CN206941372U - Concrete-filled steel tube with dumbbell sections assembled pier and the attachment structure with cushion cap - Google Patents
Concrete-filled steel tube with dumbbell sections assembled pier and the attachment structure with cushion cap Download PDFInfo
- Publication number
- CN206941372U CN206941372U CN201720751852.3U CN201720751852U CN206941372U CN 206941372 U CN206941372 U CN 206941372U CN 201720751852 U CN201720751852 U CN 201720751852U CN 206941372 U CN206941372 U CN 206941372U
- Authority
- CN
- China
- Prior art keywords
- dumbbell
- concrete
- pier
- steel pipe
- steel tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 122
- 239000010959 steel Substances 0.000 title claims abstract description 122
- 239000004567 concrete Substances 0.000 title claims abstract description 60
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 20
- 239000002184 metal Substances 0.000 claims description 16
- 238000003466 welding Methods 0.000 claims description 6
- 239000004568 cement Substances 0.000 claims description 5
- 239000000835 fiber Substances 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 2
- 230000002708 enhancing effect Effects 0.000 claims 1
- 239000007787 solid Substances 0.000 claims 1
- 239000002131 composite material Substances 0.000 abstract description 24
- 238000010276 construction Methods 0.000 abstract description 23
- 238000005452 bending Methods 0.000 abstract description 9
- 238000009417 prefabrication Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 8
- 230000000694 effects Effects 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 229910001209 Low-carbon steel Inorganic materials 0.000 description 1
- 229910000870 Weathering steel Inorganic materials 0.000 description 1
- 230000009172 bursting Effects 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000011372 high-strength concrete Substances 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型公开了一种哑铃型钢管混凝土组合桥墩及与承台的连接结构,哑铃型钢管混凝土组合桥墩,包括由两个圆形钢管及焊接于两个圆钢管之间的双层钢板构成的沿两个圆钢管的形心连线对称的哑铃型钢管,双层钢板与圆钢管之间采用角焊缝焊接。哑铃型钢管的底部焊接有端板,端板的外轮廓大于哑铃型钢管的横截面的外轮廓,端板上沿桥墩横桥向两侧各设有1个锚栓孔,哑铃型钢管内填充有混凝土。桥墩与承台采用灌浆波纹套筒埋入式连接,本实用新型中的哑铃型钢管与钢筋混凝土承台为预制构件,均可满足工厂预制,现场装配。本实用新型具有轴向及抗弯承载力高,延性好,横向刚度大的特点,施工便捷,现场作业量及湿作业少,满足快速施工的需求,可应用于重大桥梁工程的桥墩尤其是高墩结构使用。
The utility model discloses a dumbbell-shaped steel pipe concrete composite bridge pier and its connection structure with the bearing platform. It is a dumbbell-shaped steel pipe that is symmetrical along the line connecting the centroids of two round steel pipes, and the double-layer steel plate and the round steel pipe are welded by fillet welds. The bottom of the dumbbell-shaped steel pipe is welded with an end plate, and the outer contour of the end plate is larger than the outer contour of the cross-section of the dumbbell-shaped steel pipe. An anchor bolt hole is provided on each side of the end plate along the pier cross bridge, and the dumbbell-shaped steel pipe is filled with concrete. The bridge piers and caps are connected by grouting corrugated sleeves. The dumbbell-shaped steel pipes and reinforced concrete caps in the utility model are prefabricated components, which can meet the requirements of factory prefabrication and on-site assembly. The utility model has the characteristics of high axial and bending bearing capacity, good ductility, and large lateral rigidity, convenient construction, less on-site work and wet work, and meets the needs of rapid construction. It can be applied to bridge piers of major bridge projects, especially high pier structure used.
Description
技术领域technical field
本实用新型涉及桥梁工程领域,尤其是涉及一种哑铃型钢管混凝土组合桥墩。The utility model relates to the field of bridge engineering, in particular to a dumbbell-shaped steel pipe concrete composite bridge pier.
背景技术Background technique
随着我国交通事业的发展,大量的高速铁路、公路、跨海大桥等投入建设和使用。在抗震设防高烈度区,为保证桥梁结构的安全性,桥墩作为重要的承重构件,对其抗震性能有很高要求。传统桥墩多采用钢筋混凝土桥墩,其承载力及延性较差,在强震作用下易发生破坏。而对于跨海大桥等重要的生命线工程,桥墩发生破坏时修复极其困难。With the development of my country's transportation industry, a large number of high-speed railways, highways, and sea-crossing bridges have been put into construction and use. In high-intensity areas of seismic fortification, in order to ensure the safety of bridge structures, bridge piers, as important load-bearing components, have high requirements for their seismic performance. Traditional bridge piers mostly use reinforced concrete piers, which have poor bearing capacity and ductility, and are prone to damage under strong earthquakes. For important lifeline projects such as sea-crossing bridges, it is extremely difficult to repair bridge piers when they are damaged.
近年来,钢管混凝土桥墩由于其良好的抗震性能及便捷的施工被应用于桥梁结构中。现有实际工程中多采用圆形、矩形钢管混凝土桥墩。其中圆形钢管混凝土桥墩中钢管对混凝土的约束效应最好,但其横桥向与顺桥向刚度相同,在满足横桥向刚度要求时顺桥向过于浪费。矩形钢管混凝土桥墩可满足横桥向与顺桥向刚度不同的需求,但宽厚比越大,钢管对混凝土的约束效应越差,桥墩的延性越差。In recent years, CFST bridge piers have been used in bridge structures due to their good seismic performance and convenient construction. Circular and rectangular steel pipe concrete piers are mostly used in existing practical projects. Among them, the confinement effect of the steel pipe on the concrete in the circular CFST pier is the best, but its stiffness in the transverse direction is the same as that in the longitudinal direction, and the longitudinal direction is too wasteful when meeting the stiffness requirements in the transverse direction. Rectangular concrete-filled steel tube piers can meet the different requirements of stiffness in the transverse direction and along the direction of the bridge, but the larger the width-thickness ratio, the worse the confinement effect of the steel tube on the concrete, and the worse the ductility of the bridge pier.
同时,在跨海大桥、山区桥梁、水库桥梁中,由于地形复杂或通航需求等因素,高桥墩的应用越来越广泛。在横桥向风荷载、地震荷载等作用下,高桥墩底部弯矩较高,需要抗弯更为高效的截面。因此,提出由两端圆钢管及中间双层钢板构成的新型哑铃型桥墩截面,以有效增加高墩横桥向抗侧刚度及抗弯承载力,提高行车舒适性及抵抗自然灾害的能力。At the same time, in sea-crossing bridges, mountain bridges, and reservoir bridges, due to factors such as complex terrain or navigation requirements, high piers are more and more widely used. Under the action of cross bridge wind load, earthquake load, etc., the bending moment at the bottom of high bridge piers is relatively high, and a section with more efficient bending resistance is required. Therefore, a new type of dumbbell-shaped bridge pier section composed of round steel pipes at both ends and double-layer steel plates in the middle is proposed to effectively increase the lateral stiffness and bending capacity of the cross bridge with high piers, improve driving comfort and the ability to resist natural disasters.
目前,钢管混凝土桥墩与承台连接方式一般采用承压板连接和埋置式连接两种构造方法。其中承压板连接是指在钢管底端焊接端板,端板通过锚栓及锚固钢筋与承台连接,施工过程较为繁琐。埋置式连接是指钢管底端焊接端板,钢管下部与端板埋入承台内锚固,施工中多采用现浇式承台。为缩短桥梁施工工期,尽快开放交通,急需提出一种可实现预制拼装的桥墩-承台连接方法,满足桥梁快速施工的需求。At present, there are generally two construction methods for the connection between concrete filled steel pipe piers and caps: bearing plate connection and embedded connection. Among them, the pressure-bearing plate connection refers to welding the end plate at the bottom of the steel pipe, and the end plate is connected to the cap platform through anchor bolts and anchoring steel bars. The construction process is relatively cumbersome. Embedded connection means that the bottom end of the steel pipe is welded to the end plate, and the lower part of the steel pipe and the end plate are embedded in the cap for anchoring, and the cast-in-place cap is often used in construction. In order to shorten the construction period of the bridge and open it to traffic as soon as possible, it is urgent to propose a pier-cap connection method that can realize prefabricated assembly to meet the needs of rapid bridge construction.
因此,设计一种具有较大横桥向抗侧刚度及强度的高桥墩形式,以及研究一种可实现快速施工的该桥墩与承台连接方法是亟需解决的技术问题。Therefore, it is an urgent technical problem to design a high bridge pier form with relatively large lateral stiffness and strength of the transverse bridge, and to study a connection method between the bridge pier and the cap that can realize rapid construction.
实用新型内容Utility model content
本实用新型提出一种哑铃型钢管混凝土组合桥墩及与承台的连接结构。所述哑铃型钢管混凝土组合桥墩其目的在于克服现有桥墩存在的自重大,抗震性能差的缺点,充分考虑到桥墩横桥向与顺桥向刚度差异大的特点,该桥墩承载力高,延性好,横向抗侧刚度大,适用于高桥墩。所述哑铃型钢管混凝土桥墩与承台连接快速施工方法为灌浆金属波纹套筒埋入式连接,可应用于预制桥墩、承台的连接锚固,所述连接构造抗震性能好,施工便捷,现场作业量小,有利于缩短工期,具有较好的经济效益和安全性能。The utility model proposes a dumbbell-shaped steel pipe concrete composite bridge pier and a connection structure with a bearing platform. The purpose of the dumbbell-shaped concrete-filled steel pipe composite pier is to overcome the shortcomings of the existing pier such as self-heaviness and poor seismic performance, fully considering the large difference in stiffness between the transverse direction and the longitudinal direction of the pier, the pier has high bearing capacity and ductility. Well, the transverse anti-lateral stiffness is large, and it is suitable for high piers. The fast construction method for the connection between the dumbbell-shaped concrete-filled steel pipe pier and the cap is an embedded connection of grouted metal corrugated sleeves, which can be applied to the connection and anchorage of prefabricated bridge piers and caps. The connection structure has good seismic performance, convenient construction, and on-site operation. Small quantity is conducive to shortening the construction period, and has good economic benefits and safety performance.
为了解决上述技术问题,本实用新型提出的一种哑铃型钢管混凝土组合桥墩,包括哑铃型钢管,所述哑铃型钢管的底部采用角焊缝焊接有端板,所述端板的外轮廓大于所述哑铃型钢管的横截面的外轮廓,所述端板上沿桥墩横桥向两侧各设有1个锚栓孔,所述哑铃型钢管内填充有混凝土。In order to solve the above technical problems, the utility model proposes a dumbbell-shaped concrete-filled steel pipe composite bridge pier, which includes a dumbbell-shaped steel pipe. Describe the outer profile of the cross section of the dumbbell-shaped steel pipe, the end plate is provided with an anchor bolt hole on both sides along the pier cross bridge, and the dumbbell-shaped steel pipe is filled with concrete.
进一步讲,所述哑铃型钢管由两个圆形钢管及焊接于所述两个圆钢管之间的双层钢板构成,所述双层钢板沿所述两个圆钢管的形心连线对称分布。Further speaking, the dumbbell-shaped steel pipe is composed of two round steel pipes and double-layer steel plates welded between the two round steel pipes, and the double-layer steel plates are symmetrically distributed along the line connecting the centroids of the two round steel pipes .
所述双层钢板与所述两个圆钢管之间的焊接采用角焊缝焊接。The welding between the double-layer steel plate and the two round steel pipes adopts fillet welding.
上述钢管混凝土组合桥墩与承台的连接结构,其中,承台是钢筋混凝土承台,所述钢筋混凝土承台的中央位置处设有用于埋置哑铃型钢管混凝土组合桥墩的槽,所述槽的深度为桥墩埋置深度,所述槽的侧壁由与承台嵌固的金属波纹套筒构成,所述哑铃型钢管混凝土组合桥墩通过预埋螺栓与所述承台临时固定;所述哑铃型钢管混凝土组合桥墩的水平投影的外轮廓小于所述金属波纹套筒的水平投影的内轮廓,所述哑铃型钢管混凝土组合桥墩与所述金属波纹管之间填充有纤维增强水泥。The above-mentioned connection structure between steel pipe concrete composite bridge piers and caps, wherein, the caps are reinforced concrete caps, and the central position of the reinforced concrete caps is provided with a groove for embedding a dumbbell-shaped steel pipe concrete composite bridge pier. The depth is the embedding depth of the pier, the side wall of the groove is composed of a metal corrugated sleeve embedded with the cap, and the dumbbell-shaped concrete-filled steel pipe composite bridge pier is temporarily fixed with the cap through pre-embedded bolts; the dumbbell-shaped The outer contour of the horizontal projection of the steel pipe concrete composite pier is smaller than the horizontal projection inner contour of the metal corrugated sleeve, and fiber-reinforced cement is filled between the dumbbell-shaped steel pipe concrete composite pier and the metal bellows.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
1.哑铃型钢管混凝土组合桥墩横桥向抗弯刚度大,适用于高桥墩。顺桥向保证抗弯刚度的基础上降低了截面面积,满足了桥梁工程横桥向与顺桥向抗弯刚度差异大的需求,也避免了矩形钢管混凝土桥墩宽厚比较大时,钢管约束效应差的弊端。1. Dumbbell-shaped concrete-filled steel pipe composite piers have high transverse bending stiffness and are suitable for high bridge piers. On the basis of ensuring the bending stiffness along the bridge direction, the cross-sectional area is reduced, which meets the large difference in bending stiffness between the transverse bridge direction and the along bridge direction of bridge engineering, and also avoids the poor confinement effect of steel pipes when the width-thickness ratio of rectangular steel pipe concrete piers is large. disadvantages.
2.哑铃型钢管混凝土组合桥墩在保证竖向承载力的同时,横向具有更高的抗弯承载力。相比其他截面形状,哑铃型钢管混凝土桥墩中的圆钢管对混凝土的约束效应更好,提高了混凝土材料的抗压强度和延性,能充分利用材料强度。2. The dumbbell-shaped concrete-filled steel tube composite pier not only ensures the vertical bearing capacity, but also has a higher lateral bending bearing capacity. Compared with other cross-sectional shapes, the circular steel tubes in the dumbbell-shaped concrete-filled steel tube piers have a better confinement effect on the concrete, which improves the compressive strength and ductility of the concrete material, and can make full use of the material strength.
3.应用于跨江、跨海、跨水库大桥中时,桥墩横桥向为圆形截面,有利于水流通过,减少动水压力对结构的影响。3. When used in bridges that cross rivers, seas, or reservoirs, the piers have a circular cross-section in the cross-bridge direction, which is conducive to the passage of water and reduces the impact of hydrodynamic pressure on the structure.
4.本实用新型钢管混凝土桥墩与承台连接结构及方法与现有桥墩与承台连接方法相比,施工简便,现场工作量和湿作业少,可实现预制桥墩、预制承台的连接,且连接节点具有较好的抗震性能。施工过程中无需支模,有利于缩短工期,具有良好的经济效益。4. Compared with the connection method of the existing bridge pier and the cap, the structure and method of the connection between the steel pipe concrete bridge piers and the caps of the utility model are simple and convenient in construction, with less on-site workload and wet work, and can realize the connection of prefabricated bridge piers and prefabricated caps, and Connection nodes have better seismic performance. No formwork is required during the construction process, which is beneficial to shorten the construction period and has good economic benefits.
附图说明Description of drawings
图1-1是本实用新型桥墩与承台连接剖面构造示意图;Figure 1-1 is a schematic diagram of the cross-sectional structure of the connection between the pier and the cap of the utility model;
图1-2是图1-1所示桥墩与承台连接的俯视图;Figure 1-2 is a top view of the connection between the pier and the cap shown in Figure 1-1;
图2-1是本实用新型中承台的俯视图;Figure 2-1 is a top view of the platform of the utility model;
图2-2是本实用新型中承台的剖视图;Figure 2-2 is a cross-sectional view of the platform of the utility model;
图3是本实用新型中端板的俯视图;Fig. 3 is the plan view of end plate in the utility model;
图4-1是本实用新型中哑铃型钢管的俯视图;Fig. 4-1 is the top view of the dumbbell-shaped steel pipe in the utility model;
图4-2是本实用新型中哑铃型钢管的主视图;Fig. 4-2 is the front view of the dumbbell-shaped steel pipe in the utility model;
图5-1是本实用新型中桥墩钢结构部分临时固定在承台上的俯视图;Figure 5-1 is a top view of the bridge pier steel structure part temporarily fixed on the cap in the utility model;
图5-2是本实用新型中桥墩钢结构部分临时固定在承台上的主视图。Fig. 5-2 is the front view of the bridge pier steel structure part temporarily fixed on the cap in the utility model.
图中,1-哑铃型钢管,2-内填混凝土,3-端板,4-金属波纹套筒,5-承台,6-圆钢管,7-钢板,8-锚栓孔,9-锚栓连接件,10-纤维增强水泥。In the figure, 1-dumbbell-shaped steel pipe, 2-inner concrete, 3-end plate, 4-metal corrugated sleeve, 5-cap, 6-round steel pipe, 7-steel plate, 8-anchor bolt hole, 9-anchor Bolt connector, 10-fiber reinforced cement.
具体实施方式Detailed ways
下面结合附图和具体实施例对本实用新型技术方案作进一步详细描述,所描述的具体实施例仅对本实用新型进行解释说明,并不用以限制本实用新型。The technical scheme of the utility model will be further described in detail below in conjunction with the accompanying drawings and specific embodiments, and the described specific embodiments are only for explaining the utility model, and are not intended to limit the utility model.
本实用新型中提出的一种哑铃型钢管混凝土组合桥墩,包括哑铃型钢管1,如图4-1和图4-2所示,所述哑铃型钢管1由两个圆形钢管6及焊接于所述两个圆钢管6之间的双层钢板7构成,所述双层钢板7沿所述两个圆钢管6的形心连线对称分布,所述双层钢板7与所述两个圆钢管6之间的焊接采用角焊缝焊接。所述哑铃型钢管1的底部采用角焊缝焊接有端板3,所述端板3的外轮廓大于所述哑铃型钢管1的横截面的外轮廓,所述端板3上沿桥墩横桥向两侧各设有1个锚栓孔8,如图3所示,所述哑铃型钢管1内填充有混凝土2,在所述哑铃型钢管内部浇筑混凝土,抑制钢管向内屈曲。A dumbbell-shaped steel pipe concrete composite bridge pier proposed in the utility model includes a dumbbell-shaped steel pipe 1, as shown in Figure 4-1 and Figure 4-2, the dumbbell-shaped steel pipe 1 is composed of two circular steel pipes 6 and welded The double-layer steel plate 7 between the two round steel pipes 6 is formed, and the double-layer steel plate 7 is symmetrically distributed along the line connecting the centroids of the two round steel pipes 6. The double-layer steel plate 7 and the two round steel pipes The welding between the steel pipes 6 adopts fillet weld welding. The bottom of the dumbbell-shaped steel pipe 1 is welded with an end plate 3 by a fillet weld. The outer profile of the end plate 3 is larger than the outer profile of the cross-section of the dumbbell-shaped steel tube 1. An anchor bolt hole 8 is provided on both sides. As shown in FIG. 3 , the dumbbell-shaped steel pipe 1 is filled with concrete 2 , and concrete is poured inside the dumbbell-shaped steel pipe to restrain the steel pipe from buckling inward.
本实用新型钢管混凝土组合桥墩与承台的连接结构,如图2-1和图1-2所示,承台是钢筋混凝土承台5,所述钢筋混凝土承台5的中央位置处设有用于埋置哑铃型钢管混凝土组合桥墩的槽,所述槽的深度为桥墩埋置深度,所述槽的侧壁由与钢筋混凝土承台嵌固的金属波纹套筒4构成,所述哑铃型钢管混凝土组合桥墩通过预埋螺栓9与所述钢筋混凝土承台5临时固定;所述哑铃型钢管混凝土组合桥墩1的水平投影的外轮廓小于所述金属波纹套筒4的水平投影的内轮廓,所述哑铃型钢管混凝土组合桥墩与所述金属波纹套筒4之间填充有纤维增强水泥10。The connection structure between the steel pipe concrete composite pier and the bearing platform of the utility model is shown in Figure 2-1 and Figure 1-2. The bearing platform is a reinforced concrete bearing platform 5, and the central position of the reinforced concrete bearing platform 5 is provided with a A groove for embedding dumbbell-shaped concrete-filled steel pipe composite piers, the depth of which is the embedding depth of the bridge pier, and the side walls of the groove are composed of metal corrugated sleeves 4 embedded with reinforced concrete caps, and the dumbbell-shaped steel-filled steel pipe concrete The composite bridge pier is temporarily fixed to the reinforced concrete cap 5 through pre-embedded bolts 9; the horizontal projection outer contour of the dumbbell-shaped steel pipe concrete composite bridge pier 1 is smaller than the horizontal projection internal contour of the metal corrugated sleeve 4, the Fiber-reinforced cement 10 is filled between the dumbbell-shaped steel pipe concrete composite pier and the metal corrugated sleeve 4 .
本实用新型钢管混凝土组合桥墩与承台的连接结构的施工方法,桥墩与承台采用灌浆波纹套筒埋入式连接,本实用新型中的哑铃型钢管1与钢筋混凝土承台5为预制构件,均可满足工厂预制,现场装配,实现快速施工。具体的施工步骤如下:The construction method of the connection structure between the steel pipe concrete composite bridge pier and the bearing platform of the utility model, the bridge pier and the bearing platform adopt the embedded connection of the grouting corrugated sleeve, the dumbbell-shaped steel pipe 1 and the reinforced concrete bearing platform 5 in the utility model are prefabricated components, All can meet the requirements of factory prefabrication and on-site assembly to achieve rapid construction. The specific construction steps are as follows:
步骤一、哑铃型钢管1工厂预制,按照设计尺寸制作端板3,在端板3上沿桥墩横桥向两侧各设有1个锚栓孔8,如图3所示;按照设计尺寸加工双层钢板7和两个圆形钢管6,并采用角焊缝焊接将双层钢板7与两个圆形钢管6焊接,在底部采用角焊缝焊接上端板3,从而构成哑铃型钢管混凝土组合桥墩的钢结构部分,如图4-1和图4-2所示。双层钢板7和圆形钢管6的材质可选用普通低碳钢或耐候钢,也可采用屈服强度在550MP以上的高强钢。若应用于跨江、跨水库、跨海大桥中,亦可采用不锈钢,提高其抗腐蚀能力。为避免中间双层钢板7构成的腹板与圆钢管6之间的角焊缝爆裂,混凝土采用常规浇筑,不采用高压泵送。Step 1. The dumbbell-shaped steel pipe 1 is prefabricated in the factory, and the end plate 3 is made according to the designed size. On the end plate 3, an anchor bolt hole 8 is provided on both sides along the cross bridge of the pier, as shown in Figure 3; it is processed according to the designed size The double-layer steel plate 7 and two circular steel pipes 6 are welded by fillet welds. The double-layer steel plate 7 is welded to the two circular steel pipes 6, and the upper end plate 3 is welded by fillet welds at the bottom, thus forming a dumbbell-shaped concrete-filled steel pipe combination The steel structure part of the bridge pier is shown in Figure 4-1 and Figure 4-2. The material of the double-layer steel plate 7 and the circular steel pipe 6 can be selected from ordinary low-carbon steel or weathering steel, and can also be high-strength steel with a yield strength above 550MP. If it is used in cross-river, cross-reservoir, and sea-crossing bridges, stainless steel can also be used to improve its corrosion resistance. In order to avoid bursting of the fillet weld between the web formed by the middle double-layer steel plate 7 and the round steel pipe 6, the concrete is poured conventionally instead of high-pressure pumping.
步骤二、钢筋混凝土承台5工厂预制:按照钢筋混凝土承台5的设计尺寸绑扎钢筋笼,在钢筋混凝土承台5浇筑前,于桥墩埋置位置处设置金属波纹套筒4,为桥墩预留埋置空间,所述金属波纹套筒4的截面尺寸大于桥墩底部的端板3尺寸,所述金属波纹套筒4的高度为桥墩埋置深度;并于与端板3上锚栓孔8对齐的位置处设置预埋锚栓9;浇筑混凝土,得到预制钢筋混凝土承台5,如图2-1和图2-2所示。Step 2, factory prefabrication of reinforced concrete cap 5: Bind the reinforcement cage according to the design size of reinforced concrete cap 5, and set metal corrugated sleeve 4 at the embedding position of the bridge pier before pouring the reinforced concrete cap 5, to reserve for the bridge pier Embedded space, the cross-sectional size of the metal corrugated sleeve 4 is larger than the size of the end plate 3 at the bottom of the pier, the height of the metal corrugated sleeve 4 is the embedding depth of the pier; and it is aligned with the anchor hole 8 on the end plate 3 The pre-embedded anchor bolt 9 is set at the position; the concrete is poured to obtain the prefabricated reinforced concrete cap 5, as shown in Figure 2-1 and Figure 2-2.
步骤三、在施工现场,按照设计位置安装步骤二预制的钢筋混凝土承台5,将步骤一制得的哑铃型钢管混凝土组合桥墩的钢结构部分,按照端板3朝下竖立在钢筋混凝土承台5内的金属波纹套筒4中,现场吊装时,承台上的预埋锚栓9与端板3上的锚栓孔8对齐,通过锚栓连接件将哑铃型钢管混凝土组合桥墩的钢结构部分与钢筋混凝土承台5连接,锚栓9仅起施工过程中钢管临时固定作用,如图5-1和图5-2所示,即使哑铃型钢管1于桥墩指定位置处临时固定。所述哑铃型钢管1安装完成后,向哑铃型钢管1的圆钢管6内侧及双层钢板7内侧浇筑混凝土,从而构成了哑铃型钢管混凝土组合桥墩,所浇筑的混凝土可以选自于普通混凝土、高强混凝土、再生混凝土和橡胶混凝土中的任何一种,所述金属波纹套筒4与哑铃型钢管混凝土组合桥墩之间的空隙采用纤维增强水泥10填充,如图1-1和图1-2所示。Step 3. At the construction site, install the prefabricated reinforced concrete cap 5 in step 2 according to the design position, and erect the steel structure part of the dumbbell-shaped concrete filled steel pipe composite bridge pier prepared in step 1 on the reinforced concrete cap with the end plate 3 facing down In the metal corrugated sleeve 4 inside 5, during on-site hoisting, the embedded anchor bolt 9 on the cap platform is aligned with the anchor bolt hole 8 on the end plate 3, and the steel structure of the dumbbell-shaped steel pipe concrete composite pier is connected through the anchor bolt connector. Part of it is connected to the reinforced concrete cap 5, and the anchor bolt 9 is only used for temporary fixing of the steel pipe during the construction process, as shown in Figure 5-1 and Figure 5-2, even if the dumbbell-shaped steel pipe 1 is temporarily fixed at the designated position of the pier. After the dumbbell-shaped steel pipe 1 is installed, concrete is poured to the inside of the round steel pipe 6 of the dumbbell-shaped steel pipe 1 and the inside of the double-layer steel plate 7, thereby forming a dumbbell-shaped steel pipe concrete composite pier. The poured concrete can be selected from ordinary concrete, Any one of high-strength concrete, recycled concrete and rubber concrete, the gap between the metal corrugated sleeve 4 and the dumbbell-shaped concrete-filled steel pipe composite pier is filled with fiber-reinforced cement 10, as shown in Figure 1-1 and Figure 1-2 Show.
本实用新型钢管混凝土组合桥墩具有轴向及抗弯承载力高,延性好,横向刚度大的特点,施工便捷,现场作业量及湿作业少,满足快速施工的需求,可应用于重大桥梁工程的桥墩尤其是高墩结构使用The utility model steel pipe concrete composite bridge pier has the characteristics of high axial and bending bearing capacity, good ductility, and large lateral rigidity, convenient construction, less on-site operations and wet operations, meets the needs of rapid construction, and can be applied to major bridge projects. Bridge piers, especially high pier structures
尽管上面结合附图对本实用新型进行了描述,但是本实用新型并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,而不是限制性的,本领域的普通技术人员在本实用新型的启示下,在不脱离本实用新型宗旨的情况下,还可以做出很多变形,这些均属于本实用新型的保护之内。Although the utility model has been described above in conjunction with the accompanying drawings, the utility model is not limited to the above-mentioned specific embodiments, and the above-mentioned specific embodiments are only illustrative, rather than restrictive. Under the enlightenment of the utility model, many deformations can be made without departing from the purpose of the utility model, and these all belong to the protection of the utility model.
Claims (4)
- A kind of 1. concrete-filled steel tube with dumbbell sections assembled pier, it is characterised in that including dumbbell shape steel tube (1), the dumbbell shaped steel There is end plate (3) bottom of pipe (1) using fillet weld seam, and the outline of the end plate (3) is more than the dumbbell shape steel tube (1) The outline of cross section, 1 anchor hole (8), the dumbbell shape steel tube are respectively provided with along bridge pier direction across bridge both sides on the end plate (3) (1) concrete (2) is filled with.
- 2. concrete-filled steel tube with dumbbell sections assembled pier according to claim 1, it is characterised in that the dumbbell shape steel tube (1) It is made up of two round steel pipes (6) and the double-layer plate (7) being welded between described two round steel pipes (6), the double-layer plate (7) it is symmetrical along the centre of form line of described two round steel pipes (6).
- 3. concrete-filled steel tube with dumbbell sections assembled pier according to claim 2, it is characterised in that the double-layer plate (7) with Welding between described two round steel pipes (6) uses fillet weld seam.
- 4. the attachment structure of a kind of steel-pipe concrete assembled pier and cushion cap, it is characterised in that steel-pipe concrete assembled pier is Concrete-filled steel tube with dumbbell sections assembled pier as described in any in claims 1 to 3, cushion cap are reinforced concrete pile cap (5), institute The central position for stating reinforced concrete pile cap (5) is provided with the groove for being used for embedding concrete-filled steel tube with dumbbell sections assembled pier, described The depth of groove is bridge pier buried depth, and the side wall of the groove is by the wavy metal sleeve (4) with reinforced concrete pile cap (5) build-in Form, the concrete-filled steel tube with dumbbell sections assembled pier is temporarily solid by pre-embedded bolt (9) and the reinforced concrete pile cap (5) It is fixed;The outline of the floor projection of the concrete-filled steel tube with dumbbell sections assembled pier is less than the water of the wavy metal sleeve (4) The Internal periphery of flat projection, filled with fibre between the concrete-filled steel tube with dumbbell sections assembled pier and the wavy metal sleeve (4) Dimension enhancing cement (10).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720751852.3U CN206941372U (en) | 2017-06-26 | 2017-06-26 | Concrete-filled steel tube with dumbbell sections assembled pier and the attachment structure with cushion cap |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720751852.3U CN206941372U (en) | 2017-06-26 | 2017-06-26 | Concrete-filled steel tube with dumbbell sections assembled pier and the attachment structure with cushion cap |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206941372U true CN206941372U (en) | 2018-01-30 |
Family
ID=61365033
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720751852.3U Withdrawn - After Issue CN206941372U (en) | 2017-06-26 | 2017-06-26 | Concrete-filled steel tube with dumbbell sections assembled pier and the attachment structure with cushion cap |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206941372U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107190635A (en) * | 2017-06-26 | 2017-09-22 | 天津大学 | Concrete-filled steel tube with dumbbell sections assembled pier and the connection structure and method with cushion cap |
| CN110387821A (en) * | 2018-04-23 | 2019-10-29 | 东宏建设股份有限公司 | Bridge beam slab lifts spacer bar accurate placement technology |
-
2017
- 2017-06-26 CN CN201720751852.3U patent/CN206941372U/en not_active Withdrawn - After Issue
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107190635A (en) * | 2017-06-26 | 2017-09-22 | 天津大学 | Concrete-filled steel tube with dumbbell sections assembled pier and the connection structure and method with cushion cap |
| CN107190635B (en) * | 2017-06-26 | 2022-10-04 | 天津大学 | Dumbbell-shaped concrete-filled steel tubular composite pier and its connection structure and method with bearing platform |
| CN110387821A (en) * | 2018-04-23 | 2019-10-29 | 东宏建设股份有限公司 | Bridge beam slab lifts spacer bar accurate placement technology |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107190635B (en) | Dumbbell-shaped concrete-filled steel tubular composite pier and its connection structure and method with bearing platform | |
| CN105113389B (en) | Prefabricated steel-concrete composite structure pier column member | |
| CN106351113B (en) | A kind of high-speed railway bridge seismic Damage control system | |
| CN105735112B (en) | Bolt connection-based rapid assembling precast rectangular concrete filled steel tube bridge pier | |
| CN104153287B (en) | System and method for segmentally assembled concrete frame bridge piers with self-resetting ability | |
| CN111962386A (en) | Energy-consuming and shock-absorbing self-resetting prefabricated segmental pier structure and its construction method | |
| CN208501878U (en) | A kind of Self-resetting prefabrication and assembly construction frame structure interior joint | |
| CN216740039U (en) | Self-resetting fabricated composite structure beam column side node with floor | |
| CN110836121A (en) | A kind of anti-floating reinforcement structure and construction method of operating subway tunnel | |
| CN207130606U (en) | Flexing suppress round end type concrete pier of steel tube and with cushion cap attachment structure | |
| CN111535162A (en) | Energy dissipation and shock absorption device for improving shock resistance of prefabricated assembled concrete filled steel tube pier | |
| CN105926427A (en) | Pier and beam transitional connecting structure | |
| CN110578287A (en) | A prefabricated soil-covered corrugated steel plate-prestressed concrete composite arch bridge and its construction method | |
| CN110184903A (en) | A kind of prefabricated tubing string assembly bridge pier of truss-like | |
| CN116716809A (en) | A construction method for lightweight large-span cast-in-place supports for cross beams under V-shaped piers of cable-stayed bridges | |
| CN203403358U (en) | Latticed bridge tower of concrete filled steel pipe | |
| CN219080394U (en) | A wind power tower prestressed reinforced steel concrete high pile cap foundation | |
| CN111455833A (en) | A self-resetting prefabricated assembled bridge pier and its construction method | |
| CN107386098B (en) | Buckling restrained round-end type steel pipe concrete pier and bearing platform connecting structure and method | |
| CN206941372U (en) | Concrete-filled steel tube with dumbbell sections assembled pier and the attachment structure with cushion cap | |
| CN106320165A (en) | Prefabricated concrete-filled steel tube overlapped pier | |
| CN115839102A (en) | Wind power tower prestress stiffening type steel concrete high-rise pile cap foundation | |
| CN119507310B (en) | Construction and Method of Stainless Steel-ECC Prefabricated Pier Column-Foundation Connection Structure in High-Intensity Seismic Zones | |
| CN218596898U (en) | Nondestructive control's multicolumn assembled mound structure system | |
| CN114348179B (en) | Buoy moored offshore platform and construction method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP02 | Change in the address of a patent holder | ||
| CP02 | Change in the address of a patent holder |
Address after: 300350 District, Jinnan District, Tianjin Haihe Education Park, 135 beautiful road, Beiyang campus of Tianjin University Patentee after: Tianjin University Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92 Patentee before: Tianjin University |
|
| AV01 | Patent right actively abandoned | ||
| AV01 | Patent right actively abandoned | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20180130 Effective date of abandoning: 20221004 |
|
| AV01 | Patent right actively abandoned |
Granted publication date: 20180130 Effective date of abandoning: 20221004 |