CN105401598B - Automatic formwork lowering system hoisting device and method for top-down construction - Google Patents

Automatic formwork lowering system hoisting device and method for top-down construction Download PDF

Info

Publication number
CN105401598B
CN105401598B CN201510759815.2A CN201510759815A CN105401598B CN 105401598 B CN105401598 B CN 105401598B CN 201510759815 A CN201510759815 A CN 201510759815A CN 105401598 B CN105401598 B CN 105401598B
Authority
CN
China
Prior art keywords
stress
nut
rod component
hanger rod
pad
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510759815.2A
Other languages
Chinese (zh)
Other versions
CN105401598A (en
Inventor
龚剑
顾国明
刘冬华
刘星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN201510759815.2A priority Critical patent/CN105401598B/en
Publication of CN105401598A publication Critical patent/CN105401598A/en
Application granted granted Critical
Publication of CN105401598B publication Critical patent/CN105401598B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides an automatic formwork lowering system hoisting device and method for top-down construction and belongs to the field of building construction. By the adoption of the automatic formwork lowering system hoisting device and method for top-down construction, the problems that an existing formwork system hoisting device is not universal, and a formwork system needs to be dismounted and mounted repeatedly are solved. The automatic formwork lowering system hoisting device for top-down construction comprises a stress boom assembly, a force bearing support and a gasket. The stress boom assembly comprises a plurality of stress booms and a plurality of thread connectors. The force bearing support comprises two sub-nuts, a nut sleeve and a plurality of set screws. The length of the stress boom assembly can be adjusted by adjusting the number of the applied stress booms and the number of the applied thread connectors according to actual conditions, so that different engineering requirements are met. The invention further discloses the automatic formwork lowering system hoisting method for top-down construction. By the adoption of the automatic formwork lowering system hoisting method for top-down construction, the situation that the formwork system needs to be dismounted and mounted repeatedly during top-down construction can be avoided. In a word, by the adoption of the automatic formwork lowering system hoisting device and method for top-down construction, the construction cost of projects can be effectively reduced, and the labor intensity of operators is relieved.

Description

Modular system hanging apparatus and its hanging method drop in contrary sequence method automatically
Technical field
The present invention relates to the realm of building construction, modular system hanging apparatus and its lifting drop in more particularly to a kind of contrary sequence method automatically Method.
Background technology
With the rapid development in city, in Urban Building Construction field, reverse construction is due to its short time limit, safety Property it is high, be increasingly subject to people's attention the advantages of affect little to buildings or structures around, be applied to more and more engineering items In mesh.
Traditional contrary sequence method is to continue to dig out downwards certain space to after designed elevation in digging, the sky backbreak using this part Between, it is that the reinforced beam (floor) of cast-in-site builds the support system of template system and template, therefore interim pad need to be poured into a mould Layer, increased cost;At the same time, as the reinforced beam (floor) of cast-in-site needs the time to conserve, maintenance Period can not carry out earth excavation, this considerably increases the construction period of whole underground engineering.In order to shorten the construction period, people A kind of formwork hoisting device is developed, whole template system last layer can be suspended in by hanging apparatus and be poured the reinforcing bar being poured in On beams of concrete (floor), during reinforced beam (floor) is conserved, the excavation of lower floor's soil body can be synchronously carried out, one Determine in degree, to shorten the construction period of engineering;But as template system can only be suspended in last layer reinforcing bar by hanging apparatus On beams of concrete (floor), when underground reinforced concrete structure is multiple structure (number of plies N >=3), will be hanging per next layer Assembling device and template system dismounting and installation once, are wasted time and energy;On the other hand, it is due to different buildings, underground reinforced mixed The story height of Xtah Crude Clay structure differs greatly, therefore hanging apparatus used are same, just same project at last, often also needs To cover the hanging apparatus of different size (length) more, considerably increase the early investment of engineering.
In sum, in existing reverse construction, the construction of template system more comes to meet the efficient of Modern Construction The requirement of rate, low cost, in order to adapt to different building underground reinforced concrete structures and reduce template in construction process system Assembly and disassembly number of times, therefore a kind of contrary sequence method of research and development drops automatically modular system hanging apparatus and its hanging method has become art technology Personnel's technical barrier in the urgent need to address.
The content of the invention
It is an object of the invention to provide modular system hanging apparatus drop in a kind of contrary sequence method automatically, to solve existing drop modular system The construction site of different underground reinforced concrete structures cannot be well adapted to;Meanwhile, present invention also offers a kind of contrary sequence method Automatically the hanging method of drop modular system, to solve the problems, such as being dismounted for multiple times template system is needed in existing reverse construction, meets The high efficiency of building underground reinforced concrete structure reverse construction, the requirement of low cost.
To solve above-mentioned technical problem, the present invention provides following technical scheme:
First, there is provided modular system hanging apparatus drop in a kind of contrary sequence method automatically, for lifting cast-in-site armored concrete The template system of structure, including stress hanger rod component, pad and load bearing, the stress hanger rod component include some stress Suspension rod and some screw thread couplings, the stress suspension rod are joined end to end by the screw thread coupling, the pad and described are held Power bearing is set in the outside of the stress hanger rod component, and the pad is arranged at the load bearing and a reinforced concrete Tulou Between plate, the load bearing is threadedly coupled with the stress hanger rod component, lower end and the mould of the stress hanger rod component Plate system connects.
Optionally, dropped in modular system hanging apparatus automatically in the contrary sequence method, the load bearing include combination nut with And nut overcoat, the combination nut includes two sub- nuts that can be docked, and the section of sub- nut is in semi-circular shape, two institutes State sub- nut relatively and be arranged concentrically, the nut overcoat is set on the outside of the combination nut, and the nut overcoat internal diameter is big In the screw thread coupling external diameter.
Optionally, dropped in modular system hanging apparatus automatically in the contrary sequence method, the load bearing also includes some tightenings Screw, the holding screw are coordinated with the screw on the nut overcoat, and the holding screw end of thread withstands the combination spiral shell Female outer wall.
Optionally, dropped in modular system hanging apparatus automatically in the contrary sequence method, the pad is U-shaped single-open type pad Circle.
Optionally, dropped in modular system hanging apparatus automatically in the contrary sequence method, the length of the stress suspension rod is 1000mm- 1200mm。
Additionally, the present invention also provides the hanging method that modular system hanging apparatus drop in a kind of contrary sequence method automatically, including following step Suddenly:
Step one:Modular system hanging apparatus drop in contrary sequence method automatically described in providing, rely on the template system, complete described The construction of the downward floor of reinforced concrete floor;
Step 2:According to the height of next layer of construction floor again, the Bottom Runby of stress hanger rod component is determined;
Step 3:The stress hanger rod component is transferred into the Bottom Runby, when the stress hanger rod component reaches predetermined During position, the pad is inserted, merge two sub- nuts and constitute the combination nut, be rotated down outside the movement nut Cover to above the pad, the nut overcoat is enclosed within the outside of the combination nut, be fixed on the stress hanger rod component On the reinforced concrete floor.
Optionally, in the hanging method that modular system hanging apparatus drop in the contrary sequence method automatically, the step one includes:Root According to the length of the height and the stress suspension rod of construction floor, determine that the quantity of the stress suspension rod is n;By n stress suspension rod Joined end to end by the n-1 screw thread coupling and constitute the stress hanger rod component, the stress hanger rod component is passed through into institute The through hole of reinforced concrete floor is stated, and the reinforced concrete floor is fixed on by the load bearing and the pad On, connect the template system in the lower end of the stress hanger rod component;The template system is relied on, the reinforced concrete is completed The construction of the downward floor of Tulou plate;Wherein n is natural number, and n >=1.
Optionally, in the hanging method that modular system hanging apparatus drop in the contrary sequence method automatically, in the step 3:
When length of the Bottom Runby less than the stress suspension rod, the nut overcoat is moved upward out, separates two The sub- nut, outwards removes the pad, transfers the stress hanger rod component and reaches precalculated position;When the Bottom Runby it is big In equal to the stress suspension rod length when, the upper end of the stress hanger rod component by the screw thread coupling be further added by A few stress suspension rod, then moves upward out the nut overcoat again, separates two sub- nuts, outwards removes described Pad, transfers the stress hanger rod component and reaches precalculated position.
Modular system hanging apparatus and its hanging method drop in hinge structure, the contrary sequence method that the present invention is provided automatically, have Beneficial technique effect below:
The capital input and cost of engineering are greatly reduced, described stress hanger rod component is long by some standards The stress suspension rod and several described screw thread couplings of degree is formed by connecting, can be according to practical situation, can be with flexible The length of the stress hanger rod component, it is to avoid because the change of underground reinforced concrete structure depth needs different productions different The generation of hanging apparatus such case of specification (length), reduces the fixed assets investment of engineering, so as to a certain extent Reduce the cost of whole engineering.
Efficiency of construction is effectively improved, the labor intensity of operator is reduced, the contrary sequence method that the present invention is provided is automatic The hanging method of drop modular system, it is possible to reduce multi-layer underground reinforced concrete structure reverse construction template system peace tears number of times open, Avoid one layer of every construction from reinstalling template system of dismounting, it is effective to improve efficiency of construction, reduce operative employee The labor intensity of people.
Description of the drawings
Fig. 1 drops modular system hanging apparatus three-dimensional perspective automatically for the contrary sequence method of one embodiment of the invention
Fig. 2 drops modular system hanging apparatus three-dimensional explosive view automatically for the contrary sequence method of one embodiment of the invention
Fig. 3 drops modular system hanging apparatus sectional view automatically for the contrary sequence method of one embodiment of the invention;
Pad three-dimensional perspectives of the Fig. 4 for one embodiment of the invention;
Fig. 5 passes through the structural representation before armored concrete for the screw thread coupling of one embodiment of the invention;
Fig. 6 passes through the structural representation in armored concrete for the screw thread coupling of one embodiment of the invention;
Three schematic diagrams of the step of Fig. 7 is one embodiment of the invention;
In figure:Modular system hanging apparatus, 200- reinforced concrete floors (beam), 1- stress suspension rods drop in 100- contrary sequence methods automatically Component, 11- stress suspension rods, 12- screw thread couplings, 2 load bearings, 21- nut overcoats, 22- combination nuts, the sub- nuts of 22a-, 23- holding screws, 3- pads.
Specific embodiment
Below in conjunction with the drawings and specific embodiments contrary sequence method proposed by the present invention is dropped automatically modular system hanging apparatus and its Hanging method is described in further detail.According to following description and claims, advantages of the present invention and feature will be more clear Chu.It should be noted that accompanying drawing is in the form of simplifying very much and using the ratio of non-precision, only to convenient, apparent Ground aids in illustrating the purpose of the embodiment of the present invention.
With reference to Fig. 1 to Fig. 3, modular system hanging apparatus 100 drop in the contrary sequence method of one embodiment of the invention automatically, existing for lifting The template system of field cast underground reinforced concrete structure, underground reinforced concrete structure generally include multistory reinforced concrete building Plate (beam).Modular system hanging apparatus 100 drop in contrary sequence method automatically includes stress hanger rod component 1, load bearing 2 and pad 3;Stress Hanger rod component 1 includes some stress suspension rods 11 and some screw thread couplings 12, and two adjacent stress suspension rods 11 are connected by screw thread Connect device 12 to be threadedly coupled, load bearing 2 and pad 3 are set in the outside of stress hanger rod component 1, load bearing 2 and stress suspension rod In component 1, stress suspension rod 11 is threadedly coupled, and pad 3 is located between load bearing 2 and reinforced concrete floor (beam) 200, pad 3 Both ends of the surface lower surface and the upper surface of reinforced concrete floor (beam) 200 respectively with load bearing 2;Stress suspension rod group The lower end of part 1 is connected (not shown) with template system, and the upper end of stress hanger rod component 1 will by load bearing 2 and pad 3 The downward load for bearing passes to reinforced concrete floor (beam) 200.
Continuing with Fig. 2 and 3, load bearing 2 includes combination nut 22, nut overcoat 21 and some holding screws 23, group Closing nut 22 includes two sub- nut 22a that can be docked, and the section of sub- nut 22a is in semi-circular shape, two sub- nut 22a phases To and be arranged concentrically, common, corresponding two sub- nut 22a are formed by the cutting of nut, it is ensured that corresponding two The female thread concordance of sub- nut 22a, combination nut 22 is a hollow stairstepping cylinder, the endoporus and group of nut overcoat 21 The less one end of diameter for closing nut 22 is fitted close, and in load 2 load-bearing of bearing, nut overcoat 21 limits two sub- nuts 22a's moves radially, in radially distributed several screwed holes of the side wall of nut overcoat 21, holding screw 23 and corresponding threaded holes Close, the end of thread of holding screw 23 withstands on the small end lateral surface of combination nut 22, further limit the radial direction of two sub- nut 22a It is mobile.External diameter of the internal diameter of nut overcoat 21 more than screw thread coupling 12, it is ensured that stress hanger rod component 1 is in the mistake for moving up and down Cheng Zhong, ensure that screw thread coupling 12 passes through nut overcoat 21.
With reference to Fig. 4, pad 3 is U-shaped single-open type packing ring, can easily be inserted into load bearing 2 and reinforced concrete Between Tulou plate (beam) 200, the external load that stress hanger rod component 1 is subject to is transmitted, additionally, this design of pad 3 can be with fast Speed is extracted out from stress hanger rod component 1 so that in stress hanger rod component 1, screw thread coupling can pass through reinforced concrete Tulou Plate (beam) 200.
With continued reference to Fig. 1 to Fig. 3 and Fig. 5 to Fig. 7, a height of 3m of most building undergrounds floor or so, stress suspension rod 11 Manufacturing cost can be multiplied with the increase of length, while considering the convenient factor of execute-in-place, preferably hang stress The Design of length of bar 11 is 1000-1200mm, so can meet most actual demands of engineering by spreading.Preferably, The stress suspension rod 11 of 1000mm can be listed in full-length, its cost can have and significantly decline very much, while in order to adapt to Different story heights, can also arrange the stress suspension rod 11 that some length are 1200mm-1700mm.
With reference to Fig. 3 and Fig. 5 to Fig. 7, illustrate that the hanging method of modular system drops in contrary sequence method automatically, comprise the steps:
Step one:Above-mentioned contrary sequence method is provided and drops automatically modular system hanging apparatus 100, specific practice is as follows:
According to the length of the height and stress suspension rod 11 of construction floor in Practical Project, determine that the quantity of stress suspension rod 11 is N, specifically:
Wherein, height, length that l be stress suspension rod 11 of the L for construction floor.
The selection of 11 length of stress suspension rod, to facilitate execute-in-place as principle, the quantity of screw thread coupling 12 is n-1; By taking construction floor of the height for 3 meters as an example, the stress suspension rod 11 of 4 1000mm can be selected, the quantity of screw thread coupling 12 is 2 It is individual;N stress suspension rod 11 is threaded connection device 12 respectively to join end to end composition stress hanger rod component 1, by stress suspension rod group Part 1 is through the through hole on reinforced concrete floor (beam) 200, and is fixed on reinforced concrete Tulou by load bearing 2 and pad 3 On plate (beam) 200, the downward load for being born is led to by the lower end connection template system of stress hanger rod component 1, stress hanger rod component 1 Cross load bearing 2 and pad 3 is transferred on reinforced concrete floor (beam) 200;Rely on 100 institute of drop modular system hanging apparatus automatically The template system of connection, completes the construction of a 200 downward floor of reinforced concrete floor (beam);Wherein n is natural number, and n ≥1;
Step 2:When needing to continue when reinforced concrete floor (beam) 200 construction of next floor again, can be according to again The height of lower first floor layer, determines 1 Bottom Runby of stress hanger rod component:
Step 3:By stress hanger rod component 1 transfer in step 2 determined by Bottom Runby:
When the Bottom Runby of stress hanger rod component 1 is less than the length of stress suspension rod 11, nut overcoat 21 is moved upward out, point Two sub- nut 22a are opened, pad 3 is outwards removed, decentralization stress hanger rod component 1 arrives precalculated position;When under stress hanger rod component 1 When row distance is more than the length of stress suspension rod 11, device 12 is threaded connection in the upper end of stress hanger rod component 1 and is further added by least A piece stress suspension rod 11, then moves upward out nut overcoat 21 again, separates two sub- nut 22a, outwards removes pad 3, decentralization Stress hanger rod component 1 arrives precalculated position;
After the template system for being connected to 1 lower end of stress hanger rod component reaches precalculated position, pad 3 is inserted, merges two Sub- nut 22a constitutes combination nut 22, is rotated down travelling nut overcoat 21, nut overcoat 21 is set in outside combination nut 22 Side, again by downward load transfer to reinforced concrete floor (beam) 200.
It can be seen that, in the hanging method that modular system hanging apparatus 100 drop in above-mentioned contrary sequence method automatically, it is not necessary to repeated disassembled and assembled mould Plate system, it is only necessary to which the upper end for dropping automatically modular system hanging apparatus 100 in contrary sequence method increases the quantity of stress suspension rod 11, and downwards Clearance stress hanger rod component 1, it is possible to complete the automatic decentralization of template system.
In sum, modular system hanging apparatus drop in present invention offer contrary sequence method automatically, and clever structure can be according to actual work Journey adjusts the length of stress suspension rod so that the hanging apparatus of template system it needs to be determined that need the quantity and length of stress suspension rod The needs of reverse construction when disclosure satisfy that the underground reinforced concrete structure of different depth, expand hanging for template system significantly The scope of application of assembling device, reduces the fixed capital input of underground reverse construction engineering, so as to reduce whole to a certain extent The cost of individual engineering.
Additionally, the hanging method of modular system drops in contrary sequence method that the present invention is provided automatically, it is to avoid contrary sequence method is in multi-layer underground steel Need the trouble with form removal system is repeatedly installed repeatedly in bar concrete floor (beam), be effectively improved underground reinforced mixed The efficiency of construction of solidifying Tulou plate (beam) contrary sequence method, reduces the labor intensity of operator.
Foregoing description is only the description to present pre-ferred embodiments, not any restriction to the scope of the invention, this Any change that the those of ordinary skill in bright field is done according to the disclosure above content, modification, belong to the protection of claims Scope.

Claims (7)

1. modular system hanging apparatus drop in a kind of contrary sequence method automatically, for lifting the template system of cast-in-site reinforced concrete structure System, it is characterised in that including stress hanger rod component, pad and load bearing, the stress hanger rod component includes some stress Suspension rod and some screw thread couplings, the stress suspension rod are joined end to end by the screw thread coupling, the pad and described are held Power bearing is set in the outside of the stress hanger rod component, and the pad is arranged at the load bearing and a reinforced concrete Tulou Between plate, the load bearing is threadedly coupled with the stress hanger rod component, lower end and the mould of the stress hanger rod component Plate system connects, and the load bearing includes combination nut and nut overcoat, and the combination nut includes that two can dock Sub- nut, the section of sub- nut is in semi-circular shape, and two sub- nuts are relative and are arranged concentrically, and the nut overcoat is arranged On the outside of the combination nut, the nut overcoat internal diameter is more than the screw thread coupling external diameter.
2. modular system hanging apparatus drop in contrary sequence method as claimed in claim 1 automatically, it is characterised in that the load bearing also includes Some holding screws, the holding screw are coordinated with the screw on the nut overcoat, and the holding screw end of thread withstands institute State the outer wall of combination nut.
3. modular system hanging apparatus drop in contrary sequence method as claimed in claim 1 automatically, it is characterised in that the pad is U-shaped one side Open-type packing ring.
4. as described in claim 1 to any one of claim 3, modular system hanging apparatus drop in contrary sequence method automatically, it is characterised in that Length L of the single stress suspension rod is 1000mm-1200mm.
5. the hanging method of modular system hanging apparatus drops in a kind of contrary sequence method automatically, it is characterised in that comprise the steps:
Step one:The contrary sequence method as described in 1 to 4 any one of right is provided and drops automatically modular system hanging apparatus, rely on the template system System, completes the construction of the downward floor of the reinforced concrete floor;
Step 2:According to the height of next layer of construction floor again, the Bottom Runby of stress hanger rod component is determined;
Step 3:The stress hanger rod component is transferred into the Bottom Runby, when the stress hanger rod component reaches precalculated position When, the pad is inserted, is merged two sub- nuts and is constituted the combination nut, be rotated down the movement nut overcoat extremely Above the pad, the nut overcoat is enclosed within the outside of the combination nut, is fixed on the stress hanger rod component described On reinforced concrete floor.
6. the hanging method of modular system hanging apparatus drops in contrary sequence method as claimed in claim 5 automatically, it is characterised in that the step Rapid one includes:According to the length of the height and the stress suspension rod of construction floor, determine that the quantity of the stress suspension rod is n, by n Individual stress suspension rod is joined end to end by the n-1 screw thread coupling and constitutes the stress hanger rod component, by the stress suspension rod Through hole of the component through the reinforced concrete floor, and it is mixed to be fixed on the reinforcing bar by the load bearing and the pad On solidifying Tulou plate, connect the template system in the lower end of the stress hanger rod component;The template system is relied on, completes described The construction of the downward floor of reinforced concrete floor, wherein n is natural number, and n >=1.
7. the hanging method of modular system hanging apparatus drops in contrary sequence method as claimed in claim 5 automatically, it is characterised in that described In step 3:When length of the Bottom Runby less than the stress suspension rod, the nut overcoat is moved upward out, separates two The sub- nut, outwards removes the pad, transfers the stress hanger rod component and reaches precalculated position;When the Bottom Runby it is big In equal to the stress suspension rod length when, the upper end of the stress hanger rod component by the screw thread coupling be further added by A few stress suspension rod, removes the nut overcoat then up, separates two sub- nuts, outwards removes the pad Piece, transfers the stress hanger rod component and reaches precalculated position.
CN201510759815.2A 2015-11-10 2015-11-10 Automatic formwork lowering system hoisting device and method for top-down construction Active CN105401598B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510759815.2A CN105401598B (en) 2015-11-10 2015-11-10 Automatic formwork lowering system hoisting device and method for top-down construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510759815.2A CN105401598B (en) 2015-11-10 2015-11-10 Automatic formwork lowering system hoisting device and method for top-down construction

Publications (2)

Publication Number Publication Date
CN105401598A CN105401598A (en) 2016-03-16
CN105401598B true CN105401598B (en) 2017-04-19

Family

ID=55467328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510759815.2A Active CN105401598B (en) 2015-11-10 2015-11-10 Automatic formwork lowering system hoisting device and method for top-down construction

Country Status (1)

Country Link
CN (1) CN105401598B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761961A (en) * 2017-09-11 2018-03-06 贵州建工集团第建筑工程有限责任公司 A kind of electronic climbing frame monolithic construction method of high-rise building
CN110097830A (en) * 2019-04-19 2019-08-06 深圳市智讯达光电科技有限公司 A kind of complete preceding preceding display screen box body and its display screen safeguarded of installation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101575911A (en) * 2009-05-27 2009-11-11 上海市第一建筑有限公司 Top-down decreasing-formwork formwork system and construction method
CN102900099A (en) * 2011-07-26 2013-01-30 上海市第二建筑有限公司 Drop-slab construction process for underground concrete structures
CN205205860U (en) * 2015-11-10 2016-05-04 上海建工集团股份有限公司 Automatic all hoist device of module system that fall of reverse construction method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101341679B1 (en) * 2010-09-30 2013-12-16 (주)바로건설기술 Device for constructing an underground structure and method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101575911A (en) * 2009-05-27 2009-11-11 上海市第一建筑有限公司 Top-down decreasing-formwork formwork system and construction method
CN102900099A (en) * 2011-07-26 2013-01-30 上海市第二建筑有限公司 Drop-slab construction process for underground concrete structures
CN205205860U (en) * 2015-11-10 2016-05-04 上海建工集团股份有限公司 Automatic all hoist device of module system that fall of reverse construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
逆作法新型自动化降模体系的设计及应用;李增辉等;《建筑施工》;20110630;第33卷(第6期);第448-450页 *

Also Published As

Publication number Publication date
CN105401598A (en) 2016-03-16

Similar Documents

Publication Publication Date Title
CN101538936B (en) Hydraulic slip-and-lift construction method for water tower
CN102913248B (en) The overall upset hanging template of wholecircle and formwork erection, release method
CN103556627B (en) A kind of hanging cage structure for large diameter bored pile reinforcing bar cage hoisting
CN105586867A (en) Installation method for over-length over-weight steel reinforcement cage
CN105401598B (en) Automatic formwork lowering system hoisting device and method for top-down construction
CN103510541A (en) Device and method for installing steel pipe column to interior of lifting frame hole
CN103572763A (en) Large-span steel support foundation ditch support detaching construction method
CN204491640U (en) A kind of circular single-arm steel hanging box being applicable to strong tidal bore district
CN205224050U (en) Steel reinforcement cage is hung and is put device
CN203625889U (en) Hanging cage structure for large-diameter hole drilling cast pile reinforcement cage hanging
CN103924653B (en) A kind of frame type catch pit and construction method thereof
CN103556626B (en) Hanging structure for hoisting large-diameter hole drilling filling pile steel bar cage
CN205502048U (en) Cardboard formula steel reinforcement cage mounting platform
CN205205860U (en) Automatic all hoist device of module system that fall of reverse construction method
CN203782863U (en) Frame type draining well
CN105386461B (en) Reverse mechanical formwork descending system and formwork descending method thereof
CN207863464U (en) A kind of new take-off seam aluminum alloy pattern plate
CN205475324U (en) Mould device falls in reverse construction method hydraulic pressure
CN205576902U (en) Pile foundation of stress tube in advance of removable screw rod
CN201381629Y (en) Light scaffold
CN205475325U (en) Reverse construction method is mechanized to fall module system all
CN203625891U (en) Hanging structure for large-diameter hole drilling cast pile reinforcement cage hanging
CN105401597B (en) A kind of contrary sequence method fluid pressure drop die device and its drop mould method
CN207633773U (en) A kind of glomeration building prefabricated construction reinforcing bar guiding tube dismounting system
CN202689531U (en) Flexible and retractable climbing shuttering system for single-cylinder-body structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant