CN107905218A CN201711217307.7A CN201711217307A CN107905218A CN 107905218 A CN107905218 A CN 107905218A CN 201711217307 A CN201711217307 A CN 201711217307A CN 107905218 A CN107905218 A CN 107905218A
Authority
CN
China
Prior art keywords
solution cavity
hole
slurry
karst
injected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711217307.7A
Other languages
Chinese (zh)
Inventor
范锐
姜平
李少祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201711217307.7A priority Critical patent/CN107905218A/en
Publication of CN107905218A publication Critical patent/CN107905218A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to the different size and the karst cave treatment method of type in a kind of construction applied to Pile In Drill In Karst Terrain.First using the cavern depth at Advance Drilling technical limit spacing stake position and solution cavity height;Solution cavity is filled without filling solution cavity and half more than 3m for hole is high, is handled using the method for concrete perfusion;Solution cavity is filled without filling solution cavity and half between 3m in 1.5m for hole height, is handled using the method for perfusion mortar;Solution cavity is filled in 1m to half between 1.5m without filling solution cavity and hole height between 1.5m in 0.5m for hole height, is handled using the method for floral tube slip casting;For the high half filling solution cavity and full packing solution cavity that are less than 1m without filling solution cavity, hole height less than 0.5m in hole, handled using the method for sleeve valve barrel grouting.The present invention preferably can be handled different types of solution cavity.

Description

A kind of karst cave treatment method in the construction applied to Pile In Drill In Karst Terrain
Technical field
The present invention relates to the Treatment technology of karst cave field in cast-in-situ bored pile, it particularly relates to which a kind of be applied to karst The karst cave treatment method of different size and type in regional bored pile construction.
Background technology
When constructing to karst area, the prior art is frequently with meeting the mode crept into again of solution cavity fill concrete (such as Chinese patent 201410376534.4), this consumption of method concrete and waste are serious, and concrete initial set and drilling time are difficult Hold, if concrete strength creeps into difficulty after rising.
Cast-in-situ bored pile is current using more extensive pile foundation type, its mechanization degree is high, and single pile bearing is big, pile body Rigidity is strong.When constructing in karst area, stake holes, which usually may require that, passes through solution cavity, easily caused in pore forming process spillage, necking down and Collapse hole, in concrete perfusion, substantial amounts of concrete can pour in from the junction of stake holes and solution cavity and fill solution cavity, cause coagulation The superfilled amount of soil is big, fullness coefficient is high, therefore it is higher to result in project cost.In the prior art, usually all it is to use single throwing Embankment method goes to handle different types of solution cavity, but in fact, since solution cavity geological condition is complicated, traditional method is to different type Karst cave treatment effect also differ widely.This patent takes different processing sides particular for the solution cavity of different size and type Method, so as to reach reliable, economically and reasonably optimization process effect.
The content of the invention
The technical problems to be solved by the invention are to provide that a kind of construction material is simple, construction technology is ripe, and construction is just Prompt, the karst cave treatment method of economical rationality.
Technical scheme can be realized by following technical measures:
A kind of karst cave treatment method in construction applied to Pile In Drill In Karst Terrain, including following process:
The cavern depth and solution cavity height at stake position are obtained, and according to obtained solution cavity height value, is selected in accordance with the following methods Select processing mode:
(1) solution cavity is filled without filling solution cavity and half more than 3m for hole is high, using grouting pipe concrete perfusion Method is handled;
(2) solution cavity is filled without filling solution cavity and half between 3m in 1.5m for hole height, sand is irrigated using grouting pipe The method of slurry is handled;
(3) for hole height in 0.5m to molten to half filling between 1.5m in 1m without filling solution cavity and hole height between 1.5m Hole, is handled using the method for floral tube grout injection;
(4) solution cavity and full packing solution cavity are filled without half of filling solution cavity, hole height less than 1m less than 0.5m for hole height, Handled using the method for mini-valve tube grout injection.
Preferably, using the cavern depth at Advance Drilling technical limit spacing stake position and solution cavity height.
Preferably for processing mode (1), following steps are specifically included:
(1-1) surveying setting-out, measures the center of solution cavity according to the conclusion of Advance Drilling and is marked;
The drilling of (1-2) arrangement, is marked the position of injected hole and exhausting-gas hole;
(1-3) drills, and injected hole and exhausting-gas hole are drilled with using drilling device;
(1-4) installs grouting pipe, and grouting pipe is installed in injected hole and is reinforced, and grouting pipe is entered More than solution cavity hole bottom 0.3~0.5m enters the following 0.3~0.5m in solution cavity hole top, while make it that grouting pipe is above ground level about 0.5m;
(1-5) installs exhaust manifolds, exhaust manifolds is installed in exhausting-gas hole, exhaust manifolds use pvc pipe;
(1-6) mixing concrete, concrete is using the concrete marked as C15;
Concrete, is pumped into solution cavity by (1-7) pump concrete using concrete pump by grouting pipe;
(1-8) mends slurry, and neat slurry is injected into solution cavity by exhaust manifolds using floral tube;
(1-9) blocks injected hole, extracts grouting pipe and injected hole is blocked.
Preferably for processing mode (2), following steps are specifically included:
(2-1) surveying setting-out, measures the center of solution cavity according to the conclusion of Advance Drilling and is marked;
The drilling of (2-2) arrangement, is marked the position of injected hole and exhausting-gas hole;
(2-3) drills, and injected hole and exhausting-gas hole are drilled with using drilling device;
(2-4) installs grouting pipe, and grouting pipe is installed in injected hole and is reinforced, and grouting pipe is entered More than solution cavity hole bottom 0.3~0.5m enters the following 0.3~0.5m in solution cavity hole top, while make it that grouting pipe is above ground level about 0.5m;
(2-5) installs exhaust manifolds, exhaust manifolds is installed in exhausting-gas hole, exhaust manifolds use pvc pipe;
(2-6) mixing mortar, mortar use mortar of the strength grade for M10;
(2-7) pumps mortar, and mortar is pumped into solution cavity by grouting pipe using concrete pump;
(2-8) mends slurry, and neat slurry is injected into solution cavity by exhaust manifolds using floral tube;
(2-9) blocks injected hole, extracts grouting pipe and injected hole is blocked.
Preferably, in step (2-6), the volume proportion of mortar is cement:Sand:Water=1:4.8:0.8.
Preferably for processing mode (3), following steps are specifically included:
(3-1) surveying setting-out, measures the center of solution cavity according to the conclusion of Advance Drilling and is marked;
The drilling of (3-2) arrangement, is marked the position of injected hole and exhausting-gas hole;
(3-3) drills, and injected hole and exhausting-gas hole are drilled with using drilling device;
(3-4) makes and installation floral tube, makes floral tube and loads in injected hole;
(3-5) makes and installation exhaust manifolds, makes exhaust manifolds and loads in exhausting-gas hole, exhaust manifolds use pvc pipe;
(3-6) configures injection slurry, and injection slurry uses cement mortar, and cement mortar uses 32.5R Portland cements, and controls The ratio of mud is 0.8~1.0, concentration is 0.5~0.6;
(3-7) slip casting, slip casting is carried out using grouting pump by floral tube by injection slurry to solution cavity;
(3-8) mends slurry, and neat slurry is injected into solution cavity by exhaust manifolds using floral tube;
(3-9) blocks injected hole, and injected hole is blocked using mortar.
Preferably for processing mode (4), following steps are specifically included:
(4-1) surveying setting-out, measures the center of solution cavity according to the conclusion of Advance Drilling and is marked;
(4-2) pore-forming, is marked the position of injected hole using the center of solution cavity as basic point, is set afterwards using drilling It is standby to be drilled with injected hole;
(4-3) pours sleeve shell material, pours sleeve shell material in the slip casting section of injected hole, sleeve shell material uses clay cement grout;
(4-4) installs mini-valve tube, and mini-valve tube is loaded in injected hole;
(4-5) pipe is only starched admittedly, is inserted into solid pipe in the gap location of mini-valve tube and injected hole and is stopped slurry conduit until solution cavity top circle Position, stops the solid pipe of slurry conduit injection by solid pipe afterwards and stops slurries, Gu it is neat slurry that pipe, which stops slurries,;
(4-6) slip casting, is injected injection slurry in solution cavity by mini-valve tube using grouting pump, and injection slurry uses neat slurry, Cement uses 32.5R Portland cements, and the ratio of mud is 0.5~0.6;
(4-7) blocks injected hole, and injected hole is blocked using mortar.
Preferably, in step (4-3), the match ratio of sleeve shell material is weight ratio cement:Clay:Water=1:1.50:1.88.
Preferably, in step (4-4), clear water is poured into overcome the floating of sleeve shell material in mini-valve tube when installing mini-valve tube Power;The slip casting section of mini-valve tube is beyond the top of solution cavity, each 20cm in bottom circle.
Preferably, in step (4-5), Gu it is water that pipe, which stops slurries,:Cement weight ratio=1:1.5 neat slurry.
