CN109056716A - Rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom - Google Patents

Rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom Download PDF

Info

Publication number
CN109056716A
CN109056716A CN201810868749.6A CN201810868749A CN109056716A CN 109056716 A CN109056716 A CN 109056716A CN 201810868749 A CN201810868749 A CN 201810868749A CN 109056716 A CN109056716 A CN 109056716A
Authority
CN
China
Prior art keywords
rubber bag
bag tank
steel plate
hole
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810868749.6A
Other languages
Chinese (zh)
Inventor
高永光
高云飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810868749.6A priority Critical patent/CN109056716A/en
Publication of CN109056716A publication Critical patent/CN109056716A/en
Priority to PCT/CN2019/093556 priority patent/WO2020024740A1/en
Priority to CN201980000960.9A priority patent/CN110896645B/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Manually digging hole and full-sleeve engineering method bored concrete pile bottom installation rubber bag tank (chamber) Post Grouting Technique are suitable for foundation and underground space field of engineering technology, background technique is to use the drilling of mud off at present, steel reinforcement cage bottom such as installation steel plate capsule, it be easy to cause borehole wall to collapse, keep bottom hole sediment exceeded, it is also easy to accumulate the silt to get off that collapses from hole wall above steel plate, influences the quality of cast-in-situ bored pile.The most prominent feature of the present invention is to have found a restrictive condition and applicable elements for the bottom installation closed slip casting of slip casting container, to the effect that pouring pile hole utilizes manually digging hole or full-sleeve engineering method, pore forming process does not use mud off, Grouting Pipe is bound on steel reinforcement cage, steel reinforcement cage bottom is installed by steel plate, rubber bag tank is installed in steel plate bottom surface, and Grouting Pipe passes through steel plate and is connected with rubber bag tank.After above-mentioned engineering method pore-forming, bottom hole will be arrived under steel reinforcement cage, then start concrete perfusion, after pile strength is met the requirements, by Grouting Pipe to the rubber bag tank slip casing by pressure of stake bottom.

Description

Rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom
Technical field:
Ground and base basis underground space engineering technology
Background technique:
At present in foundation field, what bored concrete pile Post Grouting Technique was included in building pile foundation specification is open type slip casting, because Relatively easy for open type slip casting implementation process, Grouting Pipe is with the process under steel reinforcement cage to bottom hole to hole wall especially before perfusion Disturbance very little, but its slurries of open type slip casting note domain controllability is low, formation to stake end enlarged footing and to surrounding formation The amplitude that compacted effect and bearing capacity of pile tip improve is not if any the closed slip casting of slip casting bag (chamber).Stake bottom has slip casting bag (chamber) Although closed slip casting according to the requirement of slip casting " three fixed ", i.e. orientation, localization and quantitative aspect has more superiority, is using During the bored pile construction of mud off, there is also apparent defects.Steel plate capsule such as is installed at steel reinforcement cage bottom (chamber) is used as grouting behind shaft or drift lining container, and during under with steel reinforcement cage to bottom hole, the steel reinforcement cage with protection steel plate is in the borehole still It such as piston, is easy to form vortex in slime water, makes to circle round and the mud current scour between steel plate edge and the wall of a borehole and disturb Dynamic borehole wall, the steel plate of bottom are also easy scratch borehole wall, these factors all be easy to cause borehole wall to collapse, cause through In slip casting container, metapore bottom sediment is again exceeded on earth for drilling after crossing borehole cleaning, while the upper surface of steel plate is also easy accumulation from drilling hole Collapse the silt to get off on wall, influences the quality of cast-in-situ bored pile, broken pile is caused when serious, if protection steel plate diameter compares It is small, or because of other reasons such as collapse hole is superfilled, pile grouting capsule (chamber) can also occur and wrapped up by concrete close, work cannot be played With the phenomenon that, this is also the closing that drilled pile tail band is clearly had slip casting bag (chamber) by technical code for building pile foundation (JGJ94_2008) The main reason for formula grouting method forecloses (see provision explanation).
Summary of the invention:
The present invention " rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom " is a kind of pass The new technical solution after the improvement of pile foundation technical method, the most prominent feature of the present invention are to have found that bottom installation slip casting is held The restrictive condition and applicable elements of the closed slip casting of device, this technical solution are bottom installation rubber bag tank (chamber) Post Grouting Techniques and fill Infuse the most reasonable assembled scheme of stake drilling construction method, can solve it is above-mentioned there are problems, the technical solution is simple, practical, makes Bored concrete pile Post Grouting Technique is more reached perfection.To the effect that pouring pile hole utilizes manually digging hole or full-sleeve engineering method, pore-forming Process does not use mud off, and Grouting Pipe is bound on steel reinforcement cage, and steel plate is installed in steel reinforcement cage bottom, and rubber bag tank is installed in steel plate bottom surface, Grouting Pipe passes through steel plate and is connected with rubber bag tank, and steel plate main function is protection capsule.Using manually digging hole or full-sleeve engineering method After pore-forming, bottom is equipped with to the steel reinforcement cage of steel plate rubber bag tank, it is lower to arrive bottom hole, then start concrete perfusion and forms bored concrete pile, After pile strength is met the requirements, built-in slip casting pipe is begun through to the rubber bag tank slip casing by pressure of stake bottom, to the stratum of bored concrete pile bottom It is compacted to carry out densification, final result is to effectively eliminate a bottom sedimentation, increases substantially ultimate bearing capacity of pile tip, reduces engineering and make Valence.
Specific embodiment:
1, do not made first, in accordance with design requirement using manually digging hole or full-sleeve engineering method pore-forming, pore forming process in building-site With mud off, Grouting Pipe is bound when making steel reinforcement cage, steel plate is installed in steel reinforcement cage bottom, and rubber bag tank, note are installed in steel plate bottom surface Slurry pipe is connected across steel plate with rubber bag tank, and steel plate main function is protection capsule.
2, after using manually digging hole or full-sleeve engineering method pore-forming, bottom is equipped with to the steel reinforcement cage of steel plate rubber bag tank, under arrive Then bottom hole starts concrete perfusion and forms bored concrete pile, after pile strength is met the requirements, begins through built-in slip casting pipe to stake bottom Rubber bag tank slip casing by pressure, compacted to the stratum progress densification of bored concrete pile bottom, final result is to effectively eliminate a bottom sedimentation, substantially Degree improves ultimate bearing capacity of pile tip, reduces project cost.
3, the present invention " rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom " is suitable for Cohesive soil, silt, husky class soil, rubble class soil and rock weathering layer.

Claims (2)

1. invention " rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom " is one kind about stake Base application technology method technical solution new after improving is that pouring pile hole utilizes manually digging hole or full-sleeve engineering method, pore-forming mistake Journey does not use mud off, and Grouting Pipe is bound on steel reinforcement cage, and steel plate is installed in steel reinforcement cage bottom, and rubber bag tank, note are installed in steel plate bottom surface Slurry pipe is connected across steel plate with rubber bag tank, and after manually digging hole or full-sleeve engineering method pore-forming, bottom is equipped with steel plate rubber The steel reinforcement cage of capsule, it is lower to arrive bottom hole, then start concrete perfusion and form bored concrete pile, after pile strength is met the requirements, begins through It is compacted that built-in slip casting pipe to the rubber bag tank slip casing by pressure of stake bottom, to the stratum of bored concrete pile bottom carries out densification, finally effectively eliminates stake Bottom sedimentation, increases substantially the construction method and technical solution of ultimate bearing capacity of pile tip.
2. according to claim 1, " rubber bag tank (chamber) grouting behind shaft or drift lining is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom for the invention For technology " it is characterized in that pouring pile hole utilizes manually digging hole or full-sleeve engineering method, pore forming process does not use mud off, steel reinforcement cage Steel plate is installed in upper binding Grouting Pipe, steel reinforcement cage bottom, and rubber bag tank is installed in steel plate bottom surface, and Grouting Pipe passes through steel plate and is connected with rubber bag tank It is logical, after pore-forming, bottom is equipped with to the steel reinforcement cage of steel plate rubber bag tank, it is lower to arrive bottom hole, then start concrete perfusion and forms perfusion Stake, after pile strength is met the requirements, begins through built-in slip casting pipe to the rubber bag tank slip casing by pressure of stake bottom, to the ground of bored concrete pile bottom It is compacted that layer carries out densification, and forms an end enlarged footing.
CN201810868749.6A 2018-08-03 2018-08-03 Rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom Withdrawn CN109056716A (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201810868749.6A CN109056716A (en) 2018-08-03 2018-08-03 Rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom
PCT/CN2019/093556 WO2020024740A1 (en) 2018-08-03 2019-06-28 Pile bottom grouting cavity and use method, and poured pile body and construction method of poured pile body
CN201980000960.9A CN110896645B (en) 2018-08-03 2019-06-28 Pile bottom grouting device, using method thereof, cast-in-place pile body and construction method of cast-in-place pile body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810868749.6A CN109056716A (en) 2018-08-03 2018-08-03 Rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom

Publications (1)

Publication Number Publication Date
CN109056716A true CN109056716A (en) 2018-12-21

Family

ID=64832681

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201810868749.6A Withdrawn CN109056716A (en) 2018-08-03 2018-08-03 Rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom
CN201980000960.9A Active CN110896645B (en) 2018-08-03 2019-06-28 Pile bottom grouting device, using method thereof, cast-in-place pile body and construction method of cast-in-place pile body

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201980000960.9A Active CN110896645B (en) 2018-08-03 2019-06-28 Pile bottom grouting device, using method thereof, cast-in-place pile body and construction method of cast-in-place pile body

Country Status (2)

Country Link
CN (2) CN109056716A (en)
WO (1) WO2020024740A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020024740A1 (en) * 2018-08-03 2020-02-06 高永光 Pile bottom grouting cavity and use method, and poured pile body and construction method of poured pile body
WO2020133992A1 (en) * 2018-12-25 2020-07-02 高永光 Pile-bottom grouting cavity and method for using same, and cast-in-place pile body and method for constructing same

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309074B (en) * 2021-05-12 2022-11-25 海南省农垦设计院有限公司 A foundation ditch fender pile for building energy-saving engineering
CN113699978B (en) * 2021-08-26 2022-08-16 北京市市政一建设工程有限责任公司 Anti-settling grouting process
CN113718752A (en) * 2021-09-10 2021-11-30 中国电建集团成都勘测设计研究院有限公司 Ground diaphragm wall composite grouting method and grouting structure

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09144000A (en) * 1995-11-21 1997-06-03 Toudentsuu:Kk Method and device for retaining earth
JP3688546B2 (en) * 2000-02-02 2005-08-31 東日本旅客鉄道株式会社 Cast-in-place concrete pile construction method and cast-in-place concrete pile bottom ground preloading device
JP3669577B2 (en) * 2001-12-04 2005-07-06 東日本旅客鉄道株式会社 Construction method of cast-in-place piles
JP2003213673A (en) * 2002-01-22 2003-07-30 Jr Higashi Nippon Consultants Kk Injection control device for cast-in-place concrete pile bottom ground preloading device and construction method of cast-in-place concrete pile
CN203514303U (en) * 2013-10-30 2014-04-02 南京工业大学 Post-grouting enlarged-toe uplift micropile
CN103741683B (en) * 2013-12-23 2015-11-18 浙江天润建设有限公司 A kind of pouch expands end rigid-flexible mechanical arm and construction method
CN106320728A (en) * 2016-01-29 2017-01-11 中天建设集团有限公司 Double-fluid grouting bag type rapid hole sealing device
CN106836179B (en) * 2016-12-07 2018-12-14 浙江大学城市学院 The construction method of vertical strengthening ribs enhanced bellows grouting pile
CN108411920A (en) * 2018-01-25 2018-08-17 天津大学 A kind of the multiple spot bellows grouting device and its method of control soil deformation
CN109056716A (en) * 2018-08-03 2018-12-21 高永光 Rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020024740A1 (en) * 2018-08-03 2020-02-06 高永光 Pile bottom grouting cavity and use method, and poured pile body and construction method of poured pile body
CN110896645A (en) * 2018-08-03 2020-03-20 高永光 Pile bottom grouting cavity, using method thereof, cast-in-place pile body and construction method of cast-in-place pile body
CN110896645B (en) * 2018-08-03 2021-04-02 高永光 Pile bottom grouting device, using method thereof, cast-in-place pile body and construction method of cast-in-place pile body
WO2020133992A1 (en) * 2018-12-25 2020-07-02 高永光 Pile-bottom grouting cavity and method for using same, and cast-in-place pile body and method for constructing same
US11401674B2 (en) 2018-12-25 2022-08-02 Yunfei Gao Pile-bottom grouting cavity and method for using same, and cast-in-place pile body and method for constructing same

Also Published As

Publication number Publication date
CN110896645A (en) 2020-03-20
WO2020024740A1 (en) 2020-02-06
CN110896645B (en) 2021-04-02

Similar Documents

Publication Publication Date Title
CN109469050A (en) Grout pile bottom is installed by hollow (hole) doughnut-shaped steel plate capsule (chamber) Post Grouting Technique
CN109056716A (en) Rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom
CN101532290B (en) Granule grouting pile of ripple plastic sleeve with hole for strengthening soft soil foundation and strengthening method
CN1193141C (en) Combined grouting construction process of reinforcing foundation
CN101638891B (en) Construction method of all casing precessing isolation pile
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN101614020B (en) Flexible bladder type anticorrosion device, anticorrosion pile and construction method using same
CN104929114A (en) High pressure jet grouting pile waterproof curtain construction device and method
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN110735600B (en) Mechanical pore-forming pile construction process for karst geology
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN103147450A (en) Construction method for plugging partial steel pipe dewatering well by using flange plates for excavation of deep foundation pit
CN101481913A (en) Construction method of rock-socketed underground continuous wall punching slot section
CN104074184B (en) Pile base post-grouted expanded-base bored pile
CN102979087B (en) Construction method for rotary excavation pile
CN110409416A (en) A kind of processing method of collapsible soil or molten sunken property soil base
CN108360542A (en) Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method
CN102817349B (en) Method for consolidating soft soil foundations through fine dynamic compaction replacement
CN102425179B (en) Reinforced soil infiltration ditch structure supported by miniature steel pipe cast-in-place pile
CN201411687Y (en) Corrugated plastic sleeve pipe granule grouting pile with hole
Ischy et al. AN INTRODUCTION TO ALLUVIAL GROUTING.
CN106192987A (en) A kind of construction method that stake periphery is crushed geology reinforcing
CN109944251A (en) The drawing hole construction method that soft rock stratum steel sheet pile is squeezed into
CN212001139U (en) Deep foundation pit supporting structure capable of preventing deformation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 102600 Beijing Daxing District Kangzhuang Road No. 9 Central Railway Fifth Courtyard District B Building 703

Applicant after: Gao Yongguang

Applicant after: Gao Yunfei

Address before: 100012 Huayu City, Tiejian, China 9-1-302, Shuiban South Street, Chaoyang District, Beijing

Applicant before: Gao Yongguang

Applicant before: Gao Yunfei

WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181221