CN106555607B - A kind of old goaf grouting filling control earth's surface residual settlement method - Google Patents

A kind of old goaf grouting filling control earth's surface residual settlement method Download PDF

Info

Publication number
CN106555607B
CN106555607B CN201611093416.8A CN201611093416A CN106555607B CN 106555607 B CN106555607 B CN 106555607B CN 201611093416 A CN201611093416 A CN 201611093416A CN 106555607 B CN106555607 B CN 106555607B
Authority
CN
China
Prior art keywords
goaf
grouting filling
old
grouting
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611093416.8A
Other languages
Chinese (zh)
Other versions
CN106555607A (en
Inventor
倪建明
许家林
陈家祥
轩大洋
魏祥平
张亮
吴建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaibei Mining Group Co Ltd
Original Assignee
Huaibei Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaibei Mining Group Co Ltd filed Critical Huaibei Mining Group Co Ltd
Priority to CN201611093416.8A priority Critical patent/CN106555607B/en
Publication of CN106555607A publication Critical patent/CN106555607A/en
Application granted granted Critical
Publication of CN106555607B publication Critical patent/CN106555607B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/005Monitoring or checking of cementation quality or level
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Quality & Reliability (AREA)
  • Geophysics (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of old goaf grouting filling control earth's surface residual settlement methods, comprising the following steps: 1) collects old goaf basic parameter and information;2) calculate in old goaf can grouting filling spatial altitude;3) construction ground drills, and constructs several group of vertical drilling from the earth's surface of old above goaf to goaf;4) flushing liquor total loss in hole is such as encountered in drilling process, then stop creeping into, and implement grouting filling this layer of position, after grouting pressure to be formed, stops grouting filling, be changed to continue to creep into downwards, so circulation, until getting into seat earth, and implement last wheel grouting filling, to complete old goaf filling;5) supplement grouting filling is carried out.The present invention implements grouting filling using surface drilling, remaining crack that can effectively in sensible old goaf, and the connection packing job space without large area can reach filling effect.

Description

A kind of old goaf grouting filling control earth's surface residual settlement method
Technical field
The present invention relates to field of mining, in particular to a kind of old goaf grouting filling control earth's surface residual settlement method.
Background technique
With the continuous development of the economy and society, urban construction scale is gradually increased, and more and more proposed buildings are (such as House, workshop etc.) it is located at the old above goaf of coal mine.Since to still have part residual in old goaf and its top fracture rock mass Remaining gap, over time and under proposed building load (such as gravity) effect, rock stratum may be again in old goaf Compacting, causes rock stratum and earth's surface residual settlement occur, brings biggish security risk to top building.Therefore, to old mined out Being administered, controlling earth's surface residual settlement is the important measures for guaranteeing New Buildings safety in such region.In prior art The method of many coal working face brackets rear goaf filling is disclosed, these technologies are required to safeguard large volume of connection Mined out space can implement to fill, but the almost all sillar that is broken is full of in old goaf, it is difficult to form the company of large area Logical packing job space.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of old goaf grouting filling control earth's surface residual settlement sides Method, to solve the above-mentioned many defects caused by the prior art.
To achieve the above object, the present invention provides technical solution below: a kind of old goaf grouting filling control earth's surface Residual settlement method, comprising the following steps:
1) old goaf basic parameter and information are collected, including limit of mining, mining height M, mined out section length, goaf are wide Degree, can grouting filling height, adopt depth, surface subsidence amount S, caving zone height h;
2) calculate in old goaf can grouting filling spatial altitude, value be mining height M successively subtract surface subsidence amount S, The goaf limit remnants obtained difference of broken bulk (0.03~0.05) h;
3) construction ground drills, and constructs several group of vertical drilling from the earth's surface of old above goaf to goaf, drilling Spacing along old goaf length direction is 50~100m, and drilling number is mined out section length divided by the spacing of wells;
4) flushing liquor total loss in hole is such as encountered in drilling process, then stops creeping into, and implements grouting filling this layer of position, After grouting pressure to be formed, stop grouting filling, be changed to continue to creep into downwards, so recycle, until getting into seat earth, and real Last wheel grouting filling is applied, to complete old goaf filling;
5) after implementing grouting filling to all drilled hole, construction ground drills within the scope of old dead zone, using core drill Into, detect mortar thickness, if mortar thickness reach calculating infuse spatial altitude, show that grouting filling quality is met the requirements, it is no Then, inlet well of constructing should be continued around inspection hole, carry out supplement grouting filling.
Preferably, in the step 1), using mined out sector width, mined out section length, can grouting filling height three multiply Product determines grouting filling total amount.
Preferably, in the step 3), the whole hole that drills is constructed to goaf.
Preferably, in the step 4), grouting pressure should be less than the self weight of above goaf overlying strata.
Preferably, the radius of construction inlet well is 10-20m around the inspection hole.
Preferably, the drilling drilling and grouting filling are side brill marginal not, see leakage i.e. note mode.
It is using the beneficial effect of above technical scheme: the present invention and the direct placement method phase in coal working face bracket rear Implement grouting filling using surface drilling than, the present invention, remaining crack that can effectively in sensible old goaf is not necessarily to big face Long-pending connection packing job space, even if can also be bored by encryption in the old lesser situation of goaf internal crack degree of communication Hole reaches effective filling in crack, thus can have the residual settlement of earth's surface in control control construction zone.
Detailed description of the invention
Fig. 1 is the schematic diagram of bored grouting filling of the present invention.
Wherein, 1-- drilling, the goaf 2--, 3-- grouting filling.
Specific embodiment
The preferred embodiment that the invention will now be described in detail with reference to the accompanying drawings.
Fig. 1 shows a specific embodiment of the invention: a kind of old goaf grouting filling control earth's surface residual settlement method, The following steps are included:
1) old goaf basic parameter and information are collected, including limit of mining, mining height M, 2 length of goaf, goaf 2 are wide Degree, can grouting filling height, adopt depth, surface subsidence amount S, caving zone height h;
2) calculate in old goaf can grouting filling spatial altitude, value be mining height M successively subtract surface subsidence amount S, The goaf limit remnants obtained difference of broken bulk (0.03~0.05) h;
3) construction ground drills, and constructs several group of vertical drilling 1 from the earth's surface of old above goaf to goaf, drilling 1 along old goaf length direction spacing be 50~100m, drilling 1 number be mined out section length divided by the spacing of wells;
4) flushing liquor total loss in hole is such as encountered in drilling process, then stops creeping into, and implements grouting filling this layer of position 3, after grouting pressure to be formed, stop grouting filling 3, be changed to continue to creep into downwards, so recycles, until seat earth is got into, And implement last wheel grouting filling, to complete old goaf filling;
5) after implementing grouting filling to all drilled hole, construction ground drills within the scope of old dead zone, using core drill Into, detect mortar thickness, if mortar thickness reach calculating infuse spatial altitude, show that grouting filling quality is met the requirements, it is no Then, inlet well of constructing should be continued around inspection hole, carry out supplement grouting filling.
In step 1), using mined out sector width, mined out section length, can the product of grouting filling height three determine that slip casting is filled Fill out total amount;In step 3), the whole hole that drills is constructed to goaf;In step 4), grouting pressure should be less than above goaf overlying strata Self weight.
The radius of construction inlet well is 10-20m around inspection hole;Drilling drilling and grouting filling are side brill marginal not, see Leakage is note mode.
For the present invention compared with the direct placement method in coal working face bracket rear, the present invention implements slip casting using surface drilling Filling, remaining crack that can effectively in sensible old goaf, without the connection packing job space of large area, even if old In the lesser situation of goaf internal crack degree of communication, effective filling in crack can also be reached by encrypting drilling, thus can be with There is the residual settlement of earth's surface in control control new building object area.
What has been described above is only a preferred embodiment of the present invention, it is noted that for those of ordinary skill in the art For, without departing from the concept of the premise of the invention, various modifications and improvements can be made, these belong to the present invention Protection scope.

Claims (6)

1. a kind of old goaf grouting filling control earth's surface residual settlement method, which comprises the following steps:
1) collect old goaf basic parameter and information, including limit of mining, mining height M, mined out section length, mined out sector width, can Grouting filling height adopts depth, surface subsidence amount S, caving zone height h;
2) calculate in old goaf can grouting filling spatial altitude, value is that mining height M successively subtracts surface subsidence amount S, mined out Area's limit remnants obtained difference of broken bulk (0.03~0.05) h;
3) construction ground drills, and constructs several group of vertical drilling from the earth's surface of old above goaf to goaf, drills along old The spacing of goaf length direction is 50~100m, and drilling number is mined out section length divided by the spacing of wells;
4) flushing liquor total loss in hole is such as encountered in drilling process, then stops creeping into, and implements grouting filling this layer of position, to shape After grouting pressure, stop grouting filling, be changed to continue to creep into downwards, so recycle, until getting into seat earth, and implements most Latter wheel grouting filling, to complete old goaf filling;
5) after implementing grouting filling to all drilled hole, construction ground drills within the scope of old dead zone, is crept into using coring, examines Survey mortar thickness, if mortar thickness reach calculating infuse spatial altitude, show that grouting filling quality is met the requirements, otherwise, Continue inlet well of constructing around inspection hole, carries out supplement grouting filling.
2. old goaf grouting filling control earth's surface residual settlement method according to claim 1, which is characterized in that described In step 1), using mined out sector width, mined out section length, can the product of grouting filling height three determine grouting filling total amount.
3. old goaf grouting filling control earth's surface residual settlement method according to claim 1, which is characterized in that described In step 3), the whole hole that drills is constructed to goaf.
4. old goaf grouting filling control earth's surface residual settlement method according to claim 1, which is characterized in that described In step 4), grouting pressure should be less than the self weight of above goaf overlying strata.
5. old goaf grouting filling control earth's surface residual settlement method according to claim 1, which is characterized in that described The radius of construction inlet well is 10-20m around inspection hole.
6. old goaf grouting filling control earth's surface residual settlement method according to claim 1, which is characterized in that described Drilling drilling and grouting filling are side brill marginal not, see leakage i.e. note mode.
CN201611093416.8A 2016-12-02 2016-12-02 A kind of old goaf grouting filling control earth's surface residual settlement method Active CN106555607B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611093416.8A CN106555607B (en) 2016-12-02 2016-12-02 A kind of old goaf grouting filling control earth's surface residual settlement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611093416.8A CN106555607B (en) 2016-12-02 2016-12-02 A kind of old goaf grouting filling control earth's surface residual settlement method

Publications (2)

Publication Number Publication Date
CN106555607A CN106555607A (en) 2017-04-05
CN106555607B true CN106555607B (en) 2019-02-22

Family

ID=58445981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611093416.8A Active CN106555607B (en) 2016-12-02 2016-12-02 A kind of old goaf grouting filling control earth's surface residual settlement method

Country Status (1)

Country Link
CN (1) CN106555607B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884676B (en) 2017-04-19 2018-08-17 中国矿业大学 A kind of well work subsidence area administering method of neighbouring opencut
CN107044280A (en) * 2017-06-22 2017-08-15 中国矿业大学 A kind of bored grouting detection method of mining overburden absciss layer distribution characteristics
CN108798769B (en) * 2018-06-25 2020-06-02 山东科技大学 Strip goaf integrated comprehensive treatment construction method
CN110425004A (en) * 2019-08-16 2019-11-08 徐州中国矿大岩土工程新技术发展有限公司 The floated guide and construction method in the underwater goaf of paste body filling
CN111794799A (en) * 2020-07-16 2020-10-20 中煤天津设计工程有限责任公司 Solid waste treatment technology for ground drilling, grouting and filling of old goaf
CN112746846B (en) * 2021-02-05 2023-02-28 中煤科工集团西安研究院有限公司 Non-settling coal mining method and device for mining and filling parallel with ground directional long drill hole
CN114396242B (en) * 2021-12-23 2023-09-01 华北科技学院(中国煤矿安全技术培训中心) Colliery gas drainage hole sealing device convenient to adjust
CN114607379B (en) * 2022-03-28 2022-12-13 中国矿业大学 Continuous mining method for overlying strata compaction grouting filling

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102705001A (en) * 2012-05-25 2012-10-03 中国矿业大学 Isolated-section two-hole split-layer grouting filling well location method for mining overburden rock
CN102704933A (en) * 2012-05-25 2012-10-03 中国矿业大学 Isolated-section grouting filling coal-mining method for mining overburden rock
CN104408277A (en) * 2014-09-28 2015-03-11 沈阳大学 Method for predicting, preventing and controlling earth surface residual movement and deformation caused by newly-built building in mine lot
CN105257334A (en) * 2015-09-30 2016-01-20 中国矿业大学 Surface drilling pressure relief gas extraction and overlying strata isolated grouting filling synchronous implementing method
CN105422170A (en) * 2015-11-02 2016-03-23 安徽理工大学 Grouting reinforcement treatment method for mid-depth goaf below building foundation
CN106150546A (en) * 2016-08-05 2016-11-23 太原理工大学 A kind of method carrying out goaf part filling according to earth's surface subsidence
CN104763466B (en) * 2015-03-19 2017-01-11 中国矿业大学 Method for detecting active diffusion radius of covered rock separation grouting filling slurry

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102705001A (en) * 2012-05-25 2012-10-03 中国矿业大学 Isolated-section two-hole split-layer grouting filling well location method for mining overburden rock
CN102704933A (en) * 2012-05-25 2012-10-03 中国矿业大学 Isolated-section grouting filling coal-mining method for mining overburden rock
CN104408277A (en) * 2014-09-28 2015-03-11 沈阳大学 Method for predicting, preventing and controlling earth surface residual movement and deformation caused by newly-built building in mine lot
CN104763466B (en) * 2015-03-19 2017-01-11 中国矿业大学 Method for detecting active diffusion radius of covered rock separation grouting filling slurry
CN105257334A (en) * 2015-09-30 2016-01-20 中国矿业大学 Surface drilling pressure relief gas extraction and overlying strata isolated grouting filling synchronous implementing method
CN105422170A (en) * 2015-11-02 2016-03-23 安徽理工大学 Grouting reinforcement treatment method for mid-depth goaf below building foundation
CN106150546A (en) * 2016-08-05 2016-11-23 太原理工大学 A kind of method carrying out goaf part filling according to earth's surface subsidence

Also Published As

Publication number Publication date
CN106555607A (en) 2017-04-05

Similar Documents

Publication Publication Date Title
CN106555607B (en) A kind of old goaf grouting filling control earth's surface residual settlement method
CN111005723B (en) Ground large-range rock stratum pre-splitting area anti-impact method based on up-down combined arrangement
CN105422170B (en) Middle deep goaf grouting reinforcing and processing method under a kind of building foundation
CN104763449B (en) A kind of underground water seal cave depot water curtain system method for designing
CN110242301A (en) A kind of modified water-protection coal-mining method of two step slip casting of top plate water-bearing layer
CN106593445A (en) Old goaf underlying close distance coal seam strata-overlying isolation grouting filling exploitation method
CN113404535B (en) Method for preventing rock burst by hydraulic fracturing of coal mine underground
CN103696775B (en) The descending slip casting method of the high many group aquifer segmentations of large section
CN112780340B (en) Method for preventing rock burst in advance in underground coal mine area
CN101761346A (en) Method for constructing metamorphic rock confined water tunnel
CN110671145A (en) Large-mining-width thick coal seam mining composite grouting method
CN104633996B (en) Water source heat pump recharging technical method
CN108194132B (en) A kind of pier formula multi-arch type Mined-out Area control method
CN108343418B (en) Method for controlling mining influence range from surface directional hydraulic fracturing pre-cracked bedrock
CN107151956A (en) It is a kind of to there is pressure to return the grouting method that slurry reinforces covered karst embankment
CN109162731A (en) Iron producing area deep mining gushing water grouting treatment method
CN108222944A (en) A kind of improved drop shaft sinking driving shaft construction method
CN110284885A (en) Shield inspection-pit construction method
CN103032083A (en) Reconstruction method for water-proof shell
CN110173238A (en) The anti-reflection extraction of high seam three-dimensional roadway layout networking explosion thick gas method entirely
CN107964971B (en) A kind of precipitation method of the subway station using the construction of PBA engineering method
CN112832802A (en) Large-bottom plate supporting structure and method for asymmetric pressure
CN104005768A (en) Construction strengthening method for soft geological layer in middle section of vertical shaft
CN107313743B (en) Method for repairing weak zone of coal seam floor water-resisting layer by utilizing coal seam gas well
CN111502672B (en) Construction method for stratum reinforcement before opening of shield cutter head

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant