JPS6135334B2 - - Google Patents

Info

Publication number
JPS6135334B2
JPS6135334B2 JP59141893A JP14189384A JPS6135334B2 JP S6135334 B2 JPS6135334 B2 JP S6135334B2 JP 59141893 A JP59141893 A JP 59141893A JP 14189384 A JP14189384 A JP 14189384A JP S6135334 B2 JPS6135334 B2 JP S6135334B2
Authority
JP
Japan
Prior art keywords
foundation slab
slab
foundation
unbonded
drainage channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP59141893A
Other languages
Japanese (ja)
Other versions
JPS60102431A (en
Inventor
Katsumi Nakayama
Satoru Nukada
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP59141893A priority Critical patent/JPS60102431A/en
Publication of JPS60102431A publication Critical patent/JPS60102431A/en
Publication of JPS6135334B2 publication Critical patent/JPS6135334B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Description

【発明の詳細な説明】 この発明はフラツトスラブ構造等スパンの大き
い建築物の最下階の地下室の建築物の基礎構築法
に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of constructing a foundation for a basement on the lowest floor of a building with a large span such as a flat slab structure.

一般に建築物の地下室の最下階では湧水、雨水
の止水のためおよび結露対策のため1.50〜2.00m
の間隔をもつてかつ地中梁を配した二重スラブ構
造が採用されている。したがつてそれだけ地下の
根切りが深くなり、施工費が多くなる。
In general, the lowest floor of a building's basement is 1.50 to 2.0m to stop spring water and rainwater and to prevent condensation.
A double slab structure with underground beams is adopted, with a spacing of . Therefore, the underground root cutting becomes deeper and the construction cost increases.

そこで薄いスラブ厚としうるアンボンドPC鋼
線を使用するフラツトスラブ構造を応用すること
を考慮したが湿気対策が必要であり、特に地下で
あるため、アンボンドPC鋼線の緊張定着作業を
する空間がなく、これに対処すべき技術の開発が
要望された。
Therefore, we considered applying a flat slab structure that uses unbonded PC steel wire, which can have a thin slab thickness, but it requires measures against moisture, and because it is underground, there is no space for tension fixing of the unbonded PC steel wire. There was a demand for the development of technology to deal with this.

この発明は前記要望に対処すべく開発したもの
で、以下その詳細を図示した実施例によつて説明
する。
The present invention was developed to meet the above-mentioned needs, and details thereof will be explained below with reference to illustrated embodiments.

先ず根切りした地盤A上に接して鉄筋コンクリ
ート構造の基礎スラブ1を造成する。そしてその
基礎スラブ1は柱6の下部で下向きに膨出させて
厚くするとともにその他の部分は薄く施工し、ス
ラブの引張側に略位置するようにアンボンドPC
鋼線7が基礎スラブ1のコンクリート中に埋設し
てある。基礎スラブの周囲には土留壁2が地下連
続壁等によつて構成されている。基礎スラブ1に
は適当な位置例えば土留壁2との間あるいは基礎
スラブの中間位置に巾、深さ略1m程度の排水路
3が基礎スラブ1の上面より低く形成してある。
First, a foundation slab 1 of a reinforced concrete structure is constructed in contact with the cut ground A. The foundation slab 1 is made thicker by bulging downward at the bottom of the pillar 6, while the other parts are made thinner, and the unbonded PC is placed approximately on the tension side of the slab.
A steel wire 7 is buried in the concrete of the foundation slab 1. An earth retaining wall 2 is constructed around the foundation slab by an underground continuous wall or the like. A drainage channel 3 having a width of approximately 1 m in depth is formed in the foundation slab 1 at an appropriate location, for example, between the earth retaining wall 2 or in the middle of the foundation slab, and is lower than the upper surface of the foundation slab 1.

前記アンボンドPC鋼線7の端部は排水路3の
側壁上部から突出し、排水路3内でジヤツキAを
使用して緊張作業を実施し、側壁上部に碇着す
る。
The end of the unbonded PC steel wire 7 protrudes from the upper part of the side wall of the drainage channel 3, is tensioned using the jack A in the drainage channel 3, and is anchored at the upper part of the side wall.

次いで基礎スラブ1上にはキーストンプレー
ト、デツキプレート、折曲げ鉄板等からなる下面
に凹部を有する支持部材4を布設し、その支持部
材4上にモルタルあるいはコンクリート等の床仕
上げモルタル類5を打設して床を形成してある。
したがつて基礎スラブ上面と支持部材4との間に
は空隙が形成される。
Next, on the foundation slab 1, a support member 4 made of a keystone plate, a deck plate, a bent iron plate, etc. and having a concave portion on the lower surface is laid, and a floor finishing mortar 5 such as mortar or concrete is placed on the support member 4. The floor is formed by
Therefore, a gap is formed between the top surface of the foundation slab and the support member 4.

この発明は以上の構成からなり、先ず柱下部を
厚く、その他の部分は薄く、鉄筋コンクリート構
造の基礎スラブを地盤上の土に接して造成し、か
〓〓〓〓
つその基礎スラブの引張側に位置するようにして
内部にアンボンドPC鋼線を埋設することによ
り、全体として厚さの小さい基礎スラブを造成す
るので従来の二重スラブ構造に比較して地下階が
低く、根切り量の少ない基礎を迅速に施工でき
る。その際基礎スラブ上面より低く形成した排水
路においてアンボンドPC鋼線の緊張定着作業を
施工するので地下であつても作業性がよい。さら
に床仕上げは躯体の施工後、後から順次施工で
き、その補修も容易である。さらに基礎スラブに
連結する排水路によつて排水、湿気対策ができ
る。
This invention has the above-mentioned structure. First, the lower part of the column is thick, the other parts are thin, and a foundation slab of reinforced concrete structure is constructed in contact with the soil on the ground.
By burying the unbonded PC steel wire inside the foundation slab so that it is located on the tension side, a foundation slab with a smaller overall thickness is created, so the basement floor is smaller than the conventional double slab structure. A low foundation with a small amount of root cutting can be quickly constructed. At this time, the unbonded PC steel wire is tension-fixed in the drainage channel that is formed below the top surface of the foundation slab, so it is easy to work even underground. Furthermore, floor finishing can be done sequentially after the construction of the frame, and repairs are easy. Additionally, a drainage channel connected to the foundation slab provides drainage and moisture control.

【図面の簡単な説明】[Brief explanation of the drawing]

図面はこの発明の実施例を示した断面図面であ
る。 1……基礎スラブ、2……土留壁、3……排水
路、4……支持部材、5……モルタル類、6……
柱、7……アンボンドPC鋼線、A……ジヤツ
キ、B……空隙。 〓〓〓〓
The drawings are cross-sectional views showing embodiments of the invention. 1...Foundation slab, 2...Earth retaining wall, 3...Drainage channel, 4...Supporting member, 5...Mortar, 6...
Column, 7... unbonded PC steel wire, A... jack, B... void. 〓〓〓〓

Claims (1)

【特許請求の範囲】[Claims] 1 地盤上の土に接して柱下部を厚く、下向きに
膨出させてその他の部分を薄く鉄筋コンクリート
構造の基礎スラブを造成し、かつその基礎スラブ
の引張側に位置するようにしてアンボンドPC鋼
線をコンクリート中に埋設し、基礎スラブに連続
して基礎スラブ上面より低く形成した排水路にお
いて前記アンボンドPC鋼線端部を緊張して排水
路壁上部に定着し、次いで基礎スラブ上に床仕上
げを施工することを特徴とする建築物の基礎構築
法。
1. Create a foundation slab with a reinforced concrete structure, with the lower part of the column thick in contact with the soil on the ground, bulging downward, and thinner in other parts, and unbonded PC steel wires placed on the tension side of the foundation slab. is buried in concrete, and in a drainage channel that is continuous with the foundation slab and is formed below the top surface of the foundation slab, the end of the unbonded PC steel wire is tensioned and fixed to the upper part of the drainage channel wall, and then a floor finish is applied on the foundation slab. A building foundation construction method characterized by construction.
JP59141893A 1984-07-09 1984-07-09 Building structure Granted JPS60102431A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP59141893A JPS60102431A (en) 1984-07-09 1984-07-09 Building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP59141893A JPS60102431A (en) 1984-07-09 1984-07-09 Building structure

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP55164870A Division JPS5949975B2 (en) 1980-11-21 1980-11-21 basement structure

Publications (2)

Publication Number Publication Date
JPS60102431A JPS60102431A (en) 1985-06-06
JPS6135334B2 true JPS6135334B2 (en) 1986-08-12

Family

ID=15302614

Family Applications (1)

Application Number Title Priority Date Filing Date
JP59141893A Granted JPS60102431A (en) 1984-07-09 1984-07-09 Building structure

Country Status (1)

Country Link
JP (1) JPS60102431A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000273878A (en) * 1999-03-24 2000-10-03 Takenaka Komuten Co Ltd Foundation structure
JP2006183281A (en) * 2004-12-27 2006-07-13 Takenaka Komuten Co Ltd Building foundation structure
CN106320386A (en) * 2016-10-13 2017-01-11 中国水利水电第四工程局有限公司 Pipe rack side wall waterproof construction method
CN106351256A (en) * 2016-10-13 2017-01-25 中国水利水电第四工程局有限公司 Pipe rack bottom waterproof construction method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0784744B2 (en) * 1986-09-05 1995-09-13 株式会社竹中工務店 Prestressed concrete foundation slab construction method
JPH06104979B2 (en) * 1987-11-02 1994-12-21 株式会社大林組 How to fix uneven land on a building
JP2616366B2 (en) * 1992-12-17 1997-06-04 鹿島建設株式会社 Underground foundation structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000273878A (en) * 1999-03-24 2000-10-03 Takenaka Komuten Co Ltd Foundation structure
JP2006183281A (en) * 2004-12-27 2006-07-13 Takenaka Komuten Co Ltd Building foundation structure
JP4568109B2 (en) * 2004-12-27 2010-10-27 株式会社竹中工務店 Building foundation structure
CN106320386A (en) * 2016-10-13 2017-01-11 中国水利水电第四工程局有限公司 Pipe rack side wall waterproof construction method
CN106351256A (en) * 2016-10-13 2017-01-25 中国水利水电第四工程局有限公司 Pipe rack bottom waterproof construction method

Also Published As

Publication number Publication date
JPS60102431A (en) 1985-06-06

Similar Documents

Publication Publication Date Title
US6076320A (en) Foundation for a modular structure
US4328651A (en) Precast concrete constructions
US4570398A (en) Sprayed concrete basement structure
US4336674A (en) Underground structure for residential and business use
JPS6135334B2 (en)
US4587782A (en) Bearing wall and joint construction
JPS60500579A (en) wall slab
JP3122850B2 (en) Construction method of building with basement floor with steel pipe pile foundation
JPS5949975B2 (en) basement structure
JP2771317B2 (en) Post tension concrete foundation plate
JP3178390B2 (en) Building seismic isolation foundation
JP3319494B2 (en) Simple underground structure
JP3656452B2 (en) Seismic isolation method for existing buildings
JPH0426562Y2 (en)
CN217758906U (en) Assembled anti-settlement beam slab foundation structure
JP4731651B2 (en) Seismic isolated house
JPS64407Y2 (en)
JPH07166649A (en) Method of fixing reinforcement and anchor bolt
JPH086895Y2 (en) Roof waterproof structure of the rising wall
JPH0324525B2 (en)
JPH0323442Y2 (en)
JP3092975B2 (en) How to install the housing unit on the foundation
CA1238201A (en) Sprayed concrete basement structure
JPS627706Y2 (en)
JPH0489929A (en) Basement of precast concrete