CN106638939A - Historic building timber member imitating method - Google Patents

Historic building timber member imitating method Download PDF

Info

Publication number
CN106638939A
CN106638939A CN201611195814.0A CN201611195814A CN106638939A CN 106638939 A CN106638939 A CN 106638939A CN 201611195814 A CN201611195814 A CN 201611195814A CN 106638939 A CN106638939 A CN 106638939A
Authority
CN
China
Prior art keywords
cement mortar
layer
historic building
fire prevention
imitated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611195814.0A
Other languages
Chinese (zh)
Inventor
唐光暹
谢鸿卫
孙富达
赵亮亮
李炳尧
郑毅
邱国兴
李梅
胡波
罗伟
杨渊
谢京伟
莫华俊
黄发君
莫永雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd
Original Assignee
Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd filed Critical Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd
Priority to CN201611195814.0A priority Critical patent/CN106638939A/en
Publication of CN106638939A publication Critical patent/CN106638939A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Panels For Use In Building Construction (AREA)

Abstract

The invention discloses a historic building timber member imitating method. The historic building timber member imitating method comprises the following steps that 1, a timber member model is made; 2, a mold is made; 3, the mold is spliced and reinforced; 4, cement mortar bottoming is performed; 5, steel bars are bundled; 6, middle-layer cement mortar is constructed; 7, an imitated timber member product is spliced; 8, oil paint is applied. The historic building timber member imitating mold is made by using glass reinforced plastic, so that the surface of the imitated timber member product formed through casting is clean and smooth and shows a graceful curve. The material for timber member imitation is convenient to obtain and low in price and is superior to timbers in strength and durability after being hardened. The imitated timber member product is good in prefabricating-splicing effect, and developed imitated timber oil paint has its own characteristics, good applicability and obvious economic benefit and a practical value.

Description

The imitated method of historic building fire prevention
Technical field
The invention belongs to wooden component copies method and technology field, and in particular to a kind of imitated method of historic building fire prevention, Suitable in architectural engineering, especially building in the style of the ancients, garden architecture engineering various wooden components it is imitated.
Background technology
With social development, people start upsurge to pursuing for Chinese traditional culture.Carry as traditional national culture Ancient building, the garden architecture of body is liked all the more by domestic and international personage.It is main with timber as construction material in China's ancient building, And substantial amounts of timber of felling certainly will cause the destruction of forest cover, ecological environment is set to be on the hazard, this does not obviously meet green and applies Work and the strategic requirement of sustainable development.Then the historic building fire prevention Counterfeit Item of various materials arises at the historic moment, especially drawing materials The superior concrete of convenient, physical and mechanical property or cement mortar historic building fire prevention Counterfeit Item are main flow.
Different from the regular of modern architecture component, historic building fire prevention construction is more complex.Many curved lines, curved surface are caused General cement mortar construction means are difficult to replicate the complicated component of the construction such as ancient building eaves head, wing angle.In order to realize cement bonded sand The imitated historic building fire prevention of slurry, it is necessary to specially make shaper, take into full account the intensity of mould and be convenient to mount and dismount.Imitation wood is applied Material must be configured using alkali resistance coating, and covering with paint not only needs to make component have wood effect, and to ensure coating and concrete Component surface is fully combined, it is to avoid the phenomenons such as honeycomb, cracking occur.
The content of the invention
Present invention aims to the problems referred to above of the prior art, there is provided a kind of imitated side of historic building fire prevention Method, makes the prefabricated reinforced concrete imitation wood ancient building structure surface for pouring shaping clean and tidy smooth and graceful curve is presented, and prolonged It is durable.
For achieving the above object, present invention employs following technical scheme:
A kind of imitated method of historic building fire prevention, comprises the steps:
First, wooden component model is made:Model skeleton, then the thin portion with red clay dressing mo del and surface are made with plank, Then die joint is designed according to the physical characteristic of model, along die joint thin plate by block model;
2nd, mould is made:The debris and dust of cleaning model surface, stamp demoulding wax, are equably smeared wax with cotton In model surface, then model top layer is wiped to light with cotton, then brush last layer gel coating resin;Stand to gel coating resin solidification Afterwards, basic unit's fiber glass resin is brushed, glass mat is layered on model, often spread one layer and one layer of glass is applied i.e. on glass fabric Steel resin, until meeting the number of plies needed for mould strength requirement, standing carries out demoulding finishing after fiber glass resin solidifying and setting, plus Bolt hole needed for tool and mould assembly;
3rd, mould is assembled reinforces:According to design die joint, assembled piecemeal die assembly is into monolateral unitary mould;
4th, cement mortar bottoming:The brushing releasing agent on fiber reinforced plastic mold, with air compressor machine one layer of cement mortar is sprayed, and brush is beaten Bottom cement mortar, then covers one layer of fibrous mesh cloth on the surface of cement mortar, and fibrous mesh cloth is pressed into into cement sand bed, Watering maintenance is carried out after cement mortar initial set;
5th, assembling reinforcement:Assembling reinforcement after bottoming mortar final set, and reserved steel bar head;
6th, construction water in intermediate layer cement mortar:After reinforcing bar colligation is finished, swabbing cement mortar covers reinforcing bar, in intermediate layer cement Mortar surface covers one layer of fibrous mesh cloth, then brushed surface cement mortar, and after cement mortar initial set watering maintenance is carried out;
7th, assembled wood component Counterfeit Item:The symmetrical two parts of wooden component Counterfeit Item point carry out assembly, treat that cement mortar reaches and set After meter intensity, by the shaping of wooden component assembly;
8th, brushing paint:Wooden component assembly is polished substrate after finishing, and twice bottom water proof putty of brush, the second secondary coating exists First secondary coating is carried out after parching;After water proof putty is dried, with emery wheel or sand papering one time, twice finish paint of brush, second time Finish paint is carried out after first pass finish paint brushing is parched.
Also include the step of assembled seam is processed between step 7 and step 8:After the completion of wooden component assembly, in assembled seam Place's water drenching wetting, one layer of grid cloth of paving is stamped and repave after cement mortar one layer of grid cloth as bed die, then breaks surface layer cement bonded sand Slurry, showering curing.
Fiber glass resin in above-mentioned steps two participates in appropriate curing agent by epoxy resin and diluent is made.
Bolt hole in above-mentioned steps two is drilled using jackhammer, the size for being smaller in size than bolt in hole.
Bottoming cement mortar in above-mentioned steps four adopts coarse sand, and the cement mortar mix ratio is 1:2, mix polyphosphazene polymer Compound emulsion, volume is the 15% of cement quality.
Fibrous mesh cloth in above-mentioned steps four and step 6 adopts alkali resistant fiberglass gridding cloth, and mesh size is 10mm×10mm。
In above-mentioned steps seven, before the symmetrical two parts of wooden component Counterfeit Item point carry out assembly, first in wooden component Counterfeit Item Portion is installed by assembled bracing frame.
Finish paint in above-mentioned steps eight adopts alkali resistance coating, finish paint Color tunable.
Compared to prior art, advantage of the invention is that:
(1) historic building fire prevention cast material is done using red clay, using the plasticity of clay, ancient building wood can be realized The carving pattern of the complicated shape design of component and component surface.
(2) after model waxing, then one layer of gel coating resin of brush, make the smooth exquisiteness of model surface, more easy mold release.
(3) fiber glass resin for making mould participates in appropriate solidification according to the environment of first job site by epoxy resin Agent, accelerator are made, and adjust the viscosity of fiber glass resin, it is to avoid gummosis.The time of fiber glass resin solidification is controlled simultaneously, Mold Making is set to carry out calmly.
(4) before the construction of bottoming mortar, first one layer of cement mortar is sprayed with air compressor machine, makes component surface smooth, remove imitation wood painting from Material covers with paint, lacquer, colour wash, etc. front large area base grinding process.
(5) twice alkali resistance fiber grid cloth is added in wooden component Counterfeit Item, the crack developing of component can be effectively prevented, Ensure that the intensity and durability of component.
(6) the historic building fire prevention Counterfeit Item made by the present invention, is capable of achieving the various complicated structures of historic building fire prevention Make, reach the artistic effect of ancient building, the historic building fire prevention material therefor of the present invention draw materials conveniently, price it is relatively low, after hardening Intensity, durability are superior to timber;Wooden component Counterfeit Item precast assembly works well, and the imitation wood paint of development has itself special Color, possesses more preferable applicability, with obvious economic benefit and practical value.
Description of the drawings
Fig. 1 is ancient building eaves head threedimensional model.
Fig. 2 is ancient building eaves head model parting Surface Design schematic diagram.
Fig. 3 is that ancient building eaves head mould tool reinforces schematic diagram.
Fig. 4 is demoulding suspension hook layout drawing.
Fig. 5 is ancient building eaves head Counterfeit Item framework of steel reinforcement layout drawing.
Fig. 6 is ancient building eaves head Counterfeit Item assembly bracing frame schematic diagram.
Fig. 7 is ancient building eaves head Counterfeit Item steel pipe assembly frame schematic diagram.
In figure:1. angle steel;2. steel plate;3. demoulding suspension hook;4. suspension hook is lifted;5. top-support muscle;6. bottom bracket muscle.
Specific embodiment
With reference to embodiments and its accompanying drawing is further non-limitingly described in detail to technical solution of the present invention.
The imitated method of the present embodiment historic building fire prevention, comprises the steps:
First, wooden component model is made:As shown in figure 1, making equal proportion model according to the design drawing of ancient building eaves head, use Lightweight plywood makes model skeleton, then the thin portion with red clay dressing mo del and surface, sketches the contours of the camber line and eaves head of eaves head The carving lines of two sides, it is ensured that moulded dimension and two sides camber line moulding coincide with design drawing;The side form of ancient building eaves head two Tool is fabricated separately, and unilateral mould designs die joint, as shown in Fig. 2 parting Surface Design is with shape according to the physical characteristic of eaves head model Shape is simple, and the easy demoulding is principle, along die joint thin plate by block model;
2nd, mould is made:The debris and dust of cleaning model surface, stamp 8# demoulding waxes, with clean cotton rotating Mode wax is equably applied in model surface, after 15 minutes, then fuzzy top layer is wiped to light gradually with clean cotton It is bright, then brush last layer HR-33# metaphenylene gel coating resins;
Fiber glass resin, (20 DEG C) epoxy resin, acetone, curing agent quality under normal temperature are prepared according to the environment of job site Than for 10:1:2, temperature adjustment consumption of the curing agent according to job site at that time;First epoxy resin is heated, its viscosity is reduced; Add acetone, mechanical agitation or it is manual stir after, add curing agent, after stirring by use;
Stand to gel coating resin solidification, brush basic unit's fiber glass resin, glass mat is layered on model, often spread one layer i.e. One layer of fiber glass resin, the consumption of strict control fiber glass resin, with abundant sized glass fibres felt are applied on glass fabric It is defined, with hairbrush that fiber glass resin brushing is uniform, pressed glass fibrofelt drives bubble out of, has often brushed one layer of fiber glass resin Half an hour is stood, fiber glass resin curing exotherm is treated, then carries out next layer of construction, until meeting layer needed for mould strength requirement Number;Standing carries out demoulding finishing, the bolt hole needed for processing mold assembly, bolt hole for two days after fiber glass resin solidifying and setting Drilled using jackhammer, the size for being smaller in size than bolt in hole, spacing about 10cm;
3rd, mould is assembled reinforces:According to design die joint, assembled piecemeal die assembly is into monolateral unitary mould;According to setting Meter die joint, assembled piecemeal die assembly into monolateral unitary mould, with angle steel 1, the processing and fabricating mold bottom support of steel plate 2, plus The rigidity and globality of strong middle block mould;As shown in figure 3, the two L30 × 30 × 5mm angle steel 1 of long side direction presses eaves head Radian bends, and angle steel 1 is connected by the spot welding of 30 × 5mm steel plates 2, and the arrangement pitch of steel plate 2 is less than 1m;
4th, cement mortar bottoming:The brushing releasing agent on fiber reinforced plastic mold, with air compressor machine one layer of cement mortar, sprinkling are sprayed After cement mortar, demoulding suspension hook 3 is set, as shown in figure 4, demoulding suspension hook 3 adopts the reinforcement fabrication of diameter 12, height control is in 20cm Interior, eaves head is encorbelmented and holds two extractor hoods of arrangement, anchored end to arrange an extractor hood;After demoulding suspension hook 3 is arranged, brush bottoming cement Mortar 2cm is thick, uses wooden float dense extrusion, bottoming cement mortar to adopt coarse sand, cement, sand match ratio 1:2, mix polyphosphazene polymer Compound emulsion, volume is the 15% of cement quality;Then one layer of fibrous mesh cloth, fiber mesh are covered on the surface of cement mortar Cloth adopts alkali resistant fiberglass gridding cloth, and mesh size is 10mm × 10mm;Fibrous mesh cloth is pressed into into cement sand bed, (1h-2h) carries out watering maintenance after cement mortar initial set, and curing time is no less than 7 days;
5th, assembling reinforcement:(4h) assembling reinforcement after bottoming mortar final set, and reserved steel bar head;As shown in figure 5, longitudinal direction is received Power bar diameter 12-18mm, distribution bar diameter 8mm, Reinforcement presses eaves head design bending curvature, and spacing is not more than 100mm, distribution bar spacing 250mm, distribution bar stretches out component 3-5cm, welds for ancient building eaves head Counterfeit Item to be assembled.
6th, construction water in intermediate layer cement mortar:After reinforcing bar colligation is finished, swabbing cement mortar covers reinforcing bar, in intermediate layer cement Mortar surface covers one layer of fibrous mesh cloth, and fibrous mesh cloth adopts alkali resistant fiberglass gridding cloth, and mesh size is 10mm ×10mm;Then brushed surface cement mortar, cement mortar adopts coarse sand, cement, sand match ratio 1:2, mix high molecular polymer Emulsion, volume is the 15% of cement quality.Wooden float dense extrusion, intermediate layer is used reinforcing bar to be completely covered and makes cover to reinforcement thick Degree reaches 1cm, and in intermediate layer, mortar surface covers one layer of alkali resistance fiber grid cloth, prevents cracking.And then construct surface layer water Cement mortar, thickness 0.5-1cm.(1h-2h) carries out watering maintenance after cement mortar initial set, and curing time is no less than 7 days;
7th, assembled wood component Counterfeit Item:Assembled bracing frame is installed inside wooden component Counterfeit Item, wooden component Counterfeit Item point is right Two parts are claimed to carry out assembly, after cement mortar reaches design strength, by the shaping of wooden component assembly;
As shown in fig. 6, after the monolateral ancient building eaves head Counterfeit Item lifting demoulding, in two reserved opening position welding lifting suspension hooks 4, suspension hook is made using diameter 18mm spirals, is welded with demoulding suspension hook 3;The elongated arrangement of eaves overhead seaming position one Frame muscle, reserved distributing reinforcement bend inwards after 90 degree with the welding of support muscle;The elongated arrangement L30 × 30 × He of 5mm angle steel 1 in eaves head bottom Diameter 18mm bottom brackets muscle 6, with the reserved distributing reinforcement welding in bottom;Top-support muscle 5, bottom bracket muscle 6, angle steel 1 pass through Diameter 16mm reinforcement weldings connect to form assembled bracing frame;30 × 5mm steel plates 2 are welded on angle steel 1, steel plate 2 perpendicular to angle steel 1, Length be eaves head bottom width, spacing 0.5m;Bracing frame and suspension hook etc. expose part brush antirust paint.
As shown in fig. 7, setting up assembled frame with steel pipe, the monolateral ancient building eaves head Counterfeit Item for being welded with steel plate is hung into assembled frame On, other half of eaves head is hung on assembled frame after fixing, it is welded and fixed after adjustment good position;
8th, assembled seam is processed:The water drenching wetting at the assembled seam of prefabricated eaves overhead and rear and front end, paving after the completion of assembly One layer of alkali resistance fiber grid cloth as bed die, cement mortar of fetching water, cement, sand match ratio 1:2, mix high molecular polymer breast Liquid, volume is the 15% of cement quality, and repaving one layer of alkali resistance fiber grid cloth prevents cracking, anticracking fibrous mesh cloth from comparing tape edge Wide 10cm, then beats surface layer cement mortar, showering curing;
9th, brushing paint:Before paint is brushed, there should be enough curing periods, prefabricated eaves head will fully be dried, and surface humidity exists Less than 10%, surface alkalinty pH value is less than 10;With emery wheel or sand papering substrate surface, slurry quarrel, floating sand are removed;
Mixing water proof putty basic unit, powder of lacquer putty for use on, water quality compare 1:0.6, place 10 minutes after stirring, then be stirred Can use;With steel scraper plate or spatula routinely Pi Gua water proof putties basic unit twice, batch thickness 0.5-1.0mm is scraped, applied for second Layer is carried out after the first secondary coating is parched;After water proof putty is dried, with emery wheel or sand papering one time, painting brushes one times white and changes Property acrylic acid top-coat, thickness 0.5-1.0mm brushes twice white black modified acroleic acid finish paint compo shaping after parching, per time Thickness 0.5-1.0mm, white black modified acroleic acid finish paint is black in vain to compare 5:1.More than 2 hours (25 DEG C after compo first pass brushing When, drying time can change with environment temperature, humidity different) brush second time again, too short repainting time can cause following Dried coating film it is slow, there is corrugation, resistance to water and poor adhesive force, carry out finished product protection after finish paint is dried;Finish paint is using resistance to Alkaline coating, finish paint Color tunable.
Tenth, using material and plant equipment
Equipment:Bar cropper 1, angle-bender 1, bar straightener 1,30KWA A.C. welders 2, hand Carry electric saw 8, sander 2, mortar mixer 1,25T truck cranes 1, air compressor machine etc..
Material:Fiber glass resin, 8# waxes, 33# gel coats, glass fiber mesh felt, water proof putty, ippon QC-629 modified propylenes Sour face painting, 48 × 3.0 steel pipes (fastener is supporting), 50 × 80 × 2000mm lumps of wood, L30 × 30 × 5mm angle steel, 30 × 5mm steel plates, 320 or 240 sand paper,Reinforcing bar, the reinforcing bars of 12~Φ of Φ 20, interleaving agent, No. 14 galvanized wires, 19mm fibrous mesh cloths, cement, Coarse sand, emulsion polymerization, antirust paint etc..
In sum, the imitated method of historic building fire prevention of the invention has the advantage that:
(1) historic building fire prevention cast material is done using red clay, using the plasticity of clay, ancient building wood can be realized The carving pattern of the complicated shape design of component and component surface.
(2) after model waxing, then one layer of gel coating resin of brush, make the smooth exquisiteness of model surface, more easy mold release.
(3) fiber glass resin for making mould participates in appropriate solidification according to the environment of first job site by epoxy resin Agent, accelerator are made, and adjust the viscosity of fiber glass resin, it is to avoid gummosis.The time of fiber glass resin solidification is controlled simultaneously, Mold Making is set to carry out calmly.
(4) before the construction of bottoming mortar, first one layer of cement mortar is sprayed with air compressor machine, makes component surface smooth, remove imitation wood painting from Material covers with paint, lacquer, colour wash, etc. front large area base grinding process.
(5) twice alkali resistance fiber grid cloth is added in wooden component Counterfeit Item, the crack developing of component can be effectively prevented, Ensure that the intensity and durability of component.
(6) the historic building fire prevention Counterfeit Item made by the present invention, is capable of achieving the various complicated structures of historic building fire prevention Make, reach the artistic effect of ancient building, the historic building fire prevention material therefor of the present invention draw materials conveniently, price it is relatively low, after hardening Intensity, durability are superior to timber;Wooden component Counterfeit Item precast assembly works well, and the imitation wood paint of development has itself special Color, possesses more preferable applicability, with obvious economic benefit and practical value.
It is pointed out that above-described embodiment technology design only to illustrate the invention and feature, its object is to allow ripe The personage for knowing technique will appreciate that present disclosure and implements according to this, can not limit the protection model of the present invention with this Enclose.All equivalence changes made according to spirit of the invention or modification, all should be included within the scope of the present invention.

Claims (8)

1. a kind of imitated method of historic building fire prevention, it is characterised in that comprise the steps:
First, wooden component model is made:Model skeleton, then the thin portion with red clay dressing mo del and surface are made with plank, then Die joint is designed according to the physical characteristic of model, along die joint thin plate by block model;
2nd, mould is made:The debris and dust of cleaning model surface, stamp demoulding wax, and wax is equably applied in mould with cotton Type surface, then model top layer is wiped to light with cotton, then brush last layer gel coating resin;Stand to gel coating resin solidification, brush Basic unit's fiber glass resin, glass mat is layered on model, often spreads one layer and one layer of fiberglass tree is applied i.e. on glass fabric Fat, until meeting the number of plies needed for mould strength requirement, standing carries out demoulding finishing, processing mould after fiber glass resin solidifying and setting Bolt hole needed for tool assembly;
3rd, mould is assembled reinforces:According to design die joint, assembled piecemeal die assembly is into monolateral unitary mould;
4th, cement mortar bottoming:The brushing releasing agent on fiber reinforced plastic mold, with air compressor machine one layer of cement mortar, brush bottoming water are sprayed Cement mortar, then covers one layer of fibrous mesh cloth on the surface of cement mortar, fibrous mesh cloth is pressed into into cement sand bed, in water Watering maintenance is carried out after cement mortar initial set;
5th, assembling reinforcement:Assembling reinforcement after bottoming mortar final set, and reserved steel bar head;
6th, construction water in intermediate layer cement mortar:After reinforcing bar colligation is finished, swabbing cement mortar covers reinforcing bar, in water in intermediate layer cement mortar Surface covers one layer of fibrous mesh cloth, then brushed surface cement mortar, and after cement mortar initial set watering maintenance is carried out;
7th, assembled wood component Counterfeit Item:The symmetrical two parts of wooden component Counterfeit Item point carry out assembly, treat that cement mortar reaches design strong After degree, by the shaping of wooden component assembly;
8th, brushing paint:Wooden component assembly is polished substrate after finishing, twice bottom water proof putty of brush, and the second secondary coating is first Secondary coating is carried out after parching;After water proof putty is dried, with emery wheel or sand papering one time, twice finish paint of brush, second time finish paint Carry out after first pass finish paint brushing is parched.
2. according to a kind of imitated method of the historic building fire prevention described in claim 1, it is characterised in that in step 7 and step Also include the step of assembled seam is processed between rapid eight:After the completion of wooden component assembly, the water drenching wetting at assembled seam spreads one layer of grid Cloth is stamped and repave after cement mortar one layer of grid cloth as bed die, then beats surface layer cement mortar, showering curing.
3. according to a kind of imitated method of the historic building fire prevention described in claim 1, it is characterised in that:In the step 2 Fiber glass resin appropriate curing agent is participated in by epoxy resin and diluent is made.
4. according to a kind of imitated method of the historic building fire prevention described in claim 1, it is characterised in that:In the step 2 Bolt hole using jackhammer drill, the size for being smaller in size than bolt in hole.
5. according to a kind of imitated method of the historic building fire prevention described in claim 1, it is characterised in that:In the step 4 Bottoming cement mortar adopt coarse sand, the cement mortar mix ratio be 1:2, emulsion polymerization is mixed, volume is cement The 15% of quality.
6. according to a kind of imitated method of the historic building fire prevention described in claim 1, it is characterised in that:The step 4 and Fibrous mesh cloth in step 6 adopts alkali resistant fiberglass gridding cloth, and mesh size is 10mm × 10mm.
7. according to a kind of imitated method of the historic building fire prevention described in claim 1, it is characterised in that:The step 7 In, before the symmetrical two parts of wooden component Counterfeit Item point carry out assembly, assembled bracing frame is first installed inside wooden component Counterfeit Item.
8. according to a kind of imitated method of the historic building fire prevention described in claim 1, it is characterised in that:In the step 8 Finish paint adopt alkali resistance coating, finish paint Color tunable.
CN201611195814.0A 2016-12-22 2016-12-22 Historic building timber member imitating method Pending CN106638939A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611195814.0A CN106638939A (en) 2016-12-22 2016-12-22 Historic building timber member imitating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611195814.0A CN106638939A (en) 2016-12-22 2016-12-22 Historic building timber member imitating method

Publications (1)

Publication Number Publication Date
CN106638939A true CN106638939A (en) 2017-05-10

Family

ID=58834238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611195814.0A Pending CN106638939A (en) 2016-12-22 2016-12-22 Historic building timber member imitating method

Country Status (1)

Country Link
CN (1) CN106638939A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111247994A (en) * 2018-11-14 2020-06-09 艾姆斯南方公司 Moulded pots obtained from hand-made pots
CN114837358A (en) * 2022-03-05 2022-08-02 山西三建集团有限公司 Prefabricating and paving method for arc-shaped prefabricated member installed at roof flashing position

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4052829A (en) * 1976-03-17 1977-10-11 Chapman Ward W Semi-prefabricated monolithic steel-reinforced cement building construction
CN1272576A (en) * 1999-04-30 2000-11-08 王启新 Method for building Chinese-Western classic style buildings by adopting cement-pouring process in mould
CN1316342A (en) * 2000-04-06 2001-10-10 北京市东方御轩科技发展有限公司 Method for making models of pseudo-classic architecture
CN1364684A (en) * 2001-01-18 2002-08-21 聂瑞代 Prefabricated production method of artificial Ming-Qing ancient building component
CN1632250A (en) * 2004-12-29 2005-06-29 张福营 Method for constructing assembled type archaized buildings
CN102080453A (en) * 2010-12-22 2011-06-01 陕西省第三建筑工程公司 Process for prefabricating and constructing concrete rafters of pseudo-classic architectures
CN102824991A (en) * 2011-12-31 2012-12-19 常熟古建园林建设集团有限公司 Method for painting wooden products of historic buildings

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4052829A (en) * 1976-03-17 1977-10-11 Chapman Ward W Semi-prefabricated monolithic steel-reinforced cement building construction
CN1272576A (en) * 1999-04-30 2000-11-08 王启新 Method for building Chinese-Western classic style buildings by adopting cement-pouring process in mould
CN1316342A (en) * 2000-04-06 2001-10-10 北京市东方御轩科技发展有限公司 Method for making models of pseudo-classic architecture
CN1364684A (en) * 2001-01-18 2002-08-21 聂瑞代 Prefabricated production method of artificial Ming-Qing ancient building component
CN1139466C (en) * 2001-01-18 2004-02-25 聂瑞代 Prefabricated production method of artificial Ming-Qing ancient building component
CN1632250A (en) * 2004-12-29 2005-06-29 张福营 Method for constructing assembled type archaized buildings
CN102080453A (en) * 2010-12-22 2011-06-01 陕西省第三建筑工程公司 Process for prefabricating and constructing concrete rafters of pseudo-classic architectures
CN102824991A (en) * 2011-12-31 2012-12-19 常熟古建园林建设集团有限公司 Method for painting wooden products of historic buildings

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111247994A (en) * 2018-11-14 2020-06-09 艾姆斯南方公司 Moulded pots obtained from hand-made pots
CN114837358A (en) * 2022-03-05 2022-08-02 山西三建集团有限公司 Prefabricating and paving method for arc-shaped prefabricated member installed at roof flashing position

Similar Documents

Publication Publication Date Title
CN103470067B (en) Transformation and construction method used for facing bare concrete of existing building outer wall
CN103015717B (en) Rear superelevation steel pipe column outsourcing Construction technology of fair-faced concrete closed by a kind of floor
CN100337804C (en) Apparatus and method for producing foaming concrete construction wall plate coated by glass fiber reinforced cement
CN101585205A (en) Method for producing and mounting moulded concrete anaglyph unit plate
CN110107085A (en) Superelevation fair-faced concrete column construction method
CN102584138A (en) Precast glass fiber reinforced cement (GRC) composite member and manufacturing method thereof
CN111364754A (en) Construction method of art wood grain veneer fair-faced concrete
CN106638939A (en) Historic building timber member imitating method
CN105216531A (en) Moulded concrete decoration plate with relief sculpture is produced and installation method
CN102691423B (en) Construction method for duplicating soft mould and installing building granitic plaster floriation member
CN101121305A (en) Reproduced stone and preparing method thereof
CN209243999U (en) A kind of sculpture cement exterior wall
CN104441199A (en) Large cement flowerpot manufacturing process
CN106956541A (en) A kind of manufacture craft of waterproof pulp handicraft
CN103252309B (en) Method for processing surface of plastic wood-imitating floor
CN103195238A (en) Dismantling-free stiffened composite template and manufacturing and using method thereof
CN202450688U (en) Prefabricated glass fiber reinforced plastic composite (GRC) component
CN101892739A (en) Disposable building formwork
CN106121214B (en) Glass steel composite wooden template and production technology
CN101306548A (en) Production method of economical and durable wood-like products
CN1038117C (en) Making method for colour facing concrete board
CN113802844A (en) Rammed-earth-imitating manufacturing technology for building wall surface and auxiliary lining curve mold strip thereof
CN109809784B (en) Method for processing gypsum board convex pattern
CN207846756U (en) A kind of image decorating wall
CN214498066U (en) Decorate prefabricated light wallboard of heat preservation integration

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170510

WD01 Invention patent application deemed withdrawn after publication