CN113047595A - External hanging basket installation structure of building wall and construction method thereof - Google Patents

External hanging basket installation structure of building wall and construction method thereof Download PDF

Info

Publication number
CN113047595A
CN113047595A CN202110320843.XA CN202110320843A CN113047595A CN 113047595 A CN113047595 A CN 113047595A CN 202110320843 A CN202110320843 A CN 202110320843A CN 113047595 A CN113047595 A CN 113047595A
Authority
CN
China
Prior art keywords
hanging basket
section steel
steel
wire rope
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110320843.XA
Other languages
Chinese (zh)
Inventor
蒋福生
宫庆辉
蒋福军
胡德帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202110320843.XA priority Critical patent/CN113047595A/en
Publication of CN113047595A publication Critical patent/CN113047595A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention provides a construction wall hanging basket installation structure applied to the technical field of construction engineering, and also relates to a construction method of the construction wall hanging basket installation structure, wherein a plurality of embedded bolt sleeves (2) are arranged in a wall body (1) of the construction wall hanging basket installation structure, the embedded bolt sleeves (2) extend to the position of one side surface of the wall body (1), a section steel end plate (5) of overhanging section steel (3) is connected with one end of a section steel body (4), one end of each connecting bolt (6) penetrates through a through hole on the section steel end plate (5) to be connected with one embedded bolt sleeve (2), and the other end of each connecting bolt (6) is screwed with a positioning nut (7). Other components are recycled, so that the consumption of manpower and materials is reduced.

Description

External hanging basket installation structure of building wall and construction method thereof
Technical Field
The invention belongs to the technical field of building engineering, and particularly relates to an externally hung hanging basket mounting structure of a building wall body, and a construction method of the externally hung hanging basket mounting structure of the building wall body.
Background
In the building engineering field, the hanging flower basket needs to be used in the outer wall operation, and the bearing of building outer wall hanging flower basket suspended portion comprises lift adjustable fore-and-aft support, detachable crossbeam and counterweight, and the installation procedure is complicated relatively, and it is more to need the transported material to satisfy support equipment and bearing requirement.
Disclosure of Invention
The technical problem to be solved by the invention is as follows: the hanging basket mounting structure has the advantages that the hanging basket mounting structure is simple in structure, construction efficiency can be effectively improved, mounting and construction procedures are simplified, all components are recycled and reused except for the embedded sleeve, consumption of manpower and materials is reduced, operation is convenient, safety is high, and practicability is high.
To solve the technical problems, the invention adopts the technical scheme that:
the invention relates to an external hanging basket mounting structure of a building wall, which comprises a wall body, wherein a plurality of embedded bolt sleeves are arranged in the wall body, the embedded bolt sleeves extend to the position of one side surface of the wall body, overhanging section steel comprises a section steel body and a section steel end plate, the section steel body is arranged in a structure with a vertical section in a shape like the Chinese character 'kou' or 'ri', the section steel end plate is connected with one end of the section steel body, one end of each connecting bolt penetrates through a through hole in the section steel end plate to be connected with one embedded bolt sleeve, the other end of each connecting bolt is screwed with a positioning nut, a steel wire rope is hooked on the section steel body of the overhanging section.
The embedded bolt sleeve comprises an embedded ball body and a bolt sleeve, and the embedded ball body and the bolt sleeve are of an integrated structure.
The upper part of the profile steel body of the overhanging profile steel is provided with a steel wire rope limiting groove, and the upper part of the steel wire rope is clamped in the steel wire rope limiting groove.
The steel wire rope connecting through hole horizontally penetrating through the section steel body is formed in the section steel body of the cantilever section steel, and the steel wire rope penetrates through the steel wire rope connecting through hole.
The embedded bolt sleeves are arranged in two numbers, one end of each connecting bolt penetrates through a through hole in the section steel end plate and is connected with one embedded bolt sleeve in a screwing mode, and the other end of each connecting bolt is screwed with one positioning nut.
The hanging basket body is of a frame structure, and the hanging basket body is provided with a balancing weight.
The invention also relates to a construction method of the hanging basket mounting structure externally hung on the building wall, which comprises the following construction steps:
s1, processing and manufacturing an embedded bolt sleeve and a connecting bolt which meet the stress requirement through stress checking calculation according to the design requirement;
s2, measuring and positioning the position of the wall body, and embedding the embedded bolt sleeve in place when the wall body is manufactured, wherein the embedded bolt sleeve is fixedly arranged in the wall body;
s3, one end of a connecting bolt penetrates through a through hole in the section steel end plate to be connected with the embedded bolt sleeve, a positioning nut is screwed at the other end of the connecting bolt, the positioning nut is screwed, and the section steel end plate is clamped between the wall body and the positioning nut to realize the connection of the connecting bolt to the wall body and the overhanging section steel;
s4, connecting a steel wire rope with the hanging basket body and the overhanging section steel;
and S5, after the debugging and acceptance check are qualified, using the hanging basket mounting structure externally hung on the building wall.
By adopting the technical scheme of the invention, the following beneficial effects can be obtained:
according to the mounting structure and the construction method of the hanging basket for the external hanging of the building wall, when the mounting structure for the hanging basket for the external hanging of the building wall is arranged, an embedded bolt sleeve and a connecting bolt which meet the stress requirement are processed and manufactured through stress checking calculation according to the design requirement; measuring and positioning the position of the wall, and embedding the embedded bolt sleeve in place when the wall is manufactured, wherein the embedded bolt sleeve is fixedly arranged in the wall; one end of the connecting bolt penetrates through a through hole in the section steel end plate to be connected with the embedded bolt sleeve, the other end of the connecting bolt is screwed with the positioning nut, the section steel end plate is clamped between the wall body and the positioning nut, and the connecting bolt is used for connecting the wall body and the overhanging section steel; the steel wire rope is connected with the hanging basket body and the overhanging section steel; and after the debugging and acceptance inspection are qualified, using the hanging basket mounting structure externally hung on the building wall. And most of the components can be recycled for reuse. The mounting structure and the construction method of the hanging basket externally hung on the building wall have simple structure, can effectively improve the construction efficiency, simplify the mounting and construction processes, simultaneously realize the recycling of other components except the embedded sleeve, reduce the consumption of manpower and materials, and have convenient operation, high safety and strong practicability.
Drawings
The contents of the description and the references in the drawings are briefly described as follows:
FIG. 1 is a schematic structural view of a hanging basket mounting structure for a building wall according to the present invention;
FIG. 2 is a schematic view of a partial structure of the external hanging basket installation structure of the building wall according to the present invention;
FIG. 3 is a schematic side view of overhanging section steel of the external hanging basket installation structure of the building wall according to the present invention;
in the drawings are labeled: 1. a wall body; 2. embedding a bolt sleeve; 3. cantilever type steel; 4. a section steel body; 5. a section steel end plate; 6. a connecting bolt; 7. positioning a nut; 8. a wire rope; 9. a basket body; 10. embedding a sphere in advance; 11. a bolt bushing; 12. wire rope spacing groove.
Detailed Description
The following detailed description of the embodiments of the present invention, such as the shapes and structures of the components, the mutual positions and connection relations among the components, the functions and operation principles of the components, will be made by referring to the accompanying drawings and the description of the embodiments:
the invention discloses an externally hung hanging basket mounting structure of a building wall, as shown in attached figures 1-3, which comprises a wall body 1, wherein a plurality of embedded bolt sleeves 2 are arranged in the wall body 1, the embedded bolt sleeves 2 extend to the side surface position of one side of the wall body 1, overhanging section steel 3 comprises a section steel body 4 and a section steel end plate 5, the section steel body 4 is arranged to be of a structure with a vertical section in a shape like the Chinese character 'kou' or 'ri', the section steel end plate 5 is connected with one end of the section steel body 4, one end of each connecting bolt 6 penetrates through a through hole in the section steel end plate 5 to be connected with one embedded bolt sleeve 2, the other end of each connecting bolt 6 is screwed with a positioning nut 7, a steel wire rope 8 is hooked on the section steel body 4 of the overhanging. According to the structure, when the external hanging basket installation structure of the building wall is arranged, the embedded bolt sleeve 2 and the connecting bolt 6 meeting the stress requirement are processed and manufactured through stress checking calculation according to the design requirement; measuring and positioning the position of the wall body 1, and embedding the embedded bolt sleeve 2 in place when the wall body 1 is manufactured, wherein the embedded bolt sleeve 2 is fixedly arranged in the wall body 1; one end of a connecting bolt 6 penetrates through a through hole in a section steel end plate 5 to be connected with the embedded bolt sleeve 2, the other end of the connecting bolt 6 is screwed with a positioning nut 7, the positioning nut 7 is screwed, and the section steel end plate 5 is clamped between the wall body 1 and the positioning nut 7, so that the connecting bolt 6 is used for connecting the wall body 1 and the overhanging section steel 3; the steel wire rope 8 is connected with the hanging basket body 9 and the overhanging section steel 3; and after the debugging and acceptance inspection are qualified, using the hanging basket mounting structure externally hung on the building wall. The mounting structure and the construction method of the hanging basket externally hung on the building wall have simple structure, can effectively improve the construction efficiency, simplify the mounting and construction processes, simultaneously realize the recycling of other components except the embedded sleeve, reduce the consumption of manpower and materials, and have convenient operation, high safety and strong practicability.
The embedded bolt sleeve 2 comprises an embedded sphere 10 and a bolt sleeve 11, and the embedded sphere 10 and the bolt sleeve 11 are of an integrated structure.
The upper part of the section steel body 4 of the overhanging section steel 3 is provided with a steel wire rope limiting groove 12, and the upper part of the steel wire rope 8 is clamped in the steel wire rope limiting groove 12.
The steel wire rope connecting through hole horizontally penetrating through the section steel body 4 is formed in the section steel body 4 of the cantilever section steel 3, and the steel wire rope 8 penetrates through the steel wire rope connecting through hole.
The embedded bolt sleeves 2 are arranged in two numbers, one end of each connecting bolt 6 penetrates through a through hole in the section steel end plate 5 to be connected with one embedded bolt sleeve 2 in a screwing mode, and the other end of each connecting bolt 6 is screwed with one positioning nut 7.
The hanging basket body 9 is of a frame structure, and the hanging basket body 9 is provided with a balancing weight.
The invention also relates to a construction method of the hanging basket mounting structure externally hung on the building wall, which comprises the following construction steps:
s1, machining and manufacturing an embedded bolt sleeve 2 and a connecting bolt 6 which meet the stress requirement through stress checking calculation according to the design requirement;
s2, measuring and positioning the position of the wall body 1, and embedding the embedded bolt sleeve 2 in place when the wall body 1 is manufactured, wherein the embedded bolt sleeve 2 is fixedly arranged in the wall body 1;
s3, one end of a connecting bolt 6 penetrates through a through hole in a section steel end plate 5 to be connected with an embedded bolt sleeve 2, a positioning nut 7 is screwed at the other end of the connecting bolt 6, the positioning nut 7 is screwed, and the section steel end plate 5 is clamped between a wall body 1 and the positioning nut 7, so that the connecting bolt 6 is used for connecting the wall body 1 and the overhanging section steel 3;
s4, connecting a steel wire rope 8 with a hanging basket body 9 and the overhanging section steel 3;
and S5, after the debugging and acceptance check are qualified, using the hanging basket mounting structure externally hung on the building wall.
The construction method of the hanging basket mounting structure externally hung on the building wall has the advantages that: the construction efficiency and the requirement for repeated use are fully considered in the installation and use processes of the building outer wall decoration external hanging basket, the embedded bolt sleeves of different models are selected according to actual requirements during early production, the safety and the stability of the use of the hanging basket are ensured through strict stress checking calculation, and meanwhile, except the embedded sleeves, other components are recycled and reused, so that the material loss is reduced. After the hanging basket is used up, the embedded bolt sleeves need to be plugged, and the waterproof requirements of the wall body are met through plugging the embedded bolt sleeves by waterproof colloid bolts, so that a better using effect is achieved.
The hanging basket mounting structure for the building wall is applied to a wall or a beam column structure of a concrete structure aiming at the use characteristics of a pre-embedded hanging basket with a cantilever support, and has the advantages of good effect, large bearing capacity and high safety. The leakage part of the connecting bolt needs to be protected by a finished product to prevent the wire channel from being polluted and damaged. After the mounting structure of the hanging basket externally hung on the building wall is used, except the embedded bolt sleeve, other components can be recycled and reused. And holes reserved in the wall body after the wall body is dismantled are plugged by prefabricated waterproof colloid bolts, so that the requirements on the waterproofness and the integrity of the wall body are met. When the bearing capacity is insufficient, the number of the embedded bolt sleeves can be increased according to the size of the wall body.
According to the mounting structure and the construction method of the hanging basket for the external hanging of the building wall, when the mounting structure for the hanging basket for the external hanging of the building wall is arranged, an embedded bolt sleeve and a connecting bolt which meet the stress requirement are processed and manufactured through stress checking calculation according to the design requirement; measuring and positioning the position of the wall, and embedding the embedded bolt sleeve in place when the wall is manufactured, wherein the embedded bolt sleeve is fixedly arranged in the wall; one end of the connecting bolt penetrates through a through hole in the section steel end plate to be connected with the embedded bolt sleeve, the other end of the connecting bolt is screwed with the positioning nut, the section steel end plate is clamped between the wall body and the positioning nut, and the connecting bolt is used for connecting the wall body and the overhanging section steel; the steel wire rope is connected with the hanging basket body and the overhanging section steel; and after the debugging and acceptance inspection are qualified, using the hanging basket mounting structure externally hung on the building wall. And most of the components can be recycled for reuse. The mounting structure and the construction method of the hanging basket externally hung on the building wall have simple structure, can effectively improve the construction efficiency, simplify the mounting and construction processes, simultaneously realize the recycling of other components except the embedded sleeve, reduce the consumption of manpower and materials, and have convenient operation, high safety and strong practicability.
The present invention has been described in connection with the accompanying drawings, and it is to be understood that the invention is not limited to the specific embodiments disclosed, but is intended to cover various modifications, changes and equivalents of the embodiments of the invention, and its application to other applications without departing from the spirit and scope of the invention.

Claims (7)

1. The utility model provides an external hanging flower basket mounting structure of building wall which characterized in that: including wall body (1), wall body (1) in set up a plurality of buried bolt sleeve (2) in advance, buried bolt sleeve (2) extend to wall body (1) side surface position, shaped steel (3) of encorbelmenting includes shaped steel body (4) and shaped steel end plate (5), shaped steel body (4) set up to be "mouthful" font or "day" font structure for vertical section, shaped steel end plate (5) connection shaped steel body (4) one end, through-hole and one buried bolt sleeve (2) on shaped steel end plate (5) are passed to every connecting bolt (6) one end are connected, positioning nut (7) are screwed to every connecting bolt (6) other end, shaped steel body (4) the hook wire rope (8) on encorbelmenting shaped steel (3), hanging flower basket body (9) are connected to wire rope (8) lower extreme.
2. The external hanging basket installation structure of building wall according to claim 1, wherein: the embedded bolt sleeve (2) comprises an embedded sphere (10) and a bolt sleeve (11), and the embedded sphere (10) and the bolt sleeve (11) are of an integrated structure.
3. The structure for mounting an external hanging basket on a building wall as claimed in claim 1 or 2, wherein: the upper part of the section steel body (4) of the overhanging section steel (3) is provided with a steel wire rope limiting groove (12), and the upper part of the steel wire rope (8) is clamped in the steel wire rope limiting groove (12).
4. The structure for mounting an external hanging basket on a building wall as claimed in claim 1 or 2, wherein: the steel wire rope connecting through hole horizontally penetrating through the section steel body (4) is formed in the section steel body (4) of the cantilever section steel (3), and the steel wire rope (8) penetrates through the steel wire rope connecting through hole.
5. The structure for mounting an external hanging basket on a building wall as claimed in claim 1 or 2, wherein: the embedded bolt sleeve (2) is provided with two embedded bolt sleeves, one end of each connecting bolt (6) penetrates through a through hole in the section steel end plate (5) to be connected with one embedded bolt sleeve (2) in a screwing mode, and the other end of each connecting bolt (6) is screwed with one positioning nut (7).
6. The structure for mounting an external hanging basket on a building wall as claimed in claim 1 or 2, wherein: the hanging basket body (9) is of a frame structure, and the hanging basket body (9) is provided with a balancing weight.
7. A construction method of a hanging basket mounting structure externally hung on a building wall body is characterized in that: the construction method of the hanging basket mounting structure externally hung on the building wall comprises the following construction steps:
s1, machining and manufacturing an embedded bolt sleeve (2) and a connecting bolt (6) which meet the stress requirement through stress checking calculation according to the design requirement;
s2, measuring and positioning the position of the wall body (1), and embedding the embedded bolt sleeve (2) in place when the wall body (1) is manufactured, wherein the embedded bolt sleeve (2) is fixedly arranged in the wall body (1);
s3, one end of a connecting bolt (6) penetrates through a through hole in a section steel end plate (5) to be connected with the embedded bolt sleeve (2), a positioning nut (7) is screwed at the other end of the connecting bolt (6), the positioning nut (7) is screwed, and the section steel end plate (5) is clamped between the wall body (1) and the positioning nut (7) to realize the connection of the connecting bolt (6) to the wall body (1) and the overhanging section steel (3);
s4, connecting a steel wire rope (8) with a hanging basket body (9) and the cantilever steel section (3);
and S5, after the debugging and acceptance check are qualified, using the hanging basket mounting structure externally hung on the building wall.
CN202110320843.XA 2021-03-25 2021-03-25 External hanging basket installation structure of building wall and construction method thereof Pending CN113047595A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110320843.XA CN113047595A (en) 2021-03-25 2021-03-25 External hanging basket installation structure of building wall and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110320843.XA CN113047595A (en) 2021-03-25 2021-03-25 External hanging basket installation structure of building wall and construction method thereof

Publications (1)

Publication Number Publication Date
CN113047595A true CN113047595A (en) 2021-06-29

Family

ID=76515240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110320843.XA Pending CN113047595A (en) 2021-03-25 2021-03-25 External hanging basket installation structure of building wall and construction method thereof

Country Status (1)

Country Link
CN (1) CN113047595A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114000697A (en) * 2021-12-31 2022-02-01 中铁建工集团有限公司 Overhanging type electric hanging basket

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201198A (en) * 2015-08-28 2015-12-30 中建四局第三建筑工程有限公司 Tool-type cantilever beam and construction method thereof
CN205382699U (en) * 2016-03-14 2016-07-13 广西建工集团第一建筑工程有限责任公司 A hanging flower basket for skin shotcrete construction
CN106121255A (en) * 2016-06-26 2016-11-16 中建三局集团有限公司 Apparatus installed by a kind of Super High glass curtain wall
CN207974504U (en) * 2018-03-15 2018-10-16 北京城建集团有限责任公司 Climbing type hanging basket system for tilting decoration of exterior wall construction
CN110259105A (en) * 2019-06-10 2019-09-20 湖北亿涛建设有限公司 Cantilever Beams and construction method
CN209742346U (en) * 2019-03-28 2019-12-06 中国建筑第二工程局有限公司 Cantilever anchoring tool for roof hanging basket

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201198A (en) * 2015-08-28 2015-12-30 中建四局第三建筑工程有限公司 Tool-type cantilever beam and construction method thereof
CN205382699U (en) * 2016-03-14 2016-07-13 广西建工集团第一建筑工程有限责任公司 A hanging flower basket for skin shotcrete construction
CN106121255A (en) * 2016-06-26 2016-11-16 中建三局集团有限公司 Apparatus installed by a kind of Super High glass curtain wall
CN207974504U (en) * 2018-03-15 2018-10-16 北京城建集团有限责任公司 Climbing type hanging basket system for tilting decoration of exterior wall construction
CN209742346U (en) * 2019-03-28 2019-12-06 中国建筑第二工程局有限公司 Cantilever anchoring tool for roof hanging basket
CN110259105A (en) * 2019-06-10 2019-09-20 湖北亿涛建设有限公司 Cantilever Beams and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114000697A (en) * 2021-12-31 2022-02-01 中铁建工集团有限公司 Overhanging type electric hanging basket

Similar Documents

Publication Publication Date Title
CN206580442U (en) A kind of hanging apparatus suitable for Assembled Building gangboard prefabricated components
CN206110656U (en) Scalable foldable integrally lift up tube formwork of elevartor shaft
CN104925672B (en) The all-hydraulic self-crawling type two-sided tower crane of suspension
CN113047595A (en) External hanging basket installation structure of building wall and construction method thereof
CN106121040A (en) A kind of welding lattice column device and welding method
CN108104335B (en) Assembled flexible dry hanging system of curtain wall
CN205637622U (en) Perpendicular unit glass curtain wall hoist and mount system
CN109252656B (en) High-rise building climbing template and assembling, pouring and lifting method
CN204662951U (en) High tower hydraulic climbing scaffold
CN106351245A (en) Tower crane foundation base and construction method thereof
CN106121259B (en) The hanging apparatus and its hanging method of embedded integrated outer wall plate
CN205653104U (en) Walking crane of cell board curtain installation
CN205575534U (en) Lattice formula groined type support body lifting means
CN205822454U (en) A kind of welding lattice column device
CN204265302U (en) One can dismounting loop wheel machine flexibly
CN210658449U (en) Remove aluminum alloy template structure
CN208087065U (en) A kind of fixing device of lifting machine
CN203187370U (en) Inner mast hoisting device
CN103225390B (en) Hollow facade pulley guide attached-type lifting scaffold
CN207142688U (en) A kind of boom hoisting of pot superstructure
CN201339309Y (en) Attached self-lifting scaffold
CN205663224U (en) Hoist and mount connecting piece suitable for building prefab
CN214989677U (en) Simple tool for assisting large-scale template hoisting
CN204491988U (en) A kind of wall plate structure being convenient to lift
CN205603068U (en) A double -column support for top hoisting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210629

RJ01 Rejection of invention patent application after publication