CN103061454A - Locating method of installing concrete filled steel tubular column in underground deep hole - Google Patents

Locating method of installing concrete filled steel tubular column in underground deep hole Download PDF

Info

Publication number
CN103061454A
CN103061454A CN2012105396114A CN201210539611A CN103061454A CN 103061454 A CN103061454 A CN 103061454A CN 2012105396114 A CN2012105396114 A CN 2012105396114A CN 201210539611 A CN201210539611 A CN 201210539611A CN 103061454 A CN103061454 A CN 103061454A
Authority
CN
China
Prior art keywords
pile
steel
locator
installation
deep hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105396114A
Other languages
Chinese (zh)
Inventor
周玉兵
田玉奎
宋鹏杰
李善明
徐学磊
黄小军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 20th Bureau Group Corp
Original Assignee
China Railway 20th Bureau Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 20th Bureau Group Corp filed Critical China Railway 20th Bureau Group Corp
Priority to CN2012105396114A priority Critical patent/CN103061454A/en
Publication of CN103061454A publication Critical patent/CN103061454A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention provides a locating method of installing a concrete filled steel tubular column in an underground deep hole. The locating method includes the following steps: 1) using a manual hole digging pile as an installation work space before installing the concrete filled steel tubular column, and digging the manual hole digging pile from the original ground to a bottom elevation of a base uplift pile of the concrete filled steel tubular column; 2) hoisting a base pile (an uplift pile steel reinforcement cage) of the concrete filled steel tubular column after construction of the manual hole digging pile is finished; 3) fixing the uplift pile steel reinforcement cage, and installing a locator for locating; 4) rechecking an elevation and the central position of the locator; 5) pouring uplift pile concrete after the position and the elevation of the locator are checked to be correct; 6) installing a steel tube of the concrete filled steel tubular column after concrete strength meets a design requirement; 7) checking whether installing of the steel tube meets a requirement or not, and if yes, pouring concrete of the interior of the steel tube; and 8) inserting a top steel reinforcement cage into the steel tube to serve as a top beam anchor steel bar after the pouring of the concrete is finished. The construction method is simple and strong in operability.

Description

The installation and locating method of a kind of steel core concrete column in underground deep hole
(1) technical field
The present invention relates to a kind of job practices of steel core concrete column, specifically the installation and locating method of a kind of steel core concrete column in the ground iron covering digs the underground deep hole in station.
(2) background technology
Steel core concrete column refers to after penstock installation is in place, builds the high strength self-compacting concrete in inside as the permanent support post of agent structure.Great majority are applied to the urban skyscraper structure.Conventional construction method is: steel core concrete column is above space mounting on ground, adjust steel pipe position and height by crane, utilize electronic theodolite and level gauge measurement and positioning, because the ground construction place is open, can make its accurate location by adjusting the steel pipe position.Therefore, when installed on ground, the location and installation of steel pipe was easy to operate, and the position is easily adjusted.And for installing concrete filled steel tube column structure in the underground deep hole, owing to being subject to the impact of construction plant and construction environment, can't utilize electronic theodolite and level gauge accurately to locate, thereby installation is still rare in underground deep hole, and especially steel pipe is located the difficult point place that precision problem is construction always in underground deep hole.In addition, limited space is adjusted in steel pipe position in deep hole, does not have construction operation personnel operation space, so only realize that by adjusting steel pipe accurately the location is difficult to realize.
(3) summary of the invention
Technical assignment of the present invention is for the deficiencies in the prior art, and the installation and locating method of a kind of steel core concrete column in underground deep hole is provided.The method referred to before penstock installation, reached designing requirement for guaranteeing the penstock installation precision, installed in advance locator on the foundation pile surface, and the position of locator and absolute altitude precision and steel pipe are in full accord, reach requirement to accomplish the penstock installation precision.
The technical solution adopted for the present invention to solve the technical problems is:
The installation and locating method of a kind of steel core concrete column in underground deep hole, the method is carried out according to following steps:
1) steel core concrete column utilizes hand excavated pile as the installation work space before installation, and hand excavated pile digs to steel core concrete column foundation anti-pulling stake bottom surface absolute altitude from original ground;
2) after manual digging pile construction is finished, foundation pile---the uplift pile reinforcing cage of lifting steel core concrete column;
3) fixing uplift pile reinforcing cage, locator is installed the location;
4) check locator absolute altitude and center;
5) locator position and absolute altitude check errorless after, build the uplift pile concrete;
6) steel pipe of installing concrete filled steel tube column after concrete strength reaches designing requirement;
7) check the penstock installation after-pouring steel duct concrete that meets the requirements;
8) concreting complete after, insert in the steel pipe with being about to the top rebars cage, as with the back timber anchor bar.
Described locator comprises a positioning base and the positioning supports more than three that is installed on the positioning base, described positioning supports is up-narrow and down-wide shape, and the outermost of the junction of all positioning supports and positioning base is positioned on the same circular arc, and the diameter of this circular arc is identical with the internal diameter of steel pipe.
The installed surface of described positioning base is circle, annular, ellipse, rectangle or square.
The quantity of described positioning supports is 4, is right-angled intersection and arranges.
Described locator absolute altitude and center are checked and are adopted level gauge and laser plummet.
The operating principle of described locator:
Processing quality and volume are far smaller than the locator of steel pipe, before penstock installation, locator accurately are installed on the foundation pile surface, and make its anchoring firm.Then the lifting steel pipes edge is placed on the locator, realizes like this purpose that steel pipe is accurately installed.
The installation and locating method of a kind of steel core concrete column of the present invention in underground deep hole compared with prior art, the beneficial effect that produces is:
Job practices of the present invention is simple, and is workable, utilizes job practices of the present invention, so that the installation accuracy of steel core concrete column and installation quality are guaranteed, shortened the engineering time simultaneously, reduced work difficulty, improve operating efficiency, saved construction cost.
(4) description of drawings
Accompanying drawing 1 is excavated to the structural representation of design elevation for hand excavated pile of the present invention;
Accompanying drawing 2 is the structural representation of the present invention's lifting uplift pile reinforcing cage in the hand excavated pile;
Accompanying drawing 3 fixes and positions device mounting structure schematic diagram for uplift pile reinforcing cage of the present invention;
Accompanying drawing 4 is the structural representation that check at locator absolute altitude of the present invention and center;
Accompanying drawing 5 is uplift pile concrete pouring structure schematic diagram of the present invention;
Accompanying drawing 6 is the main TV structure schematic diagram of locator of the present invention;
Accompanying drawing 7 is the plan structure schematic diagram of Fig. 6.
Among the figure, 1, hand excavated pile, 2, man-made digging pile mould-pipe, 3, stake end absolute altitude, 4, ground level, 5, bearing bar, 6, the fixing reinforcing bar of reinforcing cage, 7, the fixing reinforcing bar of locator, 8, crab-bolt, 9, uplift pile concreting position, 10, concrete discharging conduit, 11, the uplift pile reinforcing cage, 12, locator, 12-1, positioning base, 12-2, positioning supports.
(5) specific embodiment
Qingdao City's subway first stage of the project (No. 3 lines) May Fourth Square station is positioned at Hong Kong Zhong Lu and intersection, Shandong road, arranges along Hong Kong Zhong Lu.The site is positioned at Qingdao City's economy and political center, and the position is special, and Adjacent Buildings is intensive, and the underground utilities kind is many, crisscross.
This station is reinforced concrete frame structure, adopts lid to dig half contrary way construction.According to the construction characteristics, before main structure construction, needing will be as the Construction of Steel Pipe Concrete Column installation of permanent support post, the effect that recovers the upper back load to support the structure roof that performs first and road.
Explain below below in conjunction with accompanying drawing the installation and locating method of a kind of steel core concrete column of the present invention in underground deep hole being done.
As shown in Figure 1, steel core concrete column is before installation, utilize hand excavated pile 1 as the installation work space, hand excavated pile 1 digs to steel core concrete column foundation anti-pulling stake bottom surface absolute altitude (stake end absolute altitude 3) from original ground (ground level 4), is provided with man-made digging pile mould-pipe 2 at the inwall of hand excavated pile 1.
As shown in Figure 2, after hand excavated pile 1 and man-made digging pile mould-pipe 2 constructions are finished, foundation pile---the uplift pile reinforcing cage 11 of lifting steel core concrete column.
As shown in Figure 3, fixedly the uplift pile reinforcing cage 11, and locator 12 is installed the location; Bearing bar 5 is positioned at the stake end of hand excavated pile 1, uplift pile reinforcing cage 11 by reinforcing cage fixedly reinforcing bar 6 be fixed on the man-made digging pile mould-pipe 2, locator 12 by locator fixedly reinforcing bar 7 be fixed in the uplift pile reinforcing cage 11, locator 12 is connected with crab-bolt 8.
As shown in Figure 4, check locator absolute altitude and center; Check and adopt level gauge and laser plummet.
As shown in Figure 5, after the position of locator 12 and absolute altitude inspection are errorless, in uplift pile reinforcing cage 11, build the uplift pile concrete to uplift pile concreting position 9 by concrete discharging conduit 10; The steel pipe of installing concrete filled steel tube column after concrete strength reaches designing requirement; Check the penstock installation after-pouring steel duct concrete that meets the requirements; After concreting is complete, insert in the steel pipe with being about to the top rebars cage, as with the back timber anchor bar.
Shown in accompanying drawing 6,7, described locator 12 comprises a positioning base 12-1 and four positioning supports 12-2 that are installed on the positioning base 12-1, the installed surface of described positioning base 12-1 is annular, positioning supports 12-2 is up-narrow and down-wide shape, being right-angled intersection is arranged on the positioning base 12-1, and the outermost of the junction of all positioning supports 12-2 and positioning base 12-1 is positioned on the same circular arc, and the diameter of this circular arc is identical with the internal diameter of steel pipe.Being convenient to the lifting steel pipes edge is enclosed within on the positioning supports 12-2.

Claims (5)

1. the installation and locating method of a steel core concrete column in underground deep hole is characterized in that, the method is carried out according to following steps:
1) steel core concrete column utilizes hand excavated pile as the installation work space before installation, and hand excavated pile digs to steel core concrete column foundation anti-pulling stake bottom surface absolute altitude from original ground;
2) after manual digging pile construction is finished, foundation pile---the uplift pile reinforcing cage of lifting steel core concrete column;
3) fixing uplift pile reinforcing cage, locator is installed the location;
4) check locator absolute altitude and center;
5) locator position and absolute altitude check errorless after, build the uplift pile concrete;
6) steel pipe of installing concrete filled steel tube column after concrete strength reaches designing requirement;
7) check the penstock installation after-pouring steel duct concrete that meets the requirements;
8) concreting complete after, insert in the steel pipe with being about to the top rebars cage, as with the back timber anchor bar.
2. the installation and locating method of a kind of steel core concrete column according to claim 1 in underground deep hole, it is characterized in that, described locator comprises a positioning base and the positioning supports more than three that is installed on the positioning base, described positioning supports is up-narrow and down-wide shape, and the outermost of the junction of all positioning supports and positioning base is positioned on the same circular arc, and the diameter of this circular arc is identical with the internal diameter of steel pipe.
3. the installation and locating method of a kind of steel core concrete column according to claim 2 in underground deep hole is characterized in that, the installed surface of described positioning base is circle, annular, ellipse, rectangle or square.
4. the installation and locating method of a kind of steel core concrete column according to claim 2 in underground deep hole is characterized in that, the quantity of described positioning supports is 4, is right-angled intersection and arranges.
5. the installation and locating method of a kind of steel core concrete column according to claim 1 in underground deep hole is characterized in that, locator absolute altitude and center are checked and adopted level gauge and laser plummet.
CN2012105396114A 2012-12-13 2012-12-13 Locating method of installing concrete filled steel tubular column in underground deep hole Pending CN103061454A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105396114A CN103061454A (en) 2012-12-13 2012-12-13 Locating method of installing concrete filled steel tubular column in underground deep hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105396114A CN103061454A (en) 2012-12-13 2012-12-13 Locating method of installing concrete filled steel tubular column in underground deep hole

Publications (1)

Publication Number Publication Date
CN103061454A true CN103061454A (en) 2013-04-24

Family

ID=48104317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105396114A Pending CN103061454A (en) 2012-12-13 2012-12-13 Locating method of installing concrete filled steel tubular column in underground deep hole

Country Status (1)

Country Link
CN (1) CN103061454A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895338A (en) * 2015-06-08 2015-09-09 中国建筑西北设计研究院有限公司 Installation method for building reinforced concrete structure column-contraction device
CN105926672A (en) * 2016-05-06 2016-09-07 中铁十六局集团地铁工程有限公司 Mined metro station steel pipe column construction method
CN106087991A (en) * 2016-06-17 2016-11-09 中国建筑第八工程局有限公司 The high dug pile construction method at natural below ground of stake top mark
CN111733803A (en) * 2020-07-16 2020-10-02 湖南建工集团有限公司 Dry operation one-column one-pile steel pipe composite pile concrete subsection construction method
CN111997055A (en) * 2020-08-19 2020-11-27 上海建工四建集团有限公司 Positioning and verticality adjusting device and method for steel pipe column in pile hole

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2184759A (en) * 1985-12-28 1987-07-01 Shimizu Construction Co Ltd Pre-stressed column
WO1990012174A1 (en) * 1989-04-05 1990-10-18 Thor Joergen Improvements in or relating to composite columns and a method of manufacturing the same
CN101319550A (en) * 2008-07-11 2008-12-10 大连三川建设集团股份有限公司 Construction method of steel pipe concrete column
CN201241329Y (en) * 2008-07-01 2009-05-20 北京住总集团有限责任公司 Positioner of steel pipe column
CN101498134A (en) * 2009-03-12 2009-08-05 北京市政建设集团有限责任公司 Automatic positioning equipment for underground cover and cut engineering pipe column lower end
CN101824919A (en) * 2010-03-26 2010-09-08 中铁隧道集团有限公司 Deep hole underwater installation and locating method of steel pipe column in weak watery stratum
CN201588410U (en) * 2009-12-31 2010-09-22 汕头市达濠市政建设有限公司 Automatic positioning device of steel pipe pillar
CN202039379U (en) * 2011-03-31 2011-11-16 宏润建设集团股份有限公司 Automatic positioning device for installing steel pipe column in covering and excavation top-down-method (CCTDM) construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2184759A (en) * 1985-12-28 1987-07-01 Shimizu Construction Co Ltd Pre-stressed column
WO1990012174A1 (en) * 1989-04-05 1990-10-18 Thor Joergen Improvements in or relating to composite columns and a method of manufacturing the same
CN201241329Y (en) * 2008-07-01 2009-05-20 北京住总集团有限责任公司 Positioner of steel pipe column
CN101319550A (en) * 2008-07-11 2008-12-10 大连三川建设集团股份有限公司 Construction method of steel pipe concrete column
CN101498134A (en) * 2009-03-12 2009-08-05 北京市政建设集团有限责任公司 Automatic positioning equipment for underground cover and cut engineering pipe column lower end
CN201588410U (en) * 2009-12-31 2010-09-22 汕头市达濠市政建设有限公司 Automatic positioning device of steel pipe pillar
CN101824919A (en) * 2010-03-26 2010-09-08 中铁隧道集团有限公司 Deep hole underwater installation and locating method of steel pipe column in weak watery stratum
CN202039379U (en) * 2011-03-31 2011-11-16 宏润建设集团股份有限公司 Automatic positioning device for installing steel pipe column in covering and excavation top-down-method (CCTDM) construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张军,李锦春,宋红智: "地下钢管柱逆作定位安装浇筑施工工艺", 《建筑工程》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895338A (en) * 2015-06-08 2015-09-09 中国建筑西北设计研究院有限公司 Installation method for building reinforced concrete structure column-contraction device
CN105926672A (en) * 2016-05-06 2016-09-07 中铁十六局集团地铁工程有限公司 Mined metro station steel pipe column construction method
CN105926672B (en) * 2016-05-06 2018-05-18 中铁十六局集团地铁工程有限公司 A kind of Underground Subway Station steel pipe column construction method
CN106087991A (en) * 2016-06-17 2016-11-09 中国建筑第八工程局有限公司 The high dug pile construction method at natural below ground of stake top mark
CN111733803A (en) * 2020-07-16 2020-10-02 湖南建工集团有限公司 Dry operation one-column one-pile steel pipe composite pile concrete subsection construction method
CN111997055A (en) * 2020-08-19 2020-11-27 上海建工四建集团有限公司 Positioning and verticality adjusting device and method for steel pipe column in pile hole

Similar Documents

Publication Publication Date Title
CN203603586U (en) Equipment support regulating device
CN202658909U (en) Steel column positioning rack based on reverse-building method
CN104110035A (en) Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device
CN103061454A (en) Locating method of installing concrete filled steel tubular column in underground deep hole
CN105863042A (en) All-steel structure building and construction method thereof
CN101864825B (en) Reinforced concrete prefabricated column positioning device and construction method thereof
CN110219326A (en) The underwater vertical adjustment construction technology of inverse method one-column one-pile
CN111502095B (en) Connecting structure of large-diameter steel pipe column base and construction method thereof
CN112663613A (en) Verticality control device and verticality control method for latticed column
CN106836829B (en) A kind of mounting structure and its installation method of ring crane corbel
CN201560398U (en) Inner steel mould for accurately positioning tower column cable sleeves of cable-stayed bridge
CN209779634U (en) Assembled reinforced concrete bearing structure suitable for subway station foundation ditch
CN202866304U (en) Reverse-building-method steel pipe column bottom locating device
KR101401057B1 (en) Method to build underground structures using the pillars and the stigma and steel beam and slab structures are formed
CN103076010A (en) Fabrication method of forced centering observation pillar for precision engineering measurement and observation pillar
CN102828533B (en) Vertical pressure resistance static load test pile head advanced processing node of cast-in-place pile and construction method
KR20160000702A (en) Fastening member used in concrete filled steel tube and its using concrete filled steel tube mounting structure and method and its includes build underground structure and method
CN211080332U (en) Foundation pile detects displacement measurement device for static test
CN203891060U (en) Permanent steel pipe column positioning system of major structure of cover and excavation top-down station
CN206593659U (en) A kind of base station for global navigation satellite system
CN216275712U (en) Corner bracing construction structures
CN202381269U (en) Adjusting device of mounting levelness of basic ring of wind driven generator
CN202039379U (en) Automatic positioning device for installing steel pipe column in covering and excavation top-down-method (CCTDM) construction
CN212477455U (en) Pre-buried positioner of bridge suspension cable anchor cylinder
CN209211434U (en) It is a kind of inverse to make mounting and positioning device of the steel pipe column in rotary digging bored concrete pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130424