JP3669577B2 - Construction method of cast-in-place piles - Google Patents
Construction method of cast-in-place piles Download PDFInfo
- Publication number
- JP3669577B2 JP3669577B2 JP2001369855A JP2001369855A JP3669577B2 JP 3669577 B2 JP3669577 B2 JP 3669577B2 JP 2001369855 A JP2001369855 A JP 2001369855A JP 2001369855 A JP2001369855 A JP 2001369855A JP 3669577 B2 JP3669577 B2 JP 3669577B2
- Authority
- JP
- Japan
- Prior art keywords
- bag
- injection
- grout
- hole
- cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は鉄筋籠の先端に注入バッグを設置して場所打ち杭を施工する方法に関する。
【0002】
【従来の技術及び発明が解決しようとする課題】
鉄筋籠の先端に設置した注入バッグにグラウト等を注入することにより、杭先端の地盤にプレロードを与えた後、場所打ち杭を施工する方法が知られている。この施工方法では、次のような課題がある。
▲1▼注入バッグに以下(a)、(b)、(c)の現象が発生すると考えられ、それらに起因して注入バッグの基布が切れて、グラウト等が注入バッグ外に流出し、所要の加圧が行われない場合が想定される。
(a)杭孔孔壁地盤と注入バッグ沈設用のフレームに注入バッグが挟まれ、フレームに注入バッグの基布が引っ掛かって動きを拘束する。
(b)杭孔孔壁地盤と注入バッグ沈設用のフレームに注入バッグが挟まれ、摩擦力によって注入バッグの基布の動きを拘束する。
(c)注入バッグを孔底に沈設する際に、杭孔地盤等との接触により注入バッグの基布が切れる。
▲2▼注入バッグにグラウト等を注入加圧するとグラウトの脱水現象が発生する。過度の脱水は注入バッグ内でのグラウト等の目詰まりを起こし、注入バッグ内に不均一な圧力を与えることになる。それを防止するためグラウト等に分離低減材を混入しているが、分離低減材が高価である。
▲3▼注入時に注入バッグの基布が切れて注入加圧ができない場合、流出したグラウト等は地盤内の伏流水によって洗い流される場合がある。
【0003】
【課題を解決するための手段】
本発明は上記課題を解決することを目的とし、注入バッグの基布の切れ、過度の脱水の防止、グラウト等の流出により低下した注入圧力の回復及び地盤の強化を図るようにしたものである。
そのために本発明は、鉄筋籠先端に固定した沈設用フレームを囲むように取付けられた注入バッグにより杭先端の地盤をプレロードする場所打ち杭の施工方法において、
前記沈設用フレームの突起部を被覆するとともに、沈設時の孔内水の通過用の孔が形成されている袋で前記注入バッグを覆うことを特徴とする。
また、本発明は、前記袋は不透水性の素材からなることを特徴する。
【0004】
【発明の実施の形態】
以下、本発明の実施の形態について説明する。
図1は鉄筋籠先端の注入バッグを袋で覆う場所打ち杭の施工方法を説明する図、図2は注入バッグと袋を上下に分断した状態を模式的に示す図である。
図1において、場所打ち杭を施工する杭孔1に配設する鉄筋籠2の先端に、鋼製の注入バッグ沈設用フレーム3を番線等の固定具4で取り付ける。沈設用フレーム3を囲むように注入バッグ6が取り付けられ、さらに注入バッグ6を覆って袋5が設けられる。杭孔1の底部に鉄筋籠を下ろした状態で地上から延びる注入パイプ(図示省略)を通して注入バッグ6にグラウト等を加圧注入することにより、杭孔底部の地盤が加圧される。なお、注入バッグ6にグラウト等を加圧注入したとき、グラウト等の過度の脱水が生じないように袋5はビニールシート等の不透水性の素材を用いるようにする。
【0005】
図2において、注入バッグを構成する上側と下側の基布(実際にはその縁が縫い合わされる)は6a、6bで示され、注入バッグの周囲を袋を構成する上側と下側の布5a、5b(実際にはその縁が縫い合わされる)で覆い、カバーシート7を介在させて沈設用フレーム3に紐で結ぶなどして固定する。カバーシート7、袋の上側の布5a、注入バッグの上側基布6aには、それぞれ注入パイプ通過用の孔8、仮固定用のテープ通過用の孔10が所要の数、所定の寸法で開けられ、注入パイプ11が地上から注入バッグ内まで延びてグラウト等を注入バッグ内に加圧注入され、また、仮固定用のテープ12で注入バッグ6を沈設用フレーム3に仮固定できるようになっている。また、袋を構成する上側と下側の布5a、5b、カバーシート7には、それぞれ中心部分に十字状に切り込みを入れて孔内水通過用の孔9が形成され、沈設時の孔内水の抵抗を減じるようにしている。
【0006】
図3は沈設用フレームの突起部を被覆した例を示す図である。
課題のところで述べたように、孔壁地盤と沈設用のフレームに注入バッグが挟まれると、フレームに注入バッグの基布が引っ掛かり、或いは摩擦力によって注入バッグの基布の動きが拘束されたり、注入バッグの基布が切れたりする。そこで、図示するように、沈設用フレームの突起部を柔らかい素材で被覆して鋭角部分をなくす。こうして形成された被覆部15は鋭角な突起がないため注入バッグの基布の動きを拘束したり、基布を切ったりするのを防止することができる。
【0007】
図4は孔底において沈設用フレームが潰れて広がった状態を示す図である。
孔底において鉄筋籠の重みで沈設用フレームが潰れて広がり、グラウトの加圧注入時に注入バッグの基布が切れると図5に示すように、グラウト等22が地盤中に流出するが、注入バッグを覆う袋の存在によってこれが最小限に抑えられる。この場合には、急結性のグラウト等21を注入して杭体20の下部の地盤内及び注入バッグのグラウト等の流出経路を塞ぐとともに、地盤の強化を図る。そして、急結性のグラウト等に所要の強度が発現した後に、再度グラウト等の注入加圧を行い、所要のプレロードを与えることができる。
【0008】
【発明の効果】
以上のように本発明によれば、以下のような効果を達成することができる。
▲1▼注入バッグを袋で覆うことにより、沈設時やグラウト等の注入時に注入バッグを傷つけないようにすることができる。
▲2▼注入バッグを覆う袋に不透水性の基布を用いることにより、注入用グラウト等に混入する分離低減材の混入量を減ずることができる。
▲3▼沈設用フレームの突起部を被覆することにより、沈設時に注入バッグを傷つけず、グラウト等の注入時に注入バッグが袋内を動きやすくなり、また、沈設用フレームに引っ掛かりずらくなる。
▲4▼注入バッグが破れた場合でも袋の存在によりグラウト等の流出が最小限に抑えられ、急結性のグラウト等を注入することにより、注入圧力の回復および地盤の強化を図ることができる。
【図面の簡単な説明】
【図1】 鉄筋籠先端の注入バッグを袋で覆う場所打ち杭の施工方法を説明する図である。
【図2】 注入バッグと袋を上下に分断した状態を模式的に示す図である。
【図3】 沈設用フレームの突起部を被覆した例を示す図である。
【図4】 沈設用フレームが潰れて広がった状態を示す図である。
【図5】 急結性グラウト等の注入時の説明図である。
【符号の説明】
1…杭孔、2…鉄筋籠、3…沈設用フレーム、4…固定具、5…袋、6…注入バッグ、7…カバーシート、8…注入パイプ通過用の孔、9…孔内水通過用の孔、10…仮固定用のテープ通過用の孔、11…注入パイプ、12…仮固定用のテープ、20…杭体、21…急結性のグラウト等、22…注入時に地中に漏れたグラウト等。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for constructing a cast-in-place pile by installing an injection bag at the tip of a reinforcing bar.
[0002]
[Prior art and problems to be solved by the invention]
A method is known in which cast-in-place piles are constructed after preloading the ground at the tip of the pile by injecting grout or the like into an injection bag installed at the tip of the reinforcing bar. This construction method has the following problems.
(1) The following phenomena (a), (b), (c) are considered to occur in the infusion bag, the base fabric of the infusion bag is cut due to them, and grout flows out of the infusion bag, The case where the required pressurization is not performed is assumed.
(A) The injection bag is sandwiched between the pile hole hole wall ground and the frame for setting the injection bag, and the base fabric of the injection bag is caught by the frame to restrain the movement.
(B) The injection bag is sandwiched between the pile hole hole wall ground and the injection bag laying frame, and the movement of the base fabric of the injection bag is restrained by the frictional force.
(C) When the injection bag is sunk at the bottom of the hole, the base of the injection bag is cut by contact with the pile hole ground or the like.
(2) When grout or the like is injected into the injection bag and pressurized, the dehydration phenomenon of the grout occurs. Excessive dehydration causes clogging such as grout in the infusion bag, and gives non-uniform pressure in the infusion bag. In order to prevent this, a separation reducing material is mixed in grout or the like, but the separation reducing material is expensive.
(3) When the base of the injection bag is cut at the time of injection and injection pressure cannot be applied, the grout that has flowed out may be washed away by underground water in the ground.
[0003]
[Means for Solving the Problems]
The present invention has been made to solve the above-mentioned problems, and is intended to recover the injection pressure lowered by the outflow of the grout and the like and to reinforce the ground, by cutting the base fabric of the injection bag, preventing excessive dehydration. .
Therefore, the present invention is a method for constructing a cast-in-place pile in which the ground at the tip of the pile is preloaded by an injection bag attached so as to surround the frame for settling fixed to the tip of the reinforcing bar,
The injecting bag is covered with a bag that covers the protruding portion of the setting frame and that has a hole for passing through the water in the hole at the time of setting.
Further, the present invention is characterized in that the bag is made of an impermeable material.
[0004]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below.
FIG. 1 is a diagram for explaining a method of constructing a cast-in-place pile that covers an injection bag at the tip of a reinforcing bar rod with a bag, and FIG. 2 is a diagram schematically showing a state in which the injection bag and the bag are vertically divided.
In FIG. 1, a steel injection
[0005]
In FIG. 2, the upper and lower base fabrics (actually the edges thereof are stitched together) constituting the infusion bag are indicated by 6a and 6b, and the upper and lower fabrics constituting the bag around the infusion bag. Cover with 5a, 5b (actually the edges are sewn together), and fix by tying the
[0006]
FIG. 3 is a view showing an example in which the protrusion of the sinking frame is covered.
As described in the problem, when the injection bag is sandwiched between the hole wall ground and the frame for settling, the base fabric of the injection bag is caught on the frame, or the movement of the base fabric of the injection bag is restricted by the friction force, The base fabric of the infusion bag is cut. Therefore, as shown in the figure, the projection of the laying frame is covered with a soft material to eliminate the acute angle portion. Since the covering
[0007]
FIG. 4 is a diagram showing a state in which the setting frame is crushed and spread at the hole bottom.
At the bottom of the hole, the frame for installation is crushed and spread by the weight of the reinforcing bar, and when the base fabric of the injection bag is cut at the time of grout pressure injection, the grout 22 flows out into the ground as shown in FIG. This is minimized by the presence of a bag covering the bag. In this case, the quick setting grout etc. 21 is inject | poured, and the outflow path | route of the grout etc. of the lower part of the pile body 20 and an injection | pouring bag is blocked, and the ground is strengthened. And after required intensity | strength expresses in the quick setting grout etc., injection | pouring pressurization of grout etc. can be performed again and a required preload can be given.
[0008]
【The invention's effect】
As described above, according to the present invention, the following effects can be achieved.
(1) By covering the infusion bag with a bag, it is possible to prevent the infusion bag from being damaged when it is laid or injected with grout or the like.
(2) By using an impermeable base fabric for the bag covering the infusion bag, the amount of separation reducing material mixed in the infusion grout can be reduced.
(3) By covering the protruding portion of the settling frame, the injection bag is not damaged when settling, and the injection bag is easily moved in the bag when pouring grout or the like, and is not easily caught by the settling frame.
(4) Even when the injection bag is torn, the outflow of the grout is minimized due to the presence of the bag. By injecting the quick-setting grout, the injection pressure can be recovered and the ground can be strengthened. .
[Brief description of the drawings]
FIG. 1 is a diagram for explaining a method for constructing a cast-in-place pile that covers an injection bag at the tip of a reinforcing bar rod with a bag.
FIG. 2 is a diagram schematically showing a state where an injection bag and a bag are divided into upper and lower portions.
FIG. 3 is a view showing an example in which a projection of a sinking frame is covered.
FIG. 4 is a diagram showing a state in which the sunk frame is crushed and spread.
FIG. 5 is an explanatory diagram at the time of injection of quick setting grout or the like.
[Explanation of symbols]
DESCRIPTION OF
Claims (2)
前記沈設用フレームの突起部を被覆するとともに、沈設時の孔内水の通過用の孔が形成されている袋で前記注入バッグを覆うことを特徴とする場所打ち杭の施工方法。In the construction method of cast-in-place pile that preloads the ground at the tip of the pile with an injection bag attached so as to surround the settling frame fixed to the tip of the reinforcing bar,
A cast-in-place pile construction method characterized by covering the projecting portion of the settling frame and covering the injection bag with a bag in which a hole for passage of water in the hole at the time of settling is formed .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001369855A JP3669577B2 (en) | 2001-12-04 | 2001-12-04 | Construction method of cast-in-place piles |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001369855A JP3669577B2 (en) | 2001-12-04 | 2001-12-04 | Construction method of cast-in-place piles |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2003171930A JP2003171930A (en) | 2003-06-20 |
JP3669577B2 true JP3669577B2 (en) | 2005-07-06 |
Family
ID=19179175
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001369855A Expired - Lifetime JP3669577B2 (en) | 2001-12-04 | 2001-12-04 | Construction method of cast-in-place piles |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3669577B2 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4707599B2 (en) * | 2006-04-24 | 2011-06-22 | 東日本旅客鉄道株式会社 | Construction method of tip-reinforced cast-in-place piles |
CN104389314B (en) * | 2014-12-10 | 2016-07-20 | 山东大学 | A kind of shallow clay grouting and reinforcing device and method |
JP6632390B2 (en) * | 2016-01-19 | 2020-01-22 | 東日本旅客鉄道株式会社 | Infusion bag for cast-in-place pile and method of installing the infusion bag |
CN109056716A (en) * | 2018-08-03 | 2018-12-21 | 高永光 | Rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom |
CN109469050A (en) | 2018-12-25 | 2019-03-15 | 高永光 | Grout pile bottom is installed by hollow (hole) doughnut-shaped steel plate capsule (chamber) Post Grouting Technique |
-
2001
- 2001-12-04 JP JP2001369855A patent/JP3669577B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JP2003171930A (en) | 2003-06-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101294696B1 (en) | Structure for supporting guard rail and constructing method thereof | |
KR101353882B1 (en) | Method of reinforcement and construction of pillar of neighboring tunnel | |
JP2007191856A (en) | Grouting method | |
JP3669577B2 (en) | Construction method of cast-in-place piles | |
JP6168336B2 (en) | Steel pipe pile embedding method | |
JP4696556B2 (en) | Natural ground reinforcement earth construction method and natural ground reinforcement soil structure | |
JP2009249999A (en) | Construction method for suppressing deformation of filling | |
CN106194213A (en) | A kind of shed hole structure crossing over debris flow gully and construction method | |
JP4157548B2 (en) | Reinforcing bar slope method | |
JPH0430489B2 (en) | ||
CN110424202A (en) | Border on the sea roadbed wave prevention structure and its construction method | |
KR101789450B1 (en) | Underground structures using overlapped pile wall and construction method thereof | |
KR100938483B1 (en) | Serial waterproof wall grouting method | |
CN110307012B (en) | Surrounding rock structure is consolidated to big section tunnel prestressed anchorage pole of high-speed railway | |
JP2816267B2 (en) | Ground fluidization prevention method | |
KR20040028222A (en) | Drainage structure for basic improvement of soil of road using vertical drainage member | |
JPH11181794A (en) | Method for improving ground for house and improved ground structure | |
KR200194458Y1 (en) | The structure improved outer layer of tender base for improveing constrution of the dredged soil tender base | |
JP4707599B2 (en) | Construction method of tip-reinforced cast-in-place piles | |
JPH0525828A (en) | Final excavation level lift-preventive construction | |
JP3608120B2 (en) | How to improve soft ground | |
KR102238982B1 (en) | Removable tension material type anchor and Removal method of tension material | |
JP5644303B2 (en) | Panel swelling prevention method | |
KR200209544Y1 (en) | Flexible synthetic resin lining for landfill construction | |
CN107460863A (en) | A kind of high-strength compound geotextiles reinforced suitable for Karst Subgrade |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20040630 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050105 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050304 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050406 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050407 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 3669577 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090422 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100422 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100422 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110422 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120422 Year of fee payment: 7 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130422 Year of fee payment: 8 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140422 Year of fee payment: 9 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |