth is 5m~40m.The method pile sinking that the cofferdam of land part adopts land driver to squeeze into, the stake of above-water cofferdam is then adopted by loop wheel machine on the barge and is hung the method pile sinking that vibrating hammer is squeezed into, hammer is heavy should not should to have the horizontal restrain device to prevent horizontal unstability greater than 4.5t (diesel hammer) before the pile frame in the hammering process.Pile driving process will carry out the repeatedly measurement of absolute altitude, plan-position, gradient etc., the pile sinking degree of depth of steel pipe pile 1 and steel sheet pile 2 is consistent, promptly pushes up end absolute altitude unanimity, and the high allowable variation of stake top mark is-50~100mm, pile sinking plan-position allowable variation is 150mm, and the pile sinking gradient is not more than 1%.
Case history: open excavation in certain river, the dark 5m of river, excavation of foundation pit degree of depth 10m under the riverbed, foundation ditch overall circumference 500m.Adopt the present invention as water-retaining cofferdam double as excavation supporting structure.Form combined cofferdam with Φ 800 tongue and groove steel pipe piles and III steel sheet pile (400 * 150 * 13.1), the long 32m of stake, the pile sinking degree of depth is 22m.According to " basic design specification of the foundation " (DGJ08-11-1999), " base pit engineering design discipline " (DGJ08-61-97) carry out stability checking computations to cofferdam structure, the result is as follows:
(a) resistance to overturning K RS=1.6>1.2
(b) topple and sliding stability
K a=1.38>1.3;K C=7.42>1.3
(c) swell stable K h=3.07>1.3
(d) analysis of seepage flow stability K RW=1.38>1.2
(e) sand is pressed in anti-piping checking computations, safety coefficient K=1.629,
Press clay, safety coefficient K=2.443
(f) cofferdam maximum horizontal distortion 17.9mm<30mm.
More than checking computations all meet design requirement.
This engineering is used III steel sheet pile (400 * 150 * 13.1) if adopt the conventional steel plates pile cofferdam, long 40m, and the pile sinking degree of depth is 30m, adds up to steel using amount 7532.5t.This engineering is used Φ 800 tongue and groove steel pipe piles if adopt the conventional steel pile cofferdam, long 30m, and the pile sinking degree of depth is 20m, adds up to steel using amount 6026t.In this case history, the present invention adds up to steel using amount 5785t, is respectively 75.8% and 96% of conventional steel plates pile cofferdam and steel pipe pile cofferdam steel using amount.Because the present invention links to each other steel pipe pile at interval with steel sheet pile, utilize steel pipe pile to improve the integral rigidity in cofferdam, utilize the distortion between coordinating of the flexibility of steel sheet pile, guaranteed the rigidity and the stagnant water effect in cofferdam better.

Claims (3)

1. steel sheet pile and steel pipe pile combined cofferdam, it is characterized in that being provided with between two steel pipe piles a slice steel sheet pile at least, connect by tongue and groove between adjacent steel sheet pile and the steel pipe pile, the steel sheet pile tongue and groove outside is provided with a connection and colludes part, the steel pipe pile tongue and groove outside also be provided with one with collude the part that colludes that part matches being connected of steel sheet pile tongue and groove, the length overall of steel pipe pile and steel sheet pile is consistent, is 10~50m, the pile sinking degree of depth of steel pipe pile and steel sheet pile is consistent, and the pile sinking degree of depth is 5m~40m.
2. steel sheet pile as claimed in claim 1 and steel pipe pile combined cofferdam is characterized in that being provided with between two adjacent steel pipe piles 1~3 steel sheet pile.
3. steel sheet pile and steel pipe pile combined cofferdam preparation method is characterized in that it may further comprise the steps: A, set up workbench, clear up water-bed obstruction, and with the leveling of position, cofferdam, riverbed, leveling back ground inclination degree is not more than 0.5%; B, alternately lift steel pipe pile and steel sheet pile, and connect the location with tongue and groove, 1~3 steel sheet pile is set between two adjacent steel pipe piles, the length of steel pipe pile and steel sheet pile is consistent, and length is 10~50m; C, utilize pile driving equipment that it is sunk to the riverbed, the pile sinking degree of depth of steel pipe pile and steel sheet pile is consistent, and the pile sinking degree of depth is 5m~40m, and the high allowable variation of stake top mark of steel pipe pile and steel sheet pile is-50~100mm, pile sinking plan-position allowable variation is 150mm, and the pile sinking gradient is not more than 1%.
CN200610025535XA 2006-04-07 2006-04-07 Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same Active CN1837512B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200610025535XA CN1837512B (en) 2006-04-07 2006-04-07 Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200610025535XA CN1837512B (en) 2006-04-07 2006-04-07 Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same

Publications (2)

Publication Number Publication Date
CN1837512A CN1837512A (en) 2006-09-27
CN1837512B true CN1837512B (en) 2011-04-20

Family

ID=37015009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200610025535XA Active CN1837512B (en) 2006-04-07 2006-04-07 Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same

Country Status (1)

Country Link
CN (1) CN1837512B (en)

Families Citing this family (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100575618C (en) * 2007-07-30 2009-12-30 中铁十八局集团有限公司 Construction method of opening locked steel tube pilecofferdam
JP5231344B2 (en) * 2009-06-19 2013-07-10 鹿島建設株式会社 Connection structure and structure of steel pipe sheet piles
CN101597904B (en) * 2009-07-03 2013-02-27 东南大学 Waterproof sheet pile cofferdam and construction method thereof
JP5284249B2 (en) * 2009-11-30 2013-09-11 新日鐵住金株式会社 Steel pipe sheet pile joint structure and steel pipe sheet pile foundation
WO2011125347A1 (en) * 2010-04-01 2011-10-13 住友金属工業株式会社 Connected wall structure consisting of steel pipe sheet piles and steel sheet pile, and method of constructing same
WO2011142047A1 (en) * 2010-05-10 2011-11-17 住友金属工業株式会社 Steel wall and method for constructing steel wall
CN102477735A (en) * 2010-11-25 2012-05-30 中铁十八局集团有限公司 Steel pipe pile for rectangular pier cofferdam
CN102182176B (en) * 2010-12-20 2012-12-19 陈健雄 Cast-in-place concrete tube-sheet pile, piling device and piling construction method thereof
JP5843643B2 (en) * 2012-02-09 2016-01-13 日立造船株式会社 Assembly equipment for long steel plate cell and method for moving long steel plate cell
CN103061348B (en) * 2013-01-15 2015-06-24 广州市市政工程设计研究院 Sand-bag and steel sheet pile combined cofferdam for hard formation and construction method of cofferdam
CN106368216B (en) * 2015-07-20 2018-04-03 上海思珂润机电有限公司 The construction method that a kind of steel sheet pile precisely closes
AU2016340015C1 (en) * 2015-10-13 2021-03-04 Armour Wall Group Pty Limited Improvements in sea walls, retaining walls and like structures using pin piles
CN106759347B (en) * 2016-12-12 2018-09-28 宁波建工工程集团有限公司 The construction method of steel pipe Larsen steel plate combination fender post constructing structure
CN107489102B (en) * 2017-06-29 2019-07-02 山东鲁桥建设有限公司 Based on combined steel sheet-pile cofferdam high water level difference cushion cap and construction method
CN109944261A (en) * 2017-12-21 2019-06-28 浙江兴土桥梁临时钢结构工程有限公司 In the method for big partial size boulder bed riverbed cofferdam construction
CN108239984B (en) * 2017-12-25 2021-07-23 上海建工集团股份有限公司 Trapezoidal wave shaped steel plate and steel truss combined assembled type enclosure structure and construction method thereof
CN108612111B (en) * 2018-05-22 2021-04-06 张利均 Steel pipe pile, foundation pit support structure and construction method of foundation pit support structure
CN109183779A (en) * 2018-11-08 2019-01-11 大连大学 A kind of steel pipe steel plate combination stake building enclosure
CN109235456A (en) * 2018-11-21 2019-01-18 海南大学 A kind of foundation pit enclosure structure and construction method
CN109518705A (en) * 2018-11-21 2019-03-26 广东省水利水电第三工程局有限公司 A kind of steel sheet pile and film bag sand combined cofferdam construction method
CN109610477A (en) * 2019-01-31 2019-04-12 上海宝钢工程咨询有限公司 Large area mud liquid soil layer foundation pit suspension supporting integrated construction structures and methods
CN109610476B (en) * 2019-01-31 2024-05-17 上海宝钢工程咨询有限公司 Steel pipe Larson sheet pile precipitation building envelope
CN109797756A (en) * 2019-03-20 2019-05-24 安徽省第二建筑工程有限公司 Steel pipe Larsen steel sheet pile Elements of Space Grid Truss braced cuts structure and its construction method
CN109797755B (en) * 2019-03-20 2021-02-26 安徽省第二建筑工程有限公司 Steel pipe Larsen steel sheet pile enclosure structure supported by steel mesh frame and construction method thereof
CN110067249A (en) * 2019-04-19 2019-07-30 华东交通大学 A kind of PC engineering method stake building enclosure of different length Larsen stake
CN111622203B (en) * 2020-05-18 2021-10-01 宁波市园林工程有限公司 Soft foundation structure and processing method thereof
CN113216228A (en) * 2021-01-13 2021-08-06 中交第三航务工程局有限公司 Construction process of combined pile cofferdam
CN113431032B (en) * 2021-08-27 2021-11-02 启东霓辉新材料科技有限公司 Reinforced prestressed concrete corrugated sheet pile and construction method thereof
CN113832997B (en) * 2021-09-08 2022-10-28 安徽省路港工程有限责任公司 Construction method of combined steel sheet pile cofferdam
CN114197480B (en) * 2021-11-12 2023-02-03 上海建工五建集团有限公司 Construction method of underground structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1508363A (en) * 2002-12-18 2004-06-30 株式会社德达渡 Steel-tube-sheet pile sunk-well foundation and steel-tube-sheet pile used thereof
CN1536170A (en) * 2002-10-31 2004-10-13 住友金属工业株式会社 Steel plate wall and its mfg. method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1536170A (en) * 2002-10-31 2004-10-13 住友金属工业株式会社 Steel plate wall and its mfg. method
CN1508363A (en) * 2002-12-18 2004-06-30 株式会社德达渡 Steel-tube-sheet pile sunk-well foundation and steel-tube-sheet pile used thereof

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
JP平11-140863A 1999.05.25
程优敏,黄志刚,沈属军.深水墩钢管板桩围堰施工技术.交通科技 1.2004,(1),10-12.
程优敏,黄志刚,沈属军.深水墩钢管板桩围堰施工技术.交通科技 1.2004,(1),10-12. *

Also Published As

Publication number Publication date
CN1837512A (en) 2006-09-27

Similar Documents

Publication Publication Date Title
CN1837512B (en) Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same
CN1837511B (en) Double-rowed cofferdam and method for manufacturing the same
CN103015367B (en) High-efficiency economical construction method for revetment
CN104164868A (en) Concave-convex support-engaged water-stopping pile
CN105133558B (en) Deep water drift net platform and its construction method
CN103422510A (en) Steel pipe frame type cofferdam structure and construction method
CN102926328B (en) Bridge waterside foundation pit excavation and support method and support wall structure
CN107012871A (en) A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation ditch fabricated construction
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN111424675A (en) Construction method of ultra-large pile spacing deep foundation pit supporting system
CN104652357A (en) Cylindrical-pile and insertion-plate revetment structure
CN206928281U (en) Pretensioning prestressed concrete porous hollow ecology stake
CN107119716B (en) Construction method of highway tunnel in tidal bore area of tidal marsh
CN104153350A (en) Octagonal meshed water-stopping rectangular pile of support
CN103821106B (en) Small-sized fishing port and channel revetment structure
CN1837510A (en) Steel pipe pile cofferdam and method for manufacturing the same
CN206873485U (en) It is a kind of to be used for the embedded setting basis of the ring-type in shallow overburden or naked rock area in water
CN104164871A (en) Biconcave support-engaged water-stopping pile
CN109487750A (en) Pile formula semicircular wave breaker structure and construction method
CN104179170A (en) Supporting and protecting double-convex and single-concave occluded water stopping pile
CN104234037A (en) Octagonal secant water-stop square pile for supporting
CN113668585B (en) Open caisson structure for deep and large water intaking in high-pressure water area and construction method
CN210766833U (en) Pile formula complex foundation of pouring
CN203613508U (en) Tubular pile and insertion plate revetment structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant