CN106320386A - Pipe rack side wall waterproof construction method - Google Patents
Pipe rack side wall waterproof construction method Download PDFInfo
- Publication number
- CN106320386A CN106320386A CN201610891023.5A CN201610891023A CN106320386A CN 106320386 A CN106320386 A CN 106320386A CN 201610891023 A CN201610891023 A CN 201610891023A CN 106320386 A CN106320386 A CN 106320386A
- Authority
- CN
- China
- Prior art keywords
- fat
- colophonium
- humidity sensor
- coated
- supreme
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
- E02D31/025—Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/10—Miscellaneous comprising sensor means
Abstract
The invention belongs to the technical field of building engineering, and particularly relates to a pipe rack side wall waterproof construction method. The pipe rack side wall waterproof construction method comprises the steps of firstly, base face acceptance check, secondly, base face treatment, thirdly, treatment of a 20 mm cement waterproof mortar layer with the proportion of 1:2; fourthly, treatment of an asphalt felt isolation layer; fifthly, treatment of a 2 mm three-dimensional polyurethane waterproof coating; sixthly, treatment of a 20mm cement waterproof mortar layer with the proportion of 1:2. According to the pipe rack side wall waterproof construction method, through introduction of multiple layers of different types of waterproof materials for laying and multiple layers of wireless humidity sensors, the construction quality is monitored, the construction period can be effectively shortened, the construction quality is improved, and the maintaining unit can be informed of the waterproof problem appearing in the building use process in time.
Description
Technical field
The invention belongs to building engineering field, relate in particular to a kind of piping lane sidewall waterproof construction method.
Background technology
The outer enclosed structure that piping lane sidewall covers as building envelopes, its major function is protection human being's production, life
Live from the most dangerous.In the past, asphalt felt is always waterproof for sidewall as primary roofing material.But, nature
Wind and frost sleet, the radiation of the sun, the change of temperature and other extraneous unfavorable factor etc. all can affect the normal of common waterproof roll
Use, especially affect the most prominent with sunshine, temperature, rainfall, certainly also have the impact such as sidewall of some intrinsic factor itself
Structure, improper, the later stage use of construction method etc. cause seepage or the destruction of the common waterproof roll of sidewall.
For solving these problems, applicable a kind of piping lane sidewall waterproof construction method need to be invented.
Summary of the invention
Present invention aim to address the problems such as existing waterproof means weak effect, quality cannot monitor, it is provided that Yi Zhongguan
Corridor sidewall waterproof construction method.
A kind of piping lane sidewall waterproof construction method that the present invention proposes, including: 1) basal plane examination: basal plane should reach construction to be wanted
Ask, if not meeting described construction requirement, need to civil engineering reef knot close be processed to qualified after carry out piping lane sidewall waterproof construction, base again
Concerned process steps handing over procedure is carried out when checking and accepting handing-over in face;2) basal plane processes: with the facility such as aerator, little grafter to whole described
Basal plane is cleared up, and has mortar ash block, the situation of laitance should reject mortar ash block;3) 20mm thickness 1:2 cement waterproofing mortar layer: institute
State cement mortar paving and smear compacting, surface press polish, after final set, carry out maintenance;4) asphalt felt sealing coat: use lamination construction method to enter
Row construction, working procedure be basic unit inspection, cleaning → preparation adhesive bitument primer, brush described adhesive bitument primer → node encapsulation process →
Lay malthoid → described malthoid and receive the cleaning of head process → mineral granule, heating, water heat or scrape cold Colophonium agate Supreme Being's fat paving pellet protective layer
→ clear away unnecessary described Colophonium agate Supreme Being's fat paving pellet → dress watch, examination;5) the thick three degree of polyurethane water-proof paints of 2mm: brushing
Waterproof layer line, cleans up the foreign material of substrate surface, mortar lump etc., uses rubber during brushing ground floor polyurethane water-proof paint
Glue scraper plate uniformly scratches, and thickness should keep consistent, for 1.5mm;Can be coated with evenly thereon after first curing of coating and scrape
Second film, is coated with and scrapes direction should to scrape direction with the painting of described first film vertical;After described second curing of coating i.e.
Can be coated with evenly thereon and scrape the 3rd road film, be coated with and scrape direction should to scrape direction with the painting of described second film vertical;6) 20mm
Thick 1:2 cement waterproofing mortar layer: described cement mortar paving smears compacting, surface press polish, carries out maintenance after final set.
Further, in described step 3) and described step 6), curing temperature is not less than 5 DEG C, and keeps moistening, during maintenance
Between be not less than 14 days.
Further, in described step 3), after described cement waterproofing mortar layer maintenance completes, arrange N number of wireless thereon
Humidity sensor, when the humidity value that described wireless humidity sensor is measured is more than preset value, described wireless humidity sensor leads to
Cross cordless communication network report measurement results to formulate according to described measurement result to engineering maintenance center, described engineering maintenance center
Maintenance scheme, wherein, described measurement result includes at least humidity value, the identification information of described wireless humidity sensor, described nothing
The information about power of line humidity sensor, N is the integer more than or equal to 5.
Further, in described step 4), described laying malthoid process includes boiling Colophonium agate Supreme Being's fat, waters hot described Colophonium
Agate Supreme Being's fat or be coated with cold described Colophonium agate Supreme Being's fat paving ground floor malthoid, boil Colophonium agate Supreme Being's fat the most again, water hot described Colophonium agate Supreme Being
Fat or be coated with cold described Colophonium agate Supreme Being's fat paving second layer malthoid, boil Colophonium agate Supreme Being's fat the most again, water hot described Colophonium agate Supreme Being's fat or
It is coated with cold described Colophonium agate Supreme Being's fat paving third layer malthoid.
Further, in described step 4), after described cement waterproofing mortar layer maintenance completes, arrange that X is individual wireless thereon
Humidity sensor, when the humidity value that described wireless humidity sensor is measured is more than preset value, described wireless humidity sensor leads to
Cross cordless communication network report measurement results to formulate according to described measurement result to engineering maintenance center, described engineering maintenance center
Maintenance scheme, wherein, described measurement result includes at least humidity value, the identification information of described wireless humidity sensor, described nothing
The information about power of line humidity sensor, X is the integer more than or equal to 9.
Further, in described step 5), it is coated with and scrapes described second film with the described first film time separately not
Less than 24h, no more than 72h;Painting is scraped described 3rd road film and is typically no less than 24h with the described second film time separately,
It is not more than 72h.
A kind of piping lane sidewall waterproof construction method that the present invention provides, spreads by introducing the different types of waterproof material of multilamellar
And if multilayer wireless humidity sensor monitors construction quality, being effectively reduced construction period, improving construction quality, and can will build
The waterproof problem occurred during use notifies to safeguard unit in time.
Other features and advantages of the present invention will illustrate in the following description, and, partly become from description
Obtain it is clear that or understand by implementing the present invention.The purpose of the present invention and other advantages can be by the explanations write
Structure specifically noted in book, claims and accompanying drawing realizes and obtains.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this
Bright schematic description and description is used for explaining the present invention, is not intended that inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of a kind of piping lane sidewall waterproof construction method of the present invention.
Detailed description of the invention
Functional overview
Present invention aim to address the problems such as existing waterproof means weak effect, quality cannot monitor, it is provided that a kind of piping lane side
Wall waterproof construction method.
Below in conjunction with the accompanying drawings embodiments of the invention are illustrated.It should be noted that in the case of not conflicting, this
Technical characteristic in inventive embodiment and embodiment can be combined with each other, all within protection scope of the present invention.Additionally, be
It is easy to describe, step number used below, but this should not be construed as limitation of the present invention, it addition, at following methods
Although each step described in shows logical order in flow charts, but in some cases, can be to be different from this
The step shown or described by order execution at place.
Embodiment of the method
According to embodiments of the invention, it is proposed that a kind of piping lane sidewall waterproof construction method.
Fig. 1 shows the flow chart of a kind of piping lane sidewall waterproof construction method according to the inventive method embodiment, including
Following steps:
Step S102, basal plane examination: basal plane should reach construction requirement, if not meeting described construction requirement, need to close with civil engineering reef knot
Be processed to qualified after carry out piping lane sidewall waterproof construction again, basal plane carries out concerned process steps handing over procedure when checking and accepting handing-over;
Step S104, basal plane processes: clear up whole described basal plane with the facility such as aerator, little grafter, has mortar ash
Block, the situation of laitance should reject mortar ash block;
Step S106,20mm thickness 1:2 cement waterproofing mortar layer: described cement mortar paving smears compacting, surface press polish, carries out after final set
Maintenance;
Step S108, asphalt felt sealing coat: use lamination construction method construct, working procedure be basic unit inspection, cleaning →
Preparation adhesive bitument primer, brushes described adhesive bitument primer → node encapsulation process → laying malthoid → described malthoid and receives head process → Semen phaseoli radiati
Sand cleans, heating, water heat or scrape cold Colophonium agate Supreme Being's fat paving pellet protective layer → clear away unnecessary described Colophonium agate Supreme Being's fat paving pellet →
Dress watch, examination;
Step S110, the thick three degree of polyurethane water-proof paints of 2mm: brush waterproof layer line, by the foreign material of substrate surface, mortar lump etc.
Cleaning up, use rubber flap uniformly to scratch during brushing ground floor polyurethane water-proof paint, thickness should keep consistent, for
1.5mm;Can be coated with evenly thereon after first curing of coating and scrape second film, direction is scraped in painting should be with described first
It is vertical that direction is scraped in the painting of film;Can be coated with evenly thereon after described second curing of coating and scrape the 3rd road film, painting is scraped
It is vertical that direction should be scraped with the painting of described second film in direction;
Step S112,20mm thickness 1:2 cement waterproofing mortar layer: described cement mortar paving smears compacting, surface press polish, carries out after final set
Maintenance.
The details of above-mentioned process is described below in detail.
(1) step S106
Further, curing temperature is not less than 5 DEG C, and keeps moistening, and curing time is not less than 14 days.
Further, after described cement waterproofing mortar layer maintenance completes, arrange N number of wireless humidity sensor thereon, when
When the humidity value that described wireless humidity sensor is measured is more than preset value, described wireless humidity sensor passes through cordless communication network
Report measurement results is to engineering maintenance center, and described engineering maintenance center is according to described measurement result formulation maintenance scheme, wherein,
Described measurement result is including at least humidity value, the identification information of described wireless humidity sensor, described wireless humidity sensor
Information about power, N is the integer more than or equal to 5.
(2) step S108
Further, described laying malthoid process includes boiling Colophonium agate Supreme Being's fat, waters hot described Colophonium agate Supreme Being's fat or is coated with cold described
Colophonium agate Supreme Being's fat paving ground floor malthoid, boils Colophonium agate Supreme Being's fat the most again, waters hot described Colophonium agate Supreme Being's fat or be coated with cold described Colophonium
Agate Supreme Being's fat paving second layer malthoid, boils Colophonium agate Supreme Being's fat the most again, waters hot described Colophonium agate Supreme Being's fat or be coated with cold described Colophonium agate Supreme Being
Fat paving third layer malthoid.
Further, after described cement waterproofing mortar layer maintenance completes, arrange X wireless humidity sensor thereon, when
When the humidity value that described wireless humidity sensor is measured is more than preset value, described wireless humidity sensor passes through cordless communication network
Report measurement results is to engineering maintenance center, and described engineering maintenance center is according to described measurement result formulation maintenance scheme, wherein,
Described measurement result is including at least humidity value, the identification information of described wireless humidity sensor, described wireless humidity sensor
Information about power, X is the integer more than or equal to 9.
(3) step S110
Further, painting scrapes described second film with the described first film time separately not less than 24h, no more than 72h;
Painting is scraped described 3rd road film and is typically no less than 24h with the described second film time separately, no more than 72h.
(4) step S112
Further, curing temperature is not less than 5 DEG C, and keeps moistening, and curing time is not less than 14 days.
Such as, when described preset value is set by ECC engineering control center according to the ambient conditions of this season, and by described pre-
If value is sent to described wireless humidity sensor by wireless signaling.
Such as, when the electricity ratio that ECC engineering control center obtains described wireless sensor is relatively low, wireless sensor can be increased
Report cycle or be wirelessly charged, reach economize on electricity purpose.
Such as, lay wireless senser by layering, can the waterproof state of each layer of effective monitoring provide more efficiently
Processing scheme.
A kind of piping lane sidewall waterproof construction method that the present invention provides, spreads by introducing the different types of waterproof material of multilamellar
And if multilayer wireless humidity sensor monitors construction quality, being effectively reduced construction period, improving construction quality, and can will build
The waterproof problem occurred during use notifies to safeguard unit in time.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area
For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, that is made any repaiies
Change, equivalent, improvement etc., should be included within the scope of the present invention.
Claims (6)
1. a piping lane sidewall waterproof construction method, it is characterised in that including: 1) basal plane examination: basal plane should reach construction requirement,
If not meeting described construction requirement, need to civil engineering reef knot close be processed to qualified after carry out piping lane sidewall waterproof construction, basal plane again
Concerned process steps handing over procedure is carried out when checking and accepting handing-over;2) basal plane processes: with the facility such as aerator, little grafter to whole described base
Face is cleared up, and has mortar ash block, the situation of laitance should reject mortar ash block;3) 20mm thickness 1:2 cement waterproofing mortar layer: described
Cement mortar paving smears compacting, surface press polish, carries out maintenance after final set;4) asphalt felt sealing coat: use lamination construction method to carry out
Construction, working procedure is basic unit's inspection, cleaning → preparation adhesive bitument primer, brushes described adhesive bitument primer → node encapsulation process → paving
If malthoid → described malthoid receive head processs → mineral granule clean, heating, water heat or scrape cold Colophonium agate Supreme Being's fat spread pellet protective layer →
Clear away unnecessary described Colophonium agate Supreme Being's fat paving pellet → dress watch, examination;5) the thick three degree of polyurethane water-proof paints of 2mm: brushing is anti-
Water layer line, cleans up the foreign material of substrate surface, mortar lump etc., uses rubber during brushing ground floor polyurethane water-proof paint
Scraper plate uniformly scratches, and thickness should keep consistent, for 1.5mm;Can be coated with evenly thereon after first curing of coating and scrape
Two road films, are coated with and scrape direction should to scrape direction with the painting of described first film vertical;After described second curing of coating
It is coated with evenly thereon and scrapes the 3rd road film, be coated with and scrape direction should to scrape direction with the painting of described second film vertical;6) 20mm is thick
1:2 cement waterproofing mortar layer: described cement mortar paving smears compacting, surface press polish, carries out maintenance after final set.
Method the most according to claim 1, it is characterised in that in described step 3) and described step 6), curing temperature is not
Less than 5 DEG C, and keeping moistening, curing time is not less than 14 days.
Method the most according to claim 1, it is characterised in that in described step 3), described cement waterproofing mortar layer maintenance
After completing, arranging N number of wireless humidity sensor thereon, the humidity value measured when described wireless humidity sensor is more than preset value
Time, described wireless humidity sensor passes through cordless communication network report measurement results to engineering maintenance center, described engineering maintenance
Maintenance scheme is formulated according to described measurement result in center, and wherein, described measurement result includes at least humidity value, described wireless humidity
The identification information of induction apparatus, the information about power of described wireless humidity sensor, N is the integer more than or equal to 5.
Method the most according to claim 1, it is characterised in that in described step 4), described laying malthoid process includes enduring
Colophonium agate Supreme Being's fat processed, waters hot described Colophonium agate Supreme Being's fat or is coated with cold described Colophonium agate Supreme Being's fat paving ground floor malthoid, boiling drip the most again
Blue or green agate Supreme Being's fat, waters hot described Colophonium agate Supreme Being's fat or is coated with cold described Colophonium agate Supreme Being's fat paving second layer malthoid, boiling Colophonium agate the most again
Supreme Being's fat, waters hot described Colophonium agate Supreme Being's fat or is coated with cold described Colophonium agate Supreme Being's fat paving third layer malthoid.
Method the most according to claim 1, it is characterised in that in described step 4), described cement waterproofing mortar layer maintenance
After completing, arranging X wireless humidity sensor thereon, the humidity value measured when described wireless humidity sensor is more than preset value
Time, described wireless humidity sensor passes through cordless communication network report measurement results to engineering maintenance center, described engineering maintenance
Maintenance scheme is formulated according to described measurement result in center, and wherein, described measurement result includes at least humidity value, described wireless humidity
The identification information of induction apparatus, the information about power of described wireless humidity sensor, X is the integer more than or equal to 9.
Method the most according to claim 1, it is characterised in that in described step 5), is coated with and scrapes described second film and institute
State the first film time separately not less than 24h, no more than 72h;Described 3rd road film and described second film are scraped in painting
Time is typically no less than 24h separately, no more than 72h.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610891023.5A CN106320386A (en) | 2016-10-13 | 2016-10-13 | Pipe rack side wall waterproof construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610891023.5A CN106320386A (en) | 2016-10-13 | 2016-10-13 | Pipe rack side wall waterproof construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106320386A true CN106320386A (en) | 2017-01-11 |
Family
ID=57820340
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610891023.5A Pending CN106320386A (en) | 2016-10-13 | 2016-10-13 | Pipe rack side wall waterproof construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106320386A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106894525A (en) * | 2017-02-27 | 2017-06-27 | 苏州科斯曼照明工程有限公司 | A kind of method for waterproofing of fire cistern |
CN112854499A (en) * | 2021-03-26 | 2021-05-28 | 上海欧尼拉家居有限公司 | Heat insulation treatment method for balcony |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6135334B2 (en) * | 1984-07-09 | 1986-08-12 | Kajima Corp | |
CN102230385A (en) * | 2011-06-03 | 2011-11-02 | 中铁二院工程集团有限责任公司 | Heat-resistant lining structure of tunnel with high ground temperature |
CN202706064U (en) * | 2012-06-12 | 2013-01-30 | 浙江城建建设集团有限公司 | Basement and semi-basement waterproof structure |
CN104251042A (en) * | 2013-06-27 | 2014-12-31 | 张玲玲 | Roof waterproof construction method |
CN104264717A (en) * | 2014-09-05 | 2015-01-07 | 李影 | Basement rigid material and flexible material combined waterproof construction method |
CN104594391A (en) * | 2015-02-11 | 2015-05-06 | 中国水利水电第四工程局有限公司 | Open cut tunnel waterproof construction method |
CN104695486A (en) * | 2013-12-04 | 2015-06-10 | 五冶集团上海有限公司 | Construction method of basement roof polyvinyl chloride root thorn resistance waterproof roll |
KR20150094000A (en) * | 2014-02-10 | 2015-08-19 | 송영헌 | Water proofing method of the concrete structure |
CN105507348A (en) * | 2015-11-30 | 2016-04-20 | 中国建筑第八工程局有限公司 | Waterproof construction method and structure for joints between independent columns and frame beams of basements |
CN105887923A (en) * | 2016-04-13 | 2016-08-24 | 中国十七冶集团有限公司 | Construction method for pre-paving and invertedly adhering waterproof coiled material in large underground waterproof project |
-
2016
- 2016-10-13 CN CN201610891023.5A patent/CN106320386A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6135334B2 (en) * | 1984-07-09 | 1986-08-12 | Kajima Corp | |
CN102230385A (en) * | 2011-06-03 | 2011-11-02 | 中铁二院工程集团有限责任公司 | Heat-resistant lining structure of tunnel with high ground temperature |
CN202706064U (en) * | 2012-06-12 | 2013-01-30 | 浙江城建建设集团有限公司 | Basement and semi-basement waterproof structure |
CN104251042A (en) * | 2013-06-27 | 2014-12-31 | 张玲玲 | Roof waterproof construction method |
CN104695486A (en) * | 2013-12-04 | 2015-06-10 | 五冶集团上海有限公司 | Construction method of basement roof polyvinyl chloride root thorn resistance waterproof roll |
KR20150094000A (en) * | 2014-02-10 | 2015-08-19 | 송영헌 | Water proofing method of the concrete structure |
CN104264717A (en) * | 2014-09-05 | 2015-01-07 | 李影 | Basement rigid material and flexible material combined waterproof construction method |
CN104594391A (en) * | 2015-02-11 | 2015-05-06 | 中国水利水电第四工程局有限公司 | Open cut tunnel waterproof construction method |
CN105507348A (en) * | 2015-11-30 | 2016-04-20 | 中国建筑第八工程局有限公司 | Waterproof construction method and structure for joints between independent columns and frame beams of basements |
CN105887923A (en) * | 2016-04-13 | 2016-08-24 | 中国十七冶集团有限公司 | Construction method for pre-paving and invertedly adhering waterproof coiled material in large underground waterproof project |
Non-Patent Citations (2)
Title |
---|
曲昭嘉等: "《实用建筑工程施工工艺及通病防治手册》", 31 January 2010 * |
龙正兴: "《综合性市政工程施工组织设计》", 31 August 2010 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106894525A (en) * | 2017-02-27 | 2017-06-27 | 苏州科斯曼照明工程有限公司 | A kind of method for waterproofing of fire cistern |
CN112854499A (en) * | 2021-03-26 | 2021-05-28 | 上海欧尼拉家居有限公司 | Heat insulation treatment method for balcony |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106351256A (en) | Pipe rack bottom waterproof construction method | |
CN104563507B (en) | A kind of cast in site terrazzo floor surface construction method | |
CN207048366U (en) | A kind of metal Roof breakage maintaining structure | |
CN104251042A (en) | Roof waterproof construction method | |
CN106320386A (en) | Pipe rack side wall waterproof construction method | |
CN104763111B (en) | A kind of construction technology of waterproof and insulation integrated system | |
CN102518222A (en) | Production process and painting equipment of composite heat-insulation board | |
CN104100102A (en) | Waterproof comprehensive treatment method for flat tops | |
CN103195218B (en) | Wall ceramic sand mortar external plastering construction method | |
CN105820637A (en) | Reflective thermal insulation coating system | |
CN112431231A (en) | Basement waterproof structure and construction method thereof | |
CN106320387A (en) | Pipe rack top waterproof construction method | |
CN101173549A (en) | Novel material integrating decoration, anti-crack, water-proof and heat preserving function, and its producing method | |
CN206667500U (en) | A kind of toilet waterproofing structure | |
CN105089213A (en) | Water-proof construction method with advantages of energy conservation and environment protection for conventional roof | |
CN214461863U (en) | Waterproof bare concrete canopy roof for railway station | |
CN201761107U (en) | Waterproof coiled material | |
CN211616930U (en) | Sanding device is used in waterproofing membrane production | |
CN103450729A (en) | Intelligent temperature control composite coating | |
CN208745472U (en) | A kind of asphalt water-proof coiled material | |
CN107327084A (en) | A kind of color steel tile anti-corrosion waterproof technology | |
RU131737U1 (en) | INSTALLATION FOR PREPARATION OF MODIFIED RUBBER BITUMIN MASKS | |
CN105178518A (en) | Energy-saving environment-friendly waterproof heat-insulating construction method for existing roof | |
CN218597384U (en) | Waterproof structure for indoor no leakage | |
CN204139641U (en) | The fiber reinforced structure of the damaged cement pole tempering of a kind of power transmission and transformation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170111 |