CN106706239B - 一种桥梁快速荷载试验测试方法 - Google Patents

一种桥梁快速荷载试验测试方法 Download PDF

Info

Publication number
CN106706239B
CN106706239B CN201611074605.0A CN201611074605A CN106706239B CN 106706239 B CN106706239 B CN 106706239B CN 201611074605 A CN201611074605 A CN 201611074605A CN 106706239 B CN106706239 B CN 106706239B
Authority
CN
China
Prior art keywords
bridge
displacement
model
finite element
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611074605.0A
Other languages
English (en)
Other versions
CN106706239A (zh
Inventor
谢海龙
曹蔚枝
王彬
罗鹏
张俊成
宋茂林
何鑫
郭茂泉
姬兵亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Provincial Traffic Construction Engineering Quality Inspection Center (Ltd)
Original Assignee
Shanxi Provincial Traffic Construction Engineering Quality Inspection Center (ltd)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Provincial Traffic Construction Engineering Quality Inspection Center (ltd) filed Critical Shanxi Provincial Traffic Construction Engineering Quality Inspection Center (ltd)
Priority to CN201611074605.0A priority Critical patent/CN106706239B/zh
Publication of CN106706239A publication Critical patent/CN106706239A/zh
Application granted granted Critical
Publication of CN106706239B publication Critical patent/CN106706239B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0008Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings of bridges
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0041Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings by determining deflection or stress
    • G01M5/005Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings by determining deflection or stress by means of external apparatus, e.g. test benches or portable test systems

Abstract

本发明提供了一种桥梁快速荷载试验测试方法,包括如下步骤:建立桥梁有限元计算模型;在试验跨的关键部位布置位移测点;汽车沿桥面缓慢行驶,采集桥梁的位移影响线;绘制桥梁位移影响线实测曲线;根据位移影响测试数据实际结果,选择具有高可信度的位移实测值;根据选定的实测位移值及车辆荷载对应位置,建立多工况加载模型,进行有限元分析计算;建立位移残差表达式,形成目标函数,进行有限元模型修正;采用修正后的有限元模型,计算荷载试验工况下的挠度及应变,将修正后模型计算值作为实测值,未修正模型计算值作为理论值,计算校验系数,按照桥梁承载力评定规范进行桥梁承载力评定。

Description

一种桥梁快速荷载试验测试方法
技术领域
本发明属于路桥质量检测技术领域,具体来说,涉及到一种桥梁快速荷载试验测试方法。
背景技术
本发明针对中国桥梁承载能力评价体系中检算法主观随意性大、而荷载试验又费时费力,对交通影响较大的问题,提出了一种基于实测应变影响线的模型校准技术的准静态荷载试验承载能力评定方法,该方法相比于检算法主观性小、准确性高,而又较常规荷载试验法费用低廉且对正常交通影响较小,在一定程度上可以替代常规荷载试验,或作为检算法和传统荷载试验法之间的一种中间评定方法。
桥梁荷载试验是直接在桥梁上直接加载的一种试验方法,评价桥梁在试验荷载作用下的受力性能,但这种方法费时、费力,成本高,特别对于旧桥而言,长时间封闭交通造成较大影响。因此有必要研究一种快速准确的荷载试验方法。
发明内容
本发明的目的是提供一种快速进行桥梁荷载试验的实用测试方法。该方法包括如下步骤:
步骤一:依照桥梁实际结构状况建立桥梁有限元计算模型;
步骤二:在试验跨的关键部位布置位移测点;
步骤三:汽车沿桥面缓慢行驶,采集桥梁的位移影响线;
步骤四:绘制桥梁位移影响线实测曲线;
步骤五:根据位移影响测试数据实际结果,选择具有高可信度的位移实测值;
步骤六:根据选定的实测位移值及车辆荷载对应位置,建立多工况加载模型,进行有限元分析计算;
步骤七:将理论计算中未采用的测点数据设置为0,建立位移残差表达式,形成目标函数,进行有限元模型修正;
步骤八:采用修正后的有限元模型,计算荷载试验工况下的挠度及应变,将修正后模型计算值作为实测值,未修正模型计算值作为理论值,计算校验系数,按照桥梁承载力评定规范进行桥梁承载力评定。
进一步的,步骤一中,桥梁有限元计算模型基于位移法,其力学方程为:
[k][δ]=[F] (1)
式中[k]为结构的总刚度矩阵,[δ]为结构的位移矩阵,[F]为荷载矩阵;桥梁静载试验涉及多个加载工况时,将不同工况组成荷载矩阵,每列表示不同的工况,每行表示不同的节点号。
进一步的,步骤二中,所述关键部位是试验跨的的四分点和跨中。
进一步的,步骤三中,所述汽车为两辆30吨的双后轴的三轴载重汽车。
与现有技术相比较,本发明具有如下优点:
第一,持续时间短,一般而言,只需10分钟左右便可完成数据采集,对桥梁交通影响较小,特别对于一些交通繁忙的桥梁而言,减小了交通管制的难度,节约了试验成本;
第二,不需要进行加载方案布置,加载方法简单。常规的桥梁荷载试验,需要确定加载的测试断面,拟定加载方案,在正式加载前,需要在桥面画出不同加载工跨下车辆的位置。本发明通过测试影响线,不需要进行加载方案的布置,简化了现场准备工作。
附图说明
图1是本发明中的桥型布置图。
图2是本发明中测点布置图。
图3是本发明中的第1跨1#梁L/4影响线实测曲线图。
图4是第1跨1#梁L/2影响线实测曲线图。
图5是第1跨1#梁3L/4影响线实测曲线图。
图6是第2跨1#梁L/4影响线实测曲线图。
具体实施方式
下面结合具体的实施例对本发明所述的桥梁快速荷载试验测试方法做进一步说明,但是本发明的保护范围并不限于此。
结合一座连续梁桥,其桥型见图1,说明本方法的实施方式,具体如下:
步骤一:依照桥梁实际结构状况建立桥梁有限元计算模型;
对步骤一进一步说明,桥梁有限元计算模型是基于位移法的计算原理,其力学方程为:
[k][δ]=[F] (1)
式中[k]为结构的总刚度矩阵,[δ]为结构的位移矩阵,[F]为荷载矩阵。按照上式编写相关程序,桥梁静载试验一般涉及多个加载工况,可将不同工况组成荷载矩阵,每列表示不同的工况,每行表示不同的节点号。
步骤二:在试验跨的四分点、跨中等关键部位布置位移测点;见图2;
步骤三:采用两辆30吨的双后轴的三轴载重汽车沿桥面缓慢行驶,采集桥梁的位移影响线;
步骤四:绘制桥梁位移影响线实测曲线;
步骤五:根据位移影响测试数据实际结果,选择具有较高可信度的位移实测值,见表1:
表1影响线实测数据
Figure BDA0001165976820000031
Figure BDA0001165976820000041
对步骤五的进一步说明,考虑到位移传感器测试精度,选择挠度变形量大于0.2mm并剔除部分异常测试数据进行分析。表格中,加粗的测试数据便是选择的进行有限元模型修正的实测数据。
步骤六:根据选定的实测位移值及车辆荷载对应位置,建立多工况加载模型,进行有限元分析计算;
步骤七:将理论计算中未采用的测点数据设置为0,建立位移残差表达式,形成目标函数,进行有限元模型修正;
对步骤六~步骤七的进一步说明,从表1中可以看出,在一些荷载工况下,只采用了部分测点测试数据,并没有采用所有测点数据。而理论计算中,则是考虑所有测点的测试数据,因此将理论计算中未采用的测点数据设置为0,与实测数据的差也为0,由此构造出的位移残差向量虽然也包含这部分数据,但由于残差为0,因此不影响计算结果。
选择了实测数据之后,便是荷载工况的转化,编写相关程序,通过车辆轴距,前轮位置等数据,计算车辆在不同位置下,各车轮的实际位置,并根据单元几何信息,计算出各车轮作用的单元号,距单元左节点的距离,同时考虑横向分布系数设置各车轮的竖向力。
这样便可采用有限元模型修正方法,计算桥梁的实际刚度。有限元模型修正后的挠度数据如下:
表2有限元模型修正后的挠度值
Figure BDA0001165976820000042
步骤八:采用修正后的有限元模型,计算荷载试验工况下的挠度及应变,将修正后模型计算值作为实测值,未修正模型计算值作为理论值,计算校验系数,按照桥梁承载力评定规范进行桥梁承载力评定。
对步骤八的进一步说明,利用影响线识别的刚度,按照荷载试验工况进行挠度计算,计算结果如下所示:
表3利用影线线识别刚度计算荷载试验挠度结果表
Figure BDA0001165976820000052
Figure BDA0001165976820000061
从表中可以看出,采用影响线测试数据识别出的刚度计算荷载试验各工况下挠度,与实测值的误差最大为0.28mm。这和采用荷载试验优化后的计算挠度是基本接近的,说明识别出的刚度能够符合桥梁的实际受力状况,完全满足工程应用。因此,可将此挠度值等效为实测值,将未优化后的挠度计算值作为理论值,便可计算出不同荷载工况下桥梁挠度的校验系数,从而可按照《公路桥梁承载力评定标准》进行桥梁承载力评价。实现了采用影响线测试方法的桥梁承载力评定,为桥梁快速荷载试验提供了新的方法。
可以理解的是,以上实施方式仅仅是为了说明本发明的构思而采用的示例性实施方式,然而本发明并不局限于此。对于本领域内的普通技术人员而言,在不脱离本发明的精神和实质的情况下,可以做出各种变型和改进,这些变型和改进也视为本发明的保护范围。

Claims (1)

1.一种桥梁快速荷载试验测试方法,其特征在于,包括如下步骤:
步骤一:依照桥梁实际结构状况建立桥梁有限元计算模型;
步骤二:在试验跨的关键部位布置位移测点;
步骤三:汽车沿桥面缓慢行驶,采集桥梁的位移影响线;
步骤四:绘制桥梁位移影响线实测曲线;
步骤五:根据位移影响测试数据实际结果,选择具有高可信度的位移实测值;
步骤六:根据选定的实测位移值及车辆荷载对应位置,建立多工况加载模型,进行有限元分析计算;
步骤七:将理论计算中未采用的测点数据设置为0,建立位移残差表达式,形成目标函数,进行有限元模型修正;
步骤八:采用修正后的有限元模型,计算荷载试验工况下的挠度及应变,将修正后模型计算值作为实测值,未修正模型计算值作为理论值,计算校验系数,按照桥梁承载力评定规范进行桥梁承载力评定;
步骤一中,桥梁有限元计算模型基于位移法,其力学方程为表达式(1):
[k][δ]=[F] (1)
式中[k]为结构的总刚度矩阵,[δ]为结构的位移矩阵,[F]为荷载矩阵;桥梁静载试验涉及多个加载工况时,将不同工况组成荷载矩阵,每列表示不同的工况,每行表示不同的节点号,将影响线测试数据转化为多工况的静力加载程序,便可采用式(1)进行结构分析计算。
CN201611074605.0A 2016-11-30 2016-11-30 一种桥梁快速荷载试验测试方法 Active CN106706239B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611074605.0A CN106706239B (zh) 2016-11-30 2016-11-30 一种桥梁快速荷载试验测试方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611074605.0A CN106706239B (zh) 2016-11-30 2016-11-30 一种桥梁快速荷载试验测试方法

Publications (2)

Publication Number Publication Date
CN106706239A CN106706239A (zh) 2017-05-24
CN106706239B true CN106706239B (zh) 2020-02-07

Family

ID=58934203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611074605.0A Active CN106706239B (zh) 2016-11-30 2016-11-30 一种桥梁快速荷载试验测试方法

Country Status (1)

Country Link
CN (1) CN106706239B (zh)

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107588915B (zh) * 2017-10-18 2023-05-05 厦门大学 一种桥梁影响线识别方法
CN108844702B (zh) * 2018-05-31 2020-07-31 南京东南建筑机电抗震研究院有限公司 车辆匀速通过时桥梁影响线的测定方法
CN109991098A (zh) * 2019-03-29 2019-07-09 辽宁工程技术大学 一种改建空心板梁桥现场静载试验评定方法
CN110530480B (zh) * 2019-08-29 2021-02-02 湖南大学 一种基于测距激光传感器的桥梁动态称重系统及其方法
CN110702344B (zh) * 2019-09-27 2020-05-12 济南城建集团有限公司 基于分布式应变测量技术的闭环桥梁结构损伤诊断方法
CN110793737B (zh) * 2019-10-28 2021-09-17 安徽建筑大学 基于弹性约束支承梁挠度影响线的梁桥损伤检测方法
CN110926735A (zh) * 2019-11-29 2020-03-27 邢台市交通运输局 基于多维动态参数的桥梁结构快速诊断方法
CN111400794A (zh) * 2020-03-10 2020-07-10 上海城建城市运营(集团)有限公司 一种城市高架桥梁总挠度快速智能化监测算法
CN111829738B (zh) * 2020-07-20 2022-09-06 唐堂 一种基于冲击荷载的桥梁承载力轻量化评定方法
CN111985084B (zh) * 2020-07-24 2023-10-27 华设设计集团股份有限公司 基于有限变量的桥梁力学实时分析方法
CN111832212B (zh) * 2020-07-30 2022-07-01 广西交科集团有限公司 高宽跨比梁偏载应变试验方法
CN112762885B (zh) * 2020-12-22 2022-08-16 华设设计集团股份有限公司 一种基于监测数据的桥梁实时挠度校验系数计算方法
CN112857718B (zh) * 2021-01-28 2022-09-20 合肥工业大学 一种基于移动车辆测试的桥梁承载能力快速评估方法
CN113139223B (zh) * 2021-04-09 2023-06-20 中国铁路设计集团有限公司 一种基于并发反力组的连续梁活载支反力计算方法
CN113358463A (zh) * 2021-05-19 2021-09-07 南通市顺通公路交通工程检测有限公司 一种公路桥梁承载能力的检测方法
NL2028808B1 (en) 2021-07-22 2023-01-27 Heijmans N V Method for measuring local rotation of a structural element configured for supporting a load, such as traffic, as well as a method for modelling such a structural element
CN113742959B (zh) * 2021-08-05 2023-09-01 中铁大桥勘测设计院集团有限公司 一种大跨长联结构的计算方法、装置及可读存储介质
CN113627060A (zh) * 2021-08-09 2021-11-09 苏交科集团股份有限公司 一种基于实测挠度影响线的公路梁式桥承载能力评定方法
CN114414276B (zh) * 2021-12-30 2024-04-09 东南大学 架桥机承载性能快速检测装置及评估方法
CN114577385B (zh) * 2022-02-28 2023-08-04 中铁第四勘察设计院集团有限公司 桥梁动态荷载识别方法及装置
CN114722458A (zh) * 2022-03-11 2022-07-08 浙江省交通运输科学研究院 一种针对在役空心板梁桥承载能力的综合评定方法
CN114997009B (zh) * 2022-05-30 2024-03-22 山东高速集团有限公司 一种基于机器视觉和模型修正的桥梁承载力快速评估方法
CN115374556B (zh) * 2022-08-08 2023-09-08 中建八局第三建设有限公司 一种考虑销轴滑移和刚度修正的贝雷架挠度计算方法
CN115659507B (zh) * 2022-10-27 2023-06-09 上海交通大学 一种着陆垫载荷作用下的甲板非线性响应试验测试方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101532917A (zh) * 2009-04-15 2009-09-16 江苏省交通科学研究院股份有限公司 一种桥梁承载能力快速荷载试验方法
CN103048102A (zh) * 2012-11-30 2013-04-17 江苏省交通科学研究院股份有限公司 一种梁式桥的状态评估方法
CN104573274A (zh) * 2015-01-27 2015-04-29 南京工业大学 车辆荷载下基于位移时程面积的结构有限元模型修正方法
CN104933285A (zh) * 2015-03-05 2015-09-23 西南交通大学 一种桥梁现场静载试验评定方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9417154B2 (en) * 2014-05-20 2016-08-16 Trimble Navigation Limited Monitoring a response of a bridge based on a position of a vehicle crossing the bridge

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101532917A (zh) * 2009-04-15 2009-09-16 江苏省交通科学研究院股份有限公司 一种桥梁承载能力快速荷载试验方法
CN103048102A (zh) * 2012-11-30 2013-04-17 江苏省交通科学研究院股份有限公司 一种梁式桥的状态评估方法
CN104573274A (zh) * 2015-01-27 2015-04-29 南京工业大学 车辆荷载下基于位移时程面积的结构有限元模型修正方法
CN104933285A (zh) * 2015-03-05 2015-09-23 西南交通大学 一种桥梁现场静载试验评定方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于影响线的模型修正方法初步研究;郭骞;《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》;20080915(第9(2008)期);C034-171 *
基于简易型监测系统的桥梁状态快速评定方法;徐一超 等;《现代交通技术》;20161031;第13卷(第5期);第51-54页 *

Also Published As

Publication number Publication date
CN106706239A (zh) 2017-05-24

Similar Documents

Publication Publication Date Title
CN106706239B (zh) 一种桥梁快速荷载试验测试方法
CN107247830B (zh) 一种汽车悬架k&c特性公差优化方法及系统
US10921216B2 (en) Method and system for efficient load identification
CN101592552B (zh) 预测汽车后悬架多轴疲劳的方法
CN104239734A (zh) 一种整车四轮六分力道路谱载荷分析方法
CN103761363A (zh) 乘用车副车架强度和疲劳分析方法
KR101166321B1 (ko) 하나의 디스플레이부에 차량 중량과 타이어의 압력을 표시하는 방법
CN104412086A (zh) 滚动阻力试验机所具备的多分力检测器的校正方法
CN110781607B (zh) 一种考虑车辆轮载空间分布的桥梁影响面识别方法
Zhao et al. Failure mode analysis of torsion beam rear suspension under service conditions
KR101265149B1 (ko) 고속축중계평가시스템 및 평가 방법
CN112434367A (zh) 汽车悬架疲劳载荷谱的获取方法及装置
CN110967197B (zh) 一种汽车侧翻稳定性分析方法
KR101401958B1 (ko) 개별 오차 보정 방식의 이동식 축중기
CN111090959B (zh) 车辆载荷谱获取方法和系统
CN116659906A (zh) 一种悬架总成道路模拟试验载荷谱确定方法
CN106768234A (zh) 基于经典行作用法的桥面多轴移动荷载的识别方法
Grakovski et al. Multi-purpose fibre optic system for automated vehicle's weighting-in-motion and classification in applications of intelligent transport systems
Chang et al. Analysis of rollover behavior of SUVs in the early phase of chassis development
CN115081116A (zh) 车辆底盘零部件最大应力计算方法、系统及存储介质
CN113320566B (zh) 多列车铰接角零位标定方法、装置和计算机设备
Kersten et al. Modern chassis development as a result of skilfully combining testing and simulation
CN113432894A (zh) 汽车转向拉杆的推力检测系统、方法、设备及存储介质
CN101696891A (zh) 多轴式动态轴称重方法
CN113092288A (zh) 后悬置安装点疲劳试验方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Xie Hailong

Inventor after: Cao Weizhi

Inventor after: Wang Bin

Inventor after: Luo Peng

Inventor after: Zhang Juncheng

Inventor after: Song Maolin

Inventor after: He Xin

Inventor after: Guo Maoquan

Inventor after: Ji Bingliang

Inventor before: Xie Hailong

Inventor before: Zhang Juncheng

Inventor before: Cao Weizhi

Inventor before: Guo Maoquan

Inventor before: Ji Bingliang

Inventor before: Song Maolin

Inventor before: Luo Peng

Inventor before: Wang Bin

Inventor before: He Xin

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20191219

Address after: 030002 No.27, Wuluo street, Taiyuan Economic and Technological Development Zone, Taiyuan City, Shanxi Province

Applicant after: Shanxi Provincial Traffic Construction Engineering Quality Inspection Center (Ltd)

Address before: 030006, No. 79, Xuefu street, Xiaodian District, Shanxi, Taiyuan

Applicant before: Shanxi Province Transport Science Research Institute

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant