CN108677956A - Covered karst development area rock and soil layer contact surface grouting method - Google Patents

Covered karst development area rock and soil layer contact surface grouting method Download PDF

Info

Publication number
CN108677956A
CN108677956A CN201810560893.3A CN201810560893A CN108677956A CN 108677956 A CN108677956 A CN 108677956A CN 201810560893 A CN201810560893 A CN 201810560893A CN 108677956 A CN108677956 A CN 108677956A
Authority
CN
China
Prior art keywords
grouting
rock
contact surface
area
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810560893.3A
Other languages
Chinese (zh)
Inventor
刘经强
石亮
张健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Agricultural University
Original Assignee
Shandong Agricultural University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Agricultural University filed Critical Shandong Agricultural University
Priority to CN201810560893.3A priority Critical patent/CN108677956A/en
Publication of CN108677956A publication Critical patent/CN108677956A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes

Abstract

The invention discloses a kind of covered karst development area rocks and soil layer contact surface grouting method, pass through enclosed successively dynamic grouting method, it is in the milk within the scope of 24 meters above and below the horizontal extent of 13 meters of structure foundation extension and rock and soil layer contact surface, fill all soil caves, lapies, fluid bowl, solution cavity through basement rock top plate is blocked using rapid hardening cementitious material, one layer of stable supporting course is formed with this.The present invention fills all soil caves near interface, superficial part solution cavity, lapies and fluid bowl by the supporting course that one layer of bearing capacity of formation significantly improves at ground interface that is in the milk, the channel for blocking karst to be developed to top soil ground.Slurries dosage can also be reduced in Practical Project, is shortened the construction period, and reduced project cost, be very suitable for the foundation treatment engineering of covered karst development area.

Description

Covered karst development area rock and soil layer contact surface grouting method
Technical field
The present invention relates to building engineering fields, and in particular to a kind of covered karst development area rock is filled with soil layer contact surface Paste-making method.
Background technology
Karst features are that there is the water of corrosion power to carry out corrosion etc. to solublerock to be formed by earth's surface and underground The general name of form.It is divided into bare karst, covered karst, embedded karst according to exposure condition, covered karst refers to pine Dissipate the lower karst developed of deposit covering.The soluble carbonate salt rock distribution area in China is up to 3.44 × 106Km2, account for national territorial area 1/3 or more, wherein about 910,000 km of carbonate rock outcrop area2,Distribution is wide, area is big.It is mainly distributed on Guangxi, Guizhou, Yunnan And Guangdong, it is one of maximum karst region in the world.
The karst foundation that karst unfavorable geology is constituted usually causes foundation bearing capacity deficiency, differential settlement, concrete foundation slide Is destroyed as more and more engineerings are built in karst area with equal foundation deformations are collapsed, and karst foundation problem is built as engineering If outstanding problem in, reinforce karst foundation Stability Evaluation is had emphatically using reasonable, economic measures of foundation treatment Big technological value and economic implications.
Currently, when the ground for Karst Area carries out grouting treatment, basis is generally filled by high-pressure slip-casting mode Solution cavity in following soil layer under all soil caves and basement rock, not only slurries usage amount is excessive, destroys this structure structure of the soil body itself, and And do not solve the problems, such as that karst continues development fundamentally.The present invention can effectively reduce slurries usage amount, significantly improve ground Bearing capacity, and can fundamentally solve the problems, such as that soil cave, solution cavity continue to develop to endanger building safety to ground.
Invention content
To solve the above problems, the present invention provides a kind of covered karst development area rocks and soil layer contact surface grouting side Method not only reduces slurries dosage, shortens the construction period, reduce project cost, and fundamentally solve solution cavity, soil cave is sent out upwards The possibility educated.
To achieve the above object, the technical solution that the present invention takes is:
Covered karst development area rock and soil layer contact surface grouting method, by enclosed successively dynamic grouting method, It is in the milk in 2-4 meters of ranges above and below the horizontal extent of 1-3 meters of structure foundation extension and rock and soil layer contact surface, fills institute There are soil cave, lapies, fluid bowl, the solution cavity through basement rock top plate is blocked using rapid hardening cementitious material, one layer of stabilization is formed with this Supporting course;Specifically comprise the following steps:
S1, geological mapping is carried out to proposed area
1) probing mode is used to carry out ground to the parameters such as unfavorable geology, foundation stability, underground water existing for proposed area Matter is reconnoitred;
2) karsts developing area range in proposed range, the scale of karsts developing area are found out in conjunction with results of drilling, and its laterally and Longitudinal spread situation supplements drilling surveys.
3) combine probing with physical prospecting as a result, determining that karsts developing area situation in proposed region, roof rock mass occurrence bury thickness Degree, crack situation etc..
S2, Grouting plan design
1) grouting range.Contact surface grouting method is different from conventional grout method, and the determination of grouting range is of the invention Important content strictly should determine grouting range according to exploration result.General grouting horizontal extent is 1-3 meters of construction area extension Range, vertically ranging from ground contact surface 2-4 meters of range up and down.
2) grouting pressure.Karst area is in the milk, and grouting pressure is an important factor for ensureing grouting quality.Determine grouting pressure Mode can determine grouting pressure by following formula or field test two ways.
P=p0+mh (1)
In formula:p0Grouting pressure (units MPa) is allowed generally to take 0.3-0.5 in karst area for basement rock surface layer section;M is Basement rock often deepens the increasable pressure of 1m (units MPa) and generally takes 0.2-0.5 in karst area;H is grout compartment depth (unit m)。
3) grouting material.Grouting material is generally cement grout or the chemical material with gelling property, for generally adopting Cement grout need to be determined the slurries ratio of mud.The slurries ratio of mud is depended primarily on than the selected of grade in grouting region The geological conditions such as karsts developing area situation, and with reference to the test result etc. of live grouting test and indoor size performance, integrated Consider.The common ratio of mud 8 at present:1、5:1、2:1、1:1、0.8:1、0.7:1、0.6:1、0.5:1 equal 8 grades of ratio of muds.
4) grout hole is arranged.The arrangement of pitch-row and array pitch should enable effective engaging one another of filling range of adjacent holes Come, neither leave big crack, and the part for being overlapped overlap joint is too many.Grouting port is arranged using multiple rows of determinant, in favor of rear The construction of phase enclosed successively dynamic slip casting method.
The successively dynamic slip casting of S3, enclosed
Using enclosed, successively dynamic slip casting method, grouting process are being noted using mini-valve tube method slip casting by mini-valve tube for slip casting Starch slip casting in region.Successively dynamic slip casting method is to discharge into row slip casting outermost one first to enclosed, forms a sealing ring, then Ecto-entad promotes by row in a manner of jumping and fill every hole.And implement Dynamic Construction during slip casting, side construction frontier inspection is surveyed, root Adjust the construction parameters such as grouting pressure, concentration of slurry, pitch-row array pitch at any time according to result of detection.For the solution cavity through basement rock top plate First solution cavity is carried out just using the rapid hardening of the quick-sets such as accelerated cement cream slurry, scour resistance, special flowing diffusivity Step blocks, and Reperfu- sion conventional cement mortar carries out reinforcement impervious grouting, is quickly and effectively blocked through the molten of basement rock top plate with this Hole.
S4, grouting effect detection
Inspection hole method, standard penetration test (SPT) method, tablet load experiment method, foundation settlement detection method can be used after the completion of grouting The methods of grouting effect is detected.
The invention has the advantages that:Slurries can be effectively reduced relative to current foundation grouting processing mode to use Amount, shortens the construction period, and reduces construction investment, improves foundation bearing capacity, and can prevent to generate new solution cavity, soil in foundation region Hole.And then fundamentally solves Karst Area soil cave, the solution cavity security hidden trouble caused by building longtime running.
Description of the drawings
Fig. 1 is ground contact surface grouting method schematic diagram of the embodiment of the present invention.
In figure:1 is ground line, and 2 be upper soil horizon, and 3 be grouting range, and 4 be basement rock, and 5 be Grouting Pipe, and 6 be soil cave, and 7 are Basement rock and upper soil horizon contact surface, 8 be solution cavity.
Fig. 2 is the process flow chart of the present invention.
Fig. 3 is No. 2 line result figures of High Density Resistivity.
Fig. 4 is building settlement curve.
Specific implementation mode
In order to make objects and advantages of the present invention be more clearly understood, the present invention is carried out with reference to embodiments further It is described in detail.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to limit this hair It is bright.
Embodiment
Shandong Agricultural University south school district apartment is Y-shaped apartment, 11 layers on the ground, 1 layer of underground, shear wall structure.Raft Plate basis, plank thickness 900mm, embedded depth of foundation 4.5m.Overall floorage is 26560.80m2.Engineering importance rate is two Grade, place grade are three-level, and ground grade is two level.
Grouting treatment is carried out to ground in the following way:
1, in conjunction with related record near proposed place, pass through XY-100 type hydraulic feed drill boring corings.Explore result For:Hole gap rate 33% is shown in drilling, line rate of karstification 7.2%, and molten (soil) hole at totally 16, no filling has at 5, is accounted for total 31.25%;Half filling has at 3, accounts for the 18.75% of sum, 0.1~3.6m of height of holes, and charges stick for hard plastic~plastic shape Soil is partly middle sand or rock fragment.
2, emphasis prospecting is carried out to Karst Area using High Density Resistivity, finds proposed apartment across three karst Development belt, wherein karst band of No. 2 lines centered on No. 32 electrodes and No. 33 electrode midpoints in the range of more than ten rice is deep layer (15m-20m) karst, remaining karst band are shallow-layer (10-15m) karst, see Fig. 3.
3, comprehensive analysis probing with physical prospecting the result shows that:Largely development is attached on basement rock surface layer for proposed region solution cavity, soil cave Closely, and solution cavity is distributed under bedrock surface within 3m, and solution cavity top most is there are rock top plate of varying thickness, and there are one for top plate Determine the lapies fluid bowl of degree, the soil layer that the equal cladding thickness in basement rock top does not wait.Karst development degree is medium development.
4, by the region of exploration result design basis extension 2m as plane range of grouting, vertical range of grouting is bedrock surface Upper and lower 3m;Grouting material is 42.5 grades of Portland cements, and the ratio of mud of cement grout is 0.6: 1~1: 1, first dilute rear thick; Grouting pressure is typically no less than 0.1~0.3MPa, near rock soil interface, is gradually increased to 0.3~0.6MPa;Injected hole uses Determinant arrangement, spacing 2m.Injected hole 385 is arranged in total.
5, using enclosed, successively dynamic slip casting method, grouting process use mini-valve tube method slip casting when slip casting.It is first perfused outermost One row forms a sealing ring, and then ecto-entad promotes by row in a manner of jumping and fill every hole, and implements during slip casting Dynamic Construction, side frontier inspection of constructing are surveyed, when find to have leak weight, fall brill, single hole grouting amount it is larger when, should be in hole surrounding encryption note Starch hole.When slip casting reach following standard for the moment, the hole slip casting can be terminated:(1) under whole injection pressure power continuous grouting 10min note When entering rate no more than 5L/min, slip casting can be terminated.(2) when grout point has gone out 3~5m outside range of grouting.(3) inlet well basement rock Completely or multiple slip casting, aperture pressure are more than 1.5MPa.(4) single hole grouting amount reaches 1.5~2.0 times of average grouting amount, and When grout absorption significantly reduces.
6, this time grouting effect detection detects two ways using inspection hole method and settling foundation.It is adopted first after the completion of grouting It is detected with inspection hole method, by the observation to coring, solution-cavity filling is closely knit, cement mortar and rock strong bonding;Soil cave is starched Liquid filling is uniform, is combined with surrounding soil preferably, illustrates that grouting effect is notable, achieved the purpose that foundation stabilization.
After monolithic architecture object is completed, settlement monitoring, in observation process, 17 settlement observations of apartment are carried out to building The cumulative settling amount of point is between -0.65~-4.44mm, and sedimentation rate of change is between 0.001~0.18mm/d, and settling amount is most Big is S13 points, and cumulative settling amount is -4.44mm, and it is S4 point 0.18mm/d that rate of change is maximum, each observation point last Hundred days rate of change maximum points are S6 point 0.00042mm/d, meet code requirement.Show building foundation settlement uniformly and Settling amount is small, and grouting has achieved the effect that consolidated subsoil, refers to Fig. 4.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the principle of the present invention, it can also make several improvements and retouch, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (2)

1. covered karst development area rock and soil layer contact surface grouting method, it is characterised in that:By enclosed successively dynamic Grouting method fills above and below the horizontal extent of 1-3 meters of structure foundation extension and rock and soil layer contact surface in 2-4 meters of ranges Slurry, fills all soil caves, lapies, fluid bowl, and the solution cavity through basement rock top plate is blocked using rapid hardening cementitious material, is formed with this One layer of stable supporting course.
2. covered karst development area as described in claim 1 rock and soil layer contact surface grouting method, it is characterised in that:Tool Body includes the following steps:
S1, geological mapping is carried out to proposed area
S11, unfavorable geology, foundation stability, groundwater parameter progress geology existing for proposed area are surveyed using probing mode It examines;
S12, karsts developing area range in proposed range, the scale of karsts developing area are found out in conjunction with results of drilling, and its lateral and vertical To spread situation, to drilling surveys supplement;
S13, in conjunction with probing with physical prospecting as a result, determine karsts developing area situation in proposed region, roof rock mass occurrence, bury thickness, Crack situation;
S2, Grouting plan design
1) grouting range
Grouting range is determined according to exploration result, wherein grouting horizontal extent is the range of 1-3 meters of construction area extension, vertically 2-4 meters of range ranging from above and below ground contact surface;
2) grouting pressure
Grouting pressure is determined by following formula:
P=p0+mh (1)
In formula:p0Grouting pressure, units MPa is allowed to take 0.3-0.5 in karst area for basement rock surface layer section;M is that basement rock is often deepened The increasable pressure of 1m, units MPa), in karst area, take 0.2-0.5;H is grout compartment depth, unit m;
3) grouting material
Select cement grout or the chemical material with gelling property
4) grout hole is arranged
The arrangement of pitch-row and array pitch should enable effective filling range of adjacent holes engaging one another, neither leave big crack, Do not make the part that overlap joint is overlapped too many again;Grouting port is arranged using multiple rows of determinant, so that later stage enclosed is successively dynamically noted The construction of slurry processes;
The successively dynamic slip casting of S3, enclosed
Using enclosed, successively dynamic slip casting method carries out slip casting, and grouting process uses mini-valve tube method slip casting;Specifically:First most Outer one discharges into row slip casting, forms a sealing ring, and then ecto-entad promotes by row in a manner of jumping and fill every hole, and in slip casting Implement Dynamic Construction in the process, side construction frontier inspection is surveyed, and adjusts grouting pressure, concentration of slurry, pitch-row row at any time according to result of detection Away from equal construction parameters;Solution cavity through basement rock top plate first tentatively blocks solution cavity using accelerated cement cream slurry, then is filled It notes conventional cement mortar and carries out reinforcement impervious grouting, the solution cavity through basement rock top plate is quickly and effectively blocked with this;
S4, grouting effect detection
Inspection hole method, standard penetration test (SPT) method, tablet load experiment method, foundation settlement detection method can be used after the completion of grouting to filling Slurry effect is detected.
CN201810560893.3A 2018-06-04 2018-06-04 Covered karst development area rock and soil layer contact surface grouting method Pending CN108677956A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810560893.3A CN108677956A (en) 2018-06-04 2018-06-04 Covered karst development area rock and soil layer contact surface grouting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810560893.3A CN108677956A (en) 2018-06-04 2018-06-04 Covered karst development area rock and soil layer contact surface grouting method

Publications (1)

Publication Number Publication Date
CN108677956A true CN108677956A (en) 2018-10-19

Family

ID=63809719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810560893.3A Pending CN108677956A (en) 2018-06-04 2018-06-04 Covered karst development area rock and soil layer contact surface grouting method

Country Status (1)

Country Link
CN (1) CN108677956A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441399A (en) * 2020-05-09 2020-07-24 中建四局第一建筑工程有限公司 Method for detecting strength of beaded karst cave after grouting
CN112832198A (en) * 2021-02-01 2021-05-25 四川共拓岩土科技股份有限公司 Seepage-proofing grouting method for covering layer of water storage dam foundation
CN113374465A (en) * 2021-06-08 2021-09-10 浙江数智交院科技股份有限公司 Covering type karst vertical striping method and device and electronic equipment
CN117144891A (en) * 2023-10-25 2023-12-01 中国铁路设计集团有限公司 Karst cave pretreatment method for open cut subway station in karst strong development area

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8585328B2 (en) * 2007-04-17 2013-11-19 Eric W. Smith Underground filling and sealing method
CN105422170A (en) * 2015-11-02 2016-03-23 安徽理工大学 Grouting reinforcement treatment method for mid-depth goaf below building foundation
CN107905218A (en) * 2017-11-28 2018-04-13 中国冶集团有限公司 A kind of karst cave treatment method in the construction applied to Pile In Drill In Karst Terrain

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8585328B2 (en) * 2007-04-17 2013-11-19 Eric W. Smith Underground filling and sealing method
CN105422170A (en) * 2015-11-02 2016-03-23 安徽理工大学 Grouting reinforcement treatment method for mid-depth goaf below building foundation
CN107905218A (en) * 2017-11-28 2018-04-13 中国冶集团有限公司 A kind of karst cave treatment method in the construction applied to Pile In Drill In Karst Terrain

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张健等: "《覆盖型岩溶地基注浆处理与效果检测分析》", 《建筑结构学报》 *
贾金生: "《中国大坝工程学会丛书 创新时代的水库大坝安全和生态保护 2017版》", 31 October 2017, 郑州:黄河水利出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441399A (en) * 2020-05-09 2020-07-24 中建四局第一建筑工程有限公司 Method for detecting strength of beaded karst cave after grouting
CN111441399B (en) * 2020-05-09 2021-12-24 中建四局第一建筑工程有限公司 Method for detecting strength of beaded karst cave after grouting
CN112832198A (en) * 2021-02-01 2021-05-25 四川共拓岩土科技股份有限公司 Seepage-proofing grouting method for covering layer of water storage dam foundation
CN113374465A (en) * 2021-06-08 2021-09-10 浙江数智交院科技股份有限公司 Covering type karst vertical striping method and device and electronic equipment
CN117144891A (en) * 2023-10-25 2023-12-01 中国铁路设计集团有限公司 Karst cave pretreatment method for open cut subway station in karst strong development area

Similar Documents

Publication Publication Date Title
CN105201448B (en) Block water slip casting method for blocking in a kind of high-pressure high-flow water gushing channelway
CN108677956A (en) Covered karst development area rock and soil layer contact surface grouting method
CN108468528A (en) Fourth-series deep well layered water pumping and stopping device and water pumping and stopping method thereof
CN201665871U (en) Long screw drilling bored pile post-grouting technology device
WO2013159749A1 (en) Method for distributed storage and use of underground water in mine
CN110617067B (en) Low-risk construction method for full-section boundary advanced pipe shed of extremely-soft surrounding rock tunnel
CN107299650B (en) A kind of remote open caisson casting method for correcting error
CN102561330A (en) Integrated construction method for artificial dug pile and steel pipe concrete column
CN104947650B (en) Grouting behind shaft or drift lining closed reinforcing method after sand drain piling prepressing
CN107130918A (en) Dam Heavy Curtain Grouting impact pore-forming construction method
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN107386309A (en) The prominent water burst method for blocking of the mine big flow high flow rate pipeline crack type karst that is recessed
CN115126441B (en) Vertical deep drilling grouting and stopping process
CN110904915A (en) Reservoir engineering rock-soil body water permeation and seepage prevention design method
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN104264653A (en) Superhigh energy level dynamic compaction and replacement compatible construction process
CN114233338A (en) Grouting transformation construction process for loose aquifer of coal mine
CN110749533A (en) Water-retention coal mining discrimination method based on equivalent water-resisting layer thickness
CN106149631B (en) High mountain strid arch dam avalanche type Slope Treatment method
CN110747808B (en) Construction method for directly feeding dam material by using ice water accumulation body as main rockfill area
Dou et al. Grouting experiment in a completely weathered granite dam abutment: case study on grouting technique and test analysis
CN102839825A (en) Reverse rectifying method for building
Sissakian et al. Karstification Problems in the Haditha Dam, West Iraq
Wilson et al. Earth and rockfill dams
Afiri et al. Evaluating permeability and groutability of Souk Tleta dam site based on Lugeon tests, RQD, SPI and trial grouting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181019

RJ01 Rejection of invention patent application after publication