Preferably, in step (4-6), in the slip casting liquid measure that single hole irrigates more than 20m3When not filling yet, using cement water Glass dual slurry substitutes injection slurry and is irrigated.
Preferably, cement-silicate dual slurry in the preparation, prepares 1 using 32.5R Portland cements first:1 Cement mortar, then the waterglass for taking Baume degrees to be 30-40 are diluted to 30%, and the volume of cement mortar is accounted for waterglass dilution afterwards Than being irrigated for 40% ground.
Compared with prior art, the present invention has the advantages that:
1, the method for the present invention carries out advance drilling before relying on drilling, can accurately understand solution cavity depth according to advance drilling data Degree, size, filling situation, different processing methods is taken for different size and the solution cavity for filling type, and specific aim is stronger, real Applying method is more specific;
2, the method for the present invention is used for used by karst cave treatment that construction material to be simple, construction technology is ripe, and construction is convenient, warp Ji is reasonable;
3, the method for the present invention be before bored pile construction carry out solution cavity filling pretreatment, by using injection slurries, The materials such as mortar, concrete are filled solution cavity and solidify integral, easy to creep into and retaining wall, avoid sending out in work progress Phenomena such as raw spillage, landslide, greatly reduce difficulty of construction, reduce throwing quantities, avoid the super side of concrete, save Duration, be conducive to pore-forming and pile quality control;
4, definitely sum is not unique for several processing methods and flow referred in patent of the present invention, in different engineerings and difference It can be used cooperatively in geological conditions according to specific actual conditions, strengthen its treatment effect with comprehensive, reach karst cave treatment can Lean on, the purpose of economical rationality.
Brief description of the drawings
Using attached drawing, the invention will be further described, but the embodiment in attached drawing does not form any limit to the present invention System.
Fig. 1 is the flow chart for the karst cave treatment method that the present invention is applied in Pile In Drill In Karst Terrain construction.
Embodiment
To further appreciate that present disclosure, the present invention is described in detail in conjunction with the accompanying drawings and embodiments.It should be understood that , embodiment be only the present invention is explained and and it is non-limiting.
Embodiment 1
With reference to shown in Fig. 1, present embodiments provide at the solution cavity in a kind of construction applied to Pile In Drill In Karst Terrain Reason method, it comprises the following steps:
The solution cavity distribution situation at stake position is obtained, it is high using the cavern depth at Advance Drilling technical limit spacing stake position and solution cavity Degree, and according to obtained solution cavity height value, processing mode is selected in accordance with the following methods:
(1) solution cavity is filled without filling solution cavity and half more than 3m for hole is high, is carried out using the method for concrete perfusion Processing;
(2) solution cavity is filled without filling solution cavity and half between 3m in 1.5m for hole height, using the method for perfusion mortar Handled;
(3) for hole height in 0.5m to molten to half filling between 1.5m in 1m without filling solution cavity and hole height between 1.5m Hole, is handled using the method for floral tube slip casting;
(4) solution cavity and full packing solution cavity are filled without half of filling solution cavity, hole height less than 1m less than 0.5m for hole height, Handled using the method for sleeve valve barrel grouting.
In the present embodiment, the method for concrete perfusion is further comprising the steps of in processing mode (1):
(1-1) surveying setting-out, measures the center of solution cavity according to the conclusion of step (1) and is marked;
The drilling of (1-2) arrangement, is marked the position of injected hole and exhausting-gas hole;
(1-3) drills, and injected hole and exhausting-gas hole are drilled with using drilling device;
(1-4) installs grouting pipe, and grouting pipe is installed in injected hole and is reinforced, and grouting pipe is entered More than solution cavity hole bottom 0.3~0.5m enters the following 0.3~0.5m in solution cavity hole top, while make it that grouting pipe is above ground level about 0.5m;
(1-5) installs exhaust manifolds, exhaust manifolds is installed in exhausting-gas hole, exhaust manifolds use pvc pipe;
(1-6) mixing concrete, concrete is using the concrete marked as C15;
Concrete, is pumped into solution cavity by (1-7) pump concrete using concrete pump by grouting pipe;
(1-8) mends slurry, and neat slurry is injected into solution cavity by exhaust manifolds using floral tube;
(1-9) blocks injected hole, extracts grouting pipe and injected hole is blocked.
In the present embodiment, the method for perfusion mortar is further comprising the steps of in processing mode (2),
(2-1) surveying setting-out, measures the center of solution cavity according to the conclusion of step (1) and is marked;
The drilling of (2-2) arrangement, is marked the position of injected hole and exhausting-gas hole;
(2-3) drills, and injected hole and exhausting-gas hole are drilled with using drilling device;
(2-4) installs grouting pipe, and grouting pipe is installed in injected hole and is reinforced, and grouting pipe is entered More than solution cavity hole bottom 0.3~0.5m enters the following 0.3~0.5m in solution cavity hole top, while make it that grouting pipe is above ground level about 0.5m;
(2-5) installs exhaust manifolds, exhaust manifolds is installed in exhausting-gas hole, exhaust manifolds use pvc pipe;
(2-6) mixing mortar, mortar use mortar of the strength grade for M10;
(2-7) pumps mortar, and mortar is pumped into solution cavity by grouting pipe using concrete pump;
(2-8) mends slurry, and neat slurry is injected into solution cavity by exhaust manifolds using floral tube;
(2-9) blocks injected hole, extracts grouting pipe and injected hole is blocked.
Wherein, in step (2-6), the volume proportion of mortar is cement:Sand:Water=1:4.8:0.8.
It is further comprising the steps of using the method for floral tube slip casting in processing mode (3) in the present embodiment,
(3-1) surveying setting-out, measures the center of solution cavity according to the conclusion of step (1) and is marked;
The drilling of (3-2) arrangement, is marked the position of injected hole and exhausting-gas hole;
(3-3) drills, and injected hole and exhausting-gas hole are drilled with using drilling device;
(3-4) makes and installation floral tube, makes floral tube and loads in injected hole;
(3-5) makes and installation exhaust manifolds, makes exhaust manifolds and loads in exhausting-gas hole, exhaust manifolds use pvc pipe;
(3-6) configures injection slurry, and injection slurry uses cement mortar, and cement mortar uses 32.5R Portland cements, and controls The ratio of mud is 0.8~1.0, concentration is 0.5~0.6;
(3-7) slip casting, slip casting is carried out using grouting pump by floral tube by injection slurry to solution cavity;
(3-8) mends slurry, and neat slurry is injected into solution cavity by exhaust manifolds using floral tube;
(3-9) blocks injected hole, and injected hole is blocked using mortar.
Wherein, in step (3-7), in the slip casting liquid measure that single hole irrigates more than 20m3When not filling yet, using cement water glass Glass dual slurry substitutes injection slurry and is irrigated.For cement-silicate dual slurry in configuration, cement uses 32.5R normal silicate water Mud, the Baume degrees of waterglass is 30~40.
It is further comprising the steps of using the method for sleeve valve barrel grouting in processing mode (4) in the present embodiment,
(4-1) surveying setting-out, measures the center of solution cavity according to the conclusion of step (1) and is marked;
(4-2) pore-forming, is marked the position of injected hole using the center of solution cavity as basic point, is set afterwards using drilling It is standby to be drilled with injected hole;
(4-3) pours sleeve shell material, pours sleeve shell material in the slip casting section of injected hole, sleeve shell material uses clay cement grout;
(4-4) installs mini-valve tube, and mini-valve tube is loaded in injected hole;
(4-5) pipe is only starched admittedly, is inserted into solid pipe in the gap location of mini-valve tube and injected hole and is stopped slurry conduit until solution cavity top circle Position, stops the solid pipe of slurry conduit injection by solid pipe afterwards and stops slurries, Gu it is neat slurry that pipe, which stops slurries,;
(4-6) slip casting, is injected injection slurry in solution cavity by mini-valve tube using grouting pump, injection slurry uses cement mortar;
(4-7) blocks injected hole, and injected hole is blocked using mortar.
In step (4-3), the match ratio of sleeve shell material is cement:Clay:Water=1:1.50:1.88 (weight ratios), it is measured 94kg water is added in agitator tank, adds 75kg clays (weighing), and it is equal that one bag of cement (50kg) stirring is added after strong stirring It is even.
In step (4-4), due to the presence of sleeve shell material, for the ease of the down tube of mini-valve tube, tucking inside the sleeve when installing mini-valve tube Clear water is poured into valve pipe to overcome the buoyancy of sleeve shell material;To ensure preferable slip casting effect so that the slip casting Duan Chao of mini-valve tube Go out top, each 20cm in bottom circle of solution cavity.
In step (4-5), Gu it is water that pipe, which stops slurries,:Cement=1:The neat slurry of 1.5 (weight ratios), in filling process In, the multiple recharge after pulp surface sinking, preferably consolidates pipe effect to guarantee to reach.
