系杆拱桥吊杆智能更换系统 Download PDFInfo
- Publication number
- CN106592448A CN106592448A CN201611138370.7A CN201611138370A CN106592448A CN 106592448 A CN106592448 A CN 106592448A CN 201611138370 A CN201611138370 A CN 201611138370A CN 106592448 A CN106592448 A CN 106592448A
- Authority
- CN
- China
- Prior art keywords
- hydraulic
- arch bridge
- distribution
- central controller
- distributive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
Abstract
本发明公开了一种系杆拱桥吊杆智能更换系统,其包括两根分配梁,所述两根分配梁间隔设置,并相互连接;多个液压支腿,多个所述液压支腿分别安装在所述分配梁下表面,用于支撑所述分配粱;多根连杆一端与分配梁连接;下锚梁,所述下锚梁位于所述分配梁下方,并与多根连杆的另一端连接;液压泵站,所述液压泵站与所述液压支腿通过液压油管连通;中央控制器,所述中央控制器用于控制液压泵站的工作;静力水准仪,所述静力水准仪与所述中央控制器通信连接。本发明可实现新旧吊杆与临时承载体系两次内力的无级连续转化,位移变化控制精准且曲线圆滑。全过程数据采集自动化、数据分析控制智能化、位移与力的控制精准,记录和输出监控数据文件。
Description
技术领域
本发明涉及一种系杆拱桥吊杆智能更换系统。
背景技术
近年来,下承式系杆拱桥因具有结构受力合理、造价经济、桥型美观、与周围环境协调性好等优点,从而在城市道路桥梁建设中得到广泛应用。
然而系杆拱桥的主要承载构件——吊杆,受限于材料特性、加工工艺、施工质量、运营养护等多种原因,实际使用寿命往往在12~18年之间,故我国先期建设的系杆拱桥也陆续进入吊杆更换的第一个周期。
目前系杆拱桥吊杆更换的方法主要采用临时吊杆,在需要更换的吊杆周围设置临时吊杆。临时吊杆与原吊杆采用相同的方式连接。这样操作不仅工序多、操作不方便,耗时长,且成本高,劳动强度大。而且,在更换吊杆时,无法同时更换多根;且在更换时无法正常使用拱桥,影响交通正常通行,施工非常不便。
发明内容
本发明的目的是为了克服现有技术中的不足,提供一种方便使用的系杆拱桥吊杆智能更换系统。
为实现以上目的,本发明通过以下技术方案实现:
一种系杆拱桥吊杆智能更换系统,其特征在于,包括:
两根分配梁,所述两根分配梁间隔设置,并相互连接;
多个液压支腿,多个所述液压支腿分别安装在所述分配梁下表面,用于支撑所述分配粱;
多根连杆,多根所述连杆一端与分配梁连接;
下锚梁,所述下锚梁位于所述分配梁下方,并与多根连杆的另一端连接;
液压泵站,所述液压泵站与所述液压支腿通过液压油管连通;
中央控制器,所述中央控制器用于控制液压泵站的工作;
静力水准仪,所述静力水准仪与所述中央控制器通信连接。
根据本发明的一个实施例,所述两根分配梁通过多根横梁连接,多根所述横梁间隔设置。
根据本发明的一个实施例,还包括张拉千斤顶,所述张拉千斤顶与所述下锚梁连接,并位于所述下锚梁下方。
与现有技术相比,本发明具有以下优点:
1)、本发明可实现新旧吊杆与临时承载体系两次内力的无级连续转化,位移变化控制精准且曲线圆滑。
2)、该发明具有全过程数据采集自动化、数据分析控制智能化、位移与力的控制精准化,并记录和输出监控数据文件。
3)、该发明适用于桥面交通通行状态下的吊杆更换,液压系统时时稳压补偿,作为临时阻尼器保障桥梁结构安全。
4)、该发明可多台设备并联,对称同步更换多根吊杆。
附图说明
图1为本发明中的系杆拱桥吊杆更换用装置的结构示意图。
图2为图1的俯视图,本图中未示出中央控制器、液压本站及静力水准仪。
具体实施方式
下面结合附图对本发明进行详细的描述:
如图1、图2所示,系杆拱桥吊杆更换用装置,包括两根分配梁1、多个液压支腿2、连杆4及下锚梁5。所述两根分配梁1间隔设置,并相互通过多根横梁3连接。多根所述横梁3间隔设置。每根分配梁1下表面设置有多个所述液压支腿2。液压支腿2用于支撑所述分配粱。在如图所示的示例中,设置有四根连杆4。四根连杆4围绕需要更换的吊杆10设置。所述连杆4一端与分配梁1连接,另一端与下锚梁5连接。所述下锚梁5位于所述分配梁1下方。本发明中还包括张拉千斤顶6,所述张拉千斤顶6与所述下锚梁5连接,并位于所述下锚梁5下方。液压泵站7与所述液压支腿2及张拉千斤顶6通过液压油管连通。中央控制器9控制液压泵站7的工作。本发明还设置有多个静力水准仪8,分散设置在拱桥10的桥面上,用于监控施工过程中桥面的变化。
本发明使用时,分配梁1放置在拱桥桥面,液压支腿2支撑在拱桥10桥面上。下锚梁5设置在拱桥10下表面。连杆4围绕需要更换的吊杆11设置,并穿过拱桥分别与分配梁1和下锚梁5连接。中央控制器9控制液压泵站7为液压支腿2提供液压油,使分配梁1上升,将需要更换的吊杆11所在的拱桥部位的拉力通过分配梁1分散,然后将需要更换的吊杆11逐步切割直至完全割断。然后更换新的吊杆并将新的吊杆与张拉千斤顶6连接,利用张拉千斤顶6张拉新的吊杆使其张紧。在张拉新的吊杆的同时,减小液压支腿2的支撑力。在新的吊杆张拉完成后,液压支腿2的液压力解除,分配梁1复位。多个静力水准仪8分散设置在拱桥10的桥面上,用于监控施工过程中桥面的变化。
与现有技术相比,本发明具有以下优点:
1)、本发明可实现新旧吊杆与临时承载体系两次内力的无级连续转化,位移变化控制精准且曲线圆滑。
2)、该发明具有全过程数据采集自动化、数据分析控制智能化、位移与力的控制精准化,并记录和输出监控数据文件。
3)、该发明适用于桥面交通通行状态下的吊杆更换,液压系统时时稳压补偿,作为临时阻尼器保障桥梁结构安全。
4)、该发明可多台设备并联,对称同步更换多根吊杆。
以上详细描述了本发明的较佳具体实施例。需要注意的是,本发明中的实施例仅用于对本发明进行说明,并不构成对权利要求范围的限制,本领域内技术人员可以想到的其他实质上等同的替代,均在本发明保护范围内。
Claims (3)
1.一种系杆拱桥吊杆智能更换系统,其特征在于,包括:
两根分配梁,所述两根分配梁间隔设置,并相互连接;
多个液压支腿,多个所述液压支腿分别安装在所述分配梁下表面,用于支撑所述分配粱;
多根连杆,多根所述连杆一端与分配梁连接;
下锚梁,所述下锚梁位于所述分配梁下方,并与多根连杆的另一端连接;
液压泵站,所述液压泵站与所述液压支腿通过液压油管连通;
中央控制器,所述中央控制器用于控制液压泵站的工作;
静力水准仪,所述静力水准仪与所述中央控制器通信连接。
2.根据权利要求1所述的系杆拱桥吊杆更换用装置,其特征在于,所述两根分配梁通过多根横梁连接,多根所述横梁间隔设置。
3.根据权利要求1所述的系杆拱桥吊杆更换用装置,其特征在于,还包括张拉千斤顶,所述张拉千斤顶与所述下锚梁连接,并位于所述下锚梁下方。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611138370.7A CN106592448A (zh) | 2016-12-12 | 2016-12-12 | 系杆拱桥吊杆智能更换系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611138370.7A CN106592448A (zh) | 2016-12-12 | 2016-12-12 | 系杆拱桥吊杆智能更换系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106592448A true CN106592448A (zh) | 2017-04-26 |
Family
ID=58599185
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611138370.7A Pending CN106592448A (zh) | 2016-12-12 | 2016-12-12 | 系杆拱桥吊杆智能更换系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106592448A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001207408A (ja) * | 2000-01-31 | 2001-08-03 | Mitsubishi Heavy Ind Ltd | 吊構造用ケーブルの防食装置及び吊構造用ケーブルの防食方法 |
CN102286942A (zh) * | 2011-08-23 | 2011-12-21 | 河海大学 | 系杆拱桥吊杆更换装置 |
CN203546626U (zh) * | 2013-10-14 | 2014-04-16 | 中铁大桥局股份有限公司 | 钢管混凝土拱桥吊杆更换装置 |
CN105088967A (zh) * | 2014-05-15 | 2015-11-25 | 朱兴土 | 挂篮底篮的程序控制自动升降机构 |
CN105507167A (zh) * | 2015-12-30 | 2016-04-20 | 杭州市市政工程集团有限公司 | 一种系杆拱桥plc同步张拉更换吊杆的施工方法 |
CN206418412U (zh) * | 2016-12-12 | 2017-08-18 | 上海浦东新区公路建设发展有限公司 | 系杆拱桥吊杆智能更换系统 |
-
2016
- 2016-12-12 CN CN201611138370.7A patent/CN106592448A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001207408A (ja) * | 2000-01-31 | 2001-08-03 | Mitsubishi Heavy Ind Ltd | 吊構造用ケーブルの防食装置及び吊構造用ケーブルの防食方法 |
CN102286942A (zh) * | 2011-08-23 | 2011-12-21 | 河海大学 | 系杆拱桥吊杆更换装置 |
CN203546626U (zh) * | 2013-10-14 | 2014-04-16 | 中铁大桥局股份有限公司 | 钢管混凝土拱桥吊杆更换装置 |
CN105088967A (zh) * | 2014-05-15 | 2015-11-25 | 朱兴土 | 挂篮底篮的程序控制自动升降机构 |
CN105507167A (zh) * | 2015-12-30 | 2016-04-20 | 杭州市市政工程集团有限公司 | 一种系杆拱桥plc同步张拉更换吊杆的施工方法 |
CN206418412U (zh) * | 2016-12-12 | 2017-08-18 | 上海浦东新区公路建设发展有限公司 | 系杆拱桥吊杆智能更换系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102146732B (zh) | 超大面积双曲面焊接球网架滑移施工方法 | |
CN106948268B (zh) | 变截面钢箱梁顶推组合装置及使用方法 | |
CN101717035B (zh) | 钢箱梁吊装专用吊具 | |
CN103195450B (zh) | 液压隧道仰拱作业台车及仰拱施工方法 | |
CN101082280A (zh) | 单线铁路隧道衬砌台车 | |
CN101446069A (zh) | 钢桁梁多节点整体安装方法 | |
CN104328734A (zh) | 一种多联多跨连续钢桁梁桥及其施工方法 | |
CN101392501A (zh) | 一种大跨度钢箱桥梁的架设方法 | |
CN104358215B (zh) | 整体预应力全装配箱型模块式钢栈桥制作装配工艺 | |
CN203007851U (zh) | 可模块化横移的架桥机中支腿 | |
CN206418412U (zh) | 系杆拱桥吊杆智能更换系统 | |
CN106592448A (zh) | 系杆拱桥吊杆智能更换系统 | |
CN206986750U (zh) | 可用于大跨度钢箱梁施工的支墩支架 | |
CN110512521B (zh) | 大节段钢桁梁的对接装置和对接方法 | |
CN210286438U (zh) | 一种吊装设备精确调整控制装置 | |
CN205399400U (zh) | 地下连续墙的钢筋笼单元和系统 | |
CN210888015U (zh) | 一种挂篮走行顶推装置 | |
CN108086168A (zh) | 骑索式桥面吊机 | |
CN207499501U (zh) | 一种高度可调的新型建筑成品支架 | |
CN206376191U (zh) | 智能型拱桥吊杆更换系统 | |
CN202967874U (zh) | 运梁车整体吊装吊具 | |
CN206418413U (zh) | 吊杆式拱桥吊杆智能更换系统 | |
CN206376190U (zh) | 系杆拱桥吊杆更换用装置 | |
CN201052950Y (zh) | 吊机 | |
CN205591126U (zh) | 建筑施工梁架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170426 |