CN104251042A CN201310260688.2A CN201310260688A CN104251042A CN 104251042 A CN104251042 A CN 104251042A CN 201310260688 A CN201310260688 A CN 201310260688A CN 104251042 A CN104251042 A CN 104251042A
Authority
CN
China
Prior art keywords
coiled material
spray gun
paving
construction method
roof waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310260688.2A
Other languages
Chinese (zh)
Inventor
张玲玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310260688.2A priority Critical patent/CN104251042A/en
Publication of CN104251042A publication Critical patent/CN104251042A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention provides a roof waterproof construction method, and belongs to the field of waterproof technology of buildings. The roof waterproof construction method comprises the following steps: industrial gasoline is added in chloroprene rubber asphalt adhesive for diluting, the two substances are evenly mixed, and the mixture is brushed on the cleaned surface of a substrate; then, a coiled material is laid after the brushed mixture is kept at normal temperature for 4 hours; during pavement, the joint place of the substrate and the coiled material is heated by a flame spray gun when the coiled material is uncoiled; the distance from the flame spray gun to the heated surface is 300 mm; when the surface of the coiled material is just molten by reciprocating heating, the coiled material is forwards rolled, laid and bonded; the coiled material is upwards laid from cornices and parallel to the ridge; for the bidirectional flowing slope, the coiled material is in lap joint in the flowing direction; the lap joint widths of the long edges and the ends of the coiled material are both 80 mm; and joints of the ends are staggered by 50 mm; the lap joint place of the coiled material is heated with the spray gun and the bonding is reinforced by the heating; and the closing head of the tail end is tightly filled with sealant.

