CN201241329Y - Positioner of steel pipe column - Google Patents

Positioner of steel pipe column Download PDF

Info

Publication number
CN201241329Y
CN201241329Y CNU2008203013785U CN200820301378U CN201241329Y CN 201241329 Y CN201241329 Y CN 201241329Y CN U2008203013785 U CNU2008203013785 U CN U2008203013785U CN 200820301378 U CN200820301378 U CN 200820301378U CN 201241329 Y CN201241329 Y CN 201241329Y
Authority
CN
China
Prior art keywords
pipe column
steel pipe
plate
positioning
positioning plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008203013785U
Other languages
Chinese (zh)
Inventor
赵明
杨开中
吴亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING ZHUZONG MUNICIPAL ENGINEERING Co Ltd
BEIJING ZHUZONG GROUP Co Ltd
Original Assignee
BEIJING ZHUZONG MUNICIPAL ENGINEERING Co Ltd
BEIJING ZHUZONG GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ZHUZONG MUNICIPAL ENGINEERING Co Ltd, BEIJING ZHUZONG GROUP Co Ltd filed Critical BEIJING ZHUZONG MUNICIPAL ENGINEERING Co Ltd
Priority to CNU2008203013785U priority Critical patent/CN201241329Y/en
Application granted granted Critical
Publication of CN201241329Y publication Critical patent/CN201241329Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

Disclosed is a positioner of a steel pipe column, including a horizontal positioning base and a delivery plate which is welded on a surface center of the positioning base. The delivery plate is a cross vertical plate with a cruciform cross section, the diameter of the delivery plate is decreased gradually from the middle and lower part to the top, the lower surface of the positioning base is welded with a ground anchor steel reinforcement, long circular positioning holes in radial arrangement are opened on the positioning base, a vertical bolt which is used for connecting a pre-embedded anchor protection foot is passed through the positioning hole. The utility model has the beneficial effects that the disadvantage that a traditional positioner is easy to displace is overcame, connecting the utility model with a steel casing and a foundation pile can realize the function of delivery, limitation and accurate positioning of the steel pipe column, and the structure is simple, the operation is convenient, the construction is rapid, not only the construction period is shorten, but also the fund is saved, the utility model has a very strong practicality, the safety of the constructor is guaranteed, the construction efficiency is increased, the lower end positioning of the steel pipe column is guaranteed effectively, then the construction quality and the precision of the steel pipe column are controlled.

Description

The locator of steel pipe column
Technical field
The utility model relates to a kind of positioner that steel pipe column and foundation pile are used that connects.
Background technology
At present, the steel pipe column construction of the subway station of cap excavation method construction and construction of underground structure adopts the manual pore-forming to pile interface absolute altitude place, become foundation pile from this employing mechanical hole building concrete perfusion again, then in positioning steel tube post lower end, stake top, the method of steel pipe column or excavating shaft absolute altitude place at the bottom of the steel pipe column post is installed at last, excavate the lower end of the little pilot tunnel positioning steel tube of level post then, the method that steel pipe column is installed at last.Because the quality of steel pipe column is bigger, the lower end swing is restive in the process of hanging, therefore, generally at the bottom of post, put locator in the absolute altitude place, but locator is often collided by steel pipe column, cause locator to move, pipe column lower end can't quick and precisely be located with foundation pile, finally still can not guarantee the construction quality and the required precision of steel pipe column.
The utility model content
In order to overcome the deficiencies in the prior art, the utility model provides a kind of locator of steel pipe column, solve the technical problem that steel pipe column and foundation pile are quick and precisely located.
The technical scheme that its technical problem that solves the utility model adopts is:
A kind of locator of steel pipe column, the positioning plate and the extradition plate that is welded on positioning plate upper surface center that comprise level, it is characterized in that: above-mentioned extradition plate is that cross section is criss-cross intersection riser, the diameter of extradition plate is gradually little to the top from the middle and lower part, the soffit of above-mentioned positioning plate is welded with the earth anchor reinforcing bar, have the Long Circle locating hole of radial arrangement on the positioning plate, be installed with the longitudinal bolt that is used to connect pre-buried anchoring pin in the locating hole.
Be connected with pre-buried anchoring pin through the location ironware below the above-mentioned positioning plate.
The head of above-mentioned extradition plate can be flat-headed or taper.
Above-mentioned positioning plate can be the polygon of circle, rectangle, cross, rhombus or symmetry.
The beneficial effects of the utility model are to have overcome the shortcoming that traditional locator is easy to be shifted, and it is connected with steel casing and foundation pile are organic, can realize extradition, qualification, pinpoint function to steel pipe column, and it is simple in structure, easy to operate, construction had both been shortened the duration fast, saved fund again, very strong practicality is arranged, ensured constructor's safety, improved efficiency of construction, effectively guarantee the location, lower end of steel pipe column, and then the construction quality and the precision of control steel pipe column.Long Circle locating hole on the positioning plate helps regulating the centering position of positioning plate.The selection of location ironware can make a kind of positioning plate be adapted to the steel casing of different-diameter.
The utility model can be widely used in steel pipe column and foundation pile construction technology in the underground construction, is particularly useful for steel pipe column and foundation pile pile unification construction that the ground iron covering digs the station.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the connection diagram of the utility model and steel casing.
Fig. 2 is the syndeton schematic diagram of extradition plate and positioning plate.
Fig. 3 is the schematic top plan view of Fig. 2.
Reference numeral: 1-extradition plate, 2-positioning plate, 3-locating hole, 4-earth anchor reinforcing bar, 5-longitudinal bolt, the pre-buried anchoring pin of 6-, 7-steel casing, 8-steel pipe column, 9-location ironware.
The specific embodiment
Embodiment: the locator of this steel pipe column, shown in Fig. 1-3, the positioning plate 2 and the extradition plate 1 that is welded on positioning plate upper surface center that comprise level, above-mentioned extradition plate 1 is criss-cross intersection riser for cross section, the diameter of extradition plate 1 is gradually little to the top from the middle and lower part, and the head of extradition plate 1 can be flat-headed or taper.The soffit of above-mentioned positioning plate 2 is welded with earth anchor reinforcing bar 4, have the Long Circle locating hole 3 of radial arrangement on the positioning plate 2, be installed with the longitudinal bolt 5 that is used to connect pre-buried anchoring pin 6 in the locating hole, positioning plate 2 can be the polygon of circle, rectangle, cross, rhombus or symmetry.
The utility model can pass locating hole 3 by longitudinal bolt 5 and be connected with location ironware 9, and the pre-buried anchoring pin 6 of locating on the inwall of ironware 9 other ends and steel casing 7 bottoms is connected.Also can pass locating hole 3 by longitudinal bolt 5 directly is connected with pre-buried anchoring pin 6.
A kind of job practices of using the locator of above-mentioned steel pipe column is characterized in that construction sequence is as follows:
Step 1 according to designing requirement, is bored the stake hole with rig in design and installation steel pipe column 8 parts.
Step 2 hangs foundation pile reinforcing cage and steel casing to the stake hole, and the bottom of steel casing will encase the top of the vertical muscle of foundation pile reinforcing cage, and with its welding, fixedly connected pre-buried anchoring pin on the inwall of steel casing bottom.
Step 3, earlier that the mud pump drainage in the steel casing is clean, perfusion foundation pile concrete extremely surpasses till the pile foundation end face absolute altitude in the stake hole.
Step 4 cuts the pile crown concrete laitance in the steel casing, again until exposing pre-buried anchoring pin.
Step 5, the locator of installation steel pipe column is fixedlyed connected the locator of steel pipe column with longitudinal bolt earlier with pre-buried anchoring pin in the steel casing, pours into a mould the anchoring concrete again, with the locator anchoring of steel pipe column.
Step 6 hangs steel pipe column 8, makes its root be enclosed within the locator periphery of steel pipe column, measures and determines the steel pipe column verticality, is controlled in the one thousandth scope.Above-mentioned stake top, hole performs the fore shaft collar tie beam earlier, and at the inwall pre-embedded steel slab of fore shaft collar tie beam, the locating rack location is adopted on the top of steel pipe column, and locating rack is fixedly welded on the steel plate of fore shaft collar tie beam.Between steel pipe column and steel casing, build the rim of a cup concrete, with the locator anchoring of steel pipe column and steel pipe column.
Step 7, perfusion steel pipe column inner concrete.
Step 8, gap between steel casing and steel pipe column are filled backfill sand to the face of land, treat the initial set of steel pipe column inner concrete after, play pull steel protective-cylinder so that recycling, a joint of steel casing lowermost end can keep.After pulling out the steel casing, steel pipe column and foundation pile construction finish.
Above-mentioned steel casing is joined end to end to connect by a section cylindrical shell and forms, and wherein two joints in steel casing bottom are to be connected by inner flange between the cylindrical shells, is connected with cross bolts by porose steel plate between other cylindrical shell and the cylindrical shell.

Claims (4)

  1. The locator of [claim 1] a kind of steel pipe column, comprise the positioning plate (2) of level and be welded on the extradition plate (1) at positioning plate upper surface center, it is characterized in that: above-mentioned extradition plate (1) is criss-cross intersection riser for cross section, the diameter of extradition plate (1) is gradually little to the top from the middle and lower part, the soffit of above-mentioned positioning plate (2) is welded with earth anchor reinforcing bar (4), have the Long Circle locating hole (3) of radial arrangement on the positioning plate (2), be installed with the longitudinal bolt (5) that is used to connect pre-buried anchoring pin (6) in the locating hole.
  2. The locator of [claim 2] steel pipe column according to claim 1 is characterized in that: be connected with pre-buried anchoring pin (6) through location ironware (9) below the above-mentioned positioning plate (2).
  3. The locator of [claim 3] steel pipe column according to claim 1 is characterized in that: the head of above-mentioned extradition plate (1) is flat-headed or taper.
  4. The locator of [claim 4] steel pipe column according to claim 1 is characterized in that: above-mentioned positioning plate (2) is the polygon of circle, rectangle, cross, rhombus or symmetry.
CNU2008203013785U 2008-07-01 2008-07-01 Positioner of steel pipe column Expired - Lifetime CN201241329Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008203013785U CN201241329Y (en) 2008-07-01 2008-07-01 Positioner of steel pipe column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008203013785U CN201241329Y (en) 2008-07-01 2008-07-01 Positioner of steel pipe column

Publications (1)

Publication Number Publication Date
CN201241329Y true CN201241329Y (en) 2009-05-20

Family

ID=40714624

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008203013785U Expired - Lifetime CN201241329Y (en) 2008-07-01 2008-07-01 Positioner of steel pipe column

Country Status (1)

Country Link
CN (1) CN201241329Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101941189A (en) * 2010-09-21 2011-01-12 力帆实业(集团)股份有限公司 Assembly tool for front shock absorbers of motorcycle
CN102587383A (en) * 2012-03-12 2012-07-18 长江航运规划设计院 Positioning method and device for underwater installation of prefabricated crossbeam
CN103061454A (en) * 2012-12-13 2013-04-24 中铁二十局集团第四工程有限公司 Locating method of installing concrete filled steel tubular column in underground deep hole
CN105888265A (en) * 2016-03-01 2016-08-24 中国建筑第六工程局有限公司 Steel structure provisional measure latticed column butt junction location device and method
CN107354998A (en) * 2017-07-19 2017-11-17 姚攀峰 A kind of foundation-free node and its construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101941189A (en) * 2010-09-21 2011-01-12 力帆实业(集团)股份有限公司 Assembly tool for front shock absorbers of motorcycle
CN101941189B (en) * 2010-09-21 2012-08-08 力帆实业(集团)股份有限公司 Assembly tool for front shock absorbers of motorcycle
CN102587383A (en) * 2012-03-12 2012-07-18 长江航运规划设计院 Positioning method and device for underwater installation of prefabricated crossbeam
CN102587383B (en) * 2012-03-12 2014-06-11 长江航运规划设计院 Positioning method and device for underwater installation of prefabricated crossbeam
CN103061454A (en) * 2012-12-13 2013-04-24 中铁二十局集团第四工程有限公司 Locating method of installing concrete filled steel tubular column in underground deep hole
CN105888265A (en) * 2016-03-01 2016-08-24 中国建筑第六工程局有限公司 Steel structure provisional measure latticed column butt junction location device and method
CN107354998A (en) * 2017-07-19 2017-11-17 姚攀峰 A kind of foundation-free node and its construction method
CN107354998B (en) * 2017-07-19 2023-04-11 姚攀峰 Foundation-free joint and construction method thereof

Similar Documents

Publication Publication Date Title
CN101294384A (en) Pile, pole interface positioning device and construction method
CN201241335Y (en) Pile and post in one foundation structure of underground engineering
CN101122131B (en) Foundation pit supporting pile using pipe casting pile embedding in rock
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN102162258B (en) Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof
CN201241329Y (en) Positioner of steel pipe column
CN2926319Y (en) Rooted foundation and anchored topped-push construction set apparatus
CN106759448A (en) A kind of sunk type agricultural greenhouse photovoltaic bracket foundation structure and its construction method
CN109706939A (en) Deep basal pit prestressing combination bracing members and construction method
CN104988915A (en) Prefabrication and installation method of detachable steel protection tube device and underwater connection beam
CN109811779A (en) A kind of prefabricated open caisson section of jurisdiction and open caisson construction method
CN111364449A (en) Construction method and structure for penetrating karst cave of precast tubular pile
CN104711931B (en) Temporary underwater pier manufacturing, assembling and disassembling method suitable for bridge erection
CN108360535A (en) Foundation pit supporting construction based on campshed and inner support and its construction method
CN107355008A (en) A kind of prefabricated attachment structure and method of newly-increased steel core concrete column and existing structure
CN208472718U (en) A kind of complex geological condition utilizes churning driven combination impact drill combination construction device
CN110593303A (en) Heat distribution pipeline prefabricated reinforced concrete fixed buttress and construction method
CN201991013U (en) High-piled tower footing structure of tower crane concrete-filled steel tube
CN106193644A (en) Basement reconstruction structure with raft foundation building
CN212052717U (en) Structure for penetrating karst cave of precast tubular pile
CN105064334A (en) Construction method for cast-in-situ bored pile
CN105525624A (en) Connecting and water resisting method for assembled steel pipe column type tower crane foundation and structural base plate
JPH08296243A (en) Construction method for underground structure by precast concrete central pillar
JP4373824B2 (en) Joining method of cast-in-place pile and steel pipe column
CN108952765B (en) Construction method for advanced support of super-large pipe shed on water-rich sand layer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhao Ming

Inventor after: Wu Liang

Inventor after: Yang Kaizhong

Inventor after: Zhang Zhihong

Inventor before: Zhao Ming

Inventor before: Yang Kaizhong

Inventor before: Wu Liang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHAO MING; YANG KAIZHONG; WU LIANG TO: ZHAO MING; WU LIANG; YANG KAIZHONG; ZHANG ZHIHONG

CU03 Correction of utility model patent gazette

Correction item: Name|Co-inventor

Correct: Zhao Ming|Wu Liang|Yang Kaizhong|Zhang Zhihong

False: Zhao Ming|Wu Liang|Yang Kaizhong|Zhang Zhihong

Number: 05

Volume: 26

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090520