CN106555607A - A kind of old goaf grouting filling control earth's surface residual settlement method - Google Patents
A kind of old goaf grouting filling control earth's surface residual settlement method Download PDFInfo
- Publication number
- CN106555607A CN106555607A CN201611093416.8A CN201611093416A CN106555607A CN 106555607 A CN106555607 A CN 106555607A CN 201611093416 A CN201611093416 A CN 201611093416A CN 106555607 A CN106555607 A CN 106555607A
- Authority
- CN
- China
- Prior art keywords
- goaf
- drilling
- grouting filling
- old
- grouting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000005553 drilling Methods 0.000 claims abstract description 46
- 238000010276 construction Methods 0.000 claims abstract description 15
- 238000011010 flushing procedure Methods 0.000 claims abstract description 4
- 230000001502 supplementing effect Effects 0.000 claims abstract description 4
- 238000005065 mining Methods 0.000 claims description 10
- 238000007689 inspection Methods 0.000 claims description 6
- 239000004570 mortar (masonry) Substances 0.000 claims description 6
- 238000012856 packing Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 2
- 239000011435 rock Substances 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007569 slipcasting Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/005—Monitoring or checking of cementation quality or level
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Quality & Reliability (AREA)
- Geophysics (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The invention discloses a kind of old goaf grouting filling control earth's surface residual settlement method, comprises the following steps:1) old goaf basic parameter and information are collected;2) calculate in old goaf can grouting filling spatial altitude;3) construction ground drilling, several group of vertical drilling of constructing from the earth's surface of old above goaf to goaf;4) flushing liquor total loss in hole is such as run in drilling process, then stop drilling, and implement grouting filling this layer of position, after grouting pressure to be formed, stop grouting filling, be changed to continue downwards drilling, so circulate, until getting into seat earth, and implement last wheel grouting filling, so as to complete old goaf filling;5) carry out supplementing grouting filling.The present invention implements grouting filling using surface drilling, remaining crack that can effectively in sensible old goaf, can reach filling effect without the need for the large-area packing job space that connect.
Description
Technical field
The present invention relates to field of mining, more particularly to a kind of old goaf grouting filling control earth's surface residual settlement method.
Background technology
As economic and society continuous development, urban construction scale are gradually increased, increasing proposed building is (such as
House, Factory Building etc.) positioned at the old above goaf in colliery.Due to the disrumpent feelings rock mass in old goaf and its top, to yet suffer from part residual
Remaining space, As time goes on and under proposed building load (such as gravity) effect, in old goaf, rock stratum may be again
Compacting, causes rock stratum and earth's surface residual settlement occur, brings larger security risk to top building.Therefore, to old mined out
It is the important measures for ensureing New Buildings safety in such region to carry out administering, controlling earth's surface residual settlement.In prior art
The method for disclosing many coal-face support rear goaf fillings, these technologies are required to safeguard large volume of connection
Filling can be implemented in mined out space, but the almost all sillar that is broken is full of in old goaf, it is difficult to form large-area company
Logical packing job space.
The content of the invention
The technical problem to be solved is to provide a kind of old goaf grouting filling control earth's surface residual settlement side
Method, with above-mentioned multinomial defect caused by solving in prior art.
For achieving the above object, the present invention provides following technical scheme:A kind of old goaf grouting filling control earth's surface
Residual settlement method, comprises the following steps:
1) old goaf basic parameter and information are collected, including limit of mining, mining height M, mined out section length, goaf width
Degree, can grouting filling height, adopt depth, surface subsidence amount S, caving zone height h;
2) calculate in old goaf can grouting filling spatial altitude, its value for mining height M deduct successively surface subsidence amount S,
Difference obtained by remaining broken bulk (0.03~0.05) h of the goaf limit;
3) construction ground drilling, several group of vertical drilling of constructing from the earth's surface of old above goaf to goaf, drilling
It is 50~100m along the spacing of old goaf length direction, drilling number is mined out section length divided by the spacing of wells;
4) flushing liquor total loss in hole is such as run in drilling process, is then stopped drilling, and is implemented grouting filling this layer of position,
After grouting pressure to be formed, stop grouting filling, be changed to continue downwards drilling, so circulate, until seat earth is got into, and in fact
Last wheel grouting filling is applied, so as to complete old goaf filling;
5) implement after grouting filling terminates after all drilled hole, the construction ground drilling in the range of the old dead zone, using core drill
Enter, detect mortar thickness, if mortar thickness reaches the spatial altitude noted of calculating, show that grouting filling quality meets and require, it is no
Then, construction inlet well should be continued around inspection hole, carries out supplementing grouting filling.
Preferably, the step 1) in, using mined out sector width, mined out section length, can grouting filling height three take advantage of
Product determines grouting filling total amount.
Preferably, the step 3) in, the whole hole of drilling is constructed to goaf.
Preferably, the step 4) in, grouting pressure should be less than the deadweight of above goaf overlying strata.
Preferably, the radius for checking construction inlet well around drilling is 10-20m.
Preferably, the drilling drilling is that side bores marginal not, sees that mode is noted in leakage with grouting filling.
Using the beneficial effect of above technical scheme it is:The present invention and the direct placement method phase in coal-face support rear
Than the present invention implements grouting filling using surface drilling, remaining crack that can effectively in sensible old goaf, need not big face
Long-pending connection packing job space, even if in the case of old goaf internal crack degree of communication is less, also can be bored by encrypting
Hole reaches effective filling in crack, thus can have the residual settlement of earth's surface in control control construction zone.
Description of the drawings
Fig. 1 is the schematic diagram of bored grouting filling of the present invention.
Wherein, 1-- drillings, 2-- goafs, 3-- grouting fillings.
Specific embodiment
Describe the preferred embodiment of the present invention below in conjunction with the accompanying drawings in detail.
Fig. 1 shows the specific embodiment of the present invention:A kind of old goaf grouting filling control earth's surface residual settlement method,
Comprise the following steps:
1) old goaf basic parameter and information are collected, including limit of mining, mining height M, 2 length of goaf, goaf 2 is wide
Degree, can grouting filling height, adopt depth, surface subsidence amount S, caving zone height h;
2) calculate in old goaf can grouting filling spatial altitude, its value for mining height M deduct successively surface subsidence amount S,
Difference obtained by remaining broken bulk (0.03~0.05) h of the goaf limit;
3) construction ground drilling, several group of vertical drilling 1 of constructing from the earth's surface of old above goaf to goaf, drilling
1 along old goaf length direction spacing be 50~100m, drilling 1 number be mined out section length divided by the spacing of wells;
4) flushing liquor total loss in hole is such as run in drilling process, is then stopped drilling, and is implemented grouting filling this layer of position
3, after grouting pressure to be formed, stop grouting filling 3, be changed to continue downwards drilling, so circulate, until seat earth is got into,
And implement last wheel grouting filling, so as to complete old goaf filling;
5) implement after grouting filling terminates after all drilled hole, the construction ground drilling in the range of the old dead zone, using core drill
Enter, detect mortar thickness, if mortar thickness reaches the spatial altitude noted of calculating, show that grouting filling quality meets and require, it is no
Then, construction inlet well should be continued around inspection hole, carries out supplementing grouting filling.
Step 1) in, using mined out sector width, mined out section length, can the product of grouting filling height three determine that slip casting is filled
Fill out total amount;Step 3) in, the whole hole of drilling is constructed to goaf;Step 4) in, grouting pressure should be less than above goaf overlying strata
Deadweight.
Around inspection drilling, the radius of construction inlet well is 10-20m;Drilling drilling with grouting filling be side bore marginal not,
See that mode is noted in leakage.
Compared with the direct placement method in coal-face support rear, the present invention implements slip casting using surface drilling to the present invention
Filling, remaining crack that can effectively in sensible old goaf connect packing job space without the need for large-area, even if old
In the case of goaf internal crack degree of communication is less, can also pass through to encrypt drilling and reach effective filling in crack, thus can be with
There is the residual settlement of earth's surface in control control new building object area.
Above-described is only the preferred embodiment of the present invention, it is noted that for one of ordinary skill in the art
For, without departing from the concept of the premise of the invention, some deformations and improvement can also be made, these belong to the present invention
Protection domain.
Claims (6)
1. a kind of old goaf grouting filling controls earth's surface residual settlement method, it is characterised in that comprise the following steps:
1) old goaf basic parameter and information are collected, including limit of mining, mining height M, mined out section length, mined out sector width, can
Grouting filling height, adopt depth, surface subsidence amount S, caving zone height h;
2) calculate in old goaf can grouting filling spatial altitude, its value deducts surface subsidence amount S, mined out successively for mining height M
Difference obtained by remaining broken bulk (0.03~0.05) h of area's limit;
3) construction ground drilling, several group of vertical drilling of constructing from the earth's surface of old above goaf to goaf, drilling is along old
The spacing of goaf length direction is 50~100m, and drilling number is mined out section length divided by the spacing of wells;
4) flushing liquor total loss in hole is such as run in drilling process, is then stopped drilling, and is implemented grouting filling this layer of position, treat shape
Into after grouting pressure, stop grouting filling, be changed to continue downwards drilling, so circulate, until getting into seat earth, and implement most
Latter wheel grouting filling, so as to complete old goaf filling;
5) implement after grouting filling terminates after all drilled hole, the construction ground drilling in the range of the old dead zone is crept into using coring, inspection
Mortar thickness is surveyed, if mortar thickness reaches the spatial altitude noted of calculating, is shown that grouting filling quality meets and is required, otherwise,
Continue construction inlet well around inspection hole, carry out supplementing grouting filling.
2. old goaf grouting filling according to claim 1 controls earth's surface residual settlement method, it is characterised in that described
Step 1) in, using mined out sector width, mined out section length, can the product of grouting filling height three determine grouting filling total amount.
3. old goaf grouting filling according to claim 1 controls earth's surface residual settlement method, it is characterised in that described
Step 3) in, the whole hole of drilling is constructed to goaf.
4. old goaf grouting filling according to claim 1 controls earth's surface residual settlement method, it is characterised in that described
Step 4) in, grouting pressure should be less than the deadweight of above goaf overlying strata.
5. old goaf grouting filling according to claim 1 controls earth's surface residual settlement method, it is characterised in that described
Around inspection drilling, the radius of construction inlet well is 10-20m.
6. old goaf grouting filling according to claim 1 controls earth's surface residual settlement method, it is characterised in that described
Drilling drilling is that side bores marginal not, sees that mode is noted in leakage with grouting filling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611093416.8A CN106555607B (en) | 2016-12-02 | 2016-12-02 | A kind of old goaf grouting filling control earth's surface residual settlement method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611093416.8A CN106555607B (en) | 2016-12-02 | 2016-12-02 | A kind of old goaf grouting filling control earth's surface residual settlement method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106555607A true CN106555607A (en) | 2017-04-05 |
CN106555607B CN106555607B (en) | 2019-02-22 |
Family
ID=58445981
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611093416.8A Active CN106555607B (en) | 2016-12-02 | 2016-12-02 | A kind of old goaf grouting filling control earth's surface residual settlement method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106555607B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107044280A (en) * | 2017-06-22 | 2017-08-15 | 中国矿业大学 | A kind of bored grouting detection method of mining overburden absciss layer distribution characteristics |
WO2018192066A1 (en) * | 2017-04-19 | 2018-10-25 | 中国矿业大学 | Method for controlling subsidence area caused by underground mining in adjoining open-pit mine |
CN108798769A (en) * | 2018-06-25 | 2018-11-13 | 山东科技大学 | Item adopts goaf integrated synthesis and administers construction method |
CN110425004A (en) * | 2019-08-16 | 2019-11-08 | 徐州中国矿大岩土工程新技术发展有限公司 | The floated guide and construction method in the underwater goaf of paste body filling |
CN111794799A (en) * | 2020-07-16 | 2020-10-20 | 中煤天津设计工程有限责任公司 | Solid waste treatment technology for ground drilling, grouting and filling of old goaf |
CN112746846A (en) * | 2021-02-05 | 2021-05-04 | 中煤科工集团西安研究院有限公司 | Non-settling coal mining method and device for mining and filling parallel with ground directional long drill hole |
CN114396242A (en) * | 2021-12-23 | 2022-04-26 | 华北科技学院(中国煤矿安全技术培训中心) | Coal mine gas drainage hole sealing device convenient to adjust |
CN114607379A (en) * | 2022-03-28 | 2022-06-10 | 中国矿业大学 | Overburden rock compaction grouting filling continuous mining method |
CN118375480A (en) * | 2024-04-22 | 2024-07-23 | 山东省煤田地质局第四勘探队 | Old goaf treatment method by utilizing directional drilling |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102705001A (en) * | 2012-05-25 | 2012-10-03 | 中国矿业大学 | Isolated-section two-hole split-layer grouting filling well location method for mining overburden rock |
CN102704933A (en) * | 2012-05-25 | 2012-10-03 | 中国矿业大学 | Isolated-section grouting filling coal-mining method for mining overburden rock |
CN104408277A (en) * | 2014-09-28 | 2015-03-11 | 沈阳大学 | Method for predicting, preventing and controlling earth surface residual movement and deformation caused by newly-built building in mine lot |
CN105257334A (en) * | 2015-09-30 | 2016-01-20 | 中国矿业大学 | Surface drilling pressure relief gas extraction and overlying strata isolated grouting filling synchronous implementing method |
CN105422170A (en) * | 2015-11-02 | 2016-03-23 | 安徽理工大学 | Grouting reinforcement treatment method for mid-depth goaf below building foundation |
CN106150546A (en) * | 2016-08-05 | 2016-11-23 | 太原理工大学 | A kind of method carrying out goaf part filling according to earth's surface subsidence |
CN104763466B (en) * | 2015-03-19 | 2017-01-11 | 中国矿业大学 | Method for detecting active diffusion radius of covered rock separation grouting filling slurry |
-
2016
- 2016-12-02 CN CN201611093416.8A patent/CN106555607B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102705001A (en) * | 2012-05-25 | 2012-10-03 | 中国矿业大学 | Isolated-section two-hole split-layer grouting filling well location method for mining overburden rock |
CN102704933A (en) * | 2012-05-25 | 2012-10-03 | 中国矿业大学 | Isolated-section grouting filling coal-mining method for mining overburden rock |
CN104408277A (en) * | 2014-09-28 | 2015-03-11 | 沈阳大学 | Method for predicting, preventing and controlling earth surface residual movement and deformation caused by newly-built building in mine lot |
CN104763466B (en) * | 2015-03-19 | 2017-01-11 | 中国矿业大学 | Method for detecting active diffusion radius of covered rock separation grouting filling slurry |
CN105257334A (en) * | 2015-09-30 | 2016-01-20 | 中国矿业大学 | Surface drilling pressure relief gas extraction and overlying strata isolated grouting filling synchronous implementing method |
CN105422170A (en) * | 2015-11-02 | 2016-03-23 | 安徽理工大学 | Grouting reinforcement treatment method for mid-depth goaf below building foundation |
CN106150546A (en) * | 2016-08-05 | 2016-11-23 | 太原理工大学 | A kind of method carrying out goaf part filling according to earth's surface subsidence |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11085296B2 (en) | 2017-04-19 | 2021-08-10 | China University Of Mining And Technology | Method for controlling subsidence area caused by underground mining in adjoining open-pit mine |
WO2018192066A1 (en) * | 2017-04-19 | 2018-10-25 | 中国矿业大学 | Method for controlling subsidence area caused by underground mining in adjoining open-pit mine |
AU2017410432B2 (en) * | 2017-04-19 | 2020-08-20 | China University Of Mining And Technology | Method for controlling subsidence area caused by underground mining in adjoining open-pit mine |
WO2018233329A1 (en) * | 2017-06-22 | 2018-12-27 | 中国矿业大学 | Drilling and grouting detection method for distribution characteristics of mining-induced bed separation in overlying strata |
CN107044280A (en) * | 2017-06-22 | 2017-08-15 | 中国矿业大学 | A kind of bored grouting detection method of mining overburden absciss layer distribution characteristics |
CN108798769A (en) * | 2018-06-25 | 2018-11-13 | 山东科技大学 | Item adopts goaf integrated synthesis and administers construction method |
CN108798769B (en) * | 2018-06-25 | 2020-06-02 | 山东科技大学 | Strip goaf integrated comprehensive treatment construction method |
CN110425004A (en) * | 2019-08-16 | 2019-11-08 | 徐州中国矿大岩土工程新技术发展有限公司 | The floated guide and construction method in the underwater goaf of paste body filling |
CN111794799A (en) * | 2020-07-16 | 2020-10-20 | 中煤天津设计工程有限责任公司 | Solid waste treatment technology for ground drilling, grouting and filling of old goaf |
CN112746846A (en) * | 2021-02-05 | 2021-05-04 | 中煤科工集团西安研究院有限公司 | Non-settling coal mining method and device for mining and filling parallel with ground directional long drill hole |
CN112746846B (en) * | 2021-02-05 | 2023-02-28 | 中煤科工集团西安研究院有限公司 | Non-settling coal mining method and device for mining and filling parallel with ground directional long drill hole |
CN114396242A (en) * | 2021-12-23 | 2022-04-26 | 华北科技学院(中国煤矿安全技术培训中心) | Coal mine gas drainage hole sealing device convenient to adjust |
CN114396242B (en) * | 2021-12-23 | 2023-09-01 | 华北科技学院(中国煤矿安全技术培训中心) | Colliery gas drainage hole sealing device convenient to adjust |
CN114607379A (en) * | 2022-03-28 | 2022-06-10 | 中国矿业大学 | Overburden rock compaction grouting filling continuous mining method |
CN114607379B (en) * | 2022-03-28 | 2022-12-13 | 中国矿业大学 | Continuous mining method for overlying strata compaction grouting filling |
CN118375480A (en) * | 2024-04-22 | 2024-07-23 | 山东省煤田地质局第四勘探队 | Old goaf treatment method by utilizing directional drilling |
Also Published As
Publication number | Publication date |
---|---|
CN106555607B (en) | 2019-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106555607A (en) | A kind of old goaf grouting filling control earth's surface residual settlement method | |
CN111005723B (en) | Ground large-range rock stratum pre-splitting area anti-impact method based on up-down combined arrangement | |
CN105422170B (en) | Middle deep goaf grouting reinforcing and processing method under a kind of building foundation | |
AU2013252230B2 (en) | Method for distributed storage and use of underground water in mine | |
US11085296B2 (en) | Method for controlling subsidence area caused by underground mining in adjoining open-pit mine | |
CN103696775B (en) | The descending slip casting method of the high many group aquifer segmentations of large section | |
CN113404535B (en) | Method for preventing rock burst by hydraulic fracturing of coal mine underground | |
CN108842840A (en) | Perforating causes the weak intercalated layer slip-casting lifting method of building settlement under a kind of compensation subway tunnel | |
CN112780340B (en) | Method for preventing rock burst in advance in underground coal mine area | |
CN106593445A (en) | Old goaf underlying close distance coal seam strata-overlying isolation grouting filling exploitation method | |
CN108194132B (en) | A kind of pier formula multi-arch type Mined-out Area control method | |
CN110671145A (en) | Large-mining-width thick coal seam mining composite grouting method | |
CN109162731B (en) | Water inrush grouting treatment method for deep mining of iron mine area | |
WO2018233329A1 (en) | Drilling and grouting detection method for distribution characteristics of mining-induced bed separation in overlying strata | |
CN107151956A (en) | It is a kind of to there is pressure to return the grouting method that slurry reinforces covered karst embankment | |
CN106150546B (en) | A kind of method that the filling of goaf part is carried out according to earth's surface subsidence | |
CN108343418B (en) | Method for controlling mining influence range from surface directional hydraulic fracturing pre-cracked bedrock | |
CN104330107A (en) | Method for evaluating filling quality of solid filling coal mining working face | |
CN103032083A (en) | Reconstruction method for water-proof shell | |
CN110043312A (en) | A kind of control method of grouting filling ground settlement range | |
CN110284885A (en) | Shield inspection-pit construction method | |
CN113622952A (en) | Comprehensive treatment method for water damage of mountain green coal in structurally complex area | |
CN108756944A (en) | The method that surface subsidence is controlled during mining | |
CN101985881A (en) | Method for preventing vertical shaft wellhole from being damaged | |
CN116446880B (en) | Green mining method and device, electronic equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |