CN202124865U - Quick plugging device for dewatering wellhead of sand-free cement pipe deep well - Google Patents

Quick plugging device for dewatering wellhead of sand-free cement pipe deep well Download PDF

Info

Publication number
CN202124865U
CN202124865U CN2011202192084U CN201120219208U CN202124865U CN 202124865 U CN202124865 U CN 202124865U CN 2011202192084 U CN2011202192084 U CN 2011202192084U CN 201120219208 U CN201120219208 U CN 201120219208U CN 202124865 U CN202124865 U CN 202124865U
Authority
CN
China
Prior art keywords
cement pipe
steel sleeve
flange
sand
sand cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202192084U
Other languages
Chinese (zh)
Inventor
苏源
孙兴春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG HAIZHOU CONSTRUCTION GROUP CO Ltd
Original Assignee
NANTONG HAIZHOU CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG HAIZHOU CONSTRUCTION GROUP CO Ltd filed Critical NANTONG HAIZHOU CONSTRUCTION GROUP CO Ltd
Priority to CN2011202192084U priority Critical patent/CN202124865U/en
Application granted granted Critical
Publication of CN202124865U publication Critical patent/CN202124865U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joints With Sleeves (AREA)

Abstract

The utility model discloses a quick plugging device for a dewatering wellhead of a sand-free cement pipe deep well, which comprises a sand-free cement pipe and a steel sleeve. The steel sleeve comprises a steel pipe body, a flange, a plugging plate, a bolt, a rubber waterproof cushion and at least one water stop plate, wherein the sand-free cement pipe is embedded in a foundation concrete cushion layer; the bottom of the steel sleeve is inserted to the sand-free cement pipe; the flange is arranged on the top of the steel sleeve; the plugging plate is arranged above the flange; both the flange and the sealing plate are provided with at least three screw holes; the rubber waterproof cushion is arranged between the flange and the sealing plate; the flange and the sealing plate are firmly connected by the bolt; and the water stop plate is arranged on the outer lateral wall of the steel sleeve. The quick plugging device can carry out a one-step quick plugging process to avoid the difficult problem that water is seeped inside and outside the pipe well after the well is sealed.

Description

No sand cement pipe deep-well precipitation well head fast plugging device
Technical field
The utility model relates to precipitation well plugging device field, relates in particular to a kind of no sand cement pipe deep-well precipitation well head fast plugging device.
Background technology
In the middle of the process of the deep foundation pit precipitation well of basement in high rise building, underground garage and civil air defense constructions and installations excavation; Because the infiltration of underground water in soil, the phenomenon of quicksand and gush takes place through regular meeting, gush on cheating that subsoil will not stop along with excavation; Side slope also will constantly be caved in; So not only can influence the excavation construction of the earthwork, and will have influence on the safety of adjacent building, structure and foundation pit supporting construction, also can have influence on the normal construction and the workmanship of building foundation simultaneously.
Deep foundation pit precipitation well adopts no sand cement pipe deep-well precipitation usually at present; Obtained using widely in fields such as building, railway, culverts, deep foundation pit precipitation well has plurality of advantages such as precipitation has quick construction, displacement is big, precipitation is dark, drainage effect is good, well spacing is big.
Current deep foundation pit precipitation well is when its area is bigger, owing to receive the restriction of the precipitation depth and the precipitation radius of influence, deep foundation pit precipitation well must be embedded in the foundation ditch; But this moment, the shutoff of well head became a difficult problem, and the phenomenon of seepage often appears in conventional plugging device easily in the middle of the process of shutoff or after shutoff, take a lot of work during handling; And leak stopping is not thorough; And conventional plugging device can cause the cross-operation of work post, can influence the duration, and construction cost is high; Shutoff is got up also more difficult, is difficult to guarantee the quality and the effect of shutoff.
The utility model content
In order to solve the problem of above-mentioned existence, the purpose of the utility model is the no sand cement pipe deep-well precipitation well head fast plugging device that provides a kind of plugging effect simple in structure, disposable good.
To achieve these goals, the utility model adopts following technical scheme:
No sand cement pipe deep-well precipitation well head fast plugging device, comprising no sand cement pipe and steel sleeve, steel sleeve comprises that steel tube body, flange, shrouding, bolt, rubber waterproof pad are with seal plate at least; Said no sand cement pipe is embedded in the middle of the base concrete bed course; Insert in the no sand cement pipe bottom of said steel sleeve, and said flange is positioned at the top of steel sleeve, and said shrouding is positioned at the top of flange; Be equipped with at least three screws on said flange and the shrouding; Said rubber waterproof pad is between flange and shrouding, and through the firm connection of bolt, said seal plate is positioned on the lateral wall of steel sleeve between said flange and the shrouding.
Preferably, be equipped with 12 screws on said flange and the shrouding.
Preferably, the lateral wall of said steel sleeve is provided with the twice seal plate, is positioned at the last seal plate that is at steel sleeve middle part, is positioned at the following seal plate that is of steel sleeve bottom.
Preferably, said at steel sleeve with there is not filled polyurethane waterproof sealing cream between the sand cement pipe well mouth.
Preferably, fill waterproof cement mortar between said no sand cement pipe well mouth and the following seal plate.
Preferably, arc chord angle is made with cement mortar in said junction at no sand cement pipe and base concrete bed course, on arc chord angle, is provided with the SBS coil waterproof layer one, and the SBS coil waterproof layer joins with following seal plate, and interface adopts the hot melt sealing.
The utility model has the advantages that: insert in the no sand cement pipe in the steel sleeve; On the lateral wall of steel sleeve, be provided with at least one seal plate; Between steel sleeve, no sand cement pipe and base concrete bed course, adopt materials such as polyurethane sealant, SBS waterproof roll to carry out comprehensive waterproof, build harsh concrete in the inside of steel sleeve, top couples together with shrouding, rubber waterproof pad and flange; Carry out disposable quick blocking, stopped the difficult problem of the inside and outside infiltration of shut-in well back pipe well.
Description of drawings
Fig. 1 is the structural representation of the utility model;
The flow chart that Fig. 2 is to use the utility model to seal.
Among the figure 1, no sand cement pipe, 2, steel sleeve, 201, steel tube body, 202, flange; 203, shrouding, 204, bolt, 205, the rubber waterproof pad, 206, go up seal plate; 207, following seal plate, 3, waterproof sealing cream, 4, waterproof cement mortar, 5, the SBS coil waterproof layer.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the utility model is done further to describe in detail explanation.
Of Fig. 1 to 2, no sand cement pipe deep-well precipitation well head fast plugging device, it comprises no sand cement pipe 1 and steel sleeve 2; Steel sleeve comprises steel tube body 201, flange 201, shrouding 203, bolt 204, rubber waterproof pad 205 and twice seal plate, does not wherein have sand cement pipe 1 and is embedded in the middle of the base concrete bed course, and insert in the no sand cement pipe 1 bottom of steel sleeve 2; At steel sleeve 2 with there is not filled polyurethane waterproof sealing cream 3 between sand cement pipe 1 well head, flange 202 is positioned at the top of steel sleeve 2, and shrouding 203 is positioned at the top of flange 202; On flange 202 and shrouding 203, be equipped with 12 screws, be provided with rubber waterproof pad 205 between flange 202 and the shrouding 203, pass through bolt 204 firm connections between flange 202 and the shrouding 203; Seal plate is positioned on the lateral wall of steel sleeve 2; The road number of seal plate can be confirmed according to the height of steel sleeve, is the twice seal plate in the present embodiment, wherein is positioned at the last seal plate 206 that is at steel sleeve 2 middle parts; Be positioned at the following seal plate 207 that is of steel sleeve 2 bottoms; Fill waterproof cement mortar 4 between no sand cement pipe 1 well head and the following seal plate 207, make arc chord angle with cement mortar, on arc chord angle, be provided with SBS coil waterproof layer 5 one in the no sand cement pipe 1 and the junction of base concrete bed course; SBS coil waterproof layer 5 joins with following seal plate 207, and interface adopts the hot melt sealing.
Use no sand cement pipe deep-well precipitation well head fast plugging device; The flow process of whole shutoff is that the mouth of pipe is handled---the steel sleeve making---and steel sleeve is inserted fixing in advance---the sealing joint waterproof---foundation construction---stops precipitation---successively at interval, and fill out core and seal, wherein concrete steps are:
Step 1, the mouth of pipe are handled: laying base concrete bed course makes has certain intensity, makes that simultaneously no sand cement pipe 1 well head height is higher than base concrete bed course 220mm, and the external diameter of the no sand cement pipe 1 that uses in the present embodiment is 380mm, and internal diameter is 320mm;
Step 2, steel sleeve 2 are made: outside the hole, make circular steel sleeve pipe 2 on the ground, the external diameter of steel sleeve 2 is 300mm, and steel sleeve 2 wall thickness are 6.5mm; Welding twice seal plate is respectively seal plate 206 and following seal plate 207 on the lateral wall of circular steel sleeve pipe 2, and last seal plate 206 is positioned at 1/2 height of steel sleeve 2; Following seal plate 207 is positioned at apart from 300mm place, steel sleeve 2 lower end, and the thickness of seal plate is 4mm, and width is 100mm; At flange 202 of welded top of steel sleeve 2, the thickness of flange 202 is 10mm, and width is that 12 screws are set on the 70mm flange 202; Dispose 12 corresponding bolts 204, the diameter of screw is 14mm, at the top of steel sleeve 2 shrouding 203 is set; The thickness of shrouding 203 is 10mm, between shrouding 203 and flange 202, rubber waterproof pad 205 is set, and the thickness of rubber waterproof pad 205 is 6mm.;
Step 3, steel sleeve 2 inserted fixing in advance: before the sole plate assembling reinforcement, steel sleeve 2 is inserted in 1 mouthful of the no sand cement pipe, and in the bottom welded reinforcement support of seal plate 207 down, make down seal plate 207 be higher than no sand cement pipe 1 well head 80mm;
Step 4, sealing joint waterproof: at steel sleeve 2 with there is not between sand cement pipe 1 well head waterproof sealing of filling cream 3; Waterproof sealing cream 3 in the present embodiment adopts polyurethane water-proof sealing compound 3; After treating waterproof sealing cream 3 dryings, adopt waterproof cement mortar 4 will descend the 80mm fill plug seal between seal plate 207 and no sand cement pipe 1 well head, make arc chord angle with cement mortar in the no sand cement pipe 1 and the junction of base concrete bed course; The radius of arc chord angle is 5cm; On arc chord angle, do SBS coil waterproof layer 5 one, SBS coil waterproof layer 5 is accomplished to join with following seal plate 207 always, and interface adopts the hot melt sealing;
Step 5, foundation construction: colligation basis end placing of reinforcement; Break off at no sand cement pipe 1 well head place; Periphery is provided with reinforcing rib; Concreting around no sand cement pipe 1 well head, no sand cement pipe 1 well head top are that the back cast gate is kept somewhere at the center with the well head, after the well head quick blocking, adopt than the higher leveled expansive concrete teeming of circumferential concrete grade.
Step 6, at interval stop precipitation successively: stop precipitation should be a plurality of no sand cement pipe 1 precipitation wells at interval progressively stop precipitation; Individual well stops to take out water pump immediately behind the precipitation; The adverse effect that minimizing pressure of return water that like this can maximum efficiency produces, the effect of the sealing that also can guarantee simultaneously to shunt in a well;
Step 7, fill out core and seal: be backfilling into the height of concrete cushion in the no sand cement pipe 1 with fine sand, drop in the steel sleeve 2 vibration compacting again with the harsh concrete that is mixed with early strength admixture; And be poured into the top of steel sleeve 2 always, and on the flange 202 at steel sleeve 2 tops, place rubber waterproof pad 205 immediately, cover shrouding 203; With 12 bolts 204 shrouding 203 is fixed on the flange 202; Screwing force is used the top of expansive concrete teeming in steel sleeve 2 again apart from be 50N.m-60N.m, make it with do not have sand cement pipe 1 well head around concrete surface fair mutually; Vibration compacting, covering protection.
Construction is accomplished the back and is tackled SBS coil waterproof layer 5, steel sleeve 2 and do not have each positions such as sand cement pipe 1 junction surface, seal plate, shrouding 203 and check; Next step construction can be carried out in the passed examination rear; The utility model can conveniently carry out disposable quick blocking, has stopped the difficult problem of the inside and outside infiltration of shut-in well back pipe well.
The above only is the preferred implementation of the utility model; Should be pointed out that to those skilled in the art, under the prerequisite that does not break away from the utility model creation design; Can also make some similar distortion and improvement, these also should be regarded as within the protection domain of the utility model.

Claims (6)

1. do not have sand cement pipe deep-well precipitation well head fast plugging device, it is characterized in that it comprises no sand cement pipe and steel sleeve; Steel sleeve comprises steel tube body, flange, shrouding, bolt, rubber waterproof pad with seal plate at least, and said no sand cement pipe is embedded in the middle of the base concrete bed course, and insert in the no sand cement pipe bottom of said steel sleeve; Said flange is positioned at the top of steel sleeve; Said shrouding is positioned at the top of flange, is equipped with at least three screws on said flange and the shrouding, and said rubber waterproof pad is between flange and shrouding; Through the firm connection of bolt, said seal plate is positioned on the lateral wall of steel sleeve between said flange and the shrouding.
2. no sand cement pipe deep-well precipitation well head fast plugging device according to claim 1 is characterized in that, is equipped with 12 screws on said flange and the shrouding.
3. no sand cement pipe deep-well precipitation well head fast plugging device according to claim 2 is characterized in that the lateral wall of said steel sleeve is provided with the twice seal plate, is positioned at the last seal plate that is at steel sleeve middle part, is positioned at the following seal plate that is of steel sleeve bottom.
4. no sand cement pipe deep-well precipitation well head fast plugging device according to claim 3 is characterized in that, and is said at steel sleeve with there is not filled polyurethane waterproof sealing cream between the sand cement pipe well mouth.
5. no sand cement pipe deep-well precipitation well head fast plugging device according to claim 4 is characterized in that, fills waterproof cement mortar between said no sand cement pipe well mouth and the following seal plate.
6. no sand cement pipe deep-well precipitation well head fast plugging device according to claim 5; It is characterized in that; Arc chord angle is made with cement mortar in said junction at no sand cement pipe and base concrete bed course; On arc chord angle, be provided with the SBS coil waterproof layer one, the SBS coil waterproof layer joins with following seal plate, and interface adopts the hot melt sealing.
CN2011202192084U 2011-06-22 2011-06-22 Quick plugging device for dewatering wellhead of sand-free cement pipe deep well Expired - Fee Related CN202124865U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202192084U CN202124865U (en) 2011-06-22 2011-06-22 Quick plugging device for dewatering wellhead of sand-free cement pipe deep well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202192084U CN202124865U (en) 2011-06-22 2011-06-22 Quick plugging device for dewatering wellhead of sand-free cement pipe deep well

Publications (1)

Publication Number Publication Date
CN202124865U true CN202124865U (en) 2012-01-25

Family

ID=45487937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202192084U Expired - Fee Related CN202124865U (en) 2011-06-22 2011-06-22 Quick plugging device for dewatering wellhead of sand-free cement pipe deep well

Country Status (1)

Country Link
CN (1) CN202124865U (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839691A (en) * 2011-06-22 2012-12-26 南通海洲建设集团有限公司 Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN103147450A (en) * 2013-03-19 2013-06-12 成军 Construction method for plugging partial steel pipe dewatering well by using flange plates for excavation of deep foundation pit
CN103835302A (en) * 2012-11-27 2014-06-04 中国二十冶集团有限公司 Deep foundation pit dewatering tube well shut-in construction method for superficial layer confined water soil layer
CN104153468A (en) * 2014-01-10 2014-11-19 刘宏源 Waterproof accessory at connecting position of main vertical pillar and water tank of steel pipe greenhouse
CN104264700A (en) * 2014-10-09 2015-01-07 安徽华力建设集团有限公司 Seepage prevention construction method for light-weight precipitation well point post-cast strip of underground construction
CN105178364A (en) * 2015-06-29 2015-12-23 江苏五环建设有限公司 Underground building light precipitation well point post-cast strip anti-seepage construction method
CN105332383A (en) * 2014-08-13 2016-02-17 江苏信拓建设(集团)股份有限公司 Device for rapidly blocking dewatering pipe well through drainage and decompression and method of device
CN105951859A (en) * 2016-05-31 2016-09-21 中国冶集团有限公司 Treatment method of plugging water stop construction for foundation pit dewatering well to penetrate through concrete base plate of basement
CN106400822A (en) * 2016-09-23 2017-02-15 山东金城建设有限公司 Construction method for shutting deep foundation pit precipitation well
CN106836251A (en) * 2017-02-24 2017-06-13 中国十七冶集团有限公司 A kind of new pre-buried deformation joint anti-seepage structure of the pipe well borehole wall and its construction method
CN109025899A (en) * 2018-08-14 2018-12-18 北京天润建设有限公司 A kind of well-sealing device
CN109577354A (en) * 2018-12-04 2019-04-05 江苏兴厦建设工程集团有限公司 A kind of vacuum tube well shut-in well, water stop construction method
CN109736272A (en) * 2019-03-13 2019-05-10 国家电网有限公司 A kind of concrete dam drainage hole opening arrangement and its manufacturing method
CN110836651A (en) * 2019-10-29 2020-02-25 清华大学 Landslide flexibility monitoring device and method thereof
CN111254961A (en) * 2020-02-21 2020-06-09 云南建投第六建设有限公司 Closed construction method for foundation pit relief well
CN115419096A (en) * 2022-09-30 2022-12-02 中建八局第二建设有限公司 Novel dewatering well bottom plate and dewatering well plugging method

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839691B (en) * 2011-06-22 2015-04-15 南通海洲建设集团有限公司 Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN102839691A (en) * 2011-06-22 2012-12-26 南通海洲建设集团有限公司 Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN103835302A (en) * 2012-11-27 2014-06-04 中国二十冶集团有限公司 Deep foundation pit dewatering tube well shut-in construction method for superficial layer confined water soil layer
CN103147450A (en) * 2013-03-19 2013-06-12 成军 Construction method for plugging partial steel pipe dewatering well by using flange plates for excavation of deep foundation pit
CN104153468A (en) * 2014-01-10 2014-11-19 刘宏源 Waterproof accessory at connecting position of main vertical pillar and water tank of steel pipe greenhouse
CN105332383A (en) * 2014-08-13 2016-02-17 江苏信拓建设(集团)股份有限公司 Device for rapidly blocking dewatering pipe well through drainage and decompression and method of device
CN104264700A (en) * 2014-10-09 2015-01-07 安徽华力建设集团有限公司 Seepage prevention construction method for light-weight precipitation well point post-cast strip of underground construction
CN105178364B (en) * 2015-06-29 2017-04-19 江苏五环建设有限公司 Underground building light precipitation well point post-cast strip anti-seepage construction method
CN105178364A (en) * 2015-06-29 2015-12-23 江苏五环建设有限公司 Underground building light precipitation well point post-cast strip anti-seepage construction method
CN105951859A (en) * 2016-05-31 2016-09-21 中国冶集团有限公司 Treatment method of plugging water stop construction for foundation pit dewatering well to penetrate through concrete base plate of basement
CN105951859B (en) * 2016-05-31 2018-04-10 中国一冶集团有限公司 Base pit dewatering well wears concrete of basement bottom plate closure sealing construction processing method
CN106400822A (en) * 2016-09-23 2017-02-15 山东金城建设有限公司 Construction method for shutting deep foundation pit precipitation well
CN106400822B (en) * 2016-09-23 2018-06-26 山东金城建设有限公司 Deep foundation pit precipitation well shut-in well construction method
CN106836251A (en) * 2017-02-24 2017-06-13 中国十七冶集团有限公司 A kind of new pre-buried deformation joint anti-seepage structure of the pipe well borehole wall and its construction method
CN109025899A (en) * 2018-08-14 2018-12-18 北京天润建设有限公司 A kind of well-sealing device
CN109577354A (en) * 2018-12-04 2019-04-05 江苏兴厦建设工程集团有限公司 A kind of vacuum tube well shut-in well, water stop construction method
CN109736272A (en) * 2019-03-13 2019-05-10 国家电网有限公司 A kind of concrete dam drainage hole opening arrangement and its manufacturing method
CN110836651A (en) * 2019-10-29 2020-02-25 清华大学 Landslide flexibility monitoring device and method thereof
CN111254961A (en) * 2020-02-21 2020-06-09 云南建投第六建设有限公司 Closed construction method for foundation pit relief well
CN115419096A (en) * 2022-09-30 2022-12-02 中建八局第二建设有限公司 Novel dewatering well bottom plate and dewatering well plugging method
CN115419096B (en) * 2022-09-30 2023-12-01 中建八局第二建设有限公司 Dewatering well bottom plate and dewatering well plugging method

Similar Documents

Publication Publication Date Title
CN202124865U (en) Quick plugging device for dewatering wellhead of sand-free cement pipe deep well
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN102433876B (en) Multi-compartment casing composite pile and construction method thereof
CN204343312U (en) Plugging device of precipitation well in foundation pit
CN102839691B (en) Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN105178344A (en) Built-in anti-floating anchor blocking structure used in foundation mat for deep-well dewatering well and construction method
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN206090653U (en) Anchor rod static pressure pile slip casting structure
CN109519150B (en) Dewatering well plugging device and method for large water yield
CN109736340B (en) Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab
CN204530733U (en) Underground construction deep-well precipitation well head plugging structure
CN106894428A (en) Multi-channel waterproof plugging method for dewatering well of thick and large raft foundation
CN212129150U (en) Deep basal pit precipitation well block structure
CN203145029U (en) Plugging structure for deep foundation pit dewatering well
CN202730786U (en) Well-sealing waterproof construction structure of dewatering well
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN203768925U (en) Seal device for dewatering well in foundation pit
CN212837843U (en) IV-class and V-class surrounding rock tunnel concrete lining anti-cracking structure
CN212506349U (en) Water-logging well sealing device for water-lowering zone of ultra-deep foundation pit pipe well
CN212052717U (en) Structure for penetrating karst cave of precast tubular pile
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN106638646A (en) Secondary bottom sealing structure of open caisson and construction method
CN209508995U (en) One kind closing water valve device and its shut-in well structure
CN208949889U (en) Deep basal pit karst base lime rock stratum groundwater treatment system
CN108301400B (en) Hollow drainage anchoring anti-slide pile and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120125

Termination date: 20140622

EXPY Termination of patent right or utility model