CN106078231A - A kind of round steel capsule for building - Google Patents

A kind of round steel capsule for building Download PDF

Info

Publication number
CN106078231A
CN106078231A CN201610758480.7A CN201610758480A CN106078231A CN 106078231 A CN106078231 A CN 106078231A CN 201610758480 A CN201610758480 A CN 201610758480A CN 106078231 A CN106078231 A CN 106078231A
Authority
CN
China
Prior art keywords
round steel
peeling
stripping
boring
thick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610758480.7A
Other languages
Chinese (zh)
Other versions
CN106078231B (en
Inventor
沈利强
谢晋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG ZHONGYI CONSTRUCTION GROUP Co Ltd
Original Assignee
ZHEJIANG ZHONGYI CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG ZHONGYI CONSTRUCTION GROUP Co Ltd filed Critical ZHEJIANG ZHONGYI CONSTRUCTION GROUP Co Ltd
Priority to CN201610758480.7A priority Critical patent/CN106078231B/en
Publication of CN106078231A publication Critical patent/CN106078231A/en
Application granted granted Critical
Publication of CN106078231B publication Critical patent/CN106078231B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B23P23/06Metal-working plant comprising a number of associated machines or apparatus
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/04Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of bars or wire

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Accessories And Tools For Shearing Machines (AREA)

Abstract

The present invention relates to construction timber technical field of processing equipment, a kind of round steel capsule for building.A kind of round steel capsule for building, including round steel roughing equipment and round steel rig;Before and after technique, described round steel roughing equipment includes that apparatus for peeling off, cutter sweep and centring means, described round steel rig include feeding platform, high temperature furnace, conveyor track, drilling-hole positioning device, drilling equipment and chiller successively successively;Round steel is transported by transporter between described apparatus for peeling off, described cutter sweep, described centring means and described feeding platform.The present invention has round steel processing integration, and degree of accuracy is high, the advantages such as efficiency is high, time saving and energy saving.

Description

A kind of round steel capsule for building
Technical field
The present invention relates to construction timber technical field of processing equipment, a kind of round steel integration for building processing is System.
Background technology
Round steel needs to be processed before use, and existing round steel process technology seldom has the work flow of complete set, Each processing link needs individually to carry out, and intermediate link needs artificial treatment, and the labor intensity of workman is big, and round steel processed Efficiency low.The patent of Patent No. CN203320045U provides a kind of steel-making system of processing, including smelting system, removing impurities system System, cooling system and detecting system, this system of processing only combines several round steel processing link, lacks the processed ring of early stage Joint, round steel working (machining) efficiency is the highest.
Summary of the invention
The present invention is directed to the problem that prior art exists, it is provided that the round steel system of processing of complete set, save manpower Material resources, improve the efficiency of round steel processing.
The technical solution adopted for the present invention to solve the technical problems is: a kind of round steel system of processing, slightly adds including round steel Construction equipment and round steel rig;Before and after technique, described round steel roughing equipment include successively apparatus for peeling off, cutter sweep and Centring means, described round steel rig includes feeding platform, high temperature furnace, conveyor track, drilling-hole positioning device, drilling equipment successively And chiller;Filled by transmission between described apparatus for peeling off, described cutter sweep, described centring means and described feeding platform Put transport round steel.
Apparatus for peeling off that round steel is processed by the present invention, cutter sweep, centring means, high-temperature heating equipment, boring location dress Put, drilling equipment, chiller, transporter, and drive the power-equipment of this round steel system of processing all to connect into one Entirety, saves the manpower and materials of round steel processing, improves the efficiency of round steel processing.
As preferably, described apparatus for peeling off includes support, transmission component, clamping connecting gear, peeling procedure, multiple torr Roller, and in order to drive the power-equipment of this apparatus for peeling off;Described clamping connecting gear moves after mobile dolly and stripping before including shelling Dynamic dolly;Described peeling procedure includes for round steel carrying out the thick blade insert of rough peeling, for finely shelling round steel The smart blade insert of skin, for the cleaning member that round steel after peeling is cleaned, and allow the body cavity that described round steel passes through;Institute State transmission component to be positioned at above described support;Above described transmission component, by mobile before setting gradually stripping before and after technique dolly, stripping Mobile dolly after skin mechanism, stripping;Multiple described torr Kun set up before described stripping mobile dolly after the both sides of mobile dolly and stripping separately Both sides.
As preferably, described thick blade insert includes thick cutterhead, the roughing tool being symmetrically mounted on described thick cutterhead, and is positioned at Allowing the thick cutter chamber that steel rod passes in the middle part of described thick cutterhead, the described accent in thick cutter chamber coordinates docking with the accent of described body cavity; Described essence blade insert includes essence cutterhead, the finishing tool being symmetrically mounted on described essence cutterhead, and is positioned in the middle part of described essence cutterhead fair Being permitted the smart cutter chamber that steel rod passes, the described essence accent in cutter chamber coordinates docking with the accent of described body cavity;Before and after technique, described essence Blade insert is positioned at described thick blade insert rear.
As preferably, described cutter sweep includes base, fixed mechanism, cutting mechanism, and is used for driving this cutting to fill The power-equipment put;Described fixed mechanism be included in round steel cutting process in order to rise cut with round steel after for declining Lift Part, fixed component that the round steel regulated is fixed, and appearance rod parts in order to firm placement round steel;Institute State cutting mechanism and be included in the regulation parts before round steel carries out cutting, cutting mechanism whole height being adjusted and in order to circle Steel carries out the sickle cut;Described fixed mechanism is positioned at the middle part of described base, and described cutting mechanism is symmetrically arranged at Described fixed mechanism is towards the both sides of round steel cross-wise direction.
As preferably, described centring means includes frame, connecting gear, determines holes mechanism, borehole drill construction, and in order to drive The power-equipment of this centring means;Described determine holes mechanism and include pedestal, for supporting the support member of round steel and for determining circle The centring elements of steel kernel of section point;Described borehole drill construction be positioned at described frame towards described determine holes mechanism outlet side, mainly Including bracing frame, drill bit with the extensible member stretched can be carried out in the horizontal direction;Described connecting gear is positioned at described frame face Described to determining holes mechanism inlet side;The central shaft of the central shaft of described centring elements and described drill bit and described extensible member is protected Hold in the same horizontal line.
