The existing underground space is transformed into the job practices of subway station
Technical field
The present invention relates to the city underground construction method, particularly, relate to the job practices of utilizing the underground parking garage space alteration to become the subway station.
Background technology
Subway is just being played the part of more and more important role in urban development.Along with deepening continuously of building, all constructional difficulties of subway station also show especially day by day.According to " urban track traffic design specifications " (DGJ08-109-2004), subway station general standard-required aspect civil engineering has three aspects: 1) the subway concourse floor height is not less than 4250mm, and the platform floor height is not less than 5770mm; 2) width of island station is that 16~22 meters, the width at side formula station are 13.8~17.8 meters; 3) post net spacing is 8~11 meters.The at present general open-cut that adopts, but generally all can relate to relocation of services and traffic organization problem at the open-cut that urban central zone carries out the station, the investment that this has not only improved station itself greatly also causes tremendous influence to peripheral commerce.To this, external once the trial utilizes three targe structures and Mine Method to carry out the construction of underground station, but these methods not only involve great expense, and whether it is suitable for also to still need to weak soil geology (such as the soil property in Shanghai) in essence does further research.
And all can there be the existing underground space in urban central zone at present, such as underground parking garage.For three layers of general basement, such as three layers of underground parking garage, the floor height of its B1 is generally more than 4.2 meters; Its top board and base plate thickness be also big, higher intensity is arranged; Its post net spacing is also bigger, can adapt to vehicle '.
Therefore, may utilize the existing underground space with These characteristics, such as underground parking garage, the floor height of its B1 can satisfy the 1st requirement of subway station aspect civil engineering; Simultaneously, its top board and base plate generally need not to take any measure promptly to can be used as the top board and the base plate use at station; Have again, can satisfy the gauge requirement of subway station to its post net through appropriate reconstruction.
Summary of the invention
In view of the above-mentioned defective of prior art and the possibility that the existing underground space is utilized, the object of the present invention is to provide a kind of existing underground space that will satisfy certain condition to be transformed into the job practices of subway station, a kind of job practices that existing underground parking garage is transformed into the subway station particularly is provided, needn't carry out under the prerequisite of relocation of services and traffic organization, " because of ground suits, construct in the part " just can solve the Construction Problems at whole station with less investment.
Particularly, provided by the inventionly a kind of existing F3/B3 garage parking is transformed into the job practices of two layers of subway station, described existing underground parking garage comprises top board layer, B1 floor, underground two floor plates, base plate, column and exterior wall; May further comprise the steps:
1) in existing F3/B3 garage parking, sets the transformation zone;
2) keep described top board layer as station top board layer, keep described B1 floor, keep described base plate as the station base plate as plate in the station;
3) described underground two floor plates are cut layer as quilt, described floor delimited a plurality of rectangles excavation area at interval by equal proportion, and with described rectangle excavation area longitudinally span be divided into first excavation section and second batch of excavation section, with described each first and second batch of rectangle excavation area equal proportion be divided into three sections, i.e. seat part segmentation at two ends and middle span centre section;
4) reinforce described column;
5) described first excavation section is cut, wherein at first the span centre section is cut, the seat part segmentation with two ends cuts again;
6) by above-mentioned 5) method described second batch of excavation section cut;
7) repeat above-mentioned steps 5) and 6), even two floor plates are cut entirely.
Preferably, in step 4), on four ribs of described column, coat angle steel, and link to each other by the plate that stops.
Preferably, comprise that also the B1 floor that uses as plate in the station is carried out structure to be checked, and surperficial thereon concreting overlapping layers or post carbon fiber at soffit and reinforced.
Preferably, comprise that also the hole is dug out in the corresponding section on described exterior wall when the shield structure arrives described underground garage exterior wall, to realize being connected of subway sectional tunnel and station.
Preferably, with described shield structure shell place described outer within the walls, steel hoop concrete portal circle is set on described exterior wall hole simultaneously.
Description of drawings
Fig. 1 is the sectional schematic diagram of the existing underground space, and wherein this underground space can be three layers a underground parking garage;
Fig. 2 is that column is reinforced lateral view;
Fig. 3 is that A-A after column shown in Figure 2 is reinforced is to sectional view;
Fig. 4 is the plan view that is cut layer shown in Figure 1, and shows and cut step 1;
Fig. 5 is the plan view that is cut layer shown in Figure 4, and shows and cut step 2;
Fig. 6 is the plan view that is cut layer shown in Figure 4, and shows and cut step 3;
Fig. 7 is the sectional schematic diagram after existing F3/B3 garage parking is transformed into two-layer structure;
Fig. 8 is the schematic diagram of first floor plate overlapping layers ruggedized construction under the underground garage of reconstruction structure shown in Figure 7 Central Plains;
Fig. 9 is the schematic diagram of first floor plate carbon fiber reinforcement structure under the underground garage of reconstruction structure shown in Figure 7 Central Plains;
Figure 10 is side wall and a shield structure connection diagram in the reconstruction structure;
Figure 11 is two layers of subway station schematic diagram that are transformed into, and this station is an island station; And
Figure 12 is two layers of subway station schematic diagram that are transformed into, and this station is side formula station.
The specific embodiment
Specifically describe job practices of the present invention below in conjunction with accompanying drawing, referring to Fig. 1, this figure is the sectional schematic diagram of the existing underground space, and wherein this underground space can be three layers a underground parking garage, as Gang Hui square, area, Xujiahui, Shanghai underground parking garage.Existing structure of this underground parking garage and size are: the B1 floor height can satisfy the needs of subway station station hall layer more than 4.2 meters; Top board and base plate thickness are bigger, and the top board and the base plate that need not to take other measure promptly to can be used as the station use; Post net spacing is bigger, can satisfy the gauge requirement of subway station through suitable replacement.Therefore, Gang Hui square underground parking garage is fit to be transformed into two layers of subway station, as shown in Figure 7.
Again as shown in Figure 1, existing underground parking garage comprises top board layer 1, B1 floor 2, underground two floor plates 3, base plate 4 and column 5.In transformation process, do not arrange system owing to do not change original structure, load is no change also, so keep former top board layer 1 as station top board layer.B1 floor 2 can be used as plate in the station, but because the design load of subway station is greater than general civilian construction, after transformation is finished, through original structure is checked, can post carbon fiber 21 ' this floor is reinforced this two kinds of ruggedized constructions such as Fig. 8 and shown in Figure 9 at these floor plate 2 upper surface concreting overlapping layerss 21 or at the beam slab soffit.
Because therefore nearly 6 meters of the station layer floor heights of general subway station can take to cut former underground two floor plates 3, this floor is hereinafter alleged quilt and cuts layer, so that former three layer construction is transformed into two-layer structure so that transform the requirement that the back floor height can meet the platform floor height.Be additional internal force and the distortion of avoiding producing in the process of cutting, should construct in order according to the principle of " symmetry, segmentation, balance ".Below in conjunction with accompanying drawing, describe the step that cuts of the present invention in detail.
Referring to Fig. 4, cut the plan view of layer 3 shown in the figure.At first, this floor delimited a plurality of rectangles excavation area at interval by equal proportion; Again as shown in Figure 5, with these rectangle excavation areas longitudinally span be divided into first excavation section 31 and second batch of excavation section 32, in the drawings, first excavation section 31 is shown in shade, second batch of excavation section 32 is shown in blank, simultaneously, each excavation section 31,32 again on horizontal span equal proportion be divided into three parts, i.e. the seat part segmentation 31a at two ends, 31a ', 32a, 32a ' and middle span centre section 31b, 32b.When cutting, at first cut first excavation section 31, promptly part shown in the shade wherein, cuts span centre section 31b earlier when cutting each section, and seat part segmentation 31a, the 31a ' with two ends cuts again.As shown in Figure 6, when first excavation section 31 is all cut (part shown in the figure empty), again second batch of excavation section 32 (part shown in the shade) all cut.Similarly, earlier span centre section 32b is cut when cutting each section, seat part segmentation 32a, the 32a ' with two ends cuts again.Through aforesaid cutting after the step, the garage structure that is about to former F3/B3 is transformed into two-layer structure.
Owing to cut after the former underground two floor plates 3, former column calculated length is increased greatly, supporting capacity also decreases, and therefore need be reinforced by column 5 before cutting underground two floor plates.Preferably, shown in Fig. 2 and 3, excessive for preventing to reinforce the rear column section, the present invention adopts steel structure body external reinforcement method, promptly coats angle steel 6 on 5 four ribs of existing column, and links to each other by the plate 7 that stops.
In job practices of the present invention, because the base plate 4 in garage adopts normal pile foundation support table under the original place, thickness is bigger, than one of as underground two layers of station base plate higher rigidity and durability are arranged, so kept with as the station base plate.
Through after the above-mentioned construction sequence of the present invention, former underground three-layer garage can be transformed into two layers of subway station as shown in Figure 7, and this station is an island station as shown in figure 11.Certainly, also can be as shown in figure 12 side formula station.
Preferable, no longer ad hoc end well in this improved station, but well is accepted as the shield structure in the end, station.As shown in figure 10, when the shield structure arrived former outer wall of basement 7, hole 71 was dug out in the corresponding section on exterior wall 7, to realize being connected of subway sectional tunnel and station.Consider the needs that reduce existing basement influence and practice of construction, after finishing being connected of running tunnel and station, shield shell 8 discarded in outside no longer take out within the walls, simultaneously steel hoop concrete portal circle 9 is set on the exterior wall hole, combines door with the station and form a running tunnel easily.
As can be known, adopt method of the present invention needn't carry out under the prerequisite of relocation of services and traffic organization from the description of above being done, " because of ground suits, construct in the part " just can utilize existing F3/B3 garage to build up underground two layers of subway station with less investment.