CN202706064U - Basement and semi-basement waterproof structure - Google Patents

Basement and semi-basement waterproof structure Download PDF

Info

Publication number
CN202706064U
CN202706064U CN 201220286399 CN201220286399U CN202706064U CN 202706064 U CN202706064 U CN 202706064U CN 201220286399 CN201220286399 CN 201220286399 CN 201220286399 U CN201220286399 U CN 201220286399U CN 202706064 U CN202706064 U CN 202706064U
Authority
CN
China
Prior art keywords
basement
gutter
concrete
partly
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220286399
Other languages
Chinese (zh)
Inventor
厉天数
黄璐燕
厉天定
史磊斌
王文辉
徐伟
陆国飞
包斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG CHENGJIAN CONSTRUCTION GROUP CO Ltd
Original Assignee
ZHEJIANG CHENGJIAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG CHENGJIAN CONSTRUCTION GROUP CO Ltd filed Critical ZHEJIANG CHENGJIAN CONSTRUCTION GROUP CO Ltd
Priority to CN 201220286399 priority Critical patent/CN202706064U/en
Application granted granted Critical
Publication of CN202706064U publication Critical patent/CN202706064U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model provides a basement and semi-basement waterproof structure and belongs to the technical field of building construction structure waterproof technologies. The waterproof structure mainly consists of plain soil (1), a plain concrete cushion layer (2), an anti-permeability concrete base plate (3), a graded broken stone drainage layer (4), a non-woven fabric isolating layer (5), a reinforced concrete pavement layer (6), a drainage ditch (7), a polyvinyl chloride (PVC) drainage pipe (8), a retaining wall (9) and a basement outer wall (10). A construction process is simple and easy to operate, and the problems including water permeability and water leakage of basements can be effectively solved. Under the condition that cracks on basement base plates cannot be solved, water permeating the basements and semi-basements can be timely drained out, using functions of the structure are not influenced, and the quality of waterproof construction is ensured.

Description

A kind of basement and partly-exposed basement waterproof construction structure
One, technical field
A kind of basement and partly-exposed basement waterproof construction structure belong to building operations structurally waterproof technical field.
Two, background technology
Quickening along with urbanization process, consider aspect needs such as enlarging usage space and stable building foundation, increasing building has been built basement in the city, and area constantly enlarges, the degree of depth constantly increases, basement bear the whole load of building and with Load Transfer to soil layer, its steadiness to the building safety and service life significant.Basement enlarges extremely people's welcome of effect of usage space with it, but because it is built underground, therefore, the buildings waterproof performance just will directly affect the bulk life time of behavior in service and the building of basement.The basement leakage problem belongs to the leakage in " four leak " in the construction work, be roofing, washroom, large panel building plate seam and basement leakage, seepage has become ubiquitous in China's building " pain disease ", and the annual buildings waterproof that is used in the whole nation is done over again with maintenance cost up to more than 500,000,000 yuan for this reason.The expense that is used for solution basement leakage problem is high especially.
China's urban architecture basement waterproofing mainly is indoor in order to prevent that underground water and occluded water from infiltrating, and affects indoor normal production, work, life and storage environment and makes.The design and construction of basementwaterproofing often follow " anti-, row, cut, stifled combining, temper toughness with gentleness, suit measures to local conditions, the principle of the comprehensive regulation ", accomplish to arrange first rear defence, namely at first ponding can not be arranged, water be discharged at short notice swimmingly.The traditional method of basementwaterproofing is paving waterproof roll or brush water-repellent paint on the concrete bed course.People place the hope of waterproof on the waterproofing materials on always, and waterproofing materials is constantly research renewal also.Once the heat posted asphalt felt, polyethylene polypropylene SBC-120, the cement-base infiltration crystallization coating that in succession occurred, and at present comparatively general self-adhering-type SBS modified asphalt felt etc.But the seepage key because the research and development of new material are not hited so not only do not solve root problem, the trouble waters of material market once occurred on the contrary, made waterproof work increase new unfavorable factor.
From the basement leaking part of finding, water leaks out by the concrete weak part of basement structure.It has illustrated the problem of two aspects: the one, and the rigid self-waterproof partial failure of basement structure; The 2nd, the overall flexibility waterproofing course that is made of waterproofing materials also destroys.Judge that from convention rigid structures has plenty of at same position from waterproof partial failure and flexible waterproof layer local failure, but most cases can be at same position, this is owing to underground water after the flexible waterproof layer local failure can pass flexible waterproof layer, enter the outer wall of deck, under the effect of groundwater pressure, water can be between flexible waterproof layer and structural concrete external surface, the passage of riving, when run into structural concrete from the waterproof failure position time penetrate concrete and enter basement and produce seepage.Therefore when it is found that basement leaking, the structure of its basement all has local inefficacy and destruction from waterproof and flexible waterproof layer.According to different structure aspects, it is improper etc. that the reason of basement leaking can be divided into the partial failure of structural concrete rigid self-waterproof, flexible waterproof layer local failure and architectural detail structure.
Three, utility model content
The technical problems to be solved in the utility model is: provide to overcome the problem that prior art exists, can effectively solve basement, partly-exposed basement ponding seepy question, can in time underground water be discharged basement, keep basement, partly-exposed basement dry, leak a kind of basement and partly-exposed basement waterproof construction structure without long-pending.
The technical scheme that its technical problem that solves the utility model adopts is: a kind of basement and partly-exposed basement waterproof construction structure is characterized in that: whole structure is comprised of element soil (1), plain concrete bed course (2), water-tight concrete base plate (3), graded broken stone drainage blanket (4), nonwoven separation layer (5), steel concrete surface layer (6), gutter (7), PVC gutter (8), barricade (9), outer wall of basement (10); Element soil (1) needs compacting, tamps to compactness to be not less than 93%; Element concrete bed course (2) thickness is 100mm, and strength grade of concrete is C15; Water-tight concrete base plate (3) structure is suffered from one's own actions slope 0.5%, and impervious grade must not leave constuction joint when building by designing requirement, build finish after watering maintenance in 7 days; Graded broken stone drainage blanket (4) is that 100mm is thick, links to each other with gutter (7) with PVC gutter (8); Gutter (7) width is 200mm, highly is graded broken stone drainage blanket (4)+nonwoven separation layer (5)+steel concrete surface layer (6), and drainage grade is 0.5%; PVC gutter (8) diameter is 32mm, (7) tilt 15% to the gutter by graded broken stone drainage blanket (4), (7) arrange one every 1500mm along the gutter, and the water in the graded broken stone drainage blanket (4) is dredged gutter (7); Nonwoven separation layer (5) adopts 120G/M 2Steel concrete surface layer (6) is the thick C25 concrete matched of 100mm Φ 4 200 two-way concrete slab nets, and with smashing with troweling, per 6 * 6m arranges the wide shrinkage joint of 4mm, cutting-in 20mm, and clog with the polyurethane ointment; Steel concrete surface layer (6) adopts mechanical finisher compacting to receive light; The thick brick wall of 120mm or the thick concrete wall of 120mm (9) are set between gutter (7) and the outer wall of basement (10).
The utility model concrete construction method:
1. element soil (1) is tamped to compactness 〉=93%, builds C15 element concrete bed course (2);
2. outer wall of basement (10) and water-tight concrete base plate (3) concrete are built in outer wall of basement (10) formwork, assembling reinforcement;
3. lay the thick graded broken stone drainage blanket of 100mm (4), periphery is every the pre-buried Φ 32mmPVC gutter of 1500mm (8) and stay and establish the wide gutter of 200mm, builds the thick brick wall of 120mm (9) by laying bricks or stones;
4. lay 120G/M 2Nonwoven separation layer (5);
5. build the steel concrete surface layer (6) of the thick C25 concrete matched of 100mm Φ 4@200 two-way concrete slab nets.
Compared with prior art, the beneficial effect that the utility model has is: a kind of basement and partly-exposed basement waterproof construction structure has good water-proof effect, can guarantee that basement without ponding, in time discharges underground water.Effectively brought into play anti-draining usefulness, and can the crack occur at basement bottom board, can't play structure under the unfavorable conditions of waterproof, in time percolating water has been discharged, do not affected basement and use function.
Four, description of drawings
Accompanying drawing one: a kind of basement and partly-exposed basement waterproof construction structure profile diagram;
Accompanying drawing two: a kind of basement and partly-exposed basement waterproof construction structure section detail drawing;
Accompanying drawing three: the graded broken stone drainage blanket is connected detail drawing with the gutter.
Five, the specific embodiment
Below in conjunction with accompanying drawing a kind of basement of the utility model and partly-exposed basement waterproof construction structure are described further:
With reference to accompanying drawing one:
Steel concrete surface layer (6) is the thick C25 concrete matched of 100mm Φ 4 200 two-way concrete slab nets, and with smashing with troweling, per 6 * 6m arranges the wide shrinkage joint of 4mm, cutting-in 20mm, and clog with the polyurethane ointment; Between gutter (7) and the outer wall of basement (10) the thick brick wall of 120mm (9) is set; Gutter (7) width is 200mm, and drainage grade is 0.5%; PVC gutter (8) diameter is 32mm, drainage grade 15%, and (7) arrange one every 1500mm along the gutter.
With reference to accompanying drawing two:
Whole structure is comprised of element soil (1), C15 element concrete bed course (2), water-tight concrete base plate (3), graded broken stone drainage blanket (4), nonwoven separation layer (5), steel concrete surface layer (6), gutter (7), PVC gutter (8), barricade (9), outer wall of basement (10).
With reference to accompanying drawing three:
Graded broken stone drainage blanket (4) is 100 thick, links to each other with gutter (7) with PVC gutter (8); Gutter (7) width is 200mm, highly is graded broken stone drainage blanket (4)+nonwoven separation layer (5)+steel concrete surface layer (6); PVC gutter (8) diameter is 32mm, (7) tilt 15% to the gutter by graded broken stone drainage blanket (4), (7) arrange one every 1500mm along the gutter, and the water in the graded broken stone drainage blanket (4) is dredged gutter (7).
Facts have proved, the utility model can solve effectively that basement, partly-exposed basement ooze, seepy question, can in time underground water be discharged basement, keep basement, partly-exposed basement drying, without oozing, leaking, especially at basement, partly-exposed basement base plate the crack appears, in the situation about can't repair fully, can in time infiltration be dredged the gutter by the graded broken stone drainage blanket and in time discharge, not affect basement, partly-exposed basement use function.

Claims (5)

1. a basement and partly-exposed basement waterproof construction structure is characterized in that: graded broken stone drainage blanket (4) is 100 thick, links to each other with gutter (7) with pvc pipe road (8); Gutter (7) width is 200mm, highly is graded broken stone drainage blanket (4)+nonwoven separation layer (5)+concrete pavement (6), and drainage grade is 0.5%; Pvc pipe road (8) diameter is 32mm, (7) tilt 15% to the gutter by graded broken stone drainage blanket (4), (7) arrange one every 1500mm along the gutter, and the water in the graded broken stone drainage blanket (4) is dredged gutter (7).
2. a kind of basement according to claim 1 and partly-exposed basement waterproof construction structure, it is characterized in that: element soil (1) needs compacting, tamps to compactness to be not less than 93%; C15 element concrete bed course (2) thickness is 100mm.
3. a kind of basement according to claim 1 and partly-exposed basement waterproof construction are constructed, and it is characterized in that: water-tight concrete base plate (3) structure is suffered from one's own actions slope 0.5%.
4. a kind of basement according to claim 1 and partly-exposed basement waterproof construction structure is characterized in that: nonwoven separation layer (5) employing 120G/M 2Concrete pavement (6) is 100 thick C25 concrete matched Φ 4 200 two-way concrete slab nets, and with smashing with troweling, per 6 * 6m arranges the wide shrinkage joint of 4mm, cutting-in 20, and clog with the polyurethane ointment; Concrete pavement (6) adopts mechanical finisher compacting to receive light.
5. a kind of basement according to claim 1 and partly-exposed basement waterproof construction structure is characterized in that: between gutter (7) and the outer wall of basement (10) brick wall (9) is set; Brick wall (9) is that 120mm is thick.
CN 201220286399 2012-06-12 2012-06-12 Basement and semi-basement waterproof structure Expired - Fee Related CN202706064U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220286399 CN202706064U (en) 2012-06-12 2012-06-12 Basement and semi-basement waterproof structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220286399 CN202706064U (en) 2012-06-12 2012-06-12 Basement and semi-basement waterproof structure

Publications (1)

Publication Number Publication Date
CN202706064U true CN202706064U (en) 2013-01-30

Family

ID=47586382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220286399 Expired - Fee Related CN202706064U (en) 2012-06-12 2012-06-12 Basement and semi-basement waterproof structure

Country Status (1)

Country Link
CN (1) CN202706064U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821181A (en) * 2014-02-28 2014-05-28 中天建设集团有限公司 Basement bottom plate water drainage layer construction method
CN104264717A (en) * 2014-09-05 2015-01-07 李影 Basement rigid material and flexible material combined waterproof construction method
CN104404985A (en) * 2014-10-08 2015-03-11 中国十七冶集团有限公司 Construction method for basement floor post-cast strip waterproofing structure
CN106320386A (en) * 2016-10-13 2017-01-11 中国水利水电第四工程局有限公司 Pipe rack side wall waterproof construction method
CN106351256A (en) * 2016-10-13 2017-01-25 中国水利水电第四工程局有限公司 Pipe rack bottom waterproof construction method
CN107476335A (en) * 2017-08-10 2017-12-15 中国电建集团贵阳勘测设计研究院有限公司 One kind is used for rock mass Pipe rack
CN112411630A (en) * 2020-11-10 2021-02-26 上海建工七建集团有限公司 Basement bottom plate seepage prevention structure
CN113585438A (en) * 2021-08-19 2021-11-02 北京国典建筑装饰有限公司 Kitchen drainage construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821181A (en) * 2014-02-28 2014-05-28 中天建设集团有限公司 Basement bottom plate water drainage layer construction method
CN104264717A (en) * 2014-09-05 2015-01-07 李影 Basement rigid material and flexible material combined waterproof construction method
CN104404985A (en) * 2014-10-08 2015-03-11 中国十七冶集团有限公司 Construction method for basement floor post-cast strip waterproofing structure
CN106320386A (en) * 2016-10-13 2017-01-11 中国水利水电第四工程局有限公司 Pipe rack side wall waterproof construction method
CN106351256A (en) * 2016-10-13 2017-01-25 中国水利水电第四工程局有限公司 Pipe rack bottom waterproof construction method
CN107476335A (en) * 2017-08-10 2017-12-15 中国电建集团贵阳勘测设计研究院有限公司 One kind is used for rock mass Pipe rack
CN107476335B (en) * 2017-08-10 2023-08-22 中国电建集团贵阳勘测设计研究院有限公司 Be used for rock mass piping lane structure
CN112411630A (en) * 2020-11-10 2021-02-26 上海建工七建集团有限公司 Basement bottom plate seepage prevention structure
CN113585438A (en) * 2021-08-19 2021-11-02 北京国典建筑装饰有限公司 Kitchen drainage construction method

Similar Documents

Publication Publication Date Title
CN202706064U (en) Basement and semi-basement waterproof structure
CN102720217A (en) Basement watertightness structure and construction method thereof
CN101298782B (en) Method and system for basement engineering water proof and water drain
WO2017152674A1 (en) Underground engineering waterproofing structure
CN107190844B (en) The waterproof and water drainage system and construction method of a kind of basement bottom board and exterior wall
CN202945619U (en) Basement wall and baseplate waterproof and drainage structure
CN201695408U (en) Basement baseplate integrating water-proofing and drainage functions
CN102535520B (en) Waterproof construction method of large-area civil air defense basement
CN103774800B (en) A kind of method of building ecological Roof system and ecologic roof system architecture
CN206928165U (en) A kind of water penetration armored concrete basic unit
CN203531009U (en) Macadam layer hydrophobic structure for basement base plate
CN208949929U (en) A kind of basement bottom board percolating water repairerment system
CN108086087A (en) A kind of construction method of porous pavement
CN1644799B (en) Porous brickwalk laying method
CN202450558U (en) Basement waterproof structure based on application of dewatering board
CN104594155A (en) Permeable pavement laying method
CN217439359U (en) Assembly type planting module with water purifying function and planting roof structure system
CN213233124U (en) Bridge deck pavement comprehensive drainage-proof water guide structure
CN111350164B (en) Anti-freezing damage near-water retaining wall and construction method
CN211037568U (en) Plant vegetation roof waterproof construction
CN210288620U (en) Prefabricated resin concrete escape canal
CN111962632A (en) Rainwater sewer and construction method thereof
CN111749073A (en) Water permeable reconstruction technology based on existing road base layer
CN201485883U (en) Basement deformation joint
CN207700352U (en) A kind of floor structure of silica sand honeycomb cistern

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130130

Termination date: 20180612