As preferably, described high temperature furnace includes multiple heating chamber, and the stepped arrangement of described heating chamber, in described heating chamber Bottom surface is the slope connected that cooperates;Described heating chamber inner cavity top is provided with flame heater block.
As preferably, described conveyor track is connected with the outlet of described high temperature furnace by buffering slope, described conveyor track top It is provided with the first motor, in described conveyor track, is provided with multiple delivery wheel, be located at some delivery wheels of described conveyor track end to described Drilling-hole positioning device side is that 60 degree of overturning angles are arranged.
As preferably, described drilling-hole positioning device is connected with described conveyor track end by platform with slope, described boring Positioner includes the second motor, round steel groove, push rod, two roll shafts, two block pressur plates, and described roll shaft is by universal joint and described the The outfan of two motors is connected and is respectively arranged on described round steel groove both sides, and described pressing plate coordinates described roll shaft fixed in described boring Hole, location is formed in the device of position.
As preferably, described drilling equipment includes the 4th motor, boring car, boring bar, positioning seat, described boring underbody portion Being provided with gear, described 4th motor is connected by the second chain and is driven described boring car.
As preferably, described chiller includes cooling holding device, pond, reception device, described cooling holding device Inside it is provided with the clamping wheel for clamping round steel, the preliminary sparge pipe cooling down round steel, is provided with in described pond for cooling down circle completely The cooling bay of steel.
The invention has the beneficial effects as follows, not only improve the processing unit (plant) of links, improve the accurate of round steel processing Degree, has also connected into an entirety by each processing link, manpower and materials required during saving round steel process operation, carries The high whole efficiency of round steel processing.
Accompanying drawing explanation
Fig. 1 is the structural representation of apparatus for peeling off of the present invention;
Fig. 2 is the structural representation of cutter sweep of the present invention;
Fig. 3 is the structural representation of centring means of the present invention;
Fig. 4 is the top view of rig of the present invention;
Fig. 5 is the side structure schematic diagram of high temperature furnace in Fig. 4;
Fig. 6 be in Fig. 4 drilling-hole positioning device near the structural representation of the end face of chiller;
Fig. 7 is the side view of chiller in Fig. 4;
Fig. 8 is the side view of drilling equipment in Fig. 4.
In figure: 11, support, 12, peeling procedure, 121, thick blade insert, 122, essence blade insert, 123, cleaning member, 13, stripping Rear mobile dolly, 14, mobile dolly before stripping, 15, carrying roller, 16, transmission component;21, base, 22, Lift Part, 23, fixed part Part, 24, hold rod parts, 25, regulation parts, 26, sickle;31, frame, 33, pedestal, 34, support member, 35, centring elements, 37, bracing frame, 39, drill bit, 311, extensible member;101, feeding platform, 102, buffering slope, 103, delivery wheel, 104, slope puts down Platform, the 105, second motor, 106, round steel groove, 107, universal joint, 108, push rod, 109, cooling holding device, 110, receive device, 111, the first motor, the 112, first chain, 201, heating chamber, 202, maintenance door, 203, inspection rack, 301, locating rack, 302, roller Axle, 303, pressing plate, 304, gear type slack adjuster, 401, clamping wheel, 402, sparge pipe, 403, conveying, 404, connect Receive pond, 405, cooling bay, 406, receive and hook, the 407, the 3rd motor, the 501, the 4th motor, 502, track, 503, boring car, 504, Boring bar, 505, chain, 506, stopping means, 507, positioning seat, 508, increase the weight of handle.
Detailed description of the invention
Further illustrate technical scheme below in conjunction with the accompanying drawings and by detailed description of the invention.
A kind of round steel capsule for building, including round steel roughing equipment and round steel rig;By technique Front and back, described round steel roughing equipment includes that apparatus for peeling off, cutter sweep and centring means, described round steel rig depend on successively Secondary include feeding platform 101, high temperature furnace, conveyor track, drilling-hole positioning device, drilling equipment and chiller;Described apparatus for peeling off, Round steel is transported by transporter between described cutter sweep, described centring means and described feeding platform 101.This system will be each Individual round steel processing link has all connected into an entirety, saves manpower and materials, improves the efficiency of round steel processing.
As it is shown in figure 1, the peeling procedure 12 of apparatus for peeling off includes thick blade insert 121 and essence blade insert 122.Thick blade insert 121 include thick cutterhead, the roughing tool being symmetrically mounted on thick cutterhead, and are positioned in the middle part of thick cutterhead the thick cutter allowing round steel to pass Chamber, the thick accent in cutter chamber coordinates docking with the accent of body cavity;Essence blade insert 122 includes essence cutterhead, is symmetrically mounted on essence cutterhead Finishing tool, and be positioned in the middle part of essence cutterhead and allow the smart cutter chamber that passes of round steel, it is right that the essence accent in cutter chamber coordinates with the accent of body cavity Connect.Before and after technique, essence blade insert 122 is arranged on thick blade insert 121 rear.Roughing tool includes fixing with thick cutterhead and is connected Thick handle of a knife, edge of a knife negative rake angle are the negative angle blade of 10 degree, and thick for connecting the chuck type of thick handle of a knife and negative angle blade Cutter holder;The positive angle blade that finishing tool includes fixing, with essence cutterhead, the smart handle of a knife that is connected, edge of a knife positive rake angle angle is 16 degree, Yi Jiyong In connecting essence handle of a knife and the chuck type essence cutter holder of positive angle blade.Use dual peeling structure, use thick blade insert 121 that round steel is entered The rough peeling of row, uses essence blade insert 122 that round steel is carried out fine peeling, improves the peeling effect of round steel, save round steel The peeling time, improve the peeling efficiency of round steel.
It addition, cleaning member 123 can be mounted in the running water pipe in peeling procedure 12 body, it is also possible to be mounted in stripping Automatic brush in skin mechanism 12 body.By using cleaning member 123 can make the round steel surface neat and tidy of the complete skin of stripping.Described Cleaning member 123 includes water inflow and water controlled plate;The water entering section for installing described water inflow is had above described body cavity;Described Water controlled plate is for controlling cleaning dynamics and the cleaning position of described cleaning member 123.
It addition, mobile dolly 14 is by before and after technique before described stripping, include the stripping front air cylinder regulating stripping front jig successively, In order to clamp the stripping front jig of round steel, and in order to carrying roller before supporting round steel and the stripping of altitude mixture control being carried out;Gas before described stripping Cylinder is attached by screw mandrel with described stripping front jig.Stripping front jig is before being positioned at stripping in the middle part of mobile dolly 14, and stripping front jig is by two Individual holder forms, and can clamp round steel and drive round steel to keep rectilinear direction to advance.Mobile dolly 14 before carrying roller is positioned at stripping before stripping Left side, can regulate the height of the front carrying roller of stripping as required, and before stripping, carrying roller has support round steel and makes round steel keep straight ahead Effect.Stripping front air cylinder is before being positioned at stripping on the right side of mobile dolly 14, and stripping front air cylinder can be used between regulation stripping front jig two holder Folding degree, when shelling front air cylinder and advancing towards stripping front jig, two holders of stripping front jig clamp in opposite directions, otherwise when gas before stripping Cylinder shells front jig when pushing away dorsad, and two holders of stripping front jig reversely separate.
It addition, mobile dolly 13 is by before and after technique after described stripping, include successively supporting round steel and highly adjusting Carrying roller after the stripping of joint, in order to clamp the stripping rear jig of round steel, and in order to regulate the stripping exhaust hood of described stripping rear jig;Described stripping Exhaust hood is attached by screw mandrel with described stripping rear jig.Stripping rear jig in the middle part of mobile dolly 13, shells rear jig after being positioned at stripping It is made up of two holders, round steel can be clamped and drive round steel to keep rectilinear direction to advance.Move little after after stripping, carrying roller is positioned at stripping On the right side of car 13, the height of carrying roller after stripping can be regulated as required, before carrying roller has support round steel and makes round steel keep straight line after stripping The effect entered.Stripping exhaust hood is positioned at after stripping on the left of mobile dolly 13, stripping exhaust hood can be used for regulation stripping rear jig two holder it Between folding degree, when shell exhaust hood towards stripping rear jig advance time, stripping rear jig two holders clamp in opposite directions, otherwise when stripping Exhaust hood shells rear jig when pushing away dorsad, and two holders of stripping rear jig reversely separate.
When apparatus for peeling off runs, first round steel is placed on the carrying roller 15 on the right side of support 11;Adjust according to practical operation demand The height of good carrying roller 15 and the opening degree of fixture;Round steel is mobile dolly 4 before being introduced into stripping, then in the feelings keeping linear running Peeling procedure 12 is entered under condition;Carry out rough peeling first with thick blade insert 121, then utilize essence blade insert 122 to carry out finely Peeling, cleans round steel surface, finally mobile dolly 13 after peeling procedure 12 out enters stripping followed by cleaning member 123; Round steel is by leaving this round steel apparatus for peeling off by the carrying roller 15 on the left of support 11 after dolly 13 mobile after stripping.
As in figure 2 it is shown, cutter sweep includes base 21, fixed mechanism, cutting mechanism, and it is used for driving this round steel to cut The power-equipment of device;Fixed mechanism be included in round steel cutting process in order to rise cut with round steel after for decline Lift Part 22, the fixed component 23 that the round steel regulated is fixed, and the appearance rod parts in order to firm placement round steel 24;Cutting mechanism is included in the regulation parts 25 before round steel carries out cutting being adjusted cutting mechanism whole height and in order to right Round steel carries out the sickle 26 cut;Fixed mechanism is positioned at the middle part of base 21, and cutting mechanism is symmetrically arranged at fixing machine Structure is towards the both sides of round steel cross-wise direction.
Before round steel cuts, can by regulation parts 25, the whole height of cutting mechanism be carried out according to the actual requirements Regulation.Regulation parts 25 and sickle 26 is fixing to be connected, and sickle 26 is circle electric saw and vertical with appearance rod parts 24.At round steel In cutting process, the position of sickle 26 is fixed.Lift Part 22 is vertically arranged on base;Hold rod parts 24 end Portion is vertical with Lift Part 22, parallel with base;Regulation parts 25 are vertically arranged on base, are arranged on cutting on regulation parts Cutter 26, its cut direction is with to hold rod parts 24 vertical and towards round steel vertical cross-section direction.When cutting, the horizontal position of round steel Putting and immobilize, the only height of Lift Part 23 can change, and therefore, the cross section that round steel is cut out necessarily keeps vertical Directly, the cross section regularity and after cutting is high.
Cutting mechanism lays respectively at the fixed mechanism both sides towards round steel cross-wise direction.When round steel cuts, permissible Two is carried out simultaneously, saves the clipping time of round steel.If the length of round steel is long or too short, can cut at twice Cut.After a cutting completes, it is only necessary to round steel is moved straightly to suitable position, opposite side cutting mechanism is used to cut Cut.Need not take off round steel reinstall, therefore, still save the clipping time of round steel.
As it is shown on figure 3, centring means includes frame 31, connecting gear, determines holes mechanism, borehole drill construction, and in order to drive The power-equipment of this round steel centring means, simple in construction, easy to operate.Determine holes mechanism and include pedestal 33, for supporting round steel Support member 34 and for determining the centring elements 35 of round steel kernel of section point.Borehole drill construction is positioned at described frame 31 towards described Determine holes mechanism outlet side, mainly include bracing frame 37, drill bit 39 and extensible member 311.Connecting gear be positioned at frame 31 towards Determine holes mechanism inlet side.The central shaft of centring elements 35 is maintained at same water with the central shaft of drill bit 39 and extensible member 311 On horizontal line so that the centering accuracy rate of round steel is greatly improved.
As illustrated in figures 4-5, described feeding platform 101 is for sending round steel to be processed into described high temperature furnace.Described high temperature Stove includes that multiple heating chamber 201, described heating chamber 201 inner top are provided with flame heater, and described heating chamber 201 is stepped Arrangement, described heating chamber 201 inner bottom surface is the slope connected that cooperates, and the round steel being admitted to high temperature furnace can roll across institute successively State heating chamber 201, thus heated comprehensively and simultaneously enter next device;Described high temperature furnace side is provided with inspection rack 203, described Heating chamber (201) is provided with maintenance door 202 in described inspection rack 203 ipsilateral, it is simple to staff checks situation and place in stove Reason partial fault, cannot roll down as round steel blocks.Described conveyor track is connected with the outlet of described high temperature furnace by buffering slope 102 Connecing, described conveyor track top is provided with the first motor 111, is provided with multiple delivery wheel 103, described delivery wheel 103 in described conveyor track It is connected with the first chain 112 successively, and is driven by described first motor 111.It is located at some conveyings of described conveyor track end Taking turns 103 to described drilling-hole positioning device side is that 60 degree of overturning angles are arranged, it is simple to the round steel that conveying comes rolls to described brill automatically Hole positioning device.
As shown in Figure 6, described drilling-hole positioning device is connected with described conveyor track end by ramp platform 104, described Drilling-hole positioning device includes second motor the 105, first pedestal, universal joint 107, pin-lift arrangement, positioner.Described pin-lift arrangement Including round steel groove 106, push rod 108, described round steel groove 106 is located at described first pedestal upper surface, and described push rod 108 connects described The outfan of the second motor 105 is also located at above described round steel groove 106, and described in during work, the second motor 105 drives described push rod The round steel placed in round steel groove 106 is headed into positioner by 108.The groove face of described round steel groove 106 is tilted splicing by two block plates Form, it is to avoid heated round steel makes the round steel groove expand with heat and contract with cold and deformed damaged for a long time, described steel plate is uniformly provided with multiple Hole, effectively prevent steel plate expand with heat and contract with cold cause stress concentrate and damage.Described positioner includes locating rack 301, two Roll shaft 302, two block pressur plate 303, described roll shaft 302 connects the outfan of described second motor 105 also by described universal joint 107 Being respectively arranged on described round steel groove 106 both sides, described pressing plate 303 is respectively arranged on the both sides up and down of described locating rack 301 and coordinates institute Stating roll shaft 302 and form hole, location in described locating rack 301, described locating rack 301 top is provided with gear type slack adjuster 304, it is simple to regulate the upper-lower compacting of described pressing plate 303 or unclamp.Described drilling-hole positioning device passes through two roll shafts and two pieces of pressures Round steel is accurately positioned by plate, and roll shaft drives round steel to rotate when boring simultaneously, the generation of vibration when greatly reducing round steel boring, Ensure that being smoothed out of boring.
