CN108360542A - Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method - Google Patents

Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method Download PDF

Info

Publication number
CN108360542A
CN108360542A CN201810164711.0A CN201810164711A CN108360542A CN 108360542 A CN108360542 A CN 108360542A CN 201810164711 A CN201810164711 A CN 201810164711A CN 108360542 A CN108360542 A CN 108360542A
Authority
CN
China
Prior art keywords
water
stake
slope protection
pile
curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810164711.0A
Other languages
Chinese (zh)
Inventor
仲建军
赵雪峰
宋有旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Huaxia Foundation Construction Engineering Co Ltd
Original Assignee
Beijing Urban Construction Huaxia Foundation Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Huaxia Foundation Construction Engineering Co Ltd filed Critical Beijing Urban Construction Huaxia Foundation Construction Engineering Co Ltd
Priority to CN201810164711.0A priority Critical patent/CN108360542A/en
Publication of CN108360542A publication Critical patent/CN108360542A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction methods, its drip irrigation device includes the following steps that step a, surveying setting-out determines slope protection pile stake position and marks, it determines water-stop curtain position and marks, both slope protection pile and water-stop curtain are alternately arranged;Step b, slope protection pile pore-forming;Step c, steel reinforcement cage of the both sides with mini-valve tube is hung;Step d, concrete perfusion forms slope protection pile, and carries out the pile body maintenance of slope protection pile;Step e, water-stop curtain between construction stake forms water-stop curtain stake;Step f, slope protection pile both sides sleeve valve barrel grouting, which blocks, reinforces;Step g, water-stop curtain stake conserves, and has achieved the purpose that easily to fill up the leakage between water-stop curtain and slope protection pile.

Description

Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method
Technical field
The present invention relates to geotechnical engineering construction fields, more specifically, it relates to a kind of waterproof between piles curtain combination stake side Sleeve valve barrel grouting water stop construction method.
Background technology
Limitation due to formation condition or the purpose for protection groundwater resources, part foundation pit supporting project need to use only Water curtain replaces precipitation.
It is stirred between spray mixing pile, stake between rotary churning pile, stake between stake in currently used building foundation pit slope underground water water-stopping method It is slope protection pile of first constructing to mix the methods of stake, then between stake between center or stake on the outside of axis certain position construction rotary churning pile, stir spray Stake, mixing pile etc. form water-stop curtain, are used for foundation pit side-wall earth-retaining and water blocking.It is small with vibration equipment, noise is small, is built to neighbouring Build the advantages that object influence is small, and construction speed is fast, low cost, still, construct between slope protection pile a water-stop curtain stake and slope protection pile In conjunction with waterproof curtain construction method, the case where there are slope protection pile and water-stop curtain staking contacting surface be weak or perpendicularity deviation, hold It easily leads to and forms leakage between water-stop curtain and slope protection pile, and should not handle, big inconvenience is brought for subsequent construction.
Invention content
In view of the deficiencies of the prior art, the present invention intends to provide a kind of waterproof between piles curtain combination stake side sleeve Valve pipe ejection for water plugging construction method, can easily fill up the leakage between water-stop curtain and slope protection pile.
To achieve the above object, the present invention provides following technical solutions:A kind of waterproof between piles curtain combination stake side sleeve valve Pipe ejection for water plugging construction method, includes the following steps, step a, surveying setting-out, determines slope protection pile stake position and marks, determines sealing Curtain position simultaneously marks, and both slope protection pile and water-stop curtain are alternately arranged;Step b, slope protection pile pore-forming;Step c, both sides band sleeve is hung The steel reinforcement cage of valve pipe;Step d, concrete perfusion forms slope protection pile, and carries out the pile body maintenance of slope protection pile;Step e, between construction stake Water-stop curtain forms water-stop curtain stake;Step f, slope protection pile both sides sleeve valve barrel grouting, which blocks, reinforces;Step g, water-stop curtain stake is supported Shield.
By using above-mentioned technical proposal, mini-valve tube is fixed together with steel reinforcement cage, and logical steel reinforcement cage carries out bank protection together Stake pours, and carries out slip casting closure by mini-valve tube, can easily fill up the leakage between water-stop curtain and slope protection pile.
Preferably, two sleeve valve barrel grouting devices are symmetrically bound according to sealing depth requirements and along the length direction of steel reinforcement cage On steel reinforcement cage outer side center line.
By using above-mentioned technical proposal, the installation length of mini-valve tube is determined according to sealing depth, and it is symmetrically bound On steel reinforcement cage outer side center line, steel reinforcement cage is hung to that can install mini-valve tube in bank protection stake holes, installation is simple, and conveniently Positioning.
Preferably, controlling the direction of sleeve valve barrel grouting device in the steel reinforcement cage decentralization process, ensure mini-valve tube central point On the line of bank protection pile center.
By using above-mentioned technical proposal, the casting position of mini-valve tube can be made accurate, reach good slip casting plugging effect.
It carries out preferably, the sleeve valve barrel grouting should be conserved in slope protection pile pile body in 12h-72h, and is applied in water-stop curtain stake Work is completed to carry out in for 24 hours.
By using above-mentioned technical proposal, mini-valve tube does not have sleeve shell material package, is directly wrapped in slope protection pile protective layer coagulation In soil, therefore sleeve valve barrel grouting should be conserved in 12h-72h in slope protection pile pile body and be carried out, and can avoid sleeve valve barrel grouting in the process to close The concrete of bank protection pile center side damages, meanwhile, and influence mini-valve tube note after can avoid the concrete setting of slope protection pile Slurry be smoothed out, sleeve valve barrel grouting water-stop curtain pile driving construction complete for 24 hours in carry out, convenient for make sleeve valve barrel grouting with it is original Water-stop curtain stake is connected.
Preferably, the slope protection pile both sides sleeve valve barrel grouting closure reinforcing step is:Using mini-valve tube in water-bearing layer Segmentation carries out high-pressure slip-casting, and formation pours building body, pours building body and be connected with original water-stop curtain stake.
By using above-mentioned technical proposal, slope protection pile and sealing curtain can fully be made up by pouring building body and being connected with water-stop curtain Gap between curtain stake, reaches good sealing plugging effect.
Preferably, water-stop curtain stake is one kind in rotary churning pile, mixing pile or spray mixing pile.
By using above-mentioned technical proposal, between stake between center or stake on the outside of axis certain position construction rotary churning pile, stir spray Stake, mixing pile etc. formed water-stop curtain, have vibration equipment is small, noise is small, on close to buildings influence it is small, construction speed is fast, The advantages that low cost.
Preferably, the surveying setting-out uses GPS, total powerstation or transit survey.
By using above-mentioned technical proposal, measurement can be made accurate by GPS, total powerstation or transit survey, avoid measuring Error causes construction error, influences construction effect.
In conclusion the invention has the advantages that:
1, the application of waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method solves construction one between slope protection pile Water-stop curtain stake and universal percolating water problem caused by slope protection pile faying face weakness or perpendicularity deviation, improve waterproof between piles curtain Reliability, and relatively double curtain pile scheme has saved construction cost, shortens construction period, more economical, environmentally friendly;
2, mini-valve tube material is cheap, is transferred together with steel reinforcement cage and avoids repeating pore-forming, has saved construction cost, shortens construction week Phase, good environmental protection, and avoid the construction error generated when the secondary pore-forming of mini-valve tube;
3, in the larger boulder bed of grain size, in the specific soil layer such as the big clay of pile penetration or powder soil horizon, rotary churning pile is susceptible to contracting The phenomenon that neck, using mini-valve tube to being segmented high-pressure slip-casting in specific soil layer, to soil-cement body at original water-stop curtain stake occlusion It reinforced, block gap and be engaged bad position, improve the water blocking quality of waterproof between piles curtain pile;
4, simple for process using stake side sleeve valve barrel grouting combination waterproof between piles curtain pile technique half sleeve valve pipe construction, it is efficient, it makes Valence is at low cost, wide application, is the strong supplement of " a water-seal pile scheme of constructing between slope protection pile ";
5, using symmetrically being bound on the outside of steel reinforcement cage, two sleeve valve barrel grouting device success rates are high, positioning is simple.
Description of the drawings
Fig. 1 is overall structure of the present invention;
Fig. 2 is enlarged drawing at A in Fig. 1.
Reference numeral:1, slope protection pile;11, steel reinforcement cage;111, main reinforcement;12, mini-valve tube;2, water-stop curtain stake;3, building body is poured.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail, wherein the identical reference numeral of identical parts It indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down", " bottom surface " and " top surface " refers to that the direction in attached drawing, word "inner" and "outside" are referred respectively to towards or away from geometric center of specific component Direction.
, there is shield in the waterproof curtain construction method that a water-stop curtain stake 2 of constructing between slope protection pile 1 is combined with slope protection pile 1 The case where slope stake 1 and water-stop curtain stake 2 contact surface be weak or perpendicularity deviation, be easy to cause water-stop curtain stake 2 and slope protection pile 1 it Between formed leakage, to solve the above problems, the present invention 12 slip casting construction method of mini-valve tube is fully applied to fill up water-stop curtain stake 2 with The gap of 1 link position of slope protection pile and the part of contact surface weakness.
12 slip casting construction method of mini-valve tube is pioneering in the eighties of last century 5O ages by French Soletanche foundation engineerings company A kind of slip casting construction method.12 slip casting construction method of mini-valve tube can carry out repeating note due to can preferably control range of grouting and grouting pressure Slurry, and the features such as the possibility very little of generation grout and grout leaking, it is known as one of most reliable slip casting construction method both at home and abroad.
12 structure of mini-valve tube is mainly made of Ф 52mmPVC outer tubes, 6 points of zinc-plated slip casting inner tubes, rubber case, sealing rings etc.. There is special requirement that Ф 50mm welded still pipes can also be used as outer tube.Mini-valve tube 12 be one kind can only to outside pipe pulp, Bu Nengxiang The unidirectional closing device of slurry is returned in pipe.
The concrete construction method of the present embodiment is illustrated below:
A kind of waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method, includes the following steps:
Step a, it determines 1 position of slope protection pile by using GPS, total powerstation or transit survey and marks, determine water-stop curtain stake 2 Stake position simultaneously marks, and both slope protection pile 1 and water-stop curtain stake 2 are alternately arranged, and stake diameter can be different;
Step b, the stake position set according to survey forms 1 hole of slope protection pile using mud off wet construction pore-forming or dry operation.Mud protects Rotary drilling rig, clean-out machine or percussive drill etc. can be selected in wall wet construction pore-forming drill;Long spire can be selected in dry operation pore-forming 11 technique of steel reinforcement cage is planted after being pumped concrete in drilling machine pore-forming center;
Step c, two 12 grouting devices of mini-valve tube are symmetrically bound according to sealing depth requirements and along the length direction of steel reinforcement cage 11 On 11 outer side center line of steel reinforcement cage, hangs in the steel reinforcement cage 11 with mini-valve tube 12 to 1 hole of slope protection pile of both sides, let off under steel reinforcement cage 11 The direction that 12 grouting device of mini-valve tube is controlled in journey ensures 12 central point of mini-valve tube on the line at 1 center of slope protection pile;
Step d, concrete perfusion forms slope protection pile 1, and carries out the pile body maintenance of slope protection pile 1;
Step e, water-stop curtain between construction stake, forms water-stop curtain stake 2, and water-stop curtain stake 2 is rotary churning pile, mixing pile or spray mixing pile In one kind;
Step f, 1 both sides mini-valve tube of slope protection pile, 12 slip casting, which blocks, reinforces, and is segmented in water-bearing layer into horizontal high voltage using mini-valve tube 12 Slip casting, formation pour building body 3, pour building body 3 and be connected with original water-stop curtain stake 2,12 slip casting of mini-valve tube should be in bank protection It is carried out in stake 1 pile body maintenance 12h-72h, and completes to carry out in for 24 hours in the construction of water-stop curtain stake 2;
Step g, water-stop curtain stake 2 conserves.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this It is all protected by Patent Law in the right of invention.

Claims (7)

1. a kind of waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method, which is characterized in that include the following steps,
Step a, surveying setting-out determines slope protection pile(1)Stake position simultaneously marks, and determines water-stop curtain stake(2)Position simultaneously marks, slope protection pile (1)With water-stop curtain stake(2)The two is alternately arranged;
Step b, slope protection pile(1)Pore-forming;
Step c, both sides band mini-valve tube is hung(12)Steel reinforcement cage(11);
Step d, concrete perfusion forms slope protection pile(1), and carry out slope protection pile(1)Pile body maintenance;
Step e, water-stop curtain between construction stake forms water-stop curtain stake(2);
Step f, slope protection pile(1)Both sides mini-valve tube(12)Slip casting, which blocks, reinforces;
Step g, water-stop curtain stake(2)Maintenance.
2. waterproof between piles curtain combination stake according to claim 1 side sleeve valve barrel grouting water stop construction method, feature exist In two mini-valve tubes(12)Grouting device is according to sealing depth requirements and along steel reinforcement cage(11)The symmetrical assembling reinforcement of length direction Cage(11)On outer side center line.
3. waterproof between piles curtain combination stake according to claim 1 side sleeve valve barrel grouting water stop construction method, feature exist In the steel reinforcement cage(11)Mini-valve tube is controlled in decentralization process(12)The direction of grouting device ensures mini-valve tube(12)Central point In slope protection pile(1)On the line at center.
4. waterproof between piles curtain combination stake according to claim 1 side sleeve valve barrel grouting water stop construction method, feature exist In the mini-valve tube(12)Slip casting should be in slope protection pile(1)Pile body is conserved in 12h-72h and is carried out, and in water-stop curtain stake(2)Construction It completes to carry out in for 24 hours.
5. waterproof between piles curtain combination stake according to claim 1 side sleeve valve barrel grouting water stop construction method, feature exist In the slope protection pile(1)Both sides mini-valve tube(12)Slip casting blocks reinforcing step:Utilize mini-valve tube(12)Divide in water-bearing layer Building body is poured in Duan Jinhang high-pressure slip-castings, formation(3), pour building body(3)With original water-stop curtain stake(2)It is connected.
6. waterproof between piles curtain combination stake according to claim 1 side sleeve valve barrel grouting water stop construction method, feature exist In water-stop curtain stake(2)For one kind in rotary churning pile, mixing pile or spray mixing pile.
7. waterproof between piles curtain combination stake according to claim 1 side sleeve valve barrel grouting water stop construction method, feature exist In the surveying setting-out uses GPS, total powerstation or transit survey.
CN201810164711.0A 2018-02-27 2018-02-27 Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method Pending CN108360542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810164711.0A CN108360542A (en) 2018-02-27 2018-02-27 Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810164711.0A CN108360542A (en) 2018-02-27 2018-02-27 Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method

Publications (1)

Publication Number Publication Date
CN108360542A true CN108360542A (en) 2018-08-03

Family

ID=63003101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810164711.0A Pending CN108360542A (en) 2018-02-27 2018-02-27 Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method

Country Status (1)

Country Link
CN (1) CN108360542A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137948A (en) * 2018-08-27 2019-01-04 北京住总集团有限责任公司 Grouting behind shaft or drift lining occlusion water-stopping method and equipment between a kind of stake
CN113653083A (en) * 2021-08-16 2021-11-16 北京市市政一建设工程有限责任公司 Construction process of grouting waterproof curtain
CN113668555A (en) * 2021-08-05 2021-11-19 深圳市盛业建筑科技(集团)有限公司 Deep foundation pit supporting construction method for large-pipe-diameter prestressed row piles

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105220700A (en) * 2015-09-11 2016-01-06 中铁第四勘察设计院集团有限公司 Foundation pit waterproof curtain reinforcement
CN107460882A (en) * 2017-06-20 2017-12-12 中冶天工集团有限公司 A kind of retaining piles construction method of deep basal pit closing sealing

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105220700A (en) * 2015-09-11 2016-01-06 中铁第四勘察设计院集团有限公司 Foundation pit waterproof curtain reinforcement
CN107460882A (en) * 2017-06-20 2017-12-12 中冶天工集团有限公司 A kind of retaining piles construction method of deep basal pit closing sealing

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137948A (en) * 2018-08-27 2019-01-04 北京住总集团有限责任公司 Grouting behind shaft or drift lining occlusion water-stopping method and equipment between a kind of stake
CN109137948B (en) * 2018-08-27 2020-12-11 北京住总集团有限责任公司 Post-grouting interlocking water stopping method and equipment between piles
CN113668555A (en) * 2021-08-05 2021-11-19 深圳市盛业建筑科技(集团)有限公司 Deep foundation pit supporting construction method for large-pipe-diameter prestressed row piles
CN113653083A (en) * 2021-08-16 2021-11-16 北京市市政一建设工程有限责任公司 Construction process of grouting waterproof curtain
CN113653083B (en) * 2021-08-16 2022-11-04 北京市市政一建设工程有限责任公司 Construction process of grouting waterproof curtain

Similar Documents

Publication Publication Date Title
CN109469050A (en) Grout pile bottom is installed by hollow (hole) doughnut-shaped steel plate capsule (chamber) Post Grouting Technique
CN109881694A (en) A kind of constructing structure blocked for foundation pit substrate Sand and method
CN100510274C (en) Construction method of enclosing level rotary-jet pile hole-mouth using double-liquid slip jection method
CN209339169U (en) A kind of precipitation well in foundation pit plugging device
CN102286984A (en) Water-stop curtain and construction method thereof
CN104963334A (en) Construction method for utilizing grouting freezing pipe to reinforce and freeze contact passage to restrain frost heaving and thaw collapsing
CN102286981A (en) Waterproof curtain and construction method thereof
CN206090653U (en) Anchor rod static pressure pile slip casting structure
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN206916753U (en) A kind of water sealing structure of diaphram wall and its seam crossing
CN203924137U (en) Serious seepage block structure of underground continuous wall
CN106522252A (en) Seepage-proofing blocking mechanism and method for deep foundation pit raft dewatering well
CN202194148U (en) Waterproof curtain
CN105525619A (en) Occlusive pipe curtain for bored tunnel in water-rich stratum and construction method of occlusive pipe curtain
CN108360542A (en) Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method
CN109944600B (en) Shield receiving end reinforcing construction method
CN202194149U (en) Water-proof curtain
CN106593470A (en) High-permeability water-rich sand shield terminal reinforcing system and construction method thereof
CN103114609A (en) Connection device of new and old underground diaphragm walls and construction method
CN105464685A (en) Cave-pile method bored tunnel waterproof curtain and construction method thereof
CN103572764A (en) Ultra-deep manual hole digging pile dado water stop structure and construction method thereof
CN105735323B (en) The inverse deep footing groove enclosing structure for making to combine with Percussion Piles of spray anchor and its construction method
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN109056716A (en) Rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180803

RJ01 Rejection of invention patent application after publication