CN1364684A - Prefabricated production method of artificial Ming-Qing ancient building component - Google Patents
Prefabricated production method of artificial Ming-Qing ancient building component Download PDFInfo
- Publication number
- CN1364684A CN1364684A CN 01102212 CN01102212A CN1364684A CN 1364684 A CN1364684 A CN 1364684A CN 01102212 CN01102212 CN 01102212 CN 01102212 A CN01102212 A CN 01102212A CN 1364684 A CN1364684 A CN 1364684A
- Authority
- CN
- China
- Prior art keywords
- building
- ming
- producing
- butt welding
- antique
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 title claims description 6
- 238000003466 welding Methods 0.000 claims abstract description 11
- 239000004567 concrete Substances 0.000 claims abstract description 8
- 239000003292 glue Substances 0.000 claims abstract description 5
- 239000000463 material Substances 0.000 claims description 10
- 229920002379 silicone rubber Polymers 0.000 claims description 7
- 239000011150 reinforced concrete Substances 0.000 claims description 6
- 239000000178 monomer Substances 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 9
- 230000007306 turnover Effects 0.000 abstract description 3
- 238000005266 casting Methods 0.000 abstract description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract 1
- 238000011065 in-situ storage Methods 0.000 abstract 1
- 238000009417 prefabrication Methods 0.000 abstract 1
- 230000002787 reinforcement Effects 0.000 abstract 1
- 239000002023 wood Substances 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 9
- 241000274582 Pycnanthus angolensis Species 0.000 description 2
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 2
- 239000011087 paperboard Substances 0.000 description 2
- 239000000741 silica gel Substances 0.000 description 2
- 229910002027 silica gel Inorganic materials 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 241000219112 Cucumis Species 0.000 description 1
- 235000015510 Cucumis melo subsp melo Nutrition 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- FJJCIZWZNKZHII-UHFFFAOYSA-N [4,6-bis(cyanoamino)-1,3,5-triazin-2-yl]cyanamide Chemical compound N#CNC1=NC(NC#N)=NC(NC#N)=N1 FJJCIZWZNKZHII-UHFFFAOYSA-N 0.000 description 1
- 238000004512 die casting Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
The invention relates to a method for building an antique building, which comprises the steps of firstly making a basic physical component of a wood structure of the antique building, then using mould glue to turn over the basic physical component and selecting a proper concrete grade and a proper reinforcing steel bar reinforcement ratio, using the mould obtained in the step 2 to perform component prefabrication, finally selecting the prefabricated component according to the antique building to be built, hoisting, splicing, butt welding the prefabricated component, and casting concrete on the butt welding part in situ.
Description
The present invention relates to a kind of method of construction of archaized architecture, particularly a kind of method of building artificial pseudo-classic architecture by element precast.
Present building in the style of the ancients mainly adopts the method for construction of box board, promptly spliced after the wooden profile again at the center casting reinforced concrete with box board, this method of construction effort is time-consuming, waste timber, cost height, and fidelity is not high, be difficult to build true to naturely for bright clear ancient building especially, this is because the eaves structure more complicated of bright clear ancient building adopts traditional method of construction just more difficult, such as the existing bright clear ancient building in Summer Villa, adopt traditional construction modelled after an antique just very difficult.
The objective of the invention is to design a kind of time saving and energy saving, saving timber, with low cost, the ancient building method of construction of complete simulation.
The object of the present invention is achieved like this: it comprises following step: 1. the member basic in kind of making historic building structure; 2. with mold glue above-mentioned basic member in kind is turned over mould; 3. press the designing requirement of reinforced concrete structural strength, choose suitable concrete grade and rebar ratio, carry out element precast with the 2nd mould that goes on foot gained; 4. the ancient building of building is as required selected prefabricated member, to the prefabricated components lifting splicing butt welding that chooses, and to the cast-in-place concrete of butt welding part.
The described basic member in kind of step 1 comprises wing angle material object in the said method, the combination beam material object that eaves purlin, purlin backing plate, eave beam, flower Beam capitiform become, beam frame structure monomer material object etc.
Above-mentioned steps 2 described mold glues are silicon rubber;
The silicon rubber that above-mentioned silicon rubber selection has good quality.
The present invention is owing to select the member conduct basic in kind of timber structure to turn over the substrate of mould, and the member in kind of timber structure can be done true to naturely fully, therefore particularly bright clear eaves structure can be done remarkably true to lifely especially, turns over the prefabricated components that the die casting of system comes out with this timber structure and just can reach true to nature completely.Because prefabricated component all is to be cast by mould to form, can produce various prefabricated components in batches, the structure of imitated ancient building size and quantity is on demand selected prefabricated component as required then, transport to ground is installed, lifting splicing butt welding can make building in the style of the ancients build moulding, again to the cast-in-place concrete of butt welding part, can finish the construction of building in the style of the ancients, therefore above-mentioned method of construction is time saving and energy saving, only the ancient building that needs very short time and less personnel can build a complete simulation because whole ancient building adopts the reinforced concrete structure, can be saved a large amount of timber, member batch is produced, and construction cost is reduced greatly.
The present invention is described further below in conjunction with embodiment.
Embodiment 1: the bright clear square pavilion of emulation: each one on the wooden material object of 1 wing angle full pattern of at first making timber structure, identity roofing material object, the basic building blocks such as combination beam material object, pillar and purlin material object that become by eaves purlin, purlin backing plate, eave beam, flower Beam capitiform; 2. with silicon rubber above-mentioned basic member in kind is turned over mould; 3. press the designing requirement of reinforced concrete structural strength, choose the concrete and the rebar ratio of corresponding label, the 2nd mould that goes on foot gained is carried out element precast, above-mentioned prefabricated component is all reserved the bar splicing part, and above-mentioned prefabricated component can be produced in batches according to mould; 4. the square pavilion of building is as required selected prefabricated member, comprise that wing angle, identity roofing and combination beam number spare etc. partly lift the splicing butt welding with flange angle muscle overlap and the bar splicing of identity roofing respectively, combination beam bar splicing part partly lifts the splicing butt welding to the combination beam bar splicing, and squeegee to overlap is cast-in-place, add ridge step roofing after
Watt, Jia Baoding promptly builds up required bright clear square pavilion.
Embodiment 2: do the bright clear ancient building of three standard width of a room in an old-style house 5-purlin beam mountain structures of having a rest: make the part full pattern of wing angle full pattern, identity roofing earlier, the combination beam full pattern that the angle part, room is become by eaves purlin, purlin backing plate, eave beam, flower Beam capitiform, mid portion and melon post full pattern, pillar and the purlin full pattern of three, five Beam 1.; 2 usefulness silica gel turn over mould to above-mentioned full pattern; The silica gel mould of above-mentioned 2 gained of 3 usefulness makes the steel reinforced concrete prefabricated component; 4 with above-mentioned prefabricated component by gable and hip roof structure assembly unit butt welding, squeegee, and press
The bricklayer preface is carried out
Watt.
Claims (4)
1. a prefabricating method for producing Ming-Qing dynasty antique building member is characterized in that it comprises following step: 1). make the member basic in kind of historic building structure; 2). with mold glue above-mentioned basic member in kind is turned over mould; 3). press the designing requirement of reinforced concrete structural strength, choose suitable concrete grade and rebar ratio, carry out element precast with the 2nd mould that goes on foot gained; 4). the ancient building of building is selected prefabricated member as required, to the prefabricated components lifting splicing butt welding that chooses, and to the cast-in-place concrete of butt welding part.
2. prefabricating method for producing Ming-Qing dynasty antique building member according to claim 1, the member basic in kind that it is characterized in that described step 1 comprises wing angle material object, the combination beam material object that eaves purlin, purlin backing plate, eave beam, flower Beam capitiform become, beam frame structure monomer material object etc.
3. prefabricating method for producing Ming-Qing dynasty antique building member according to claim 1 is characterized in that the described mold glue of described step 2 is a silicon rubber;
4. prefabricating method for producing Ming-Qing dynasty antique building member according to claim 3 is characterized in that the silicon rubber that described silicon rubber selection has good quality.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB011022124A CN1139466C (en) | 2001-01-18 | 2001-01-18 | Prefabricated production method of artificial Ming-Qing ancient building component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB011022124A CN1139466C (en) | 2001-01-18 | 2001-01-18 | Prefabricated production method of artificial Ming-Qing ancient building component |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1364684A true CN1364684A (en) | 2002-08-21 |
CN1139466C CN1139466C (en) | 2004-02-25 |
Family
ID=4652560
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB011022124A Expired - Fee Related CN1139466C (en) | 2001-01-18 | 2001-01-18 | Prefabricated production method of artificial Ming-Qing ancient building component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1139466C (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1302902C (en) * | 2004-03-03 | 2007-03-07 | 黄半耕 | Manufacturing method of wood imitation prefabricate construction member for building |
CN102922590A (en) * | 2012-11-08 | 2013-02-13 | 中交第一航务工程局有限公司 | Precast concrete unit vertical butt matching turnover formwork process method |
CN103753693A (en) * | 2013-10-31 | 2014-04-30 | 中交第一航务工程局有限公司 | Vertical matching manufacturing method for precast concrete members |
CN105908889A (en) * | 2016-04-29 | 2016-08-31 | 陕西建工第三建设集团有限公司 | Construction method for prefabrication and reverse installation of cornice concrete decoration members of archaistic building |
CN106638939A (en) * | 2016-12-22 | 2017-05-10 | 广西建工集团第建筑工程有限责任公司 | Historic building timber member imitating method |
CN107190919A (en) * | 2017-05-18 | 2017-09-22 | 江苏龙冠新型材料科技有限公司 | A kind of multifunction imitated palaiotype roofing and its manufacture method |
-
2001
- 2001-01-18 CN CNB011022124A patent/CN1139466C/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1302902C (en) * | 2004-03-03 | 2007-03-07 | 黄半耕 | Manufacturing method of wood imitation prefabricate construction member for building |
CN102922590A (en) * | 2012-11-08 | 2013-02-13 | 中交第一航务工程局有限公司 | Precast concrete unit vertical butt matching turnover formwork process method |
CN103753693A (en) * | 2013-10-31 | 2014-04-30 | 中交第一航务工程局有限公司 | Vertical matching manufacturing method for precast concrete members |
CN105908889A (en) * | 2016-04-29 | 2016-08-31 | 陕西建工第三建设集团有限公司 | Construction method for prefabrication and reverse installation of cornice concrete decoration members of archaistic building |
CN105908889B (en) * | 2016-04-29 | 2018-04-03 | 陕西建工第三建设集团有限公司 | Building in the style of the ancients cornice concrete decoration element is prefabricated and reverse construction method of installation |
CN106638939A (en) * | 2016-12-22 | 2017-05-10 | 广西建工集团第建筑工程有限责任公司 | Historic building timber member imitating method |
CN107190919A (en) * | 2017-05-18 | 2017-09-22 | 江苏龙冠新型材料科技有限公司 | A kind of multifunction imitated palaiotype roofing and its manufacture method |
Also Published As
Publication number | Publication date |
---|---|
CN1139466C (en) | 2004-02-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106088326B (en) | Assembling frame rod structure based on 3D printing | |
CN103470040A (en) | Splicing method of composite floor slab and beam | |
CN103009477A (en) | Construction method for prefabricated components for prefabricated component factory | |
CN104727476A (en) | Assembly type light 3D steel bar truss floor plate and manufacturing method thereof | |
CN105839784B (en) | Assembled jacking type construction techniques | |
GB2056524A (en) | Building module | |
CN1364684A (en) | Prefabricated production method of artificial Ming-Qing ancient building component | |
CN112853983B (en) | Manufacturing and on-site assembling process of light segment prefabricated bridge pier | |
CN211899849U (en) | Assembled integral type railway platform concrete single-column canopy structure | |
CN1279250C (en) | Method for constructing assembled type archaized buildings | |
CN111663695A (en) | Assembly type template-free box-type floor system and construction process thereof | |
CN107268755A (en) | A kind of construction method of inlet for stom water | |
CN1108721A (en) | Method of post-tensioning steel/concrete truss before installation | |
CN111719578B (en) | Archaized building and construction process | |
CN214696361U (en) | Cavity floor based on assembled coincide box with a net | |
CN107035022A (en) | A kind of exterior wall built through cast-in-place overlapping precast concrete plate and its construction method | |
CN113417218A (en) | Prestressed concrete half-inverted T-shaped invisible bent cap steel-wood combined template and construction method | |
CN106760936A (en) | A kind of light-duty Assembled enclosing wall of post-tensioned prestressing | |
CN206873670U (en) | A kind of exterior wall through cast-in-place overlapping precast concrete plate structure | |
WO2001048327A1 (en) | A quickly building method with permanent fancy self-fixing plate | |
CN112761294A (en) | Cavity floor based on assembled superposed net cages and construction method | |
CN1073658C (en) | 3-D Structure System for building and construction method therefor | |
CN1166560A (en) | Construction method and basic structural members for framework of building | |
CN220099972U (en) | Assembled superposed retaining wall | |
CN221822947U (en) | Assembled building foundation of transformer substation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |