CN1693591A - Construction method of reconstrating existant underground space into subway station - Google Patents

Construction method of reconstrating existant underground space into subway station Download PDF

Info

Publication number
CN1693591A
CN1693591A CN 200510026628 CN200510026628A CN1693591A CN 1693591 A CN1693591 A CN 1693591A CN 200510026628 CN200510026628 CN 200510026628 CN 200510026628 A CN200510026628 A CN 200510026628A CN 1693591 A CN1693591 A CN 1693591A
Authority
CN
China
Prior art keywords
station
underground
floor
cut
garage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510026628
Other languages
Chinese (zh)
Other versions
CN100338315C (en
Inventor
徐正良
王卓瑛
崔勤
张中杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai city construction and Design Research Institute
Shanghai Urban Construction Group Co.
Original Assignee
Shanghai Urban Construction Design Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Co ltd filed Critical Shanghai Urban Construction Design Research Institute Co ltd
Priority to CNB200510026628XA priority Critical patent/CN100338315C/en
Publication of CN1693591A publication Critical patent/CN1693591A/en
Application granted granted Critical
Publication of CN100338315C publication Critical patent/CN100338315C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A construction method of renovate underground three-storey garage into double-storey subway station. The garage includes top board storey, the first underground floor slab, the second underground floor slab, bottom floor, column and external wall. The procedures are that 1) reconstruction area is set in the garage. 2) The top board storey is reserved as station top board storey, the first underground floor slab is reserved as station central board; the bottom floor is reserved as station bottom floor. 3) The second underground floor slab is eliminated, and is connected to the column said above. The pipe line and traffic structure is not changed, and the reconstruction is local construction is low to change existing underground three storey garage into underground double storey subway station.

Description

The existing underground space is transformed into the job practices of subway station
Technical field
The present invention relates to the city underground construction method, particularly, relate to the job practices of utilizing the underground parking garage space alteration to become the subway station.
Background technology
Subway is just being played the part of more and more important role in urban development.Along with deepening continuously of building, all constructional difficulties of subway station also show especially day by day.According to " urban track traffic design specifications " (DGJ08-109-2004), subway station general standard-required aspect civil engineering has three aspects: 1) the subway concourse floor height is not less than 4250mm, and the platform floor height is not less than 5770mm; 2) width of island station is that 16~22 meters, the width at side formula station are 13.8~17.8 meters; 3) post net spacing is 8~11 meters.The at present general open-cut that adopts, but generally all can relate to relocation of services and traffic organization problem at the open-cut that urban central zone carries out the station, the investment that this has not only improved station itself greatly also causes tremendous influence to peripheral commerce.To this, external once the trial utilizes three targe structures and Mine Method to carry out the construction of underground station, but these methods not only involve great expense, and whether it is suitable for also to still need to weak soil geology (such as the soil property in Shanghai) in essence does further research.
And all can there be the existing underground space in urban central zone at present, such as underground parking garage.For three layers of general basement, such as three layers of underground parking garage, the floor height of its B1 is generally more than 4.2 meters; Its top board and base plate thickness be also big, higher intensity is arranged; Its post net spacing is also bigger, can adapt to vehicle '.
Therefore, may utilize the existing underground space with These characteristics, such as underground parking garage, the floor height of its B1 can satisfy the 1st requirement of subway station aspect civil engineering; Simultaneously, its top board and base plate generally need not to take any measure promptly to can be used as the top board and the base plate use at station; Have again, can satisfy the gauge requirement of subway station to its post net through appropriate reconstruction.
Summary of the invention
In view of the above-mentioned defective of prior art and the possibility that the existing underground space is utilized, the object of the present invention is to provide a kind of existing underground space that will satisfy certain condition to be transformed into the job practices of subway station, a kind of job practices that existing underground parking garage is transformed into the subway station particularly is provided, needn't carry out under the prerequisite of relocation of services and traffic organization, " because of ground suits, construct in the part " just can solve the Construction Problems at whole station with less investment.
Particularly, provided by the inventionly a kind of existing F3/B3 garage parking is transformed into the job practices of two layers of subway station, described existing underground parking garage comprises top board layer, B1 floor, underground two floor plates, base plate, column and exterior wall; May further comprise the steps:
1) in existing F3/B3 garage parking, sets the transformation zone;
2) keep described top board layer as station top board layer, keep described B1 floor, keep described base plate as the station base plate as plate in the station;
3) described underground two floor plates are cut layer as quilt, described floor delimited a plurality of rectangles excavation area at interval by equal proportion, and with described rectangle excavation area longitudinally span be divided into first excavation section and second batch of excavation section, with described each first and second batch of rectangle excavation area equal proportion be divided into three sections, i.e. seat part segmentation at two ends and middle span centre section;
4) reinforce described column;
5) described first excavation section is cut, wherein at first the span centre section is cut, the seat part segmentation with two ends cuts again;
6) by above-mentioned 5) method described second batch of excavation section cut;
7) repeat above-mentioned steps 5) and 6), even two floor plates are cut entirely.
Preferably, in step 4), on four ribs of described column, coat angle steel, and link to each other by the plate that stops.
Preferably, comprise that also the B1 floor that uses as plate in the station is carried out structure to be checked, and surperficial thereon concreting overlapping layers or post carbon fiber at soffit and reinforced.
Preferably, comprise that also the hole is dug out in the corresponding section on described exterior wall when the shield structure arrives described underground garage exterior wall, to realize being connected of subway sectional tunnel and station.
Preferably, with described shield structure shell place described outer within the walls, steel hoop concrete portal circle is set on described exterior wall hole simultaneously.
Description of drawings
Fig. 1 is the sectional schematic diagram of the existing underground space, and wherein this underground space can be three layers a underground parking garage;
Fig. 2 is that column is reinforced lateral view;
Fig. 3 is that A-A after column shown in Figure 2 is reinforced is to sectional view;
Fig. 4 is the plan view that is cut layer shown in Figure 1, and shows and cut step 1;
Fig. 5 is the plan view that is cut layer shown in Figure 4, and shows and cut step 2;
Fig. 6 is the plan view that is cut layer shown in Figure 4, and shows and cut step 3;
Fig. 7 is the sectional schematic diagram after existing F3/B3 garage parking is transformed into two-layer structure;
Fig. 8 is the schematic diagram of first floor plate overlapping layers ruggedized construction under the underground garage of reconstruction structure shown in Figure 7 Central Plains;
Fig. 9 is the schematic diagram of first floor plate carbon fiber reinforcement structure under the underground garage of reconstruction structure shown in Figure 7 Central Plains;
Figure 10 is side wall and a shield structure connection diagram in the reconstruction structure;
Figure 11 is two layers of subway station schematic diagram that are transformed into, and this station is an island station; And
Figure 12 is two layers of subway station schematic diagram that are transformed into, and this station is side formula station.
The specific embodiment
Specifically describe job practices of the present invention below in conjunction with accompanying drawing, referring to Fig. 1, this figure is the sectional schematic diagram of the existing underground space, and wherein this underground space can be three layers a underground parking garage, as Gang Hui square, area, Xujiahui, Shanghai underground parking garage.Existing structure of this underground parking garage and size are: the B1 floor height can satisfy the needs of subway station station hall layer more than 4.2 meters; Top board and base plate thickness are bigger, and the top board and the base plate that need not to take other measure promptly to can be used as the station use; Post net spacing is bigger, can satisfy the gauge requirement of subway station through suitable replacement.Therefore, Gang Hui square underground parking garage is fit to be transformed into two layers of subway station, as shown in Figure 7.
Again as shown in Figure 1, existing underground parking garage comprises top board layer 1, B1 floor 2, underground two floor plates 3, base plate 4 and column 5.In transformation process, do not arrange system owing to do not change original structure, load is no change also, so keep former top board layer 1 as station top board layer.B1 floor 2 can be used as plate in the station, but because the design load of subway station is greater than general civilian construction, after transformation is finished, through original structure is checked, can post carbon fiber 21 ' this floor is reinforced this two kinds of ruggedized constructions such as Fig. 8 and shown in Figure 9 at these floor plate 2 upper surface concreting overlapping layerss 21 or at the beam slab soffit.
Because therefore nearly 6 meters of the station layer floor heights of general subway station can take to cut former underground two floor plates 3, this floor is hereinafter alleged quilt and cuts layer, so that former three layer construction is transformed into two-layer structure so that transform the requirement that the back floor height can meet the platform floor height.Be additional internal force and the distortion of avoiding producing in the process of cutting, should construct in order according to the principle of " symmetry, segmentation, balance ".Below in conjunction with accompanying drawing, describe the step that cuts of the present invention in detail.
Referring to Fig. 4, cut the plan view of layer 3 shown in the figure.At first, this floor delimited a plurality of rectangles excavation area at interval by equal proportion; Again as shown in Figure 5, with these rectangle excavation areas longitudinally span be divided into first excavation section 31 and second batch of excavation section 32, in the drawings, first excavation section 31 is shown in shade, second batch of excavation section 32 is shown in blank, simultaneously, each excavation section 31,32 again on horizontal span equal proportion be divided into three parts, i.e. the seat part segmentation 31a at two ends, 31a ', 32a, 32a ' and middle span centre section 31b, 32b.When cutting, at first cut first excavation section 31, promptly part shown in the shade wherein, cuts span centre section 31b earlier when cutting each section, and seat part segmentation 31a, the 31a ' with two ends cuts again.As shown in Figure 6, when first excavation section 31 is all cut (part shown in the figure empty), again second batch of excavation section 32 (part shown in the shade) all cut.Similarly, earlier span centre section 32b is cut when cutting each section, seat part segmentation 32a, the 32a ' with two ends cuts again.Through aforesaid cutting after the step, the garage structure that is about to former F3/B3 is transformed into two-layer structure.
Owing to cut after the former underground two floor plates 3, former column calculated length is increased greatly, supporting capacity also decreases, and therefore need be reinforced by column 5 before cutting underground two floor plates.Preferably, shown in Fig. 2 and 3, excessive for preventing to reinforce the rear column section, the present invention adopts steel structure body external reinforcement method, promptly coats angle steel 6 on 5 four ribs of existing column, and links to each other by the plate 7 that stops.
In job practices of the present invention, because the base plate 4 in garage adopts normal pile foundation support table under the original place, thickness is bigger, than one of as underground two layers of station base plate higher rigidity and durability are arranged, so kept with as the station base plate.
Through after the above-mentioned construction sequence of the present invention, former underground three-layer garage can be transformed into two layers of subway station as shown in Figure 7, and this station is an island station as shown in figure 11.Certainly, also can be as shown in figure 12 side formula station.
Preferable, no longer ad hoc end well in this improved station, but well is accepted as the shield structure in the end, station.As shown in figure 10, when the shield structure arrived former outer wall of basement 7, hole 71 was dug out in the corresponding section on exterior wall 7, to realize being connected of subway sectional tunnel and station.Consider the needs that reduce existing basement influence and practice of construction, after finishing being connected of running tunnel and station, shield shell 8 discarded in outside no longer take out within the walls, simultaneously steel hoop concrete portal circle 9 is set on the exterior wall hole, combines door with the station and form a running tunnel easily.
As can be known, adopt method of the present invention needn't carry out under the prerequisite of relocation of services and traffic organization from the description of above being done, " because of ground suits, construct in the part " just can utilize existing F3/B3 garage to build up underground two layers of subway station with less investment.

Claims (5)

1. one kind is transformed into the job practices of two layers of subway station with existing F3/B3 garage parking, and described existing underground parking garage comprises top board layer, B1 floor, underground two floor plates, base plate, column and exterior wall; It is characterized in that, may further comprise the steps:
1) in existing F3/B3 garage parking, sets the transformation zone;
2) keep described top board layer as station top board layer, keep described B1 floor, keep described base plate as the station base plate as plate in the station;
3) described underground two floor plates are cut layer as quilt, described floor delimited a plurality of rectangles excavation area at interval by equal proportion, and with described rectangle excavation area longitudinally span be divided into first excavation section and second batch of excavation section, with described each first and second batch of rectangle excavation area equal proportion be divided into three sections, i.e. seat part segmentation at two ends and middle span centre section;
4) reinforce described column;
5) described first excavation section is cut, wherein at first the span centre section is cut, the seat part segmentation with two ends cuts again;
6) by above-mentioned 5) method described second batch of excavation section cut;
7) repeat above-mentioned steps 5) and 6), until entirely descending two floor plates to be cut.
2. job practices as claimed in claim 1 is characterized in that, in step 4), coats angle steel on four ribs of described column, and links to each other by the plate that stops.
3. job practices as claimed in claim 1 is characterized in that, comprises that also the B1 floor that uses as plate in the station is carried out structure to be checked, and surperficial thereon concreting overlapping layers or post carbon fiber at soffit and reinforced.
4. job practices as claimed in claim 1 is characterized in that, comprises that also the hole is dug out in the corresponding section on described exterior wall when the shield structure arrives described underground garage exterior wall, to realize being connected of subway sectional tunnel and station.
5. job practices as claimed in claim 4 is characterized in that, with described shield structure shell place described outer within the walls, steel hoop concrete portal circle is set on described exterior wall hole simultaneously.
CNB200510026628XA 2005-06-09 2005-06-09 Construction method of reconstrating existant underground space into subway station Active CN100338315C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200510026628XA CN100338315C (en) 2005-06-09 2005-06-09 Construction method of reconstrating existant underground space into subway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200510026628XA CN100338315C (en) 2005-06-09 2005-06-09 Construction method of reconstrating existant underground space into subway station

Publications (2)

Publication Number Publication Date
CN1693591A true CN1693591A (en) 2005-11-09
CN100338315C CN100338315C (en) 2007-09-19

Family

ID=35352702

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200510026628XA Active CN100338315C (en) 2005-06-09 2005-06-09 Construction method of reconstrating existant underground space into subway station

Country Status (1)

Country Link
CN (1) CN100338315C (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102108658B (en) * 2009-12-29 2012-10-31 上海市城市建设设计研究院 Construction method for modifying conventional structural slab into subway bed foundation
CN102865083A (en) * 2012-10-24 2013-01-09 上海市城市建设设计研究总院 Working well free shield arrival engineering method and structure of existing basement structure
CN102953739A (en) * 2012-10-26 2013-03-06 中铁二十二局集团第六工程有限公司 Bidirectional punching method for underground excavation of subway station
CN103334771A (en) * 2013-07-09 2013-10-02 中铁十四局集团有限公司 Concrete pouring method of side wall and joint of middle plate and vault by means of underground excavation reverse construction method
CN103469817A (en) * 2013-09-30 2013-12-25 中铁一局集团有限公司 Existing subway station main structure broadening construction method
CN103485366A (en) * 2013-09-30 2014-01-01 中铁一局集团有限公司 Safe stress conversion construction method for improvement on main structure of subway station
CN103541371A (en) * 2013-10-30 2014-01-29 北京城建亚泰建设集团有限公司 Bearing platform for heating pipe channels to stride reserved subway station and construction method thereof
CN103670454A (en) * 2012-09-25 2014-03-26 陈海水 Dislocation type subway station structure
CN104131816A (en) * 2014-06-20 2014-11-05 上海建工五建集团有限公司 Construction method for forming door opening in underground wall of subway tunnel in operation
EA021287B1 (en) * 2011-03-03 2015-05-29 Общество С Ограниченной Ответственностью "Спецметропроект" (Ооо "Спецметропроект") Double-level deep subway station complex
CN105019715A (en) * 2015-08-06 2015-11-04 上海市城市建设设计研究总院 Structure jointly constructed by subway station and buildings
CN105507101A (en) * 2016-01-27 2016-04-20 上海市城市建设设计研究总院 Method for laying tramcar in existing underground space and tramcar framework
CN106193644A (en) * 2016-07-26 2016-12-07 朱奎 Basement reconstruction structure with raft foundation building
CN106285032A (en) * 2016-07-26 2017-01-04 朱奎 Basement reconstruction structure with raft foundation building
CN107489284A (en) * 2017-08-02 2017-12-19 南京叭叭智能科技有限公司 Basement locally increases the construction method in deeper subsurface garage newly
CN108343085A (en) * 2018-03-02 2018-07-31 中铁十二局集团第二工程有限公司 The subway work method of major urban arterial highway
CN114439267A (en) * 2022-02-16 2022-05-06 浙大城市学院 Road structure transformed from super-huge independent underground garage and construction method thereof
RU2808273C1 (en) * 2023-02-14 2023-11-28 Акционерное общество "Научно-исследовательский центр "Строительство" Subway line in deep urban areas

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1021986C (en) * 1991-05-25 1993-09-01 北京市城建设计研究院 Method for building large underground space
JP3327191B2 (en) * 1997-11-19 2002-09-24 鹿島建設株式会社 Underground structure and its construction method

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102108658B (en) * 2009-12-29 2012-10-31 上海市城市建设设计研究院 Construction method for modifying conventional structural slab into subway bed foundation
EA021287B1 (en) * 2011-03-03 2015-05-29 Общество С Ограниченной Ответственностью "Спецметропроект" (Ооо "Спецметропроект") Double-level deep subway station complex
CN103670454B (en) * 2012-09-25 2016-05-18 陈海水 Dystopy formula subway station structure
CN103670454A (en) * 2012-09-25 2014-03-26 陈海水 Dislocation type subway station structure
CN102865083A (en) * 2012-10-24 2013-01-09 上海市城市建设设计研究总院 Working well free shield arrival engineering method and structure of existing basement structure
CN102953739B (en) * 2012-10-26 2015-05-06 中铁二十二局集团第六工程有限公司 Bidirectional punching method for underground excavation of subway station
CN102953739A (en) * 2012-10-26 2013-03-06 中铁二十二局集团第六工程有限公司 Bidirectional punching method for underground excavation of subway station
CN103334771A (en) * 2013-07-09 2013-10-02 中铁十四局集团有限公司 Concrete pouring method of side wall and joint of middle plate and vault by means of underground excavation reverse construction method
CN103469817A (en) * 2013-09-30 2013-12-25 中铁一局集团有限公司 Existing subway station main structure broadening construction method
CN103469817B (en) * 2013-09-30 2015-05-13 中铁一局集团有限公司 Existing subway station main structure broadening construction method
CN103485366B (en) * 2013-09-30 2015-05-13 中铁一局集团有限公司 Safe stress conversion construction method for improvement on main structure of subway station
CN103485366A (en) * 2013-09-30 2014-01-01 中铁一局集团有限公司 Safe stress conversion construction method for improvement on main structure of subway station
CN103541371A (en) * 2013-10-30 2014-01-29 北京城建亚泰建设集团有限公司 Bearing platform for heating pipe channels to stride reserved subway station and construction method thereof
CN103541371B (en) * 2013-10-30 2015-07-15 北京城建亚泰建设集团有限公司 Bearing platform for heating pipe channels to stride reserved subway station and construction method thereof
CN104131816A (en) * 2014-06-20 2014-11-05 上海建工五建集团有限公司 Construction method for forming door opening in underground wall of subway tunnel in operation
CN104131816B (en) * 2014-06-20 2019-02-12 上海建工五建集团有限公司 The construction method in subway tunnel subterranean wall enabling hole in a kind of operation
CN105019715A (en) * 2015-08-06 2015-11-04 上海市城市建设设计研究总院 Structure jointly constructed by subway station and buildings
CN105507101A (en) * 2016-01-27 2016-04-20 上海市城市建设设计研究总院 Method for laying tramcar in existing underground space and tramcar framework
CN106285032A (en) * 2016-07-26 2017-01-04 朱奎 Basement reconstruction structure with raft foundation building
CN106193644A (en) * 2016-07-26 2016-12-07 朱奎 Basement reconstruction structure with raft foundation building
CN106285032B (en) * 2016-07-26 2018-12-14 朱奎 Basement reconstruction construction with raft foundation building
CN106193644B (en) * 2016-07-26 2018-12-14 朱奎 Basement reconstruction structure with raft foundation building
CN107489284B (en) * 2017-08-02 2020-05-29 南京叭叭智能科技有限公司 Construction method for local newly-added deep underground garage of basement
CN107489284A (en) * 2017-08-02 2017-12-19 南京叭叭智能科技有限公司 Basement locally increases the construction method in deeper subsurface garage newly
CN108343085A (en) * 2018-03-02 2018-07-31 中铁十二局集团第二工程有限公司 The subway work method of major urban arterial highway
CN114439267A (en) * 2022-02-16 2022-05-06 浙大城市学院 Road structure transformed from super-huge independent underground garage and construction method thereof
WO2023155469A1 (en) * 2022-02-16 2023-08-24 浙大城市学院 Road structure transformed from oversized detached underground garage and construction method thereof
CN114439267B (en) * 2022-02-16 2024-03-22 浙大城市学院 Transformation of oversized independent underground garage into road structure and construction method thereof
US11952728B2 (en) 2022-02-16 2024-04-09 Hangzhou City University Road structure reconstructed from large-scale independent underground garage and construction method thereof
RU2808273C1 (en) * 2023-02-14 2023-11-28 Акционерное общество "Научно-исследовательский центр "Строительство" Subway line in deep urban areas

Also Published As

Publication number Publication date
CN100338315C (en) 2007-09-19

Similar Documents

Publication Publication Date Title
CN100338315C (en) Construction method of reconstrating existant underground space into subway station
CN111945891B (en) Ring truss high-altitude in-situ splicing construction method
CN100348835C (en) Construction method of subsurface excavation and layer added by using top layer of existed basement as native cover board
CN100441779C (en) Bridge construction method for air prefabrication and translation in place
CN105862910B (en) A kind of the inverse of assembled stereoscopic underground garage makees formula method of construction
CN110578339B (en) Construction method of shaft type underground stereo garage
CN101092850A (en) Method and installation for rising building or historical building / cluster of historical building integrally
CN106894639A (en) The hanging reverse construction method of installation of steel construction under a kind of
CN107842035A (en) A kind of ultra-high performance concrete precast assembly pipe gallery system and construction method
CN110886227B (en) Main tower cast-in-place lower cross beam support system and construction method
CN1818233A (en) Underpinning method of pile ground underground
CN202787055U (en) Pier fixed connection structure of steel structure overhead bridge
CN208266912U (en) A kind of roadbed section retaining wall
CN112982433A (en) Foundation pit supporting system supported by foot hanging piles and main body structure and construction method
CN110939139B (en) Pile plate wall structure based on rigid contact of post-pile special-shaped retaining wall and construction method thereof
CN111608435A (en) Subway station and viaduct combined construction structure and construction method thereof
CN116856932A (en) Large-diameter prestress assembly vertical shaft structure containing glass fiber rib part and construction method
CN104074370B (en) A kind of building with brick-concrete structure entirety cross the river shift method and special support changing device thereof
CN1126786A (en) Hidden construction process of large underground engineering with flat roof and vertical walls
CN207211869U (en) A kind of basic digging-free assembled tower-type space garage
CN1206422C (en) Technology building up diagonal space brace by reverse masonry method
JP2004225529A (en) Continuous laying method for precast concrete slab
CN208009464U (en) A kind of intelligence rail train ground stop basis structure and station
CN205636771U (en) Assembled garage structure system based on precast pile
CN219732023U (en) Fender pile and steel diagonal bracing fender structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI URBAN CONSTRUCTION ACADEMY; SHANGHAI URB

Free format text: FORMER OWNER: SHANGHAI URBAN CONSTRUCTION ACADEMY

Effective date: 20080829

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20080829

Address after: No. 3447 Dongfang Road, Shanghai, Pudong New Area: 200125

Co-patentee after: Shanghai Urban Construction Group Co.

Patentee after: Shanghai city construction and Design Research Institute

Address before: No. 1170 South Shanghai Road, Tibet, China: 200011

Patentee before: Shanghai Urban Construction Design and Research Institute