CN103147450A - Construction method for plugging partial steel pipe dewatering well by using flange plates for excavation of deep foundation pit - Google Patents

Construction method for plugging partial steel pipe dewatering well by using flange plates for excavation of deep foundation pit Download PDF

Info

Publication number
CN103147450A
CN103147450A CN2013100876637A CN201310087663A CN103147450A CN 103147450 A CN103147450 A CN 103147450A CN 2013100876637 A CN2013100876637 A CN 2013100876637A CN 201310087663 A CN201310087663 A CN 201310087663A CN 103147450 A CN103147450 A CN 103147450A
Authority
CN
China
Prior art keywords
well
water
casing
steel
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100876637A
Other languages
Chinese (zh)
Inventor
成军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2013100876637A priority Critical patent/CN103147450A/en
Publication of CN103147450A publication Critical patent/CN103147450A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a construction method for plugging a partial steel pipe dewatering well by using flange plates for the excavation of a deep foundation pit. The method comprises the steps of dewatering well construction, foundation construction, dewatering well plugging and the like. The method is convenient to construct and safe, and has a good construction effect.

Description

The local steel pipe downcast well flange plate of deep foundation ditch method plugging construction method
Technical field
The present invention relates to the local steel pipe downcast well plugging construction method of a kind of deep foundation ditch.
Background technology
The local steel pipe downcast well plugging construction of existing deep foundation ditch is complicated, have defective in inventions such as security performance, construction effects, requires further improvement.
Summary of the invention
The object of the present invention is to provide the local steel pipe downcast well flange plate of the good deep foundation ditch of a kind of easy construction, safety, construction effect method plugging construction method.
Technical solution of the present invention is:
The local steel pipe downcast well flange plate of a kind of deep foundation ditch method plugging construction method is characterized in that: comprise the following steps:
(1) dewatering well construction:
(1) well location unwrapping wire: emit the center, well point by the precipitation design, find out the underground obstacle situation, avoid simultaneously the structures such as basis;
(2) bury casing underground: in boring procedure, circulating water flow bursts the aperture backfill in order to avoid, need bury before boring that 2m grows, external diameter is the steel casing of 1m underground, and tamp outside casing with straw bag dress clay, casing is laid smooth, and the central point of steel casing is the dewatering well central point;
(3) stock tank of dredging: digging a volume before boring is 8-10m 3Mud pit, for preventing the running pulp spillage, mud pit clay filling, and use the Polypropylence Sheet substrate;
(4) rig is in place: for preventing hole deviation, adjust the planeness of rig and the verticality of boring tower with spirit level when rig is in place, and real with the board headblock, the deviation of rig contraposition is answered<20mm;
(5) change slurry: creep into dark to design after, drill bit is improved 50cm, then continue anti-circulating picture-changing slurry with clear water, to being till 20 seconds to mud viscosity;
(6) lower pipe: note by designing requirement looping nylon gauze during lower pipe, well casing interface Polypropylence Sheet Bao Yan is in case filtrate or stratum powder fine sand bleed in well; Filter pipe partly twines 60 order nylon gauzes; Between well casing and the borehole wall, bottom 5m fills out φ 2-4mm gravel material, and clay ball is filled out on top;
(7) well-flushing: use the pressure fan well-flushing, annotate clear water in case of necessity in well, every well is with till washing water sand removal to the greatest extent, and installation pump draws water;
(2) foundation construction
(1) the thick particle diameter 35mm of backfill 20cm rubble as pervious layer, is done one thick plastic sheeting of paving as water barrier on stone in well, makes water see through stone as far as possible under film and flows in well;
(2) the Φ 150mm steel pipe and the Ф 600mm dewatering well that before bed course is poured into a mould, an end are welded steel plate for sealing water join;
(3) because groundwater table is high, the mat surface high humidity carries out back cover with cement-based capillary crystalline waterproof coating to mat surface;
(4) along steel tube well length direction welding 3 road steel plate water-stopping rings, the thick 4mm of steel plate, guarantee that the tight and steel tube well of welding is welded and fixed, elimination water is along the steel tube well outer wall liter of upwards lying prone; Carry out the construction of sole plate reinforcement construction and sole plate concrete;
(3) plugging dewatering well
(1) underground structure is completed, backfill cuts off the water after completing, place immediately air bag after cutting off the water to cheating 〉=the 300mm position at the end, to airbag aeration, make air bag be full of whole steel tube well inwall, hinder in this well water level by this kind method air bag and rise, air bag top residual water is cleaned out;
(2) carry out immediately slip casing by pressure after air bag places; The slip casting plain-water slurry, water/binder ratio 0.5:1 carries out slip casing by pressure to the pipe top, if do not reach plane, well head top after slip casting, after closing ball valve, then with the fine-stone concrete concrete, well head is filled up; Steel pipe top is tightened with flange.
Easy construction of the present invention, safety, construction effect are good.
The invention will be further described below in conjunction with embodiment.
The specific embodiment
The local steel pipe downcast well flange plate of a kind of deep foundation ditch method plugging construction method comprises the following steps:
(1) dewatering well construction:
(1) well location unwrapping wire: emit the center, well point by the precipitation design, find out the underground obstacle situation, avoid simultaneously the structures such as basis;
(2) bury casing underground: in boring procedure, circulating water flow bursts the aperture backfill in order to avoid, need bury before boring that 2m grows, external diameter is the steel casing of 1m underground, and tamp outside casing with straw bag dress clay, casing is laid smooth, and the central point of steel casing is the dewatering well central point;
(3) stock tank of dredging: digging a volume before boring is 8-10m 3Mud pit, for preventing the running pulp spillage, mud pit clay filling, and use the Polypropylence Sheet substrate;
(4) rig is in place: for preventing hole deviation, adjust the planeness of rig and the verticality of boring tower with spirit level when rig is in place, and real with the board headblock, the deviation of rig contraposition is answered<20mm;
(5) change slurry: creep into dark to design after, drill bit is improved 50cm, then continue anti-circulating picture-changing slurry with clear water, to being till 20 seconds to mud viscosity;
(6) lower pipe: note by designing requirement looping nylon gauze during lower pipe, well casing interface Polypropylence Sheet Bao Yan is in case filtrate or stratum powder fine sand bleed in well; Filter pipe partly twines 60 order nylon gauzes; Between well casing and the borehole wall, bottom 5m fills out φ 2-4mm gravel material, and clay ball is filled out on top;
(7) well-flushing: use the pressure fan well-flushing, annotate clear water in case of necessity in well, every well is with till washing water sand removal to the greatest extent, and installation pump draws water;
(2) foundation construction
(1) the thick particle diameter 35mm of backfill 20cm rubble as pervious layer, is done one thick plastic sheeting of paving as water barrier on stone in well, makes water see through stone as far as possible under film and flows in well;
(2) the Φ 150mm steel pipe and the Ф 600mm dewatering well that before bed course is poured into a mould, an end are welded steel plate for sealing water join;
(3) because groundwater table is high, the mat surface high humidity carries out back cover with cement-based capillary crystalline waterproof coating to mat surface;
(4) along steel tube well length direction welding 3 road steel plate water-stopping rings, the thick 4mm of steel plate, guarantee that the tight and steel tube well of welding is welded and fixed, elimination water is along the steel tube well outer wall liter of upwards lying prone; Carry out the construction of sole plate reinforcement construction and sole plate concrete;
(3) plugging dewatering well
(1) underground structure is completed, backfill cuts off the water after completing, place immediately air bag after cutting off the water to cheating 〉=the 300mm position at the end, to airbag aeration, make air bag be full of whole steel tube well inwall, hinder in this well water level by this kind method air bag and rise, air bag top residual water is cleaned out;
(2) carry out immediately slip casing by pressure after air bag places; The slip casting plain-water slurry, water/binder ratio 0.5:1 carries out slip casing by pressure to the pipe top, if do not reach plane, well head top after slip casting, after closing ball valve, then with the fine-stone concrete concrete, well head is filled up; Steel pipe top is tightened with flange.

Claims (1)

1. the local steel pipe downcast well flange plate of a deep foundation ditch method plugging construction method, is characterized in that: comprise the following steps:
(1) dewatering well construction:
(1) well location unwrapping wire: emit the center, well point by the precipitation design, find out the underground obstacle situation, avoid simultaneously the structures such as basis;
(2) bury casing underground: in boring procedure, circulating water flow bursts the aperture backfill in order to avoid, need bury before boring that 2m grows, external diameter is the steel casing of 1m underground, and tamp outside casing with straw bag dress clay, casing is laid smooth, and the central point of steel casing is the dewatering well central point;
(3) stock tank of dredging: digging a volume before boring is 8-10m 3Mud pit, for preventing the running pulp spillage, mud pit clay filling, and use the Polypropylence Sheet substrate;
(4) rig is in place: for preventing hole deviation, adjust the planeness of rig and the verticality of boring tower with spirit level when rig is in place, and real with the board headblock, the deviation of rig contraposition is answered<20mm;
(5) change slurry: creep into dark to design after, drill bit is improved 50cm, then continue anti-circulating picture-changing slurry with clear water, to being till 20 seconds to mud viscosity;
(6) lower pipe: note by designing requirement looping nylon gauze during lower pipe, well casing interface Polypropylence Sheet Bao Yan is in case filtrate or stratum powder fine sand bleed in well; Filter pipe partly twines 60 order nylon gauzes; Between well casing and the borehole wall, bottom 5m fills out φ 2-4mm gravel material, and clay ball is filled out on top;
(7) well-flushing: use the pressure fan well-flushing, annotate clear water in case of necessity in well, every well is with till washing water sand removal to the greatest extent, and installation pump draws water;
(2) foundation construction
(1) the thick particle diameter 35mm of backfill 20cm rubble as pervious layer, is done one thick plastic sheeting of paving as water barrier on stone in well, makes water see through stone as far as possible under film and flows in well;
(2) the Φ 150mm steel pipe and the Ф 600mm dewatering well that before bed course is poured into a mould, an end are welded steel plate for sealing water join;
(3) because groundwater table is high, the mat surface high humidity carries out back cover with cement-based capillary crystalline waterproof coating to mat surface;
(4) along steel tube well length direction welding 3 road steel plate water-stopping rings, the thick 4mm of steel plate, guarantee that the tight and steel tube well of welding is welded and fixed, elimination water is along the steel tube well outer wall liter of upwards lying prone; Carry out the construction of sole plate reinforcement construction and sole plate concrete;
(3) plugging dewatering well
(1) underground structure is completed, backfill cuts off the water after completing, place immediately air bag after cutting off the water to cheating 〉=the 300mm position at the end, to airbag aeration, make air bag be full of whole steel tube well inwall, hinder in this well water level by this kind method air bag and rise, air bag top residual water is cleaned out;
(2) carry out immediately slip casing by pressure after air bag places; The slip casting plain-water slurry, water/binder ratio 0.5:1 carries out slip casing by pressure to the pipe top, if do not reach plane, well head top after slip casting, after closing ball valve, then with the fine-stone concrete concrete, well head is filled up; Steel pipe top is tightened with flange.
CN2013100876637A 2013-03-19 2013-03-19 Construction method for plugging partial steel pipe dewatering well by using flange plates for excavation of deep foundation pit Pending CN103147450A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100876637A CN103147450A (en) 2013-03-19 2013-03-19 Construction method for plugging partial steel pipe dewatering well by using flange plates for excavation of deep foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100876637A CN103147450A (en) 2013-03-19 2013-03-19 Construction method for plugging partial steel pipe dewatering well by using flange plates for excavation of deep foundation pit

Publications (1)

Publication Number Publication Date
CN103147450A true CN103147450A (en) 2013-06-12

Family

ID=48545743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100876637A Pending CN103147450A (en) 2013-03-19 2013-03-19 Construction method for plugging partial steel pipe dewatering well by using flange plates for excavation of deep foundation pit

Country Status (1)

Country Link
CN (1) CN103147450A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563144A (en) * 2014-12-04 2015-04-29 成都迅德科技有限公司 Plugging structure
CN108316950A (en) * 2018-03-18 2018-07-24 中铁十九局集团第三工程有限公司 Tunnel vault concrete belt mould backfills filling system and its grouting method
CN109723384A (en) * 2019-01-29 2019-05-07 中国建筑第七工程局有限公司 With pipe at well dewatering construction engineering method
CN110093941A (en) * 2019-04-25 2019-08-06 中铁十二局集团有限公司 Deep foundation pit precipitation construction method
CN110886307A (en) * 2019-11-08 2020-03-17 济南轨道交通集团有限公司 Pipe well backfill method based on protection of karst water channel
CN111980045A (en) * 2020-08-06 2020-11-24 广州协安建设工程有限公司 Foundation pit continuous dewatering construction method for foundation anti-floating

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002206232A (en) * 2001-01-10 2002-07-26 Shimizu Corp Groundwater drainage well and execution method therefor
CN101294393A (en) * 2007-04-29 2008-10-29 上海市第七建筑有限公司 Construction method with dewatering water well equipped outside of foundation pit
CN101363228A (en) * 2008-05-23 2009-02-11 上海广联建设发展有限公司 Tube well for simultaneously dewatering and decompressing and technology thereof
CN201326176Y (en) * 2008-12-15 2009-10-14 上海市第二建筑有限公司 Deep foundation pit dewatering retention well
CN101736732A (en) * 2009-12-17 2010-06-16 上海隧道工程股份有限公司 Pressure and water reduction construction method of ultra-deep foundation pit confined water
CN101748742A (en) * 2008-12-04 2010-06-23 上海市基础工程公司 Dual-plugging construction method of concrete and flange for depressurization well
CN101768976A (en) * 2009-12-29 2010-07-07 中建城市建设发展有限公司 Base pit dewatering and water saving device and construction method thereof
CN202124865U (en) * 2011-06-22 2012-01-25 南通海洲建设集团有限公司 Quick plugging device for dewatering wellhead of sand-free cement pipe deep well

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002206232A (en) * 2001-01-10 2002-07-26 Shimizu Corp Groundwater drainage well and execution method therefor
CN101294393A (en) * 2007-04-29 2008-10-29 上海市第七建筑有限公司 Construction method with dewatering water well equipped outside of foundation pit
CN101363228A (en) * 2008-05-23 2009-02-11 上海广联建设发展有限公司 Tube well for simultaneously dewatering and decompressing and technology thereof
CN101748742A (en) * 2008-12-04 2010-06-23 上海市基础工程公司 Dual-plugging construction method of concrete and flange for depressurization well
CN201326176Y (en) * 2008-12-15 2009-10-14 上海市第二建筑有限公司 Deep foundation pit dewatering retention well
CN101736732A (en) * 2009-12-17 2010-06-16 上海隧道工程股份有限公司 Pressure and water reduction construction method of ultra-deep foundation pit confined water
CN101768976A (en) * 2009-12-29 2010-07-07 中建城市建设发展有限公司 Base pit dewatering and water saving device and construction method thereof
CN202124865U (en) * 2011-06-22 2012-01-25 南通海洲建设集团有限公司 Quick plugging device for dewatering wellhead of sand-free cement pipe deep well

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王家法等: "深基坑局部钢管降水井法兰片法封堵施工技术", 《施工技术》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563144A (en) * 2014-12-04 2015-04-29 成都迅德科技有限公司 Plugging structure
CN108316950A (en) * 2018-03-18 2018-07-24 中铁十九局集团第三工程有限公司 Tunnel vault concrete belt mould backfills filling system and its grouting method
CN109723384A (en) * 2019-01-29 2019-05-07 中国建筑第七工程局有限公司 With pipe at well dewatering construction engineering method
CN110093941A (en) * 2019-04-25 2019-08-06 中铁十二局集团有限公司 Deep foundation pit precipitation construction method
CN110886307A (en) * 2019-11-08 2020-03-17 济南轨道交通集团有限公司 Pipe well backfill method based on protection of karst water channel
CN110886307B (en) * 2019-11-08 2021-06-29 济南轨道交通集团有限公司 Pipe well backfill method based on protection of karst water channel
CN111980045A (en) * 2020-08-06 2020-11-24 广州协安建设工程有限公司 Foundation pit continuous dewatering construction method for foundation anti-floating

Similar Documents

Publication Publication Date Title
CN103334444B (en) A kind of method for blocking of foundation pit dewatering well pressure release type
CN109469050A (en) Grout pile bottom is installed by hollow (hole) doughnut-shaped steel plate capsule (chamber) Post Grouting Technique
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN103147450A (en) Construction method for plugging partial steel pipe dewatering well by using flange plates for excavation of deep foundation pit
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
CN109519150B (en) Dewatering well plugging device and method for large water yield
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN110374068B (en) Construction method of drain hole of bottom plate of sluice stilling pool capable of preventing blockage
CN110219359A (en) A kind of Submersed type inspection well and its construction method
CN209339169U (en) A kind of precipitation well in foundation pit plugging device
CN106894428A (en) Multi-channel waterproof plugging method for dewatering well of thick and large raft foundation
CN109056716A (en) Rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom
CN107587502B (en) Construction method for rotary drilling hole-forming pressure-grouting cement soil occlusion curtain pile
CN113957913A (en) Construction method of film bag sand filling combined steel sheet pile cofferdam
CN114606964B (en) Foundation pit dewatering method used under complex geological conditions
CN103572764A (en) Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof
CN105484277A (en) Component for tubular well precipitation construction in elevator foundation pit or sump and construction method
CN205205844U (en) Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit
CN106050239A (en) Construction method for retaining structure of deep and large vertical shaft in water-abundant upper-soft lower-hard stratum
CN109555140A (en) Foundation pit and Tunnel Base spring pump drainage method for blocking and device
CN107190776B (en) Water discharge tunnel standpipe plants pipe construction device and method
CN117738192A (en) Construction method combining deep well shallow excavation and open caisson method
CN110670613B (en) Foundation pit elevator shaft water seepage prevention structure and construction method thereof
CN205152969U (en) A precipitation tubular well structure for foundation ditch precipitation
KR101398915B1 (en) Reinforcement method for earthfill dam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130612