CN106121255A - Apparatus installed by a kind of Super High glass curtain wall - Google Patents
Apparatus installed by a kind of Super High glass curtain wall Download PDFInfo
- Publication number
- CN106121255A CN106121255A CN201610470191.7A CN201610470191A CN106121255A CN 106121255 A CN106121255 A CN 106121255A CN 201610470191 A CN201610470191 A CN 201610470191A CN 106121255 A CN106121255 A CN 106121255A
- Authority
- CN
- China
- Prior art keywords
- bracket
- electric
- cable
- curtain wall
- embedded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
本发明公开了一种超高层玻璃幕墙安装设备装置,包括斜拉钢丝、斜拉杆、安装在多层墙体上的预埋连墙件、支架连接螺栓、电动吊篮、悬挑支架和起重电动葫芦,悬挑支架的两端分别连接最下层的预埋连墙件与支架连接螺栓,斜拉钢丝连接在支架连接螺栓和最上层的预埋连墙件之间,斜拉杆连接在支架连接螺栓和中间层的预埋连墙件之间;悬挑支架上的工字钢轨道上连接电动吊篮和起重电动葫芦。本发明可使管理人员作业更加安全、方便、快捷、人性化,提高工作舒适度与工作效率;安拆简单,可多次回收利用;吊装效率高,安装速度快,大幅提高了施工速度。
The invention discloses a super-high-rise glass curtain wall installation device, which includes cable-stayed steel wires, cable-stay rods, pre-buried wall parts installed on multi-layer walls, bracket connecting bolts, electric hanging baskets, cantilever brackets and lifting frames. Electric hoist, the two ends of the cantilever bracket are respectively connected to the lowermost pre-embedded wall parts and the bracket connecting bolts, the cable-stayed steel wires are connected between the bracket connecting bolts and the uppermost pre-embedded wall parts, and the diagonal-stay rods are connected to the brackets. Between the bolts and the pre-embedded wall parts of the middle layer; the I-beam rail on the cantilever bracket is connected to the electric hanging basket and the electric lifting hoist. The invention can make the operation of managers safer, more convenient, faster and more humanized, and improve work comfort and work efficiency; the installation and disassembly are simple, and can be recycled multiple times; the hoisting efficiency is high, the installation speed is fast, and the construction speed is greatly improved.
Description
技术领域technical field
本发明涉及建筑工程领域,具体是一种超高层玻璃幕墙安装设备装置。The invention relates to the field of construction engineering, in particular to a super high-rise glass curtain wall installation device.
背景技术Background technique
在超高层建筑施工中,幕墙施工是整个工程中重要的一个环节。幕墙板块的安装情况直接影响室内施工工期、建筑物室外形象进度等方面。另外。幕墙板块的安装与吊装多为室外高空作业,操作难度大,危险系数大。超高层建筑不同于普通建筑,无法通过搭架等方法完成单元板块的安装。大多数幕墙单元板块尺寸大,自重大,无法通过人力安装,必须采取各种机械设备辅助进行安装。In the construction of super high-rise buildings, curtain wall construction is an important part of the whole project. The installation of curtain wall panels directly affects the indoor construction period and the progress of the building's outdoor image. in addition. The installation and hoisting of curtain wall panels are mostly outdoor high-altitude operations, which is difficult to operate and has a high risk factor. Super high-rise buildings are different from ordinary buildings, and the installation of unit panels cannot be completed by erecting frames or other methods. Most of the curtain wall unit plates are large in size and heavy in weight, so they cannot be installed by manpower, and various mechanical equipment must be used to assist in the installation.
传统超高层玻璃幕墙安装的难点在于安装单元板块必须使用塔吊配合,且安装时间长,安装效率低,安装风险大。除此之外,建筑物的转角等部位幕墙板块尺寸特殊,人员操作空间小,很难找到安全有效的作业方式。所以,基于超高层建筑的玻璃幕墙安装难度与挑战,传统的安装方式已无法满足施工现场的种种需求。The difficulty in the installation of traditional super high-rise glass curtain walls is that the installation of unit panels must be done with tower cranes, and the installation time is long, the installation efficiency is low, and the installation risk is high. In addition, the corners of the building and other parts of the curtain wall have special dimensions, and the space for personnel to operate is small, so it is difficult to find a safe and effective operation method. Therefore, due to the difficulty and challenge of installing glass curtain walls in super high-rise buildings, traditional installation methods can no longer meet the various needs of the construction site.
发明内容Contents of the invention
本发明的目的在于提供一种超高层玻璃幕墙安装设备装置,以解决上述背景技术中提出的问题。The object of the present invention is to provide a super-high-rise glass curtain wall installation equipment to solve the problems raised in the above-mentioned background technology.
为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:
一种超高层玻璃幕墙安装设备装置,包括斜拉钢丝、斜拉杆、安装在多层墙体上的预埋连墙件、支架连接螺栓、电动吊篮、悬挑支架和起重电动葫芦,所述的悬挑支架一端连接在最下层的预埋连墙件上,悬挑支架另一端安装有支架连接螺栓,所述的斜拉钢丝连接在支架连接螺栓和最上层的预埋连墙件之间,所述的斜拉杆连接在支架连接螺栓和中间层的预埋连墙件之间;所述的悬挑支架上安装有两排工字钢轨道,所述的电动吊篮连接在外侧的工字钢轨道的下方,所述的起重电动葫芦安装在内侧的工字钢轨道上,所述的起重电动葫芦连接有幕墙单元板。An installation device for a super high-rise glass curtain wall, comprising cable-stayed steel wires, cable-stay rods, pre-embedded wall fittings installed on multi-layer walls, bracket connecting bolts, electric hanging baskets, cantilever brackets and electric lifting hoists. One end of the cantilever bracket is connected to the lowermost pre-embedded wall piece, the other end of the cantilever bracket is installed with a bracket connecting bolt, and the cable-stayed steel wire is connected between the bracket connecting bolt and the uppermost pre-embedded wall piece Between, the diagonal stay rods are connected between the bracket connecting bolts and the pre-embedded wall parts of the middle layer; two rows of I-beam rails are installed on the cantilever bracket, and the electric hanging basket is connected to the outer Below the I-shaped steel track, the electric lifting hoist is installed on the inner I-shaped steel track, and the electric lifting hoist is connected with a curtain wall unit board.
作为本发明进一步的方案:所述的斜拉钢丝、斜拉杆通过预埋连墙件与墙体紧密连接。As a further solution of the present invention: the cable-stayed steel wires and cable-stay rods are tightly connected to the wall through pre-embedded wall connecting parts.
作为本发明进一步的方案:所述的起重电动葫芦上设置有限位开关和专用电箱,起重电动葫芦牵引的链条上升到限定高度即自动断电。As a further solution of the present invention: the electric lifting hoist is provided with a limit switch and a special electric box, and the chain pulled by the electric lifting hoist rises to a limited height and automatically cuts off the power.
作为本发明再进一步的方案:所述的起重电动葫芦在工字钢轨道上沿轨道水平方向自由移动。As a further solution of the present invention: the electric hoist moves freely on the I-shaped steel track along the horizontal direction of the track.
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
本发明可使管理人员作业更加安全、方便、快捷、人性化,提高工作舒适度与工作效率;安拆简单,可多次回收利用;吊装效率高,安装速度快,大幅提高了施工速度;通过该发明,可减少幕墙吊装对塔吊使用的需求,避免高空长距离吊装带来的外立面磕碰、吊装安装不精准等问题;为作业人员提供高空建筑外作业面;确保超高建筑物施工过程的安全性、避免作业中高空坠物;制作简易、方便,维护维修简单。The invention can make the work of managers safer, more convenient, quicker and more humanized, and improve work comfort and work efficiency; the installation and disassembly are simple, and can be recycled for many times; the hoisting efficiency is high, the installation speed is fast, and the construction speed is greatly improved; through This invention can reduce the need for tower cranes for curtain wall hoisting, avoid problems such as façade collisions and inaccurate hoisting installations caused by high-altitude and long-distance hoisting; provide operators with a working surface outside high-altitude buildings; ensure the construction process of super-high buildings High safety, avoiding falling objects during operation; easy and convenient to manufacture, easy to maintain and repair.
附图说明Description of drawings
图1为本发明的结构示意图Fig. 1 is a structural representation of the present invention
图中:1-斜拉钢丝;2-斜拉杆;3-预埋连墙件;4-支架螺栓连接;5-电动吊篮;6-幕墙单元板;7-悬挑支架;8-起重电动葫芦;9-工字钢轨道。In the figure: 1- cable-stayed steel wire; 2- cable-stayed rod; 3- embedded wall parts; 4- bracket bolt connection; 5- electric hanging basket; 6- curtain wall unit plate; Electric hoist; 9-I-beam track.
具体实施方式detailed description
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
请参阅图1,本发明实施例中,一种超高层玻璃幕墙安装设备装置,包括斜拉钢丝1、斜拉杆2、预埋连墙件3、支架螺栓连接4、电动吊篮5、幕墙单元板6、悬挑支架7、起重电动葫芦8、工字钢轨道9。Please refer to Fig. 1, in the embodiment of the present invention, a super high-rise glass curtain wall installation equipment, including cable-stayed steel wire 1, cable-stayed rod 2, pre-embedded wall parts 3, bracket bolt connection 4, electric hanging basket 5, curtain wall unit Plate 6, cantilever bracket 7, lifting electric hoist 8, I-beam track 9.
悬挑支架7一端连接在最下层的预埋连墙件3上,悬挑支架7另一端安装有支架连接螺栓4,斜拉钢丝1连接在支架连接螺栓4和最上层的预埋连墙件3之间,斜拉杆2连接在支架连接螺栓4和中间层的预埋连墙件3之间;悬挑支架7上安装有两排工字钢轨道9,电动吊篮5连接在外侧的工字钢轨道9的下方,起重电动葫芦8安装在内侧的工字钢轨道9上,起重电动葫芦8连接有幕墙单元板6。One end of the cantilever bracket 7 is connected to the lowermost pre-embedded wall connecting piece 3, the other end of the cantilever bracket 7 is installed with a bracket connecting bolt 4, and the cable-stayed steel wire 1 is connected to the bracket connecting bolt 4 and the uppermost pre-embedded wall connecting piece 3, the diagonal stay rod 2 is connected between the bracket connecting bolt 4 and the pre-embedded wall part 3 of the middle layer; two rows of I-beam rails 9 are installed on the cantilever bracket 7, and the electric hanging basket 5 is connected to the outer work Below the beam-shaped steel track 9 , an electric lifting hoist 8 is installed on the inner I-shaped steel track 9 , and the electric lifting hoist 8 is connected with a curtain wall unit plate 6 .
在结构墙体施工到需设置吊篮层时,预先安装预埋连墙件3,并浇筑在楼层混凝土中,确保连墙件具有足够的承载力与稳定性。预埋连墙件3安装完毕,结构楼层施工至高处时,安装吊篮支架的斜拉杆2。使用悬挂装置将其运送到设置楼层指定处,在预埋连墙件3上安装连接板及挂钩。在此连接板上系两根工作吊绳和一根保险绳,使其垂置到要安装悬挑支架7的位置。施工人员将登高板与工作吊绳按正确方法系牢,检查牢固可靠后坐上登高板、系好安全带,顺着吊绳缓缓滑到安装悬挑支架7上层拟安装钢性加强构件的预埋连墙件3位置,将钢性构件挂于预埋连墙件3的耳板上,紧固支架连接螺栓4并检查牢靠。When the construction of the structural wall reaches the stage where the hanging basket needs to be set, the pre-embedded wall connecting parts 3 are pre-installed and poured into the floor concrete to ensure that the connecting wall parts have sufficient bearing capacity and stability. After the pre-embedded wall connecting parts 3 are installed, when the structural floor is constructed to a high place, the diagonal tie rod 2 of the hanging basket support is installed. Use the suspension device to transport it to the designated place on the set floor, and install the connecting plate and hook on the pre-embedded connecting wall piece 3. Tie two working suspension ropes and a safety rope on this connecting plate, make it hang down to the position that cantilever support 7 will be installed. The construction personnel fasten the climbing board and the working sling firmly in the correct way. After checking that it is firm and reliable, sit on the climbing board, fasten the safety belt, and slide slowly along the sling to the pre-installed steel reinforcement component on the upper layer of the cantilever bracket 7. Embed the position of the connecting wall part 3, hang the rigid member on the lug plate of the pre-embedded connecting wall part 3, fasten the bracket connecting bolt 4 and check whether it is secure.
接着顺工作吊绳滑至电动吊篮5的悬臂杆的安装位置,由操作工人垂下一根吊绳至安装楼层的开口端,楼层内的人员将吊绳拴牢所安装的悬挑支架7,并缓慢地水平移到安装位置,交至吊绳上的施工人员;吊绳上的施工人员核对安装尺寸后将悬挑支架7一端与柱面上预先安装的埋件耳板连接,并穿好销钉,然后将上层垂下的钢性加强构件与悬臂杆外端部拉接,确保悬挑支架7安装完毕。Then slide along the work suspension rope to the installation position of the cantilever bar of the electric hanging basket 5, hang down a suspension rope to the opening end of the installation floor by the operator, and the personnel in the floor fasten the suspension rope to the installed suspension bracket 7, And slowly move horizontally to the installation position, and hand it over to the construction personnel on the suspension rope; after checking the installation size, the construction personnel on the suspension rope connect one end of the cantilever bracket 7 with the pre-installed ear plate of the embedded part on the cylinder surface, and put it on pin, and then the steel reinforcing member hanging from the upper floor is connected with the outer end of the cantilever rod to ensure that the cantilever bracket 7 is installed.
当所有的部件安装完成并检查牢靠无误后,安装工字钢轨道9,首先在悬挑支架7上面铺设脚手板,作为临时的操作平台,然后由靠近结构一侧顺序安装工字钢轨道9,首先安装外侧的吊篮用工字钢轨道9,然后安装内侧吊装铝单板的工字钢轨道9。工字钢轨道9安装完毕,依次安装吊篮用和吊装用电动葫芦8。以上步骤全部完成后,安装电动吊篮5,并确保安全绳连接牢固,电动吊篮5使用正常。确保整个装置可正常吊运并水平、竖向移动与安装幕墙单元板6。After all the components are installed and checked for reliability, the I-beam track 9 is installed. First, a scaffolding board is laid on the cantilever bracket 7 as a temporary operating platform, and then the I-beam track 9 is sequentially installed on the side close to the structure. First install the I-steel track 9 for the hanging basket on the outside, and then install the I-steel track 9 for hoisting the aluminum veneer on the inside. I-beam track 9 is installed, and electric hoist 8 is installed successively for hanging basket and hoisting. After all the above steps are completed, install the electric hanging basket 5, and ensure that the safety rope is firmly connected, and the electric hanging basket 5 is in normal use. Ensure that the whole device can be normally hoisted and moved horizontally and vertically and the curtain wall unit panel 6 is installed.
本发明可使管理人员作业更加安全、方便、快捷、人性化,提高工作舒适度与工作效率;安拆简单,可多次回收利用;吊装效率高,安装速度快,大幅提高了施工速度;通过该发明,可减少幕墙吊装对塔吊使用的需求,避免高空长距离吊装带来的外立面磕碰、吊装安装不精准等问题;为作业人员提供高空建筑外作业面;确保超高建筑物施工过程的安全性、避免作业中高空坠物;制作简易、方便,维护维修简单。The invention can make the work of managers safer, more convenient, quicker and more humanized, and improve work comfort and work efficiency; the installation and disassembly are simple, and can be recycled for many times; the hoisting efficiency is high, the installation speed is fast, and the construction speed is greatly improved; through This invention can reduce the need for tower cranes for curtain wall hoisting, avoid problems such as façade collisions and inaccurate hoisting installations caused by high-altitude and long-distance hoisting; provide operators with a working surface outside high-altitude buildings; ensure the construction process of super-high buildings High safety, avoiding falling objects during operation; easy and convenient to manufacture, easy to maintain and repair.
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the invention is not limited to the details of the above-described exemplary embodiments, but that the invention can be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Accordingly, the embodiments should be regarded in all points of view as exemplary and not restrictive, the scope of the invention being defined by the appended claims rather than the foregoing description, and it is therefore intended that the scope of the invention be defined by the appended claims rather than by the foregoing description. All changes within the meaning and range of equivalents of the elements are embraced in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610470191.7A CN106121255A (en) | 2016-06-26 | 2016-06-26 | Apparatus installed by a kind of Super High glass curtain wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610470191.7A CN106121255A (en) | 2016-06-26 | 2016-06-26 | Apparatus installed by a kind of Super High glass curtain wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106121255A true CN106121255A (en) | 2016-11-16 |
Family
ID=57268831
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610470191.7A Pending CN106121255A (en) | 2016-06-26 | 2016-06-26 | Apparatus installed by a kind of Super High glass curtain wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106121255A (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109555302A (en) * | 2019-01-04 | 2019-04-02 | 万华节能科技集团股份有限公司 | A kind of the hanging basket bracket and its construction technology of thermal-insulating leakage-resistant crossed construction |
| CN110485698A (en) * | 2019-08-28 | 2019-11-22 | 中国建筑第八工程局有限公司 | Horizontally moveable hanging basket sliding system |
| CN111395730A (en) * | 2020-04-22 | 2020-07-10 | 深圳市三鑫科技发展有限公司 | Curtain wall construction system and method suitable for high-rise building with special-shaped giant columns |
| CN112110330A (en) * | 2020-09-21 | 2020-12-22 | 中建二局第一建筑工程有限公司 | Curtain wall unit track hoisting system and method |
| CN113047595A (en) * | 2021-03-25 | 2021-06-29 | 中国十七冶集团有限公司 | External hanging basket installation structure of building wall and construction method thereof |
| CN113309363A (en) * | 2021-06-30 | 2021-08-27 | 中建六局建设发展有限公司 | Installation method of double-ring rail system of super high-rise unit type curtain wall |
| CN113734943A (en) * | 2021-08-27 | 2021-12-03 | 湖北富烨装饰工程有限公司 | Rail type hoisting tool for mounting building curtain wall |
| CN113914638A (en) * | 2021-11-29 | 2022-01-11 | 中国建筑一局(集团)有限公司 | Overhanging steel beam double-rail curtain wall hoisting system and curtain wall plate hoisting method |
| CN115506568A (en) * | 2022-09-21 | 2022-12-23 | 五冶集团装饰工程有限公司 | A hanging basket structure and installation method for construction of internally inclined special-shaped external walls |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3460308A (en) * | 1964-08-21 | 1969-08-12 | Elcon Ag | Manufacture of structural units |
| CN101514586A (en) * | 2009-01-14 | 2009-08-26 | 北京江河幕墙股份有限公司 | Hanger rail type electric hanging boat and high-rise long span house, bridge building construction method and use thereof |
| CN201433079Y (en) * | 2009-05-26 | 2010-03-31 | 中国建筑第八工程局有限公司 | High-altitude inclined supporting wire lifting device for construction curtain wall |
| CN103711301A (en) * | 2013-12-30 | 2014-04-09 | 江河创建集团股份有限公司 | Construction method and device for two-track movable electric basket and lifting hoist |
| CN204703534U (en) * | 2015-05-27 | 2015-10-14 | 中建三局(厦门)建设有限公司 | A kind of large-scale unit plates of curtain wall two-rail hanging apparatus |
-
2016
- 2016-06-26 CN CN201610470191.7A patent/CN106121255A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3460308A (en) * | 1964-08-21 | 1969-08-12 | Elcon Ag | Manufacture of structural units |
| CN101514586A (en) * | 2009-01-14 | 2009-08-26 | 北京江河幕墙股份有限公司 | Hanger rail type electric hanging boat and high-rise long span house, bridge building construction method and use thereof |
| CN201433079Y (en) * | 2009-05-26 | 2010-03-31 | 中国建筑第八工程局有限公司 | High-altitude inclined supporting wire lifting device for construction curtain wall |
| CN103711301A (en) * | 2013-12-30 | 2014-04-09 | 江河创建集团股份有限公司 | Construction method and device for two-track movable electric basket and lifting hoist |
| CN204703534U (en) * | 2015-05-27 | 2015-10-14 | 中建三局(厦门)建设有限公司 | A kind of large-scale unit plates of curtain wall two-rail hanging apparatus |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109555302A (en) * | 2019-01-04 | 2019-04-02 | 万华节能科技集团股份有限公司 | A kind of the hanging basket bracket and its construction technology of thermal-insulating leakage-resistant crossed construction |
| CN110485698A (en) * | 2019-08-28 | 2019-11-22 | 中国建筑第八工程局有限公司 | Horizontally moveable hanging basket sliding system |
| CN110485698B (en) * | 2019-08-28 | 2021-07-09 | 中国建筑第八工程局有限公司 | Sliding system capable of horizontally moving hanging basket |
| CN111395730A (en) * | 2020-04-22 | 2020-07-10 | 深圳市三鑫科技发展有限公司 | Curtain wall construction system and method suitable for high-rise building with special-shaped giant columns |
| CN112110330A (en) * | 2020-09-21 | 2020-12-22 | 中建二局第一建筑工程有限公司 | Curtain wall unit track hoisting system and method |
| CN112110330B (en) * | 2020-09-21 | 2023-03-14 | 中建二局第一建筑工程有限公司 | Curtain wall unit body rail hoisting system and method |
| CN113047595A (en) * | 2021-03-25 | 2021-06-29 | 中国十七冶集团有限公司 | External hanging basket installation structure of building wall and construction method thereof |
| CN113309363A (en) * | 2021-06-30 | 2021-08-27 | 中建六局建设发展有限公司 | Installation method of double-ring rail system of super high-rise unit type curtain wall |
| CN113734943A (en) * | 2021-08-27 | 2021-12-03 | 湖北富烨装饰工程有限公司 | Rail type hoisting tool for mounting building curtain wall |
| CN113734943B (en) * | 2021-08-27 | 2023-10-20 | 湖北富烨装饰工程有限公司 | Rail mounted lifting device for building curtain installation |
| CN113914638A (en) * | 2021-11-29 | 2022-01-11 | 中国建筑一局(集团)有限公司 | Overhanging steel beam double-rail curtain wall hoisting system and curtain wall plate hoisting method |
| CN115506568A (en) * | 2022-09-21 | 2022-12-23 | 五冶集团装饰工程有限公司 | A hanging basket structure and installation method for construction of internally inclined special-shaped external walls |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106121255A (en) | Apparatus installed by a kind of Super High glass curtain wall | |
| CN106698208B (en) | A kind of hanging device and hanging method for being transported outside high-rise building | |
| CN103603504B (en) | The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction | |
| CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
| CN102877637B (en) | Method for implementing operating platform in bottom wall construction of cantilever beam | |
| CN212176541U (en) | Light-duty high-efficient construction that can have enough to meet need makes building equipment | |
| CN102864936A (en) | Combination lifting construction method for large-scale high hollow building roof of steel structure | |
| CN109779244A (en) | A kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction | |
| CN107119921B (en) | A kind of skyscraper Bailey beam Demolition Construction method | |
| CN106241618A (en) | A kind of curtain wall profiles boom hoisting | |
| CN111395730A (en) | Curtain wall construction system and method suitable for high-rise building with special-shaped giant columns | |
| CN110748139A (en) | Hanging basket support system | |
| CN104847102A (en) | Wall attaching method and device of attached self-lifting scaffold on retraction section of building outer wall | |
| CN206562264U (en) | A kind of hanging device for transport outside high-rise building | |
| CN106948604A (en) | The irregular alien invasion glass curtain wall positioning apparatus of high-rise building and construction method | |
| CN206753012U (en) | A kind of attachment type raise scaffold just hangs hanging apparatus | |
| CN116062626A (en) | A super high-rise building tower crown part curtain wall hoisting equipment and hoisting method | |
| WO2023193403A1 (en) | Row pipe bundle hoisting tooling and construction method therefor | |
| CN204474271U (en) | A kind of high wind resistance nacelle device | |
| CN104291222B (en) | The inner hard protection of a kind of high-rise building Core Walls Structure hangs integrated system with row | |
| CN115538792B (en) | Building construction method and building construction structure by using residential building machine | |
| CN102061810B (en) | Construction method of safe flat net positioned on periphery of building | |
| CN104153586A (en) | Construction method for installing purline through suspension cable cranes | |
| CN204401999U (en) | Climbing scaffold with unloading platform | |
| CN108277994A (en) | On across the high ferro safe guarding shed quick method for dismounting of operation line |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161116 |