CN105422170A - Grouting reinforcement treatment method for mid-depth goaf below building foundation - Google Patents

Grouting reinforcement treatment method for mid-depth goaf below building foundation Download PDF

Info

Publication number
CN105422170A
CN105422170A CN201510738353.6A CN201510738353A CN105422170A CN 105422170 A CN105422170 A CN 105422170A CN 201510738353 A CN201510738353 A CN 201510738353A CN 105422170 A CN105422170 A CN 105422170A
Authority
CN
China
Prior art keywords
grouting
slip casting
goaf
rock
depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510738353.6A
Other languages
Chinese (zh)
Other versions
CN105422170B (en
Inventor
刘增辉
冯英华
娄嵩
李慧宗
张若飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Mingbo Mining Technology Co.,Ltd.
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201510738353.6A priority Critical patent/CN105422170B/en
Publication of CN105422170A publication Critical patent/CN105422170A/en
Application granted granted Critical
Publication of CN105422170B publication Critical patent/CN105422170B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention provides a grouting reinforcement treatment method for a mid-depth goaf below a building foundation. The method mainly includes the steps that the grouting boundary range is determined through calculation, the grouting drilling depth is determined through a water injection test, grouting drilling, a grouting pump, a grouting rod and a hole packer are involved, the grouting boundary range is determined through theoretical calculation and the water injection test, grouting parameters and the grouting process are designed, and grouting reinforcement effect quality detection and settlement monitoring are conducted. The building foundation treatment method suitable for the coal mine goaf is provided. The method is characterized in that the grouting range is determined through theoretical calculation by looking up exploration and geographical data; the grouting drilling depth is determined through the water injection test; the corresponding grouting parameters are designed, grouting equipment is selected, and the grouting process is determined; drilling coring is conducted after one month after grouting construction, and grouting quality detection and surface deformation monitoring are conducted. The method has the beneficial effects that the damaged rock stratum and loosened rock of the coal mine goaf on the lower portion of a building are reinforced, residual displacement and deformation of overlaying rock on the upper portion of the goaf are effectively controlled, and normal use of the building is guaranteed.

Description

Dark goaf grouting reinforcing and processing method under a kind of building foundation
Technical field
The invention belongs to a kind of method that Mine Geological Disasters is administered, be applicable to have coal mine gob to need reinforcement process more than 30m buried depth under building lot.
Background technology
After underground mineral resources is exploited, the Mined-out Area control method formed is mainly contained to filling method, stays and establish ore pillar supporting methods, roof caving method etc.In order to energy fully Resource recovery, it is many that filling method processes in the exploitation of valuable or rare metal mineral products resource that goaf uses, but the higher filling cost of strength of filling mass is corresponding higher, even if employing cut and fill is valuable or rare metal mineral products resource, the country rock of obturation still has deformation failure; Stay in goaf and establish ore pillar roof supporting rock mass damage, but along with exploitation disturbance, underground water or Mineral rheology, the intensity of ore pillar can reduce, and even destroys; It is commonplace that roof caving method processes goaf in coal mining, namely after exploitation of coal resources, roof strata is caving, formed " three bands ": caving zone, fissure zone and warp damage, rock stratum and surface movement is caused under the many factors combined influences such as hydrologic condition, geological conditions, exploitation disturbance, landform, road is caused to ftracture, a series of geotechnical engineering problems such as house collapse.
At present two aspects are mainly contained to Mined-out Area control: be adopt lasting exploit theoretical direction to produce on the one hand, namely in mining Design and generative process, goaf is processed, but due to the reason such as understanding, environmental concept of cost of winning, lasting exploit theory, this theory can not effectively be promoted.That heavy process is subtracted to local goaf grouting on the other hand, namely grouting and reinforcing is carried out on the part goaf affecting engineering foundation basis, as patent (application number: 2015101306536) disclose a kind of goaf slurry processes construction technology, patent (application number: 2015103374519) disclose the quick filling system in a kind of goaf; Patent (application number: the grouting process 2015103369690) disclosing the quick filling system in a kind of goaf; Patent (application number: 2011102394042) disclose goaf slip casting treatment method of road; Patent (application number: the preparation method 2010101381426) disclosing slurry for grouting and sand feeding of mined-out region under highway.
These patented technologies all cause geotechnical engineering problems to propose various solution to goaf at the technology and equipment of goaf grouting, but the strata movement that goaf is caused and Overburden Rock Failure have himself rule, these strata movement rules should be utilized to goaf grouting, improve separation in reducing subsidence by grouting effect.
Summary of the invention
The object of the present invention is to provide a kind of building foundation treating method be applicable on coal mine gob.
For achieving the above object, technical scheme of the present invention is:
In under a kind of building foundation, dark goaf grouting reinforcing and processing method is by inlet well, grouting pump, slip casting bar, hole packer forms, by the scope of theory calculate determination slip casting border and the slip casting degree of depth, devise grouting parameter and technique, grouting consolidation effect quality examination and settlement monitoring.
Horizontal range design formulas between the outer round of slip casting and outside, basis:
L 1=l+l 1;L 2=l+l 2
In formula: L 1the horizontal range of ore body superficial part injected hole is arrived in outside ,-basis, m; L 2the horizontal range of Deep Orebodies injected hole is arrived in outside ,-basis, m; L-native section horizontal range of outside, basis table, m; l 1outside ,-basis rock section ore body superficial part horizontal range, m; l 2outside ,-basis rock section Deep Orebodies horizontal range, m; H a-ore body superficial part buried depth, m; H b-Deep Orebodies buried depth, m; H-show native buried depth, m; -show native section traveling angle, get 45 °; α-ore body mean obliquity, °; γ-rock section travelling limit angle, gets 75 °.
The improvement length in goaf, thickness and to administer width etc. be as checking foundation with " building, water body, railway and main roadway coal column stay and set and mining pressed coal code ".
Slip casting depth calculation formula:
H+ (H rock-H split-H emit)≤H note≤ h+ (H rock-H emit)
In formula: h-table soil thickness, m; H rock-rock stratum gross thickness, m; H split-fissure zone height, m; H emit-caving zone height, m; Wherein, fissure zone height and caving zone height calculate according to " mining engineering design manual " and determine.
Water injection test uses grouting pump, grouting pipeline and the hole packer formula Grouting Pipe subsection water injection determination inlet well degree of depth, and water injection pressure is normal pressure, judges goaf top plate fissure zone height according to the dehydrating speed of pouring water into borehole amount.
Goaf buried depth is less than the pressure controllable of 50m built in 2.0MPa, and goaf buried depth is greater than the control of 50m at 1MPa; 2. mortar depositing construction: the denseness of slurries is first rare rear thick, the method that injected hole adopts continuous grouting and interval slip casting to combine, goaf grouting adopts hole-bottom slurry-injection method and delamination pour slurry, from periphery boring to direction, building foundation successively slip casting; 3. design adopts and carries out grouting like flange grouting method; 4. injected hole spacing is 30-50m; 5. injecting paste material selects cement and fly ash material; 6. the solid body uniaxial compressive strength of designing requirement slurries is greater than 3MPa;
Packer permeability test-closedown filling system-extraction grouting plug-sealing of hole-analysis slip casting effect after range of grouting-design grouting parameter-construction injected hole-set up slip casting station-filling system withstand voltage test-bore flushing and packer permeability test-slurrying slip casting-peephole grouting process-observation terminate with reading control slip casting.
Mortar depositing construction terminates to detect grouting quality after 1 month, and boring coring and laboratory test, require that the solid body uniaxial compressive strength of slurries is greater than 3MPa; The surface deformation monitoring cycle should last till completion the previous moon latter 1 ~ 2 year from construction.
Advantageous Effects of the present invention is: (1) determines range of grouting and grouting process in conjunction with resource exploitation overlying strata motion theory; (2) slurries are filled with erecting dense individual props spoil space and overlying strata separation layer space, have prevented and treated the further sinking that resource exploitation damages stratum; (3) resistance to overturning and the non-deformability of structure foundation is improved.
The present invention is used in structure foundation consolidation process on Types Below goaf:
(1) through the highway, the railway that have goaf ground settlement; (2) building goaf can not moved; (3) by the water engineering facility that goaf affects.
Accompanying drawing explanation
Fig. 1 goaf grouting apparatus arrangement and grouting process schematic diagram.
Fig. 2 inlet well layout schematic diagram.
Fig. 3 goaf grouting effect schematic diagram.
Fig. 4 slip casting effect surface subsidence monitoring schematic diagram.
Fig. 5 Grouting Pipe schematic diagram.
In figure: hole packer 2-8a-guide peg 2-1b-inlet well 2-2b-feed pipe for mortar 2-3b-grouting tube under hole packer 2-4a-hole packer liquid injection pipe 2-5a-hole packer closed section boring 2-6a-Grouting Pipe 2-7a-on 1-grouting pump station 2-grouting pipeline 3-building lot scope 4-grouting pipeline 5-grouting pump station 6-topsoil and horizon d 7-warp damage 8-fissure zone 9-caving zone 10-seat earth rock stratum 11-grouting and reinforcing body 12-settlement monitor 13-settlement monitoring stake 2-1a-inlet well 2-2a-feed pipe for mortar 2-3a-
Detailed description of the invention
Data acquisition, and investigation: to hydrogeologic data, the resource enrichness condition in mine, the Data acquisition, of mining Design, exploitation method, production practice, Mined-out Area control mode; Field investigation underground mining situation and ground settlement survey data.
Scheme of Strengthening: goaf buried depth is less than 30m stiffening basic ground, can adopt the method such as strong rammer, digging up and filling in, pile foundation, slip casting, waffle slab; Goaf buried depth is greater than 30m stiffening basic ground and adopts grouting filling.
Range of grouting is determined: according to investigation and data collection, by the horizontal range between the outer round (2-1A, 2-2A, 2-3A, 4-1A, 4-2A, 4-3A) of theory calculate determination slip casting and outside, basis (3) and the slip casting degree of depth, preliminary reinforcing scope; When the data disappearance of collecting and investigate, then adopt water injection test determination fissure zone (8) highly.
Grouting parameter designs: goaf buried depth is less than the pressure controllable of 50m built in 2.0MPa, and goaf buried depth is greater than the control of 50m at 1MPa; Injected hole (2-1A and 2-2A, 2-1A and 2-1B) spacing is 30-50m; Injecting paste material selects cement and fly ash material, and the solid body uniaxial compressive strength of designing requirement slurries is greater than 3MPa;
Grouting construction process: the denseness of slurries is first rare rear thick, the method that injected hole (2,4) adopts continuous grouting and interval slip casting to combine, goaf grouting caving zone (9) scope adopts hole-bottom slurry-injection method or rock stratum absciss layer scope to adopt segmenting slip casting, from periphery boring (2-1A, 2-2A, 2-3A, 4-1A, 4-2A, 4-3A) to the slip casting successively of building foundation (3) direction; Hole-bottom slurry-injection method: namely at the bottom of the first patchhole of Grouting Pipe, then marginal not limit is up pulled out, until fill complete opening, can not the direct slip casting from top; Delamination pour slurry: in adopting two hole packers (2-3a, 2-7a) up and down of hole packer formula Grouting Pipe (2-6a) to hole, one section is separated by slip casting section (2-5a) to the rock stratum slip casting of mutual absciss layer, realizes fixed point slip casting.Determine that slip casting terminates according to grouting pressure change, the inflation fluid of the lower hole packer (2-3a, 2-7a) of first release, the inflation fluid of the upper hole packer (2-3a, 2-7a) of release again, by moving the rock stratum slip casting of hole packer formula Grouting Pipe (2-6a) to next section of mutual absciss layer at the bottom of hole successively to aperture; Design adopts carries out grouting like flange grouting method.
Packer permeability test-closedown filling system-extraction grouting plug-sealing of hole-analysis slip casting effect after range of grouting-design grouting parameter-construction injected hole-set up slip casting station-filling system withstand voltage test-bore flushing and packer permeability test-slurrying slip casting-peephole grouting process-observation terminate with reading control slip casting.
Slip casting effect is assessed: mortar depositing construction terminates to detect grouting quality after 1 month, and boring coring and laboratory test, require that the solid body uniaxial compressive strength of slurries is not less than 3MPa; The surface deformation monitoring cycle should last till completion the previous moon latter 1 ~ 2 year from construction.
The above; be only the specific embodiment of the present invention; but the protection domain of invention is not limited thereto; any engineers and technicians being familiar with the art are in technical scope of the present invention; some conversion can be done; as range of grouting computational methods, grouting process, injecting paste material etc., all should as infringement protection scope of the present invention.Therefore protection scope of the present invention should be as the criterion with the protection domain of claims.

Claims (1)

1. dark goaf grouting reinforcing and processing method under a building foundation, by inlet well, grouting pump, slip casting bar, hole packer forms, by the scope of theory calculate determination slip casting border and the slip casting degree of depth, devise grouting parameter and technique, grouting consolidation effect quality examination and settlement monitoring, is characterized in that:
(1) slip casting horizontal plane range computation, the horizontal range design formulas between the outer round of slip casting and outside, basis is as follows,
L 1=l+l 1;L 2=l+l 2
In formula: L 1the horizontal range of ore body superficial part injected hole is arrived in outside ,-basis, m; L 2the horizontal range of Deep Orebodies injected hole is arrived in outside ,-basis, m; L-native section horizontal range of outside, basis table, m; l 1outside ,-basis rock section ore body superficial part horizontal range, m; l 2outside ,-basis rock section Deep Orebodies horizontal range, m; H a-ore body superficial part buried depth, m; H b-Deep Orebodies buried depth, m; H-show native buried depth, m; -show native section traveling angle, get 45 °; α-ore body mean obliquity, °; γ-rock section travelling limit angle, gets 75 °;
The improvement length in goaf, thickness and to administer width etc. be as checking foundation with " building, water body, railway and main roadway coal column stay and set and mining pressed coal code ";
(2) the slip casting degree of depth is determined
Theoretical calculation formula:
H+ (H rock-H split-H emit)≤H note≤ h+ (H rock-H emit)
In formula: h-table soil thickness, m; H rock-rock stratum gross thickness, m; H split-fissure zone height, m; H emit-caving zone height, m; Wherein, fissure zone height and caving zone height calculate according to " mining engineering design manual " and determine;
Water injection test: use grouting pump, grouting pipeline and the hole packer formula Grouting Pipe subsection water injection determination inlet well degree of depth, water injection pressure is normal pressure, judges goaf top plate fissure zone height according to the dehydrating speed of pouring water into borehole amount;
(3) grouting parameter grouting pressure: goaf buried depth is less than the pressure controllable of 50m built in 2.0MPa, goaf buried depth is greater than the control of 50m at 1MPa; 2. mortar depositing construction: the denseness of slurries is first rare rear thick, the method that injected hole adopts continuous grouting and interval slip casting to combine, goaf grouting adopts hole-bottom slurry-injection method and delamination pour slurry, from periphery boring to direction, building foundation successively slip casting; ; 3. design adopts and carries out grouting like flange grouting method; 4. injected hole spacing is 30-50m; 5. injecting paste material selects cement and fly ash material; 6. the solid body uniaxial compressive strength of designing requirement slurries is greater than 3MPa;
(4) grouting process, determine range of grouting-design grouting parameter-construction injected hole-set up slip casting station-filling system withstand voltage test-bore flushing and packer permeability test-slurrying slip casting-peephole grouting process-observation terminate with reading control slip casting after packer permeability test-closedown filling system-extraction grouting plug-sealing of hole-analysis slip casting effect;
(5) consolidation effect and settlement monitoring, mortar depositing construction terminates to detect grouting quality after 1 month, and boring coring and laboratory test, require that the solid body uniaxial compressive strength of slurries is greater than 3MPa; The surface deformation monitoring cycle should last till completion the previous moon latter 1 ~ 2 year from construction.
CN201510738353.6A 2015-11-02 2015-11-02 Middle deep goaf grouting reinforcing and processing method under a kind of building foundation Active CN105422170B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510738353.6A CN105422170B (en) 2015-11-02 2015-11-02 Middle deep goaf grouting reinforcing and processing method under a kind of building foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510738353.6A CN105422170B (en) 2015-11-02 2015-11-02 Middle deep goaf grouting reinforcing and processing method under a kind of building foundation

Publications (2)

Publication Number Publication Date
CN105422170A true CN105422170A (en) 2016-03-23
CN105422170B CN105422170B (en) 2018-10-23

Family

ID=55500664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510738353.6A Active CN105422170B (en) 2015-11-02 2015-11-02 Middle deep goaf grouting reinforcing and processing method under a kind of building foundation

Country Status (1)

Country Link
CN (1) CN105422170B (en)

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106555607A (en) * 2016-12-02 2017-04-05 淮北矿业(集团)有限责任公司 A kind of old goaf grouting filling control earth's surface residual settlement method
CN107503768A (en) * 2017-08-23 2017-12-22 广西大学 The method of the oblique Soil-nailed of Small Data Sets shallow embedding tunnel overlying ground
CN108104766A (en) * 2017-12-18 2018-06-01 中国矿业大学 Guarantor/the process for purifying water on iron content waste water injection Surface cracking stratum
CN108240234A (en) * 2017-12-28 2018-07-03 辽宁工程技术大学 A kind of Along Railway underlies coal mine gob Grouting method
CN108661705A (en) * 2018-06-25 2018-10-16 山东科技大学 Item adopts goaf quaternity comprehensive treatment construction method
CN108677956A (en) * 2018-06-04 2018-10-19 山东农业大学 Covered karst development area rock and soil layer contact surface grouting method
CN108708768A (en) * 2018-06-04 2018-10-26 徐州中国矿大岩土工程新技术发展有限公司 Slip casting tube head, grouting device and its construction method
CN108708723A (en) * 2018-05-02 2018-10-26 中国矿业大学 Alternately support subtracts heavy method without coal column filling mining for a kind of coal petrography column
CN108756945A (en) * 2018-06-04 2018-11-06 徐州中国矿大岩土工程新技术发展有限公司 The device and construction method administered for multilayer goaf grouting
CN108798769A (en) * 2018-06-25 2018-11-13 山东科技大学 Item adopts goaf integrated synthesis and administers construction method
CN110118991A (en) * 2019-05-16 2019-08-13 中国矿业大学 A kind of mining induced stress appraisal procedure based on microseism damage reconstruct
CN110307034A (en) * 2019-04-04 2019-10-08 中国矿业大学(北京) The strip-type grouting filling method in goaf
CN110439611A (en) * 2019-09-02 2019-11-12 徐州中国矿大岩土工程新技术发展有限公司 Fill the assembled storage slurry device and its assembly method of underwater deep confined space
CN111396056A (en) * 2020-03-25 2020-07-10 长安大学 Comprehensive treatment method for storage type inclined coal seam goaf under highway
CN111810196A (en) * 2020-07-15 2020-10-23 中勘资源勘探科技股份有限公司 Method for reinforcing broken top plate through ground grouting
CN112878956A (en) * 2021-01-20 2021-06-01 天津市华普生产力促进有限公司 Foundation construction method for municipal engineering
CN112878955A (en) * 2021-01-20 2021-06-01 天津市华普生产力促进有限公司 Foundation construction method for municipal engineering
CN113756282A (en) * 2021-09-08 2021-12-07 河南理工大学 Precise grouting reinforcement method for towering-affected high-rise structure
CN113931659A (en) * 2021-09-30 2022-01-14 华北水利水电大学 Goaf deep pile forming device
CN114483173A (en) * 2022-01-18 2022-05-13 安徽理工大学 Overburden separation layer grouting subsidence reducing method with controllable lag subsidence
CN114718503A (en) * 2022-03-29 2022-07-08 中煤科工集团重庆研究院有限公司 Coal mine underground structure broken stratum fixed-point grouting reinforcement system and method
WO2023029617A1 (en) * 2021-08-30 2023-03-09 中国矿业大学 Isolated overburden grouting filling method for coal gangue underground emission reduction
CN117052344A (en) * 2023-08-04 2023-11-14 内蒙古平庄煤业(集团)有限责任公司老公营子煤矿 Leakage blocking drilling method for goaf of close-range coal seam group

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103572680A (en) * 2012-08-02 2014-02-12 五冶集团上海有限公司 Road roadbed filling construction method of coal mine gob
CN204186400U (en) * 2014-10-22 2015-03-04 中铁二院工程集团有限责任公司 High-pressure water-enriched goaf ruggedized construction
CN104762950A (en) * 2015-04-07 2015-07-08 山西交科岩土工程有限公司 Road mined-out area treatment method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103572680A (en) * 2012-08-02 2014-02-12 五冶集团上海有限公司 Road roadbed filling construction method of coal mine gob
CN204186400U (en) * 2014-10-22 2015-03-04 中铁二院工程集团有限责任公司 High-pressure water-enriched goaf ruggedized construction
CN104762950A (en) * 2015-04-07 2015-07-08 山西交科岩土工程有限公司 Road mined-out area treatment method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘天翔等: "高速公路桥跨煤层采空区工程影响及处治关键技术参数初步研究", 《2011年全国工程地质学术年会论文集》 *
郭弯弯: "采空区环境下高速公路构筑物变形指标确定和稳定性处置", 《中国优秀硕士学位论文全文数据库工程科技II辑》 *

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106555607A (en) * 2016-12-02 2017-04-05 淮北矿业(集团)有限责任公司 A kind of old goaf grouting filling control earth's surface residual settlement method
CN106555607B (en) * 2016-12-02 2019-02-22 淮北矿业(集团)有限责任公司 A kind of old goaf grouting filling control earth's surface residual settlement method
CN107503768A (en) * 2017-08-23 2017-12-22 广西大学 The method of the oblique Soil-nailed of Small Data Sets shallow embedding tunnel overlying ground
CN108104766A (en) * 2017-12-18 2018-06-01 中国矿业大学 Guarantor/the process for purifying water on iron content waste water injection Surface cracking stratum
CN108240234A (en) * 2017-12-28 2018-07-03 辽宁工程技术大学 A kind of Along Railway underlies coal mine gob Grouting method
CN108240234B (en) * 2017-12-28 2019-06-28 辽宁工程技术大学 A kind of Along Railway underlies coal mine gob Grouting method
CN108708723A (en) * 2018-05-02 2018-10-26 中国矿业大学 Alternately support subtracts heavy method without coal column filling mining for a kind of coal petrography column
CN108708768A (en) * 2018-06-04 2018-10-26 徐州中国矿大岩土工程新技术发展有限公司 Slip casting tube head, grouting device and its construction method
CN108756945A (en) * 2018-06-04 2018-11-06 徐州中国矿大岩土工程新技术发展有限公司 The device and construction method administered for multilayer goaf grouting
CN108677956A (en) * 2018-06-04 2018-10-19 山东农业大学 Covered karst development area rock and soil layer contact surface grouting method
CN108798769A (en) * 2018-06-25 2018-11-13 山东科技大学 Item adopts goaf integrated synthesis and administers construction method
CN108798769B (en) * 2018-06-25 2020-06-02 山东科技大学 Strip goaf integrated comprehensive treatment construction method
CN108661705A (en) * 2018-06-25 2018-10-16 山东科技大学 Item adopts goaf quaternity comprehensive treatment construction method
CN110307034A (en) * 2019-04-04 2019-10-08 中国矿业大学(北京) The strip-type grouting filling method in goaf
CN110118991B (en) * 2019-05-16 2020-06-23 中国矿业大学 Mining induced stress assessment method based on microseismic damage reconstruction
CN110118991A (en) * 2019-05-16 2019-08-13 中国矿业大学 A kind of mining induced stress appraisal procedure based on microseism damage reconstruct
CN110439611A (en) * 2019-09-02 2019-11-12 徐州中国矿大岩土工程新技术发展有限公司 Fill the assembled storage slurry device and its assembly method of underwater deep confined space
CN111396056A (en) * 2020-03-25 2020-07-10 长安大学 Comprehensive treatment method for storage type inclined coal seam goaf under highway
CN111810196B (en) * 2020-07-15 2022-02-11 中勘资源勘探科技股份有限公司 Method for reinforcing broken top plate through ground grouting
CN111810196A (en) * 2020-07-15 2020-10-23 中勘资源勘探科技股份有限公司 Method for reinforcing broken top plate through ground grouting
CN112878956A (en) * 2021-01-20 2021-06-01 天津市华普生产力促进有限公司 Foundation construction method for municipal engineering
CN112878955A (en) * 2021-01-20 2021-06-01 天津市华普生产力促进有限公司 Foundation construction method for municipal engineering
WO2023029617A1 (en) * 2021-08-30 2023-03-09 中国矿业大学 Isolated overburden grouting filling method for coal gangue underground emission reduction
CN113756282A (en) * 2021-09-08 2021-12-07 河南理工大学 Precise grouting reinforcement method for towering-affected high-rise structure
CN113756282B (en) * 2021-09-08 2022-09-16 河南理工大学 Precise grouting reinforcement method for towering-affected high-rise structure
CN113931659A (en) * 2021-09-30 2022-01-14 华北水利水电大学 Goaf deep pile forming device
CN113931659B (en) * 2021-09-30 2024-05-07 华北水利水电大学 Goaf deep piling method
CN114483173A (en) * 2022-01-18 2022-05-13 安徽理工大学 Overburden separation layer grouting subsidence reducing method with controllable lag subsidence
CN114483173B (en) * 2022-01-18 2023-03-14 安徽理工大学 Overlying strata separation layer grouting subsidence reducing method with controllable hysteretic subsidence
CN114718503A (en) * 2022-03-29 2022-07-08 中煤科工集团重庆研究院有限公司 Coal mine underground structure broken stratum fixed-point grouting reinforcement system and method
CN117052344A (en) * 2023-08-04 2023-11-14 内蒙古平庄煤业(集团)有限责任公司老公营子煤矿 Leakage blocking drilling method for goaf of close-range coal seam group
CN117052344B (en) * 2023-08-04 2024-05-31 内蒙古平庄煤业(集团)有限责任公司老公营子煤矿 Leakage blocking drilling method for goaf of close-range coal seam group

Also Published As

Publication number Publication date
CN105422170B (en) 2018-10-23

Similar Documents

Publication Publication Date Title
CN105422170B (en) Middle deep goaf grouting reinforcing and processing method under a kind of building foundation
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN102251777B (en) Large-scale karst cavity treatment method for karst tunnel
CN108035335A (en) A kind of construction freezing method well shaft type underground parking garage method
CN109593957B (en) Active extraction method for in-situ leaching of ionic rare earth ore
Richards et al. Pore water pressure and horizontal stress changes measured during construction of a contiguous bored pile multi-propped retaining wall in Lower Cretaceous clays
CN106522981B (en) Pass through the method for protecting support in goaf tunnel
CN101832137B (en) Pre-embedding method for coal seam roof strut
CN106837382A (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN104989408A (en) Safe and high-efficiency mining method for metal mine in mountainous area
CN105040705A (en) Ground foundation treatment construction technology under multi-karst-cave geological conditions
Türkmen et al. Grouting a tunnel cave-in from the surface: a case study on Kurtkulağı irrigation tunnel, Turkey
Newman et al. Sinking a jacked caisson within the London Basin geological sequence for the Thames Water Ring Main extension
CN204899930U (en) Secretly dig leading dry out well in subway hole
CN114183139A (en) Method and device for controlling mining influence on working face
CN208073484U (en) One kind passing through fine sand layer tunnel structure
Roberts et al. Multi-aquifer pressure relief in east London
Walker An example of the use of jet grouting to permit tunneling in chemically weathered limestone
CN107905219A (en) The construction method of ultra-deep hand excavation stake holes under a kind of complex geological condition
Yang et al. Model test of the overburden deformation and failure law in close distance multi-seam mining
Bennet et al. Tunnels
Wang et al. Water inrush and countermeasures at a tunnel in South-Link Highway, Taiwan
CN117846561A (en) Coal and uranium collaborative mining method based on separation layer grouting
Hein et al. Semmering Base Tunnel–Geotechnical Challenges at Crossing a Fault System in Combination with High Water Pressure
Wang et al. Recovery execution in landslide at the portal of highway tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191220

Address after: Room c506a-19, University Business Park, No. 99, University Road, Xuzhou hi tech Industrial Development Zone, Xuzhou City, Jiangsu Province

Patentee after: Xuzhou Tiancheng Intelligent Technology Co., Ltd

Address before: 232001 Anhui Province, Huainan city Shungeng Road No. 168

Patentee before: Anhui University Of Science And Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200608

Address after: 221000 building 1-1516, office a, Southeast impression city, Quanzhan District, Xuzhou City, Jiangsu Province

Patentee after: Xuzhou Mingbo Mining Technology Co.,Ltd.

Address before: Room c506a-19, University Business Park, No. 99, University Road, Xuzhou hi tech Industrial Development Zone, Xuzhou City, Jiangsu Province

Patentee before: Xuzhou Tiancheng Intelligent Technology Co.,Ltd.