In step (4-6), in the slip casting liquid measure that single hole irrigates more than 20m3When not filling yet, using cement-silicate biliquid Slurry substitutes injection slurry and is irrigated.Injection slurry uses neat slurry, and cement uses 32.5R Portland cements, and the ratio of mud is 0.5~0.6.Cement-silicate dual slurry in the preparation, prepares 1 using 32.5R Portland cements first:1 cement mortar, The waterglass for taking Baume degrees to be 30-40 again is diluted to 30%, afterwards using waterglass dilution to the volume accounting of cement mortar as 40% ground is irrigated.
In the present embodiment, the quantity of injected hole can be 1 or 2, and when the quantity of injected hole is 1, injected hole is located at The center position of Pile position;When the quantity of injected hole is 2,2 injected holes are relative to cast-in-situ bored pile The center of stake position is arranged with being centrosymmetric.Designed by this kind so that can be preferably to molten at the region of stake position during slip casting Hole is handled, so as to the settling amount for preferably lifting the intensity of ground at stake position, reducing ground at stake position, and then can It may be preferable to ensure that the stability of ground at stake position, ensure the safe and smooth construction of bored concrete pile.
In the present embodiment, exhausting-gas hole at solution cavity position split 2 every 20cm, so as to effectively ensure at solution cavity Reason is smoothed out.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention rather than the present invention is protected The limitation of scope is protected, although being explained in detail with reference to preferred embodiment to the present invention, those of ordinary skill in the art should Understand, can be to technical scheme technical scheme is modified or replaced equivalently, without departing from the essence of technical solution of the present invention And scope.

Claims (10)

1. a kind of karst cave treatment method in construction applied to Pile In Drill In Karst Terrain, it is characterised in that including following mistake Journey:
Obtain the cavern depth and solution cavity height at stake position, and according to obtained solution cavity height value, in accordance with the following methods at selection Reason mode:
(1) solution cavity is filled without filling solution cavity and half more than 3m for hole is high, using the method for grouting pipe concrete perfusion Handled;
(2) solution cavity is filled without filling solution cavity and half between 3m in 1.5m for hole height, using grouting pipe perfusion mortar Method is handled;
(3) solution cavity is filled in 1m to half between 1.5m without filling solution cavity and hole height between 1.5m in 0.5m for hole height, adopted Handled with the method for floral tube grout injection;
(4) for the high half filling solution cavity and full packing solution cavity that are less than 1m without filling solution cavity, hole height less than 0.5m in hole, use The method of mini-valve tube grout injection is handled.
2. the karst cave treatment method in the construction according to claim 1 applied to Pile In Drill In Karst Terrain, its feature It is, using the cavern depth at Advance Drilling technical limit spacing stake position and solution cavity height.
3. the karst cave treatment method in the construction according to claim 1 applied to Pile In Drill In Karst Terrain, its feature It is, for processing mode (1), specifically includes following steps:
(1-1) surveying setting-out, measures the center of solution cavity according to the conclusion of Advance Drilling and is marked;
The drilling of (1-2) arrangement, is marked the position of injected hole and exhausting-gas hole;
(1-3) drills, and injected hole and exhausting-gas hole are drilled with using drilling device;
(1-4) installs grouting pipe, and grouting pipe is installed in injected hole and is reinforced, and causes grouting pipe to enter solution cavity More than hole bottom 0.3~0.5m enters the following 0.3~0.5m in solution cavity hole top, while causes grouting pipe about 0.5m above ground level;
(1-5) installs exhaust manifolds, exhaust manifolds is installed in exhausting-gas hole, exhaust manifolds use pvc pipe;
(1-6) mixing concrete;
Concrete, is pumped into solution cavity by (1-7) pump concrete using concrete pump by grouting pipe;
(1-8) mends slurry, and neat slurry is injected into solution cavity by exhaust manifolds using floral tube;
(1-9) blocks injected hole, extracts grouting pipe and injected hole is blocked.
4. the karst cave treatment method in the construction according to claim 1 applied to Pile In Drill In Karst Terrain, its feature It is, for processing mode (2), specifically includes following steps:
(2-1) surveying setting-out, measures the center of solution cavity according to the conclusion of Advance Drilling and is marked;
The drilling of (2-2) arrangement, is marked the position of injected hole and exhausting-gas hole;
(2-3) drills, and injected hole and exhausting-gas hole are drilled with using drilling device;
(2-4) installs grouting pipe, and grouting pipe is installed in injected hole and is reinforced, and causes grouting pipe to enter solution cavity More than hole bottom 0.3~0.5m enters the following 0.3~0.5m in solution cavity hole top, while causes grouting pipe about 0.5m above ground level;
(2-5) installs exhaust manifolds, exhaust manifolds is installed in exhausting-gas hole, exhaust manifolds use pvc pipe;
(2-6) mixing mortar, mortar use mortar of the strength grade for M10;
(2-7) pumps mortar, and mortar is pumped into solution cavity by grouting pipe using concrete pump;
(2-8) mends slurry, and neat slurry is injected into solution cavity by exhaust manifolds using floral tube;
(2-9) blocks injected hole, extracts grouting pipe and injected hole is blocked.
5. the karst cave treatment method in the construction according to claim 4 applied to Pile In Drill In Karst Terrain, its feature It is, in step (2-6), the volume proportion of mortar is cement:Sand:Water=1:4.8:0.8.
6. the karst cave treatment method in the construction according to claim 1 applied to Pile In Drill In Karst Terrain, its feature It is, for processing mode (3), specifically includes following steps:
(3-1) surveying setting-out, measures the center of solution cavity according to the conclusion of Advance Drilling and is marked;
The drilling of (3-2) arrangement, is marked the position of injected hole and exhausting-gas hole;
(3-3) drills, and injected hole and exhausting-gas hole are drilled with using drilling device;
(3-4) makes and installation floral tube, makes floral tube and loads in injected hole;
(3-5) makes and installation exhaust manifolds, makes exhaust manifolds and loads in exhausting-gas hole, exhaust manifolds use pvc pipe;
(3-6) configures injection slurry, and injection slurry uses cement mortar, and cement mortar uses 32.5R Portland cements, and controls water grey Than being 0.5~0.6 for 0.8~1.0, concentration;
(3-7) slip casting, slip casting is carried out using grouting pump by floral tube by injection slurry to solution cavity;
(3-8) mends slurry, and neat slurry is injected into solution cavity by exhaust manifolds using floral tube;
(3-9) blocks injected hole, and injected hole is blocked using mortar.
7. the karst cave treatment method in the construction according to claim 1 applied to Pile In Drill In Karst Terrain, its feature It is, for processing mode (4), specifically includes following steps:
(4-1) surveying setting-out, measures the center of solution cavity according to the conclusion of Advance Drilling and is marked;
(4-2) pore-forming, is marked the position of injected hole using the center of solution cavity as basic point, is bored afterwards using drilling device If injected hole;
(4-3) pours sleeve shell material, and sleeve shell material is poured in the slip casting section of injected hole, and sleeve shell material uses clay cement grout, in sleeve shell material Cement:Clay:Water weight ratio=1:1.50:1.88;
(4-4) installs mini-valve tube, and mini-valve tube is loaded in injected hole;
(4-5) pipe is only starched admittedly, is inserted into solid pipe in the gap location of mini-valve tube and injected hole and is stopped slurry conduit until solution cavity top circle position, The solid pipe of slurry conduit injection is stopped by solid pipe afterwards and stops slurries, Gu it is water that pipe, which stops slurries,:Cement weight ratio=1:1.5 striaght cement Slurry;
(4-6) slip casting, is injected injection slurry in solution cavity by mini-valve tube using grouting pump, injection slurry uses neat slurry, cement Using 32.5R Portland cements, the ratio of mud is 0.5~0.6;
(4-7) blocks injected hole, and injected hole is blocked using mortar.
8. the karst cave treatment method in the construction according to claim 7 applied to Pile In Drill In Karst Terrain, its feature It is, in step (4-4), clear water is poured into mini-valve tube to overcome the buoyancy of sleeve shell material when installing mini-valve tube;Mini-valve tube Slip casting section beyond the top of solution cavity, each 20cm in bottom circle.
9. the karst cave treatment method in the construction according to claim 7 applied to Pile In Drill In Karst Terrain, its feature It is, in step (4-6), in the slip casting liquid measure that single hole irrigates more than 20m3When not filling yet, using cement-silicate dual slurry Injection slurry is substituted to be irrigated.
10. the karst cave treatment method in the construction according to claim 9 applied to Pile In Drill In Karst Terrain, its feature It is, cement-silicate dual slurry in the preparation, prepares 1 using 32.5R Portland cements first:1 cement mortar, then take Baume degrees be 30-40 waterglass be diluted to 30%, afterwards using waterglass dilution to the volume accounting of cement mortar as 40% ground It is irrigated.
CN201711217307.7A 2017-11-28 2017-11-28 A kind of karst cave treatment method in the construction applied to Pile In Drill In Karst Terrain Pending CN107905218A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711217307.7A CN107905218A (en) 2017-11-28 2017-11-28 A kind of karst cave treatment method in the construction applied to Pile In Drill In Karst Terrain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711217307.7A CN107905218A (en) 2017-11-28 2017-11-28 A kind of karst cave treatment method in the construction applied to Pile In Drill In Karst Terrain

Publications (1)

Publication Number Publication Date
CN107905218A true CN107905218A (en) 2018-04-13

Family

ID=61848980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711217307.7A Pending CN107905218A (en) 2017-11-28 2017-11-28 A kind of karst cave treatment method in the construction applied to Pile In Drill In Karst Terrain

Country Status (1)

Country Link
CN (1) CN107905218A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108585692A (en) * 2018-06-20 2018-09-28 广州地铁设计研究院有限公司 It is a kind of to fill molten, soil cave injecting paste material and grout filling construction method suitable for karst region
CN108677956A (en) * 2018-06-04 2018-10-19 山东农业大学 Covered karst development area rock and soil layer contact surface grouting method
CN108999181A (en) * 2018-08-15 2018-12-14 广州地铁设计研究院有限公司 Molten, soil cave injecting treatment construction method and its application
CN109356171A (en) * 2018-11-28 2019-02-19 中国十七冶集团有限公司 A kind of device and its operating method blocking solution cavity using rubber bag
CN109577313A (en) * 2018-12-11 2019-04-05 宝钢集团新疆八钢铁有限公司 A kind of cold region factory built-up areas grouting and reinforcing technology
CN109653197A (en) * 2019-01-10 2019-04-19 湖北工业大学 It is a kind of can the three-dimensional pile base construction method expanded
CN109750662A (en) * 2019-01-10 2019-05-14 湖北工业大学 A kind of method for constructing foundation pile passing through solution cavity section
CN110230309A (en) * 2019-01-24 2019-09-13 中建新疆建工土木工程有限公司 Karst region bridge solution cavity pile base construction method
CN111254933A (en) * 2020-01-20 2020-06-09 武汉正洪岩土工程有限公司 Karst grouting construction method for sleeve valve pipe
CN111395346A (en) * 2020-03-19 2020-07-10 广州市建筑科学研究院有限公司 Construction method for pouring concrete into karst cave
CN111485544A (en) * 2020-05-27 2020-08-04 中交路桥建设有限公司 Disposal detection structure and method for karst cave under rock-socketed pile base
CN112302014A (en) * 2020-10-26 2021-02-02 中建四局第一建筑工程有限公司 Construction method for reinforcing H-shaped steel bottom karst cave of pile in SMW construction method
CN114278312A (en) * 2021-12-31 2022-04-05 中铁五局集团有限公司 Karst treatment construction method for river channel area in subway tunnel shield construction
CN115419047A (en) * 2022-09-13 2022-12-02 中铁二十局集团南方工程有限公司 Karst cave grouting process

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2270294C1 (en) * 2004-09-08 2006-02-20 Ахсар Николаевич Басиев Bored pile and method for pile erection in karst or soft ground
CN101864763A (en) * 2010-05-29 2010-10-20 中国二十二冶集团有限公司 Foundation integrated processing construction method of cover type karst area
CN102155241A (en) * 2011-05-10 2011-08-17 广州市城市规划勘测设计研究院 Karst grouting reinforcement water-stop constructing method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2270294C1 (en) * 2004-09-08 2006-02-20 Ахсар Николаевич Басиев Bored pile and method for pile erection in karst or soft ground
CN101864763A (en) * 2010-05-29 2010-10-20 中国二十二冶集团有限公司 Foundation integrated processing construction method of cover type karst area
CN102155241A (en) * 2011-05-10 2011-08-17 广州市城市规划勘测设计研究院 Karst grouting reinforcement water-stop constructing method

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
夏中杰: "岩溶地区修建明挖地铁车站的勘察与风险评估研究", 《硕士论文电子期刊》 *
庄玉海: "广州万达文化旅游城—万达茂项目桩基础施工技术研究", 《硕士论文电子期刊》 *
李星: "溶洞处理采芯率和泥浆漏失的施工技术应用", 《广东土木与建筑》 *
蔡希杰等人: "袖阀式劈裂注浆在深港西部通道工程中的应用", 《建材技术与应用》 *
雷金山: "《轨道交通隐伏型岩溶地基稳定性分析及岩溶处治》", 30 November 2016 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677956A (en) * 2018-06-04 2018-10-19 山东农业大学 Covered karst development area rock and soil layer contact surface grouting method
CN108585692A (en) * 2018-06-20 2018-09-28 广州地铁设计研究院有限公司 It is a kind of to fill molten, soil cave injecting paste material and grout filling construction method suitable for karst region
CN108999181A (en) * 2018-08-15 2018-12-14 广州地铁设计研究院有限公司 Molten, soil cave injecting treatment construction method and its application
CN109356171A (en) * 2018-11-28 2019-02-19 中国十七冶集团有限公司 A kind of device and its operating method blocking solution cavity using rubber bag
CN109577313A (en) * 2018-12-11 2019-04-05 宝钢集团新疆八钢铁有限公司 A kind of cold region factory built-up areas grouting and reinforcing technology
CN109653197A (en) * 2019-01-10 2019-04-19 湖北工业大学 It is a kind of can the three-dimensional pile base construction method expanded
CN109750662A (en) * 2019-01-10 2019-05-14 湖北工业大学 A kind of method for constructing foundation pile passing through solution cavity section
CN110230309B (en) * 2019-01-24 2021-07-16 中建新疆建工土木工程有限公司 Karst area bridge karst cave pile foundation construction method
CN110230309A (en) * 2019-01-24 2019-09-13 中建新疆建工土木工程有限公司 Karst region bridge solution cavity pile base construction method
CN111254933A (en) * 2020-01-20 2020-06-09 武汉正洪岩土工程有限公司 Karst grouting construction method for sleeve valve pipe
CN111254933B (en) * 2020-01-20 2021-05-28 武汉正洪岩土工程有限公司 Karst grouting construction method for sleeve valve pipe
CN111395346A (en) * 2020-03-19 2020-07-10 广州市建筑科学研究院有限公司 Construction method for pouring concrete into karst cave
CN111485544A (en) * 2020-05-27 2020-08-04 中交路桥建设有限公司 Disposal detection structure and method for karst cave under rock-socketed pile base
CN112302014A (en) * 2020-10-26 2021-02-02 中建四局第一建筑工程有限公司 Construction method for reinforcing H-shaped steel bottom karst cave of pile in SMW construction method
CN114278312A (en) * 2021-12-31 2022-04-05 中铁五局集团有限公司 Karst treatment construction method for river channel area in subway tunnel shield construction
CN114278312B (en) * 2021-12-31 2023-10-17 中铁五局集团有限公司 Karst treatment construction method for river channel region in subway tunnel shield construction
CN115419047A (en) * 2022-09-13 2022-12-02 中铁二十局集团南方工程有限公司 Karst cave grouting process

Similar Documents

Publication Publication Date Title
CN107905218A (en) A kind of karst cave treatment method in the construction applied to Pile In Drill In Karst Terrain
CN104153352B (en) Karst geology rotary-drilling bored concrete pile hole forming process
CN103195076B (en) Muddy Bottoms deep-excavation tower crane foundation construction method
CN101713278B (en) One-pile double-machine construction method for drilling pouring pile hole formation
CN103924987B (en) A kind of SMW engineering method stake tunnel shielding portal seepage-proof structure and construction method thereof
CN104806257A (en) Sandy gravel stratum shield construction cap-type ground advance reinforcement structure and sandy gravel stratum shield construction cap-type ground advance reinforcement method
CN102162253B (en) Precipitation construction method employing pipe embedded in deep foundation pits
CN104895055A (en) Building grouting pile foundation construction method
CN104831705A (en) Ultra-deep hole grouting method during underground excavation of tunnel
CN104631440B (en) A kind of existing large-section in-situ concrete pile strength core increases foundation pit supporting construction and constructional method
CN109138011B (en) Foundation reinforcing and deviation rectifying method for existing building
CN203361143U (en) Combination structure of high-pressure jet grouting pile and prestressed pipe pile
CN114108649A (en) Foundation pit reinforcing construction method for mucky soil layer
CN104790982B (en) A kind of bored tunnel superdeep holes grouting sleeve shell material
CN109594575A (en) A kind of open caisson periphery grouting and reinforcing soil body construction method
CN110700240B (en) Grouting tubular pile and construction method thereof
CN102304915B (en) New method for controlling top quality of drilled pile
CN107829441A (en) It is a kind of do not influence surrounding enviroment draw hole caisson structure and its construction method
CN106284311B (en) A kind of dry efficient construction technology of pore-forming cast-in-place concrete pile of rotary drilling rig
CN111364449A (en) Construction method and structure for penetrating karst cave of precast tubular pile
CN103343534A (en) Closed precipitation method for foundation pit construction
CN104453915B (en) Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method
CN201635072U (en) Centrally grouted static-pressured anchor pile former
CN107975027A (en) The construction method that shield launching is reinforced with reaching end soil body
CN107975376A (en) Tunneling shield push pipe and vertical duct connection structure and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180413