CN101864763A - Foundation integrated processing construction method of cover type karst area - Google Patents

Foundation integrated processing construction method of cover type karst area Download PDF

Info

Publication number
CN101864763A
CN101864763A CN 201010190331 CN201010190331A CN101864763A CN 101864763 A CN101864763 A CN 101864763A CN 201010190331 CN201010190331 CN 201010190331 CN 201010190331 A CN201010190331 A CN 201010190331A CN 101864763 A CN101864763 A CN 101864763A
Authority
CN
China
Prior art keywords
construction
foundation
hole
slip casting
sleeve valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010190331
Other languages
Chinese (zh)
Other versions
CN101864763B (en
Inventor
彭华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
MCC Jingtang Construction Co Ltd
Original Assignee
China 22MCC Group Corp Ltd
MCC Jingtang Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd, MCC Jingtang Construction Co Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN 201010190331 priority Critical patent/CN101864763B/en
Publication of CN101864763A publication Critical patent/CN101864763A/en
Application granted granted Critical
Publication of CN101864763B publication Critical patent/CN101864763B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention relates to a foundation processing method, in particular to a foundation integrated processing construction method of a cover type karst area. The method comprises the following steps of: evacuating earth moving machinery when a foundation pit is excavated until a limestone formation is exposed in a large area; basically exposing rocks of the bottom of the foundation pit after excavating, wherein rock buds are exposed from a foundation base, and the storage quantity of damic earth among the rock buds does not influence the next procedure construction; adopting weakened loose blasting operation, aiming at solution cracks, intermountain gulches and locally crushing bedrocks, and mechanically crushing and clearing; adopting a complex geophysical prospecting technological means that a high-density resistivity method is combined with a geological radar, arranging a high-density electrical geophysical prospecting wire in a construction site according to an arrangement rule, meanwhile, arranging a detailed exploratory hole in a building planning position, and mechanically picking the solution cracks, the intermountain gulches and the locally crushing bedrocks; adopting sleeve valve cement flour and coal ash slurry injecting constriction and cement flour and coal ash slurry filling constriction by a solution cavity slurry-injection method; and filling and casting concrete. The invention can quicken a work progress and can save construction cost compared with other foundation processing modes.

Description

Foundation integrated processing construction method of cover type karst area
Technical field
The present invention relates to method for processing foundation, especially a kind of foundation integrated processing construction method of cover type karst area.
Background technology
At present, domestic many construction enterprises handle ground and did corresponding research, also obtain certain successful experience.But still none enterprise or a project so far, the expert that can make up prospecting, design, construction and geology aspect effectively studies together, so far can't obtain new breakthrough aspect the foundation treatment technology of karst area, on cover type karst area, launch to change the experience of filling out the integrated treatment construction, also do not have relevant construction technology and can use for reference.
Summary of the invention
How the present invention is intended to solve under the prerequisite of control construction investment, guarantees the Foundation Design quality, guarantees programming, and a kind of foundation integrated processing construction method of cover type karst area is provided.
For achieving the above object, this job practices is carried out according to the following step:
(1) discloses excavation construction: when excavation of foundation pit exposes to the lime rock stratum large tracts of land, withdraw from earth moving plant; Foundation ditch bottom, excavation back reaches rock and exposes substantially, and clint exposes substrate, and the admaic earth amount retained does not influence the next procedure construction and gets final product between clint;
(2) explosion and machinery cut cleaning: blasting method is adopted and is weakened loosening blasting, at solution crack and intermountain coombe and local broken basement rock, takes the Mechanical Crushing cleaning;
(3) the complex geophysical prospecting technological means of taking high-density electric to combine with geological radar: high-density electric is by layout rules high-density electric physical prospecting line to be set in the building site, in proposed building location arrangements detailed exploration hole, machinery cuts at solution crack and intermountain coombe and local broken basement rock simultaneously;
(4) slip casting of solution cavity is handled: the solution cavity grouting method adopts sleeve valve cementing coal ash pulp construction and the construction of cement injection fly-ash mortar;
(5) plain concrete is filled and is built.
The present invention makes up by effectively explosion and machinery being cut, the complex geophysical prospecting technology that high-density electric and geological radar combine, accelerated programming greatly, more single foundation treatment mode can be constructed respectively, take practicable processing mode, played the purpose of saving construction fund.
Outstanding effect of the present invention is: accelerated programming, saved construction fund with respect to other foundation treatment modes, handling for ground of the same type provides beneficial reference and reference.
The specific embodiment
Below in conjunction with specific embodiment in detail invention is described in detail:
One, discloses excavation construction
Described this place landform of present embodiment is comparatively smooth, and geomorphic type is single, and earth formation is complicated, and Geological Conditions of Environmental Engineering is simpler, is easy to regulation, belongs to the less stable place.Soil property is not really even, ground is more stable, underground water is less to effect of project, the bedrock relief bigger to the engineering construction influence is bigger, drainage condition still can, construction than the appropriate architecture thing, but limit by Systems of Red Line in Planning Based and site operation road, carry out natural discharging slope and may cause and close on enclosure wall or road caves in.So must do soil nailing wall bank protection around the part building foundation ditch, all foundation ditches are put sloping coefficient by 1: 0.3.Because cutting depth does not reach the underground water absolute altitude, behind the excavation of foundation pit, does not consider the stability influence of underground water to foundation ditch.
When excavation of foundation pit exposes to the lime rock stratum large tracts of land, withdraw from earth moving plant; Foundation ditch bottom, excavation back reaches rock and exposes substantially, and clint exposes substrate, and the admaic earth amount retained does not influence the next procedure construction and gets final product between clint.
Two, explosion and machinery cut cleaning
A, blasting method and type
Blasting method is adopted and to be weakened loosening blasting, and blasting action index n gets about 0.5, and the sillar that reaches after the explosion is loose substantially, available machinery shipment.
B, machinery cut
Adopt machinery to cut cleaning.At solution crack and intermountain coombe and local broken basement rock, take the Mechanical Crushing cleaning at the explosion scene.
Three, take the technological means of the complex geophysical prospecting that high-density electric combines with geological radar
The utilization of a, high-density electric
According to the areal geology data, the place belongs to karst and grows the district, and development degree is not quite clear.So this prospecting is arranged in on-site and has arranged 21 high-density electric physical prospecting lines, simultaneously in the proposed building location arrangements detailed exploration hole, the exploratory hole data is both as general house prospecting data, again as the checking hole of place karst.
In addition, in 258 probing holes that on-site is arranged altogether, main along planning to build the thing periphery.It is identical substantially that the stratum, place reflected, these 258 probing holes and high-density electric are reconnoitred the result, the performance of karst corrosion district in boring that high-density electric reflected mainly is that rock mass is broken shape, little solution crack is grown, the solution crack of the overwhelming majority is the admaic earth institute filling of plastic-soft-plastic state, the solution cavity that differs in size has been found in indivedual probings hole, plan-position and hole body size can be determined substantially, for next step processing provides advantageous conditions.
The utilization of b, ground penetrating radar detection method
For growth, the distribution situation of grasping this geology karst more accurately, and take the control measures of corresponding economical rationality, accumulate experience for surveying similar many solution cavities geology simultaneously, engineering has selected for use SIR-2 type ground penetrating radar that this geology is surveyed more meticulously.
Four, the slip casting of solution cavity is handled
A, the construction of sleeve valve cementing coal ash pulp
1) arranges boring:, and carry out mark at every pile periphery reasonable Arrangement injected hole.
2) drilling construction: adopt XY2100 type rig, diameter is that 91mm or 110mm drill bit mud off creep into, and conscientiously observes drilling process, further understands fully filling situation in hole body developmental state and the hole.
3) following sleeve valve pipe: sleeve valve pipe is divided into floral tube and real pipe two parts, highly is equipped with floral tube according to slip casting, pours into clear water in the following Guan Shiguan and overcomes buoyancy, makes under the floral tube at the bottom of the hole, and the length of floral tube is higher than hole top board 50cm at least.For sleeve valve injected hole, the valve pipe of will and tucking inside the sleeve at present behind the pore-forming will be built sleeve shell material behind the following sleeve valve pipe, and solid again pipe ends slurry.
4) slip casting: according to the sequencing of pore-forming, treat that sleeve shell material has (being generally 1d) after certain intensity, with the slip casting steel pipes of 4 fens two plugs of band from the sleeve valve down to the slip casting position, segmenting slip casting from bottom to top, sector boss 0.5m-1.0m.
In the slip casting process, should observe adjacent injected hole exhaust, return water, emit situation such as slurry, if around the hole have slurries to emerge, should stop cement-grouting consolidation.Again slip casting behind the 12h.
If around not reaction of injected hole, and grouting amount is excessive and when surpassing the volume of itself, should adopt " intermittently quantitatively branchs preface slip casting method " to carry out slip casting, and is excessive with the loss of control injection slurry.
B, the construction of cement injection fly-ash mortar
1) slurries match ratio: cement: sand: flyash: clay: water=1: 3: 2: 0.4: 2.
2) slip casting: adopt extrusion pump composite mortar directly to be injected soil cave, solution cavity from holing by sleeve valve pipe, the valve cementing coal ash pulp of tucking inside the sleeve again, the fixed hole of secondary filling body top board, base plate be the closely knit position of filling not, carries out necessary additional reinforcing, makes the hole body form closely knit integral body.
3) irritate the whole filling standard of mortar: guarantee that ground does not produce crack and protuberance, under the grouting pressure of 0.6MPa~0.8MPa, the pump amount is less than 1L/min~2L/min, voltage stabilizing 15min.
Five, plain concrete is filled and is built
The basis is filled building of concrete by in time organizing test slot of foundation after explosion and the cleaning after check of foundation subsoil is qualified, strengthens vibrating.

Claims (4)

1. foundation integrated processing construction method of cover type karst area, undertaken by following step:
(1) discloses excavation construction: when excavation of foundation pit exposes to the lime rock stratum large tracts of land, withdraw from earth moving plant; Foundation ditch bottom, excavation back reaches rock and exposes substantially, and clint exposes substrate, and the admaic earth amount retained does not influence the next procedure construction and gets final product between clint;
(2) explosion and machinery cut cleaning: blasting method is adopted and is weakened loosening blasting, at solution crack and intermountain coombe and local broken basement rock, takes the Mechanical Crushing cleaning;
(3) the complex geophysical prospecting technological means of taking high-density electric to combine with geological radar: high-density electric is by layout rules high-density electric physical prospecting line to be set in the building site, in proposed building location arrangements detailed exploration hole, machinery cuts at solution crack and intermountain coombe and local broken basement rock simultaneously;
(4) slip casting of solution cavity is handled: the solution cavity grouting method adopts sleeve valve cementing coal ash pulp construction and the construction of cement injection fly-ash mortar;
(5) plain concrete is filled and is built.
2. foundation integrated processing construction method of cover type karst area according to claim 1 is characterized in that, the blasting action index n in the above-mentioned steps (2) gets about 0.5.
3. foundation integrated processing construction method of cover type karst area according to claim 1 is characterized in that, the concrete grammar of the described sleeve valve of above-mentioned steps (4) cementing coal ash pulp construction is:
1) arranges boring:, and carry out mark at every pile periphery reasonable Arrangement injected hole;
2) drilling construction: adopt XY2100 type rig, diameter is that 91mm or 110mm drill bit mud off creep into, and conscientiously observes drilling process, further understands fully filling situation in hole body developmental state and the hole;
3) following sleeve valve pipe: sleeve valve pipe is divided into floral tube and real pipe two parts, highly is equipped with floral tube according to slip casting, pours into clear water in the following Guan Shiguan and overcomes buoyancy, makes under the floral tube at the bottom of the hole, and the length of floral tube is higher than hole top board 50cm at least.For sleeve valve injected hole, the valve pipe of will and tucking inside the sleeve at present behind the pore-forming will be built sleeve shell material behind the following sleeve valve pipe, and solid again pipe ends slurry;
4) slip casting: according to the sequencing of pore-forming, treat that sleeve shell material has (being generally 1d) after certain intensity, with the slip casting steel pipes of 4 fens two plugs of band from the sleeve valve down to the slip casting position, segmenting slip casting from bottom to top, sector boss 0.5m-1.0m.
4. foundation integrated processing construction method of cover type karst area according to claim 1 is characterized in that, the concrete grammar of the described coal ash mortar construction of above-mentioned steps (4) is:
1) slurries match ratio: cement: sand: flyash: clay: water=1: 3: 2: 0.4: 2;
2) slip casting: adopt extrusion pump composite mortar directly to be injected soil cave, solution cavity from holing by sleeve valve pipe, the valve cementing coal ash pulp of tucking inside the sleeve again, the fixed hole of secondary filling body top board, base plate be the closely knit position of filling not, carries out necessary additional reinforcing, makes the hole body form closely knit integral body;
3) irritate the whole filling standard of mortar: guarantee that ground does not produce crack and protuberance, under the grouting pressure of 0.6MPa~0.8MPa, the pump amount is less than 1L/min~2L/min, voltage stabilizing 15min.
CN 201010190331 2010-05-29 2010-05-29 Foundation integrated processing construction method of cover type karst area Active CN101864763B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010190331 CN101864763B (en) 2010-05-29 2010-05-29 Foundation integrated processing construction method of cover type karst area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010190331 CN101864763B (en) 2010-05-29 2010-05-29 Foundation integrated processing construction method of cover type karst area

Publications (2)

Publication Number Publication Date
CN101864763A true CN101864763A (en) 2010-10-20
CN101864763B CN101864763B (en) 2011-09-14

Family

ID=42956675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010190331 Active CN101864763B (en) 2010-05-29 2010-05-29 Foundation integrated processing construction method of cover type karst area

Country Status (1)

Country Link
CN (1) CN101864763B (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102162255A (en) * 2011-04-07 2011-08-24 西安建筑科技大学 Method for reinforcing existing pile foundation in collapsed loess area by slip casting
CN102660952A (en) * 2012-05-30 2012-09-12 湖南宏禹水利水电岩土工程有限公司 Controllable clay paste slurry grouting technique
CN102877884A (en) * 2012-09-13 2013-01-16 山东能源集团有限公司 Method for modification and construction of top of Ordovician limestone of mine based on kilometer directional drilling technique
CN102979087A (en) * 2012-12-21 2013-03-20 中铁二局股份有限公司 Construction method for rotary excavation pile
CN104278667A (en) * 2013-07-02 2015-01-14 浙江国泰建设集团有限公司 Underground karst cave filling treatment method
CN104360046A (en) * 2014-11-06 2015-02-18 水利部交通运输部国家能源局南京水利科学研究院 Comprehensive geophysical-prospecting combined diagnosis method for hidden danger inside wharf concrete structure
CN105627843A (en) * 2014-11-27 2016-06-01 华北冶建工程建设有限公司 New method for blasting rock foundation
CN106088165A (en) * 2016-06-13 2016-11-09 贵州正业工程技术投资有限公司 A kind of karst area basement bottom board Anti-floating design method
CN106284315A (en) * 2016-09-22 2017-01-04 河北建设勘察研究院有限公司 A kind of bored pile construction method through solution cavity
CN106285636A (en) * 2016-08-29 2017-01-04 上海交通大学 In karst strata, shield tunnel solution cavity along the line filling grouting amount determines method
CN106400825A (en) * 2016-09-06 2017-02-15 中铁二十四局集团南昌铁路工程有限公司 Method for protecting water level in historic ancient well during water plugging in strong karst water-rich region
CN106517954A (en) * 2016-11-17 2017-03-22 中南大学 Jacket material used for controllable grouting of shield tunnel underwater karst, and preparation method thereof
CN107905218A (en) * 2017-11-28 2018-04-13 中国冶集团有限公司 A kind of karst cave treatment method in the construction applied to Pile In Drill In Karst Terrain
CN108487229A (en) * 2018-03-28 2018-09-04 贵州省地质矿产勘查开发局111地质大队 Artificial pore-forming method after strong rock-soluble foundation pre-grouting treatment
CN109024569A (en) * 2018-08-22 2018-12-18 中国建筑第四工程局有限公司 A kind of beading solution cavity pretreatment construction method
CN112302014A (en) * 2020-10-26 2021-02-02 中建四局第一建筑工程有限公司 Construction method for reinforcing H-shaped steel bottom karst cave of pile in SMW construction method
CN112982051A (en) * 2021-02-20 2021-06-18 温俊魁 Roadbed suitable for karst landform and construction method
CN113374465A (en) * 2021-06-08 2021-09-10 浙江数智交院科技股份有限公司 Covering type karst vertical striping method and device and electronic equipment
CN114814977A (en) * 2022-03-01 2022-07-29 山东大学 Method for local accurate investigation of structural plane and weak part of soil-rock double-element foundation pit slope rock mass

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1779713C (en) * 1990-08-07 1992-12-07 Специальная региональная геофизическая экспедиция Method for erecting foundation of structure
RU2270294C1 (en) * 2004-09-08 2006-02-20 Ахсар Николаевич Басиев Bored pile and method for pile erection in karst or soft ground
CN101230570A (en) * 2008-02-20 2008-07-30 山东省交通厅公路局 Layered multitime pressure regulating pulp conditioning casting method
CN101634142A (en) * 2009-08-13 2010-01-27 广东省基础工程公司 Construction method of filling pretreatment of multilayer-steel sleeve karst cave

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1779713C (en) * 1990-08-07 1992-12-07 Специальная региональная геофизическая экспедиция Method for erecting foundation of structure
RU2270294C1 (en) * 2004-09-08 2006-02-20 Ахсар Николаевич Басиев Bored pile and method for pile erection in karst or soft ground
CN101230570A (en) * 2008-02-20 2008-07-30 山东省交通厅公路局 Layered multitime pressure regulating pulp conditioning casting method
CN101634142A (en) * 2009-08-13 2010-01-27 广东省基础工程公司 Construction method of filling pretreatment of multilayer-steel sleeve karst cave

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《山西建筑》 20080301 杜万强 武广客专5标桩基础岩溶处理技术 336-337 1-4 第34卷, 第7期 2 *
《广东水利水电》 20051030 李世忠 惠州市覆盖型岩溶区地基土类型及处理技术 5-7 1-4 , 2 *

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102162255B (en) * 2011-04-07 2012-09-26 西安建筑科技大学 Method for reinforcing existing pile foundation in collapsed loess area by slip casting
CN102162255A (en) * 2011-04-07 2011-08-24 西安建筑科技大学 Method for reinforcing existing pile foundation in collapsed loess area by slip casting
CN102660952A (en) * 2012-05-30 2012-09-12 湖南宏禹水利水电岩土工程有限公司 Controllable clay paste slurry grouting technique
CN102660952B (en) * 2012-05-30 2014-07-23 湖南宏禹水利水电岩土工程有限公司 Controllable clay paste slurry grouting technique
CN102877884B (en) * 2012-09-13 2016-03-16 山东能源集团有限公司 The difficult to understand grey top transformation of a kind of mine based on km directional drilling technology and construction method
CN102877884A (en) * 2012-09-13 2013-01-16 山东能源集团有限公司 Method for modification and construction of top of Ordovician limestone of mine based on kilometer directional drilling technique
CN102979087A (en) * 2012-12-21 2013-03-20 中铁二局股份有限公司 Construction method for rotary excavation pile
CN102979087B (en) * 2012-12-21 2015-05-20 中铁二局股份有限公司 Construction method for rotary excavation pile
CN104278667A (en) * 2013-07-02 2015-01-14 浙江国泰建设集团有限公司 Underground karst cave filling treatment method
CN104360046B (en) * 2014-11-06 2017-01-11 水利部交通运输部国家能源局南京水利科学研究院 Comprehensive geophysical-prospecting combined diagnosis method for hidden danger inside wharf concrete structure
CN104360046A (en) * 2014-11-06 2015-02-18 水利部交通运输部国家能源局南京水利科学研究院 Comprehensive geophysical-prospecting combined diagnosis method for hidden danger inside wharf concrete structure
CN105627843A (en) * 2014-11-27 2016-06-01 华北冶建工程建设有限公司 New method for blasting rock foundation
CN106088165B (en) * 2016-06-13 2018-05-11 贵州正业工程技术投资有限公司 A kind of karst area basement bottom board Anti-floating design method
CN106088165A (en) * 2016-06-13 2016-11-09 贵州正业工程技术投资有限公司 A kind of karst area basement bottom board Anti-floating design method
CN106285636B (en) * 2016-08-29 2020-08-04 上海交通大学 Method for determining karst cave filling and grouting amount along shield tunnel in karst stratum
CN106285636A (en) * 2016-08-29 2017-01-04 上海交通大学 In karst strata, shield tunnel solution cavity along the line filling grouting amount determines method
CN106400825B (en) * 2016-09-06 2018-06-08 中铁二十四局集团南昌铁路工程有限公司 To the guard method of historical relic Gu Well Water Level during a kind of strong rich water karst area sealing
CN106400825A (en) * 2016-09-06 2017-02-15 中铁二十四局集团南昌铁路工程有限公司 Method for protecting water level in historic ancient well during water plugging in strong karst water-rich region
CN106284315B (en) * 2016-09-22 2019-08-30 河北建设勘察研究院有限公司 A kind of bored pile construction method across solution cavity
CN106284315A (en) * 2016-09-22 2017-01-04 河北建设勘察研究院有限公司 A kind of bored pile construction method through solution cavity
CN106517954A (en) * 2016-11-17 2017-03-22 中南大学 Jacket material used for controllable grouting of shield tunnel underwater karst, and preparation method thereof
CN106517954B (en) * 2016-11-17 2018-05-08 中南大学 The sleeve shell material and its preparation method of the controllable grouting of the underwater karst of shield tunnel
CN107905218A (en) * 2017-11-28 2018-04-13 中国冶集团有限公司 A kind of karst cave treatment method in the construction applied to Pile In Drill In Karst Terrain
CN108487229A (en) * 2018-03-28 2018-09-04 贵州省地质矿产勘查开发局111地质大队 Artificial pore-forming method after strong rock-soluble foundation pre-grouting treatment
CN109024569A (en) * 2018-08-22 2018-12-18 中国建筑第四工程局有限公司 A kind of beading solution cavity pretreatment construction method
CN112302014A (en) * 2020-10-26 2021-02-02 中建四局第一建筑工程有限公司 Construction method for reinforcing H-shaped steel bottom karst cave of pile in SMW construction method
CN112982051A (en) * 2021-02-20 2021-06-18 温俊魁 Roadbed suitable for karst landform and construction method
CN112982051B (en) * 2021-02-20 2024-04-26 温俊魁 Roadbed suitable for karst landform and construction method
CN113374465A (en) * 2021-06-08 2021-09-10 浙江数智交院科技股份有限公司 Covering type karst vertical striping method and device and electronic equipment
CN114814977A (en) * 2022-03-01 2022-07-29 山东大学 Method for local accurate investigation of structural plane and weak part of soil-rock double-element foundation pit slope rock mass

Also Published As

Publication number Publication date
CN101864763B (en) 2011-09-14

Similar Documents

Publication Publication Date Title
CN101864763B (en) Foundation integrated processing construction method of cover type karst area
CN109371974A (en) A kind of PHC tubular pole implantation construction method suitable for hard geology
CN104694746A (en) Ion-adsorption-type rare earth in-situ leaching method and leaching system thereof
CN110512593A (en) Reclaimation area ultra-deep ground-connecting-wall structure and its construction method
CN105625293A (en) Dissolution rock strong-development construction site filling-type geological processing structure and construction method thereof
CN110656947B (en) Method for tunneling raised section of seabed bedrock
CN110080169A (en) A kind of construction method reclaimed fields from the sea utilized based on basement
CN111663513B (en) Shallow-buried thick coal seam mining surface subsidence crack treatment method based on check dam group
CN105421286A (en) Combined rock excavation construction method using backhoe dredger and drill ship
CN113250220A (en) Novel dewatering method for deep foundation pit close to existing building
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN110359473A (en) A kind of closed precipitation environmental protection and energy saving construction technology of deep basal pit
CN114059527A (en) Large-diameter mixing pile construction method suitable for high-groundwater-level hard soil layer
CN108071110A (en) Rotary drilling rig Pile method under complex geological condition
Marinin et al. State-of-Art of mine engineering reclamation while developing of steep-dipping ore fields
CN105301672A (en) Method for prospecting and drilling of maritime gold mine
CN102678127B (en) Method for constructing weakly consolidated non-stratified sandstone tunnel
Milanovic Prevention and remediation in karst engineering
CN103774698B (en) Soil engineering drainage-free construction method
CN103967000A (en) Rotary excavating pile construction method in combined construction
Kath et al. Engineering impacts of karst: three engineering case studies in cambrian and ordovician carbonates of the valley and ridge province
CN102031821B (en) Pile-wall type draining hole of circular water of seaside power plant with soft soil foundation
CN110306530A (en) The construction Treatment Methods of diaphram wall when a kind of experience boulder
CN111436243B (en) Method for treating pit mining geological environment by using planting soil prepared from solid wastes
CN107313438A (en) The dewatering well in complex geological condition area is into well construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant