CN108071110A - Rotary drilling rig Pile method under complex geological condition - Google Patents
Rotary drilling rig Pile method under complex geological condition Download PDFInfo
- Publication number
- CN108071110A CN108071110A CN201610994891.6A CN201610994891A CN108071110A CN 108071110 A CN108071110 A CN 108071110A CN 201610994891 A CN201610994891 A CN 201610994891A CN 108071110 A CN108071110 A CN 108071110A
- Authority
- CN
- China
- Prior art keywords
- drilling rig
- rotary drilling
- pile
- method under
- geological condition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 51
- 239000011435 rock Substances 0.000 claims abstract description 13
- 238000004140 cleaning Methods 0.000 claims abstract description 9
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 6
- 238000005755 formation reaction Methods 0.000 claims abstract description 6
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 4
- 238000005266 casting Methods 0.000 claims abstract description 4
- 230000002787 reinforcement Effects 0.000 claims abstract description 4
- 239000010959 steel Substances 0.000 claims abstract description 4
- 241000219430 Betula pendula Species 0.000 claims description 3
- 230000010006 flight Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 15
- 238000000034 method Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 229940105657 CATALASE Drugs 0.000 description 1
- 102000016938 EC 1.11.1.6 Human genes 0.000 description 1
- 108010053835 EC 1.11.1.6 Proteins 0.000 description 1
- 235000019738 Limestone Nutrition 0.000 description 1
- 210000004681 Ovum Anatomy 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 229910052570 clay Inorganic materials 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000006028 limestone Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- -1 silt Substances 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
Abstract
The present invention relates to the dedicated sheet pile wall of foundation engineering, stake or other structures member arts are specially a kind of rotary drilling rig Pile method under complex geological condition.A kind of rotary drilling rig Pile method under complex geological condition, it is characterized in that:Implement successively as follows:A. smooth location;B. measure of pile position positioning review;C. rotary drilling rig is in place and centering, embedded casing are crept into;D. drill to middle weathered rock formation absolute altitude face;E. drilling proceeds to design requirement socket length;F. a borehole cleaning;G. steel reinforcement cage and conduit are placed;H. secondary pile hole cleaning;I. casting concrete;J. casing is finally extracted.The present invention is easy to use, applied widely.
Description
Technical field
The present invention relates to the dedicated sheet pile wall of foundation engineering, stake or other structures member arts, specially one kind are intricately
Rotary drilling rig Pile method under the conditions of matter.
Background technology
In recent years, rotary drilling rig because its is efficient, speed of application is fast, it is mobile flexibly, environmental protection and to adapt to stratum property wider etc. excellent
Point and be widely used in the pile foundation engineerings such as highway bridge, railroad bridge, municipal administration, water conservancy, Super High and large industrial buildings it
In.Rotary drilling rig applies in general to clay, silt, sand, muck soil, artificial backfill and containing part cobble, rubble etc.
Finer and close ovum gravel bed, boulder layer and hard formation within soft soil layer and 60m.But as extra-large bridge and industry are built
That builds continues to bring out, and Big-Diameter Rock-Embedded Pile base is more and more, and when running into hard rock base stratum, the application of rotary drilling rig is just subject to
Certain limitation.
The content of the invention
The defects of in order to overcome the prior art, a kind of pile-driving method easy to use, applied widely is provided, the present invention is public
A kind of rotary drilling rig Pile method under complex geological condition is opened.
The present invention reaches goal of the invention by following technical solution:
A kind of rotary drilling rig Pile method under complex geological condition, it is characterized in that:Implement successively as follows:
A. smooth location:By the compacting of rotary drilling rig position and scene leveling, in easy flights in 3 ° under normal circumstances, earth bearing strength is not
Less than 100kPa, with suitable for construction machinery rotary drilling rig, crane, concrete tank discrepancy construction site.Construction site water, electricity,
Road threeway, reaches construction requirement;
B. measure of pile position positioning review:For the place of 1~3 pile, stake position tolerance is controlled within 10cm, for more
In the place of a clump of piles for 3 piles, stake position tolerance is controlled within 15cm, and specific standards refer to《Building foundation engineering
Construction quality accident specification》GB 50202-2002 tables 5.1.4;
C. rotary drilling rig is in place and centering, subsequent rotary drilling rig bury casing drilling;
D. rotary drilling rig drills to middle weathered rock formation absolute altitude face(Need to through management, design survey live confirmation);
E. rotary drilling rig, which continues to drill, proceeds to design requirement socket length(Management surveys common confirmation to design);
F. a borehole cleaning;
G. steel reinforcement cage and conduit are placed;
H. secondary pile hole cleaning;
I. casting concrete;
J. casing is finally extracted.
Rotary drilling rig Pile method under the complex geological condition, it is characterized in that:Step c to step e is to bore
The axis of Kong Shikong and ground keep vertical, and the axis in the hole bored and the angle of plumb line are not more than 2 °.
Rotary drilling rig Pile method under the complex geological condition, it is characterized in that:During step e, drilling depth
For 1~4 times of embedded rock pile outer diameter.
The present invention is applicable in the Pile Grouting that supporting course is the weathered rock formation in other such as limestone, sandstone, and socket length can
Up to 1D~4D(D is stake footpath), in constructing applied to piles set into rock, construction is simple, speed of application is fast, and pile quality is high, avoids
Substantial amounts of useless slurry is generated using impact holing and the substantial amounts of rubble of down-hole hammer construction generation exists everywhere the generation of phenomenon.
The present invention has the advantages that:
1. the advantages that rotary drilling rig speed of application is fast, pile quality is high, energy conservation and environmental protection can be given full play to, and rotary drilling rig is constructed
Generation rubble in stake bottom is less, and side wall mudcake thickness is relatively thin, and the more previous traditional construction technique of bearing capacity of pile foundation is more guaranteed, enters rock
It is efficient.
2. it is theoretical based on catalase, different embedding core bits and reasonable cloth tooth are selected according to lithological characteristic, are aided with rationally
Drilling process generally all can be taken off complete rock, reaches rotary drilling rig and efficiently enters rock purpose, and construction speed is fast, while can be big
It is big to save construction cost.
It is 3. good into hole perpendicularity.In soft or hard interface or lithology anisotropy, by reasonably tunnel engineering method and
Cleaning bottom of hole technique, can effectively ensure that into hole perpendicularity, and rotary drilling rig carries verticality monitoring system, in drilling process can at any time
Control adjustment.
Description of the drawings
Nothing.
Specific embodiment
It is further illustrated the present invention below by way of specific embodiment.
Embodiment 1
Rotary drilling rig Pile method, implements successively as follows under a kind of complex geological condition:
A. smooth location:By the compacting of rotary drilling rig position and scene leveling, in easy flights in 3 ° under normal circumstances, earth bearing strength is not
Less than 100kPa, with suitable for construction machinery rotary drilling rig, crane, concrete tank discrepancy construction site.Construction site water, electricity,
Road threeway, reaches construction requirement;
B. measure of pile position positioning review:For the place of 1~3 pile, stake position tolerance is controlled within 10cm, for more
In the place of a clump of piles for 3 piles, stake position tolerance is controlled within 15cm, and specific standards refer to《Building foundation engineering
Construction quality accident specification》GB 50202-2002 tables 5.1.4;
C. rotary drilling rig is in place and centering, and subsequent rotary drilling rig buries casing drilling, and the axis in hole and ground keep hanging down during drilling
Directly, the axis in the hole bored and the angle of plumb line are not more than 2 °;
D. rotary drilling rig drills to middle weathered rock formation absolute altitude face(Need to through management, design survey live confirmation), the axis in hole during drilling
Line and ground keep vertical, and the axis in the hole bored and the angle of plumb line are not more than 2 °;
E. rotary drilling rig, which continues to drill, proceeds to design requirement socket length(Management surveys common confirmation to design), hole during drilling
Axis and ground keep vertical, and no more than 2 °, drilling depth is embedded rock pile outer diameter for the axis in the hole bored and the angle of plumb line
1~4 times;
F. a borehole cleaning;
G. steel reinforcement cage and conduit are placed;
H. secondary pile hole cleaning;
I. casting concrete;
J. casing is finally extracted.
Claims (3)
1. a kind of rotary drilling rig Pile method under complex geological condition, it is characterized in that:Implement successively as follows:
A. smooth location:By the compacting of rotary drilling rig position and scene leveling, in easy flights in 3 ° under normal circumstances, earth bearing strength is not
Less than 100kPa;
B. measure of pile position positioning review:For the place of 1~3 pile, stake position tolerance is controlled within 10cm, for more
In the place of a clump of piles for 3 piles, stake position tolerance is controlled within 15cm;
C. rotary drilling rig is in place and centering, subsequent rotary drilling rig bury casing drilling;
D. rotary drilling rig drills to middle weathered rock formation absolute altitude face;
E. rotary drilling rig, which continues to drill, proceeds to design requirement socket length;
F. a borehole cleaning;
G. steel reinforcement cage and conduit are placed;
H. secondary pile hole cleaning;
I. casting concrete;
J. casing is finally extracted.
2. rotary drilling rig Pile method under complex geological condition as described in claim 1, it is characterized in that:Step c is extremely
Step e is, the axis in hole and ground keep vertical during drilling, and the axis in the hole bored and the angle of plumb line are not more than 2 °.
3. rotary drilling rig Pile method under complex geological condition as claimed in claim 1 or 2, it is characterized in that:Step e
When, drilling depth is 1~4 times of embedded rock pile outer diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610994891.6A CN108071110A (en) | 2016-11-11 | 2016-11-11 | Rotary drilling rig Pile method under complex geological condition |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610994891.6A CN108071110A (en) | 2016-11-11 | 2016-11-11 | Rotary drilling rig Pile method under complex geological condition |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108071110A true CN108071110A (en) | 2018-05-25 |
Family
ID=62153689
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610994891.6A Pending CN108071110A (en) | 2016-11-11 | 2016-11-11 | Rotary drilling rig Pile method under complex geological condition |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108071110A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109137957A (en) * | 2018-09-19 | 2019-01-04 | 上海市机械施工集团有限公司 | A kind of pile base construction method |
CN109723373A (en) * | 2018-12-26 | 2019-05-07 | 中铁二十五局集团第五工程有限公司 | A kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction method |
CN111058767A (en) * | 2019-12-06 | 2020-04-24 | 广东省基础工程集团有限公司 | Construction method of rock-socketed cast-in-situ bored pile |
CN111692932A (en) * | 2020-06-04 | 2020-09-22 | 中交一公局集团有限公司 | Rotary excavating drilling internal auxiliary blasting construction technology for rock-socketed pile foundation |
-
2016
- 2016-11-11 CN CN201610994891.6A patent/CN108071110A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109137957A (en) * | 2018-09-19 | 2019-01-04 | 上海市机械施工集团有限公司 | A kind of pile base construction method |
CN109723373A (en) * | 2018-12-26 | 2019-05-07 | 中铁二十五局集团第五工程有限公司 | A kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction method |
CN111058767A (en) * | 2019-12-06 | 2020-04-24 | 广东省基础工程集团有限公司 | Construction method of rock-socketed cast-in-situ bored pile |
CN111058767B (en) * | 2019-12-06 | 2021-08-31 | 广东省基础工程集团有限公司 | Construction method of rock-socketed cast-in-situ bored pile |
CN111692932A (en) * | 2020-06-04 | 2020-09-22 | 中交一公局集团有限公司 | Rotary excavating drilling internal auxiliary blasting construction technology for rock-socketed pile foundation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018210019A1 (en) | Pile formation method for down-the-hole impact rotary jet composite piles | |
CN106088099B (en) | A kind of subway foundation pit anchor cable processing method | |
CN109371974A (en) | A kind of PHC tubular pole implantation construction method suitable for hard geology | |
CN104295239A (en) | Method for using rotary drilling rig to drill into hard rock stratum | |
CN108517877B (en) | Supporting construction method combining consolidation grouting of hybrid filling ultra-deep foundation pit with double-row steel pipe piles | |
CN105464074B (en) | A kind of artificial digging pile high polymer grouting safeguard structure and its construction method | |
CN108071110A (en) | Rotary drilling rig Pile method under complex geological condition | |
CN204199335U (en) | A kind of pressure release well reducing PHC tube pile construction soil compaction effect | |
CN206070508U (en) | Device for reinforcing foundation | |
CN1657711A (en) | Rotary spray anchoring pile construction process | |
CN104141311A (en) | Mechanical holing method for protecting wall and structure formed with method | |
CN110284885A (en) | Shield inspection-pit construction method | |
CN105970918A (en) | Pile foundation hole forming construction process under large-particle-size cobble sandy soil and severe water seepage geological condition | |
CN112482364A (en) | Construction process of rotary digging cast-in-place pile under strong corrosive soft geological conditions in coastal region | |
CN104532853A (en) | Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning | |
CN203821414U (en) | Structure of protecting wall of hole-digging pile | |
CN108842802A (en) | Piles in Karst Region base construction method | |
CN111501781A (en) | Supporting method and structure combining consolidation grouting of hybrid filling ultra-deep foundation pit with double rows of steel pipe piles | |
CN103850261A (en) | In-rock deep foundation pit rock-socketed water-stop curtain construction method | |
CN103821140B (en) | A kind of construction method of reinforcing soft foundation | |
CN101597903B (en) | Construction method of cylindrical slurry core pile for retaining and protecting foundation pit | |
CN110512594A (en) | The simple and easy method of churning driven opportunity cavity pore-forming | |
CN110080209A (en) | Cast-in-place pile construction method in deep backfill | |
CN109113054A (en) | A kind of reclaimation area complex geological condition cast-in-situ bored pile multimachine combined construction method | |
CN205296194U (en) | Rich irrigated land layer undercut tunnel interlock pipe curtain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180525 |