Description

The construction method of roof waterproof
?
Technical field
The invention belongs to building waterproof technical field, particularly relate to a kind of construction method of roof waterproof.
Background technology
Building infiltration problem is the comparatively general common quality defect of building, the problem that the reflection of Ye Shi resident family is the strongest.Many resident families find the infiltration of roof leakage, wall, rendering layer obscission when use, day by day, roof, inner wall surface can occur that because of seepage large area is peeled off, and cause mouldy spoiled because long-time seepage is moist, directly affect the healthy of resident family, let alone carry out interior decoration.The work such as office, machine room, workshop produce institute as long-term seepage will badly damaged office facility, precision instrument, machine tool etc. also can be malfunctioning because mildewing spot, even cause electrical short-circuit.In the face of Seepage, people will spend a large amount of man power and materials to reprocess every the several years.Seepage not only upsets the normal life of people, work, the production order, and directly has influence on the application life of whole solitary building.The quality of waterproof effect as can be seen here, most important to the quality of building, waterproofing occupies very consequence in construction work thus.In whole building engineering construction, strictly, in earnest must carry out construction waterproofing engineering.
Summary of the invention
The invention provides a kind of construction method of roof waterproof, the technical solution used in the present invention comprises the steps:
(1) bituminous neoprene bonding adhesive is added industrial gasoline dilution, stir, be painted in the substrate surface cleaned out, normal temperature, after 4h, starts paving coiled material;
(2) during paving with unreeling with flame gun heating basic unit and the junction of coiled material, coiled material, apart from heater surface 300mm, through coming and going heating, when the face taking advantage of coiled material just melts, is rolled forward paving, stickup by spray gun;
(3) coiled material should parallel ridge from the up paving of eaves day, two-way drain slope coiled material lapping is along current direction, and the lap width of long limit and termination, is 80mm, and termination connects stubble will stagger 50mm;
(4) coiled material lapping place spray gun is heated, make the two bonding while hot firmly; It is tight that end receives head sealing compound pointing.
The construction method of roof waterproof of the present invention, waterproofing materials is selected in the requirement of the waterproofing materials kind that roof waterpoof material strictly indicates by design document, specification, performance.Strictly can use after retrial is qualified before using.Forbid to use the waterproofing materials detecting department's inspection without country, the waterproofing materials selected is except work certificate, and the durability of its material must meet the service life of designing requirement.Well-designed simultaneously enforcement manages with delicacy, well construction.Waterproof construction operating personnel, must have the post certificate of waterproof special operation work post, and person without license mustn't on dutyly operate, to ensure construction quality.
Detailed description of the invention
Below in conjunction with detailed description of the invention the present invention made and further illustrating.
1. material and requirement
Waterproof roll: EPDM rubber waterproof rolling material.The outgoing quality certification must be had, have examining report, properties of product and description that corresponding qualification grade detection department provides; Should carry out visual inspection after marching into the arena, by regulation sampling retrial after qualified, and implementation has witness sampling and censorship.
Primer: polyurethane primer (being equivalent to adhesive bitument primer) point first, second two component, first is yellowish-brown colloid, and second is black colloid.
CX 1 glue: be the muddy colloid of yellow, for basic unit and coiled material bonding.
Polyurethane coating film material: for the treatment of seam, supplement, encapsulation process, point first, component B.
Butyl cementing agent: for coiled material seam, point A, B two component, A is yellow turbid colloid, and B is black colloid.
Poly-ammonia is indulged in sealant: receive head position, point first, component B for sealing coiled material.
Dimethylbenzene or ethyl acetate: for dilution or cleaning means.
Polymer modified bituminous waterproof sheet material: be synthesising macromolecule copolymer modified asphalt felt.
Bituminous neoprene bonding adhesive: adding pitch and solvent etc. by neoprene formulated, is black liquor.
Rubber asphalt sealant: i.e. sealing compound, for thin portion build-in side seam.
Protective layer material: according to designing requirement.
No. 70 gasoline, dimethylbenzene, for cleaning contaminated position.
2. construction equipment
Electric mixer, high pressure air blowing machine, automatic hot-air bonding machine, plasterer's trowel, rolling brush, benzine blow lamp, invar tape, scissors, whisk broom, little line, chalk, rouge and powder.
3. technological process (Hot-melt construction)
Cleaning basic unit → brushing base treatment agent → paving coiled material extra play → paving coiled material → hot melt edge sealing → water-storing test → topping
4. operating procedure
Cleaning basic unit
Before construction, the substrate surface dust of acceptance(check), foreign material are cleaned out.
Brushing base treatment agent
High-polymer modified pitch coiled material is constructed, and supports the use by product description, and base treatment agent bituminous neoprene bonding adhesive is added industrial gasoline dilution, stir, with long, round brush is evenly painted in substrate surface, normal temperature, after 4h, starts paving coiled material.
Extra play is constructed
General hot melt uses modified bituminous pitch coiled material to before construction of waterproof layer, and at parapet, Shui Luokou, Guan Gen, cornice, negative and positive angle etc., extra play is first done in thin portion, and additional scope should meet designing requirement.
Paving coiled material
The number of plies, the thickness of coiled material should meet designing requirement.During multilayer paving, seam should stagger.Modified asphalt waterproof coiled material is cut into corresponding size, spools for subsequent use with the reel heart; With unreeling with flame gun heating basic unit and the junction of coiled material during paving, coiled material, apart from heater surface about 300mm, through coming and going homogeneous heating, when the face taking advantage of coiled material just melts, is rolled forward paving, stickup by spray gun.
Coiled material should parallel ridge from the up paving of eaves day, two-way drain slope coiled material lapping acts in accordance with current direction, the lap width of long limit and termination, and full bonding is 80mm, and termination connects stubble will stagger 50mm.
Coiled material from the descending of drain slope, should eject reference line paving by coiled material specification, and makes the long limit of coiled material vertical with flowing water slope aspect.Notice that coiled material preparation should reduce the joint at negative and positive angle place.
The coiled material that paving plane is connected with facade, should carry out from bottom to top, makes coiled material be close to negative and positive angle, when sprawling to coiled material can not La get Tai tight, and the phenomenon such as gauffer, hollowing must not be had.
Hot melt edge sealing
Coiled material lapping place spray gun is heated, makes the two bonding while hot firmly, extrude pitch for degree with edge; It is tight that end receives head sealing compound pointing.
Waterproofing course water-storing test
After coil waterproof layer completion, confirm that way meets designing requirement, blocked by all inlets for stom water, then pour water, the water surface should exceed roofing peak 20mm, conscientiously observes after 24h, especially pipe root, air channel root, and no seepage and no leakage is qualified, otherwise should do over again.
Fish tail and waterproof layer is constructed
Accessible roof does various rigid waterproof layer roof protecting layer by designing requirement.Accessible roof does not do topping two kinds of forms:
Waterproofing course external coating bituminous neoprene bonding adhesive, spreads flag immediately, requires that spreading is even, and bonding firmly, forms flag topping.
Waterproofing course external coating silvery reflection coating.
5. finished product protection
The coil waterproof layer spread, should take to wipe to execute to protect, and forbids to carry out construction operation and transport on waterproofing course, and should do the topping of waterproofing course in time.
Through the pipeline at roofing, metope waterproofing course place, in construction with after completion, displacement must not be damaged.
Before place's construction of waterproof layer such as deformation joint, the water setting sun, temporary plugging should be carried out, after waterproofing course completion, should remove, ensure in pipe, seam unobstructed, meet using function.
Metope, cornice and other finished products must not be polluted during roofing construction.
The quality problems that should note
Roofing out-of-flatness: leveling layer irregularity, causes ponding, answers hanging wire to put slope during construction, answers bracing wire inspection in construction of leveling blanket.Accomplish that the gradient meets the requirements, smooth without ponding.
Hollowing: during paving coiled material, basic unit is moist, and paving is half-hearted, and edge easily occurs hollowing; Basic unit's moisture content should be grasped during paving coiled material, undesirable can not paving coiled material, should put down during paving simultaneously, real, flanging is tight, and bonding is firmly.
Seepage: mostly occur in thin position.During paving extra play, coiled material cut join, paste operation should make extra play be close to put in place, obturage, compacting, must not have the phenomenons such as alice.
Parapet coiled material seals non-compacting and fixes, and seals without ointment.
Guan Genwei does circular arc, above without umbrella cover, is wound around receives head without Bituminous hemp fiber.
Coiled material enters the lower mouth of a river less than 10mm.

Claims (2)

1. a construction method for roof waterproof, is characterized in that comprising the following steps:
(1) bituminous neoprene bonding adhesive is added industrial gasoline dilution, stir, be painted in the substrate surface cleaned out, normal temperature, after 4h, starts paving coiled material;
(2) during paving with unreeling with flame gun heating basic unit and the junction of coiled material, coiled material, apart from heater surface 300mm, through coming and going heating, when the face taking advantage of coiled material just melts, is rolled forward paving, stickup by spray gun;
(3) coiled material should parallel ridge from the up paving of eaves day, two-way drain slope coiled material lapping is along current direction, and the lap width of long limit and termination, is 80mm, and termination connects stubble will stagger 50mm;
(4) coiled material lapping place spray gun is heated, make the two bonding while hot firmly; It is tight that end receives head sealing compound pointing.
2. the construction method of roof waterproof according to claim 1, is characterized in that: in step (4), and spray gun heating extrudes pitch for degree with coil edge.
CN201310260688.2A 2013-06-27 2013-06-27 Roof waterproof construction method Pending CN104251042A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310260688.2A CN104251042A (en) 2013-06-27 2013-06-27 Roof waterproof construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310260688.2A CN104251042A (en) 2013-06-27 2013-06-27 Roof waterproof construction method

Publications (1)

Publication Number Publication Date
CN104251042A true CN104251042A (en) 2014-12-31

Family

ID=52186273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310260688.2A Pending CN104251042A (en) 2013-06-27 2013-06-27 Roof waterproof construction method

Country Status (1)

Country Link
CN (1) CN104251042A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019678A (en) * 2015-07-29 2015-11-04 北京中联天盛建材有限公司 Energy-saving and environment-friendly type waterproof construction method of existing roof
CN105019676A (en) * 2015-07-29 2015-11-04 北京中联天盛建材有限公司 Energy-saving and environment-friendly type waterproof construction method of existing roof
CN106320386A (en) * 2016-10-13 2017-01-11 中国水利水电第四工程局有限公司 Pipe rack side wall waterproof construction method
CN106351256A (en) * 2016-10-13 2017-01-25 中国水利水电第四工程局有限公司 Pipe rack bottom waterproof construction method
CN109441113A (en) * 2018-12-26 2019-03-08 首钢水城钢铁(集团)赛德建设有限公司 Roof waterproof engineering construction method
CN110541524A (en) * 2019-08-27 2019-12-06 深圳市深安企业有限公司 heat-insulation roof for planting green vegetation and construction method thereof
CN112854629A (en) * 2021-03-19 2021-05-28 苏州国敏智匠新材料应用技术有限公司 Method for pasting film on waterproof coiled material of color steel tile roof
CN113738035A (en) * 2021-09-29 2021-12-03 河北佳倩建筑工程有限公司 Hot melting construction method for SBS waterproof coiled material

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1510231A (en) * 2002-12-23 2004-07-07 沈成斌 Waterproof heat treating construction method and apparatus thereof
CN201090001Y (en) * 2007-09-19 2008-07-23 乔金栋 Composite heat preservation water-proof roofing

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1510231A (en) * 2002-12-23 2004-07-07 沈成斌 Waterproof heat treating construction method and apparatus thereof
CN201090001Y (en) * 2007-09-19 2008-07-23 乔金栋 Composite heat preservation water-proof roofing

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
周海涛: "屋面防水施工技术探讨", 《科技创新与应用》, no. 18, 31 July 2012 (2012-07-31) *
杨杰: "屋面防水层SBS热熔法施工工艺及注意事项", 《科技信息》, no. 9, 31 March 2010 (2010-03-31) *
王斌: "基于屋顶花园防水处理的工程实践", 《门窗》, no. 8, 31 August 2012 (2012-08-31) *
王树俭: "SBS聚氯乙烯防水卷材及排汽屋面施工技术", 《建筑技术》, vol. 33, no. 7, 31 July 2002 (2002-07-31) *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019678A (en) * 2015-07-29 2015-11-04 北京中联天盛建材有限公司 Energy-saving and environment-friendly type waterproof construction method of existing roof
CN105019676A (en) * 2015-07-29 2015-11-04 北京中联天盛建材有限公司 Energy-saving and environment-friendly type waterproof construction method of existing roof
CN105019678B (en) * 2015-07-29 2018-03-13 北京中联天盛建材有限公司 A kind of energy-saving environment-protecting type waterproof construction method for having roofing
CN106320386A (en) * 2016-10-13 2017-01-11 中国水利水电第四工程局有限公司 Pipe rack side wall waterproof construction method
CN106351256A (en) * 2016-10-13 2017-01-25 中国水利水电第四工程局有限公司 Pipe rack bottom waterproof construction method
CN109441113A (en) * 2018-12-26 2019-03-08 首钢水城钢铁(集团)赛德建设有限公司 Roof waterproof engineering construction method
CN110541524A (en) * 2019-08-27 2019-12-06 深圳市深安企业有限公司 heat-insulation roof for planting green vegetation and construction method thereof
CN112854629A (en) * 2021-03-19 2021-05-28 苏州国敏智匠新材料应用技术有限公司 Method for pasting film on waterproof coiled material of color steel tile roof
CN113738035A (en) * 2021-09-29 2021-12-03 河北佳倩建筑工程有限公司 Hot melting construction method for SBS waterproof coiled material

Similar Documents

Publication Publication Date Title
CN104251042A (en) Roof waterproof construction method
KR100744727B1 (en) Expoused double waterproof plus film of paint and sheet in the building and construction method of the same
CN103465540B (en) The preparation method and construction method of uncured rubber-asphalt coating and coiled material complex waterproof layer
CN111911190B (en) Improved construction method for caulking shield tunnel segment
CN102312582A (en) Construction method for applying polyurea to old flexible waterproof roof for renovation transformation
CN110528789A (en) A kind of roof waterproof engineering construction method
KR102261398B1 (en) manufacturing method of Complex waterproofing layer
CN105604198A (en) Rigid-soft combined watertightness construction method
CN106499068B (en) Acrylate polymer composite waterproof system and its construction method
CN110984406A (en) Waterproof leakage-repairing construction method using non-cured rubber asphalt waterproof coating
CN109536026A (en) Complex waterproof layer and its construction method
KR100879933B1 (en) Constructing method of triple waterproofing material consists of double paint film plus expoused waterproofing sheet in the concrete structure
CN108086603A (en) A kind of anti-water-stopping system of existing roofing and prevent water roofing
CN109441113A (en) Roof waterproof engineering construction method
CN103774797A (en) Construction technology of bituminous waterproof sheet materials
CN109723475B (en) Waterproof single-layer lining spraying waterproof construction process for hard rock tunnel and application of waterproof single-layer lining spraying waterproof construction process
CN111535368A (en) Basement waterproof construction process
CN206667603U (en) Roof waterproof panel in a kind of new construction
CN104453108A (en) Flexible waterproof construction method of light steel roofing
CN105089213A (en) Water-proof construction method with advantages of energy conservation and environment protection for conventional roof
CN105133855A (en) Energy-saving and environment-friendly waterproof warming construction method for existing roof surface
CN214739146U (en) Arc roofing structure
CN208745472U (en) A kind of asphalt water-proof coiled material
CN103924783A (en) Waterproof construction method for through-wall pipe position
KR101338583B1 (en) Water resistant constructing method for roof and water resistant roof constructed by the same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141231

WD01 Invention patent application deemed withdrawn after publication