CN106193644A - Basement reconstruction structure with raft foundation building - Google Patents

Basement reconstruction structure with raft foundation building Download PDF

Info

Publication number
CN106193644A
CN106193644A CN201610637962.7A CN201610637962A CN106193644A CN 106193644 A CN106193644 A CN 106193644A CN 201610637962 A CN201610637962 A CN 201610637962A CN 106193644 A CN106193644 A CN 106193644A
Authority
CN
China
Prior art keywords
joint bar
concrete
bearing column
stake
original
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610637962.7A
Other languages
Chinese (zh)
Other versions
CN106193644B (en
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sheyang Port Fishery Industry And Trade Development Co Of Sheyang County
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610637962.7A priority Critical patent/CN106193644B/en
Priority to CN201810152603.1A priority patent/CN108331154A/en
Priority to CN201810152604.6A priority patent/CN108331367A/en
Priority to CN201810152607.XA priority patent/CN108360561A/en
Publication of CN106193644A publication Critical patent/CN106193644A/en
Application granted granted Critical
Publication of CN106193644B publication Critical patent/CN106193644B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/48Foundations inserted underneath existing buildings or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/64Repairing piles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Hydrology & Water Resources (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses the Basement reconstruction structure of a kind of band raft foundation building, it is characterized in that utilizing original stake as basement bearing column, and removably lower chamber part bit position stake, carry out original stake reinforcing and form bearing column, use special connecting structure to carry out between bearing column with original stake and be effectively connected.Basement bottom board arranges shearing resistance muscle in bearing column position, and shearing resistance muscle is shaped as split heads shape.In concrete floor, original outer surface arranges watertight rubber ring, and it is in the middle part of concrete floor that watertight rubber ring arranges position, arranges ring seal groove along original outer surface, and ring seal groove embeds watertight rubber ring;Concrete floor is arranged above with polyurethane water-proof mortar.Present configuration performance is good, safe and reliable.

Description

Basement reconstruction structure with raft foundation building
Technical field
The present invention relates to a kind of Basement reconstruction method, particularly to the Basement reconstruction of a kind of band raft foundation building Structure.
Background technology
Along with the development in city, the problem that parking difficulty becomes puzzlement common people.It is necessary that some are possessed transformation condition Building is transformed, and resets basement.For band raft foundation building, Basement reconstruction structure is due at raft plate base Plinth stake disposed below, pile spacing is the closeest, and pile spacing is generally between 1.8~2.5mm, and these are main vertical How load-carrying member, can ensure that the safety of building can ensure that again the use function of basement, be engineering staff will faced by class Topic.
Summary of the invention
The present invention is to provide the Basement reconstruction structure of a kind of band raft foundation building, during solving Basement reconstruction The problem of safety.
The present invention utilize during the Basement reconstruction of building original stake as basement bearing column, and removably under Room site portion stake, for the situation that original dowel section area is inadequate, carries out original stake reinforcing formation bearing column, and bearing column is with former Have between stake and use special connecting structure to carry out effectively connection.It is logical that original stake and concrete floor contact site easily become infiltration Road, uses watertight rubber ring to carry out waterproof.
Bearing column is the cylinder after original stake is reinforced, bearing column radius ratio original stake half path length 120~300mm, i.e. Reinforcing annular concrete width in bearing column is 120~300mm, and the principal rod reinforcing annular concrete in bearing column uses diameter Being the reinforcing bar of 22~25mm, adjacent bearing column spacing is 3.5~6mm;After reinforcing, the total sectional area of bearing column is total with former all piles Sectional area is identical or difference is less than 10%;Basement bottom board thickness is 400~550mm, and basement bottom board is in bearing column position Arranging shearing resistance muscle, shearing resistance muscle diameter uses 32~35mm, and shearing resistance muscle is shaped as split heads shape.Original outer surface in concrete floor Arranging watertight rubber ring, it is in the middle part of concrete floor that watertight rubber ring arranges position, arranges ring seal along original outer surface Groove, ring seal groove indent 3~5mm, ring seal groove embeds watertight rubber ring;Concrete floor is arranged above with polyurethane water-proof Mortar, polyurethane water-proof mortar thickness is 15~25mm.
When original stake is hollow shell pill, bearing column is reinforced annular concrete and uses as follows with original connecting structure: Hollow shell pill inserts joint bar, and hollow shell pill arranges joint bar hole, and joint bar hole is arranged symmetrically with, and joint bar bore dia is 28~31mm, joint bar A diameter of 25~28mm;If reinforcing annular concrete section width to form cross less than or equal to 150mm, joint bar combination, as Really reinforcing ring tee section width is more than 150mm, and joint bar combination forms M shape;Joint bar is evenly arranged along stake length direction, joint bar edge The spacing that stake length direction is arranged is 500~600mm, and between joint bar and joint bar hole, space uses high-strength epoxy resin to close.
Construction procedure includes:
(1) excavation foundation soil is to basement bottom board elevation of bottom position;
(2) casting concrete base plate
Original outer surface digs out ring seal groove, and watertight rubber ring embeds annular water stopping trough;Colligation concrete floor Reinforcing bar, shearing resistance muscle, install template and pour;
(3) temporary steel support being provided below at concrete raft plate, temporary steel support uses I-steel, I-steel setting space It is 2~2.5mm, between adjacent I-steel, cross bar is set and is attached, to ensure the globality that I-steel supports;Topmost cross bar Being 0.6~0.8mm from concrete raft plate distance from bottom, remaining cross bar distance is 1.8~2.2mm;
(4) reinforce original stake, form bearing column;
Using original for part stake as the bearing column of basement, and original stake is reinforced;It is hollow pipe for original stake During stake, arranging joint bar hole in hollow shell pill, use high-strength epoxy resin to close after joint bar inserts joint bar hole, colligation is held The principal rod of power post also welds with joint bar, and install template, then pours reinforcing annular concrete in bearing column;
Cut concrete raft plate and basement bottom board pile concrete in addition to bearing column, and cut off a reinforcing bar;
(5) the hollow shell pill hollow parts stretching into below concrete floor and concrete floor 500mm position uses strong The degree concrete more than or equal to C30 is closed, and first transfers steel supporting plate before concrete enclosing, and steel supporting plate is as closed concrete Bracket, steel plate thickness is 15~18mm;
(6) brushing polyurethane water-proof mortar on concrete floor.
Present configuration performance is good, safe and reliable.
Accompanying drawing explanation
Fig. 1 is the raft foundation schematic diagram after excavation foundation soil, and Fig. 2 is Basement reconstruction formwork system schematic diagram, and Fig. 3 is Basement reconstruction structural representation, Fig. 4 is hollow shell pill ruggedized construction schematic diagram one, and Fig. 5 is the signal of hollow shell pill ruggedized construction Figure two.
In each accompanying drawing: 1, concrete raft plate, 2, Yuan Youzhuan, 3, bearing column, 4, basement bottom board, 5, watertight rubber ring, 6, I-steel, 7, cross bar, 8, polyurethane water-proof mortar, 9, shearing resistance muscle, 10, joint bar, 11, principal rod, 12, connect stirrup, 13, reinforce Annular concrete, 14, hollow shell pill.
Detailed description of the invention
Embodiment one
In embodiment, bearing column 3 is the cylinder after original stake 2 is reinforced, bearing column 3 radius ratio original stake 2 half path length Reinforcing annular concrete 13 width in 120mm, i.e. bearing column 3 is 120mm, reinforces the stress of annular concrete 13 in bearing column 3 Muscle 11 uses the reinforcing bar of a diameter of 22~25mm, and adjacent bearing column 3 spacing is 3.5~6mm;The total cross section of bearing column 3 after reinforcing Long-pending identical with former all piles total sectional area or difference is less than 10%;Basement bottom board 4 thickness is 400~550mm, at the bottom of basement Plate 4 arranges shearing resistance muscle 9 in bearing column 3 position, and shearing resistance muscle 9 diameter uses 32~35mm, and shearing resistance muscle 9 is shaped as split heads shape.Coagulation In soil base plate, original stake 2 outer surface arranges watertight rubber ring 5, and it is in the middle part of concrete floor that watertight rubber ring 5 arranges position, along former Having stake 2 outer surface to arrange ring seal groove, ring seal groove indent 3~5mm, ring seal groove embeds watertight rubber ring 5;Coagulation Soil substrate arranges polyurethane water-proof mortar 8, and polyurethane water-proof mortar 8 thickness is 15~25mm.
When original stake 2 is hollow shell pill 14, bearing column 3 is reinforced annular concrete 13 and adopts with original stake 2 connecting structure With as follows: hollow shell pill 14 inserts joint bar 10, hollow shell pill 14 arranges joint bar hole, and joint bar hole is arranged symmetrically with, and joint bar bore dia is 28~31mm, joint bar 10 a diameter of 25~28mm;Reinforcing annular concrete 13 cross-sectional width is 120mm, and joint bar 10 combination is formed Cross;Joint bar 10 is evenly arranged along stake length direction, and joint bar 10 is 500~600mm along the spacing that stake length direction is arranged, joint bar 10 And space uses high-strength epoxy resin to close between joint bar hole.
Construction procedure includes:
(1) excavation foundation soil is to basement bottom board 4 elevation of bottom position;
(2) casting concrete base plate
Original stake 2 outer surface digs out ring seal groove, and watertight rubber ring 5 embeds annular water stopping trough;Colligation concrete bottom Slab muscle, shearing resistance muscle 9, install template and pour;
(3) temporary steel support being provided below at concrete raft plate 1, temporary steel support uses I-steel 6, and I-steel 6 is arranged Spacing is 2~2.5mm, arranges cross bar 7 and be attached between adjacent I-steel 6, to ensure the globality that I-steel 6 supports;? Upper cross bar 7 is 0.6~0.8mm from concrete raft plate 1 distance from bottom, and remaining cross bar 7 distance is 1.8~2.2mm;
(4) reinforce original stake 2, form bearing column 3;
Using original for part stake 2 as the bearing column 3 of basement, and original stake 2 is reinforced;It is empty for original stake 2 During heart pile tube 14, joint bar hole is set in hollow shell pill 14, after joint bar 10 inserts joint bar hole, uses high-strength epoxy resin to carry out Closing, the principal rod 11 of colligation bearing column 3 also welds with joint bar 10, and install template, then pours and reinforces annular in bearing column 3 Concrete 13.
Cut concrete raft plate 1 and the basement bottom board 4 pile concrete in addition to bearing column 3, and cut off a reinforcing bar;
(5) hollow shell pill 14 hollow parts stretching into below concrete floor and concrete floor 500mm position uses The intensity concrete more than or equal to C30 is closed, and first transfers steel supporting plate before concrete enclosing, and steel supporting plate is as closed concrete Bracket, steel plate thickness is 15~18mm.
(6) brushing polyurethane water-proof mortar 8 on concrete floor.
Embodiment two
In embodiment, bearing column 3 is the cylinder after original stake 2 is reinforced, bearing column 3 radius ratio original stake 2 half path length Reinforcing annular concrete 13 width in 170mm, i.e. bearing column 3 is 170mm, reinforces the stress of annular concrete 13 in bearing column 3 Muscle 11 uses the reinforcing bar of a diameter of 22~25mm, and adjacent bearing column 3 spacing is 3.5~6mm;The total cross section of bearing column 3 after reinforcing Long-pending identical with former all piles total sectional area or difference is less than 10%;Basement bottom board 4 thickness is 400~550mm, at the bottom of basement Plate 4 arranges shearing resistance muscle 9 in bearing column 3 position, and shearing resistance muscle 9 diameter uses 32~35mm, and shearing resistance muscle 9 is shaped as split heads shape.Coagulation In soil base plate, original stake 2 outer surface arranges watertight rubber ring 5, and it is in the middle part of concrete floor that watertight rubber ring 5 arranges position, along former Having stake 2 outer surface to arrange ring seal groove, ring seal groove indent 3~5mm, ring seal groove embeds watertight rubber ring 5;Coagulation Soil substrate arranges polyurethane water-proof mortar 8, and polyurethane water-proof mortar 8 thickness is 15~25mm.
When original stake 2 is hollow shell pill 14, bearing column 3 is reinforced annular concrete 13 and adopts with original stake 2 connecting structure With as follows: hollow shell pill 14 inserts joint bar 10, hollow shell pill 14 arranges joint bar hole, and joint bar hole is arranged symmetrically with, and joint bar bore dia is 28~31mm, joint bar 10 a diameter of 25~28mm;Reinforcing annular concrete 13 cross-sectional width is 170mm, and joint bar 10 combination is formed M shape;Joint bar 10 is evenly arranged along stake length direction, and joint bar 10 is 500~600mm along the spacing that stake length direction is arranged, joint bar 10 And space uses high-strength epoxy resin to close between joint bar hole.
Construction procedure includes:
(1) excavation foundation soil is to basement bottom board 4 elevation of bottom position;
(2) casting concrete base plate
Original stake 2 outer surface digs out ring seal groove, and watertight rubber ring 5 embeds annular water stopping trough;Colligation concrete bottom Slab muscle, shearing resistance muscle 9, install template and pour;
(3) temporary steel support being provided below at concrete raft plate 1, temporary steel support uses I-steel 6, and I-steel 6 is arranged Spacing is 2~2.5mm, arranges cross bar 7 and be attached between adjacent I-steel 6, to ensure the globality that I-steel 6 supports;? Upper cross bar 7 is 0.6~0.8mm from concrete raft plate 1 distance from bottom, and remaining cross bar 7 distance is 1.8~2.2mm;
(4) reinforce original stake 2, form bearing column 3;
Using original for part stake 2 as the bearing column 3 of basement, and original stake 2 is reinforced;It is empty for original stake 2 During heart pile tube 14, joint bar hole is set in hollow shell pill 14, after joint bar 10 inserts joint bar hole, uses high-strength epoxy resin to carry out Closing, the principal rod 11 of colligation bearing column 3 also welds with joint bar 10, and install template, then pours and reinforces annular in bearing column 3 Concrete 13;
Cut concrete raft plate 1 and the basement bottom board 4 pile concrete in addition to bearing column 3, and cut off a reinforcing bar;
(5) hollow shell pill 14 hollow parts stretching into below concrete floor and concrete floor 500mm position uses The intensity concrete more than or equal to C30 is closed, and first transfers steel supporting plate before concrete enclosing, and steel supporting plate is as closed concrete Bracket, steel plate thickness is 15~18mm;
(6) brushing polyurethane water-proof mortar 8 on concrete floor.

Claims (4)

1. a Basement reconstruction structure for band raft foundation building, is characterized in that utilizing original stake as basement load Post, and removably lower chamber part bit position stake, carry out original stake reinforcing formation bearing column, use specially between bearing column and original stake Effectively connection is carried out with connecting structure;Original stake and concrete floor contact site use watertight rubber ring to carry out waterproof.
Bearing column is the cylinder after original stake is reinforced, bearing column radius ratio original stake half path length 120~300mm, i.e. load Reinforcing annular concrete width in post is 120~300mm, and the principal rod reinforcing annular concrete in bearing column uses a diameter of 22 ~the reinforcing bar of 25mm, adjacent bearing column spacing is 3.5~6mm;The total sectional area of bearing column and former all piles total cross section after reinforcing Long-pending identical or difference is less than 10%;Basement bottom board thickness is 400~550mm, and basement bottom board is arranged in bearing column position Shearing resistance muscle, shearing resistance muscle diameter uses 32~35mm, and shearing resistance muscle is shaped as split heads shape;In concrete floor, original outer surface is arranged Watertight rubber ring, it is in the middle part of concrete floor that watertight rubber ring arranges position, arranges ring seal groove, ring along original outer surface Shape water stopping trough indent 3~5mm, ring seal groove embeds watertight rubber ring;Concrete floor is arranged above with polyurethane water-proof mortar, Polyurethane water-proof mortar thickness is 15~25mm.
The Basement reconstruction structure of band raft foundation building the most according to claim 1, is characterized in that special connection structure Make employing as follows: when original stake is hollow shell pill, bearing column is reinforced annular concrete and uses such as with original connecting structure Under: hollow shell pill inserts joint bar, and hollow shell pill arranges joint bar hole, and joint bar hole is arranged symmetrically with, and joint bar bore dia is 28~31mm, inserts Muscle a diameter of 25~28mm;If reinforcing annular concrete section width to form cross less than or equal to 150mm, joint bar combination; Joint bar is evenly arranged along stake length direction, and joint bar is 500~600mm along the spacing that stake length direction is arranged, between joint bar and joint bar hole Space uses high-strength epoxy resin to close.
The Basement reconstruction structure of band raft foundation building the most according to claim 1, is characterized in that special connection structure Make employing as follows: when original stake is hollow shell pill, bearing column is reinforced annular concrete and uses such as with original connecting structure Under: hollow shell pill inserts joint bar, and hollow shell pill arranges joint bar hole, and joint bar hole is arranged symmetrically with, and joint bar bore dia is 28~31mm, inserts Muscle a diameter of 25~28mm;If reinforcing ring tee section width is more than 150mm, joint bar combination forms M shape;Joint bar is long along stake Direction is evenly arranged, and joint bar is 500~600mm along the spacing that stake length direction is arranged, between joint bar and joint bar hole, space uses height Strong epoxy resin is closed.
The Basement reconstruction structure of band raft foundation building the most according to claim 1, is characterized in that construction procedure is adopted With as follows:
(1) excavation foundation soil is to basement bottom board elevation of bottom position;
(2) casting concrete base plate
Original outer surface digs out ring seal groove, and watertight rubber ring embeds annular water stopping trough;Colligation concrete floor reinforcing bar, Shearing resistance muscle, installs template and pours;
(3) temporary steel support being provided below at concrete raft plate, temporary steel support uses I-steel, and I-steel setting space is 2 ~2.5mm, between adjacent I-steel, cross bar is set and is attached, to ensure the globality that I-steel supports;Topmost cross bar from Concrete raft plate distance from bottom is 0.6~0.8mm, and remaining cross bar distance is 1.8~2.2mm;
(4) reinforce original stake, form bearing column;
Using original for part stake as the bearing column of basement, and original stake is reinforced;When being hollow shell pill for original stake, Joint bar hole is set in hollow shell pill, uses high-strength epoxy resin to close after joint bar inserts joint bar hole, colligation bearing column Principal rod and weld with joint bar, and install template, then pour reinforcing annular concrete in bearing column;
Cut concrete raft plate and basement bottom board pile concrete in addition to bearing column, and cut off a reinforcing bar;
(5) the hollow shell pill hollow parts stretching into below concrete floor and concrete floor 500mm position uses intensity big Closing in the concrete equal to C30, first transfer steel supporting plate before concrete enclosing, steel supporting plate is as the torr of closed concrete Frame, steel plate thickness is 15~18mm;
(6) brushing polyurethane water-proof mortar on concrete floor.
CN201610637962.7A 2016-07-26 2016-07-26 Basement reconstruction structure with raft foundation building Active CN106193644B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201610637962.7A CN106193644B (en) 2016-07-26 2016-07-26 Basement reconstruction structure with raft foundation building
CN201810152603.1A CN108331154A (en) 2016-07-26 2016-07-26 Basement reconstruction construction method with raft foundation building
CN201810152604.6A CN108331367A (en) 2016-07-26 2016-07-26 The Basement reconstruction structure of raft foundation
CN201810152607.XA CN108360561A (en) 2016-07-26 2016-07-26 The Basement reconstruction of raft foundation constructs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610637962.7A CN106193644B (en) 2016-07-26 2016-07-26 Basement reconstruction structure with raft foundation building

Related Child Applications (3)

Application Number Title Priority Date Filing Date
CN201810152603.1A Division CN108331154A (en) 2016-07-26 2016-07-26 Basement reconstruction construction method with raft foundation building
CN201810152607.XA Division CN108360561A (en) 2016-07-26 2016-07-26 The Basement reconstruction of raft foundation constructs
CN201810152604.6A Division CN108331367A (en) 2016-07-26 2016-07-26 The Basement reconstruction structure of raft foundation

Publications (2)

Publication Number Publication Date
CN106193644A true CN106193644A (en) 2016-12-07
CN106193644B CN106193644B (en) 2018-12-14

Family

ID=57513583

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201810152607.XA Pending CN108360561A (en) 2016-07-26 2016-07-26 The Basement reconstruction of raft foundation constructs
CN201810152603.1A Pending CN108331154A (en) 2016-07-26 2016-07-26 Basement reconstruction construction method with raft foundation building
CN201810152604.6A Pending CN108331367A (en) 2016-07-26 2016-07-26 The Basement reconstruction structure of raft foundation
CN201610637962.7A Active CN106193644B (en) 2016-07-26 2016-07-26 Basement reconstruction structure with raft foundation building

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201810152607.XA Pending CN108360561A (en) 2016-07-26 2016-07-26 The Basement reconstruction of raft foundation constructs
CN201810152603.1A Pending CN108331154A (en) 2016-07-26 2016-07-26 Basement reconstruction construction method with raft foundation building
CN201810152604.6A Pending CN108331367A (en) 2016-07-26 2016-07-26 The Basement reconstruction structure of raft foundation

Country Status (1)

Country Link
CN (4) CN108360561A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285032A (en) * 2016-07-26 2017-01-04 朱奎 Basement reconstruction structure with raft foundation building
CN109610882A (en) * 2018-12-26 2019-04-12 北京建工四建工程建设有限公司 A kind of support construction and its construction method for building translation

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984226B (en) * 2019-11-19 2021-08-03 山东建固特种专业工程有限公司 Waterproof construction method for frame column in reverse construction method
CN111411791A (en) * 2020-01-21 2020-07-14 武大巨成结构股份有限公司 Existing foundation upper and lower column connecting structure and method for expanding underground space

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1693591A (en) * 2005-06-09 2005-11-09 上海市城市建设设计研究院 Construction method of reconstrating existant underground space into subway station
JP4722783B2 (en) * 2006-07-03 2011-07-13 株式会社竹中工務店 Foundation reinforcement method for existing buildings
CN106285032A (en) * 2016-07-26 2017-01-04 朱奎 Basement reconstruction structure with raft foundation building

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1078294C (en) * 1998-12-11 2002-01-23 北京市第七城市建设工程公司 Integral foundation underpinning technology for building added floor
JP2002115260A (en) * 2000-10-11 2002-04-19 Shimizu Corp Extension method for basement
CN102127974B (en) * 2011-04-18 2012-08-29 上海现代建筑设计(集团)有限公司 Design and construction method of additional cellar under existing building
CN102444142B (en) * 2011-09-20 2014-01-15 新世纪建设集团有限公司 Pile group column replacement expanded basement and construction method of same
CN203222817U (en) * 2013-05-11 2013-10-02 王镛 Connecting structure of basement stand column
CN107119917B (en) * 2015-05-19 2018-12-14 叶长青 Increase the construction method of basement structure behind strip footing house

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1693591A (en) * 2005-06-09 2005-11-09 上海市城市建设设计研究院 Construction method of reconstrating existant underground space into subway station
JP4722783B2 (en) * 2006-07-03 2011-07-13 株式会社竹中工務店 Foundation reinforcement method for existing buildings
CN106285032A (en) * 2016-07-26 2017-01-04 朱奎 Basement reconstruction structure with raft foundation building

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285032A (en) * 2016-07-26 2017-01-04 朱奎 Basement reconstruction structure with raft foundation building
CN106285032B (en) * 2016-07-26 2018-12-14 朱奎 Basement reconstruction construction with raft foundation building
CN109610882A (en) * 2018-12-26 2019-04-12 北京建工四建工程建设有限公司 A kind of support construction and its construction method for building translation
CN109610882B (en) * 2018-12-26 2020-09-29 北京建工四建工程建设有限公司 Support structure for building translation and construction method thereof

Also Published As

Publication number Publication date
CN108331367A (en) 2018-07-27
CN108360561A (en) 2018-08-03
CN108331154A (en) 2018-07-27
CN106193644B (en) 2018-12-14

Similar Documents

Publication Publication Date Title
CN202124865U (en) Quick plugging device for dewatering wellhead of sand-free cement pipe deep well
CN104018518B (en) The method of prefabricated diaphragm wall and construction outer wall of basement and floor
CN205742213U (en) Foundation pit supporting construction
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN102162258B (en) Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN106193644A (en) Basement reconstruction structure with raft foundation building
CN106285032A (en) Basement reconstruction structure with raft foundation building
CN108612110A (en) A kind of Deep Foundation Pit of Metro Stations combined type construction method for supporting
CN102839691A (en) Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN204000925U (en) Prefabricated diaphragm wall
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN201241329Y (en) Positioner of steel pipe column
CN206308707U (en) A kind of city integrated Pipe rack of prefabricated assembled concrete
CN105525624A (en) Connecting and water resisting method for assembled steel pipe column type tower crane foundation and structural base plate
CN202347534U (en) Force transferring structure between foundation ditch support pile and basement outer wall
CN205591210U (en) Formula cast member and construction assembly are spliced to underground
CN112012761A (en) Construction method of anti-disturbance double-arch tunnel structure
CN206941372U (en) Concrete-filled steel tube with dumbbell sections assembled pier and the attachment structure with cushion cap
CN109989414B (en) Assembled foundation
CN209585028U (en) A kind of open caisson applies broken pile
CN103924595B (en) A kind of hollow pipe column underwater casting self-floating inner formwork system
CN210122735U (en) Underground structure anti-floating system based on outward-protruding wing foot plate
CN106088762A (en) The prefabricated assembled circular underground granary of a kind of insertion slot type encased steel plate
CN102322065B (en) Bottom channel inner support of foundation pit supporting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201124

Address after: No.39, Rongxin Road, Ouhai District, Yancheng City, Jiangsu Province

Patentee after: Gu Yaobin

Address before: Ouhai District of Zhejiang city in Wenzhou province 325000 Rong Road No. 39

Patentee before: Zhu Kui

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210415

Address after: 224000 Lingang Industrial Zone, Sheyang County, Yancheng City, Jiangsu Province

Patentee after: Sheyang port fishery industry and Trade Development Company of Sheyang County

Address before: 224300 No.39 Rongxin Road, Ouhai District, Yancheng City, Jiangsu Province

Patentee before: Gu Yaobin