As it is shown in fig. 7, described chiller include five parallel and uniformly lay cooling holding device 109, pond, connect Receiving apparatus 110.Described cooling holding device 109 includes clamping framework, is located at three clamping wheels of described clamping lower portion 401, it is located at described clamping framework side and has the sparge pipe 402 of opening in described gripper frame top of the trellis;Described pond includes leaning on Nearly described cooling holding device 109 for receiving the reception tank 404 of cooling waste water, away from described cooling holding device 109 Cooling bay 405 for complete cooling pipe.Described reception device is located at described cooling bay 405 away from described reception tank 404 1 Side, reception that is parallel including four and that be uniformly arranged hooks 406, for driving described the 3rd motor 407 receiving and hooking;Described clamping Framework is provided with opening to described reception tank 404 side at described clamping wheel 401, and described clamping framework both sides are under described opening Side is respectively equipped with two and is simultaneously connected with the conveying 403 entering described cooling bay 405 across described reception tank 404.Described connect Receive hook 406 in mating connection with the end of described conveying 403 when extreme lower position.Described chiller clamps described boring Positioner carries the round steel come, and coordinates set drilling equipment to hole round steel in time herein, logical after having holed Cross described sparge pipe steel pipe is tentatively cooled down, be then delivered to described cooling bay 405 and steel pipe cooled down completely, finally Steel pipe after cooling is received to described cooling bay 405 limit steel pipe placing position by described reception device 110.Described cooling holding device Ensure that boring complete steel pipe cooled down in time, the setting of cooling bay ensure that steel pipe cooled down completely while significantly Decrease the waste of water resource, also improve the efficiency of cooling.
As shown in Figure 8, described drilling equipment includes the second pedestal, the 4th motor 501, boring car 503, boring bar 504.Institute Stating the 4th motor 501 and be located at the caudal of described second pedestal, described second pedestal upper surface is provided with what described boring garage entered Track 502, is provided with between described track 502 for driving described boring car 503 the outfan phase with described 4th motor 501 The chain 505 connected, described boring car 503 is arranged below the gear in mating connection with described chain 505, thus realizes described Second motor 501 controls advance or the retrogressing of described boring car 503.Described boring car 503 tail end is provided with and increases the weight of handle 508, On the one hand serve the effect of balancing drilling bar gravity, make boring car can be stable on track, on the other hand also allow for work people Member picks and places boring car.Described boring car 503 head is provided with multiple fixing hole for the described boring bar of fixing connection 504, it is simple to Change the boring bar of different model.Described boring bar 504 includes drill bit and bar, and the end face diameter of described drill bit is more than described bar End face diameter so that leave burr and chip clearance between described bar and steel pipe inner wall during boring, it is ensured that boring is smoothed out.Described second The head of pedestal is provided with the positioning seat 507 for positioning and hold up described boring bar 504;Simultaneously as described boring car 503 work Speed when holing of advancing when making is relatively slow, and it is fast to retreat to speed time in situ after holing, in order to avoid boring car rolls rail away from Road, described track 502 afterbody is provided with the stopping means 506 limiting described boring car 503 shift position, and in order to alleviate boring car And the shock between stopping means, described stopping means 506 uses spring structure near described track one end.Described drilling equipment Design be well matched with described drilling-hole positioning device and described chiller, drilling-hole positioning device is by fixed for the round steel after heating Position and while pushing at chiller drilling equipment in time round steel is holed, after hole, described cooling fills Put and reasonably steel pipe is carried out step cooling.
Embodiment described above is only to be described the preferred embodiment of the present invention, the not design to the present invention It is defined with scope.On the premise of without departing from design concept of the present invention, this area ordinary person technical side to the present invention Various modification that case is made and improvement, all should drop into protection scope of the present invention, the technology contents that the present invention is claimed, Through all recording in detail in the claims.

Claims (10)

1. a round steel capsule for building, it is characterised in that: include that round steel roughing equipment and round steel boring set Standby;Before and after technique, described round steel roughing equipment includes apparatus for peeling off, cutter sweep and centring means, described round steel successively Rig includes feeding platform (101), high temperature furnace, conveyor track, drilling-hole positioning device, drilling equipment and chiller successively; Transported by transporter between described apparatus for peeling off, described cutter sweep, described centring means and described feeding platform (101) Round steel.
One the most according to claim 1 round steel for building capsule, it is characterised in that: described apparatus for peeling off Including support (11), transmission component (16), clamping connecting gear, peeling procedure (12), multiple carrying roller (15), and in order to drive The power-equipment of this apparatus for peeling off;Described clamping connecting gear moves dolly (13) after mobile dolly (14) and stripping before including shelling; Described peeling procedure (12) includes the thick blade insert (121) for round steel carries out rough peeling, for carrying out round steel finely The smart blade insert (122) of peeling, for the cleaning member (123) that round steel after peeling is cleaned, and allow described round steel The body cavity passed through;Described transmission component (16) is positioned at described support (11) top;Described transmission component (16) top, before technique After set gradually stripping before mobile dolly (13) after mobile dolly (14), peeling procedure (12), stripping;Multiple described torr Kun (15) are set up separately The both sides of mobile dolly (14) and the both sides of mobile dolly (13) after stripping before described stripping.
One the most according to claim 2 round steel for building capsule, it is characterised in that: described thick blade insert 121 include thick cutterhead, the roughing tool being symmetrically mounted on described thick cutterhead, and are positioned in the middle part of described thick cutterhead and allow steel rod to pass Thick cutter chamber, the described accent in thick cutter chamber coordinates docking with the accent of described body cavity;Described essence blade insert 122 include essence cutterhead, It is symmetrically mounted on the finishing tool on described essence cutterhead, and is positioned at the smart cutter chamber allowing steel rod to pass in the middle part of described essence cutterhead, described The essence accent in cutter chamber coordinates docking with the accent of described body cavity;Before and after technique, described essence blade insert 122 is positioned at described thick cutter portion Part 121 rear.
One the most according to claim 1 round steel for building capsule, it is characterised in that: described cutter sweep Including base (21), fixed mechanism, cutting mechanism, and for driving the power-equipment of this cutter sweep;Described fixed mechanism Be included in round steel cutting process in order to rise cut with round steel after for decline Lift Part (22), by regulate The fixed component (23) that round steel is fixed, and appearance rod parts (24) in order to firm placement round steel;Described cutting mechanism bag Include the regulation parts (25) before round steel carries out cutting, cutting mechanism whole height being adjusted and in order to round steel to be cut The sickle (26) cut;Described fixed mechanism is positioned at the middle part of described base (21), and described cutting mechanism is symmetrically arranged at Described fixed mechanism is towards the both sides of round steel cross-wise direction.
One the most according to claim 1 round steel for building capsule, it is characterised in that: described centring means Including frame (31), connecting gear, determine holes mechanism, borehole drill construction, and in order to drive the power-equipment of this centring means;Described Determine holes mechanism and include pedestal (33), for supporting the support member (34) of round steel and for determining the centering of round steel kernel of section point Parts (35);Described borehole drill construction is positioned at described frame (31) and determines holes mechanism outlet side towards described, mainly includes bracing frame (37), drill bit (39) and the extensible member (311) stretched can be carried out in the horizontal direction;Described connecting gear is positioned at described frame (31) to determining holes mechanism inlet side described in face;The central shaft of described centring elements (35) and described drill bit (39) and described flexible The central shaft of parts (311) keeps in the same horizontal line.
One the most according to claim 1 round steel for building capsule, it is characterised in that: described high temperature furnace bag Including multiple heating chamber (201), described heating chamber (201) stepped arrangement, described heating chamber (201) inner bottom surface is for cooperating The slope connected;Described heating chamber (201) inner cavity top is provided with flame heater block.
One the most according to claim 1 round steel for building capsule, it is characterised in that: described conveyor track leads to Crossing buffering slope (102) to be connected with the outlet of described high temperature furnace, described conveyor track top is provided with the first motor (111), described defeated It is provided with multiple delivery wheel (103) in sending rail, is located at some delivery wheels (103) of described conveyor track end to described boring location dress Putting side is that 60 degree of overturning angles are arranged.
One the most according to claim 1 round steel for building capsule, it is characterised in that: described boring location Device is connected with described conveyor track end by platform with slope (104), and described drilling-hole positioning device includes the second motor (105), round steel groove (106), push rod (108), two roll shafts (302), two block pressur plates (303), described roll shaft passes through universal joint (107) it is connected with the outfan of described second motor (105) and is respectively arranged on described round steel groove (106) both sides, described pressing plate (303) described roll shaft (302) is coordinated to form hole, location in described drilling-hole positioning device.
One the most according to claim 1 round steel for building capsule, it is characterised in that: described drilling equipment Including the 4th motor (501), boring car (503), boring bar (504), positioning seat (507), described boring car (503) bottom is provided with Gear, described 4th motor (501) is connected by the second chain (505) and is driven described boring car (503).
One the most according to claim 1 round steel for building capsule, it is characterised in that: described cooling dress Put and include cooling holding device (109), pond, reception device (110), be provided with for clamping round steel in described cooling holding device Clamping wheel (401), the preliminary sparge pipe (402) cooling down round steel, be provided with the cooling for cooling down round steel completely in described pond Pond (405).
CN201610758480.7A 2016-08-30 2016-08-30 A kind of round steel capsule for building Active CN106078231B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610758480.7A CN106078231B (en) 2016-08-30 2016-08-30 A kind of round steel capsule for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610758480.7A CN106078231B (en) 2016-08-30 2016-08-30 A kind of round steel capsule for building

Publications (2)

Publication Number Publication Date
CN106078231A true CN106078231A (en) 2016-11-09
CN106078231B CN106078231B (en) 2018-02-16

Family

ID=57224038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610758480.7A Active CN106078231B (en) 2016-08-30 2016-08-30 A kind of round steel capsule for building

Country Status (1)

Country Link
CN (1) CN106078231B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107263118A (en) * 2017-07-20 2017-10-20 禹州市新光铸造有限公司 A kind of integrated processing device for pipeline
CN110614524A (en) * 2019-10-18 2019-12-27 浙江长兴中磊科技有限公司 Steel rod drilling positioning device
CN110614510A (en) * 2019-10-18 2019-12-27 浙江长兴中磊科技有限公司 Steel rod machining device
CN110614534A (en) * 2019-10-18 2019-12-27 浙江长兴中磊科技有限公司 Steel pipe cooling device
CN111941082A (en) * 2020-07-17 2020-11-17 天津市双兴自动门有限公司 Special machining center device for stand column
CN112045422A (en) * 2020-08-28 2020-12-08 江西江南新材料科技有限公司 Phosphorus copper extruder
CN112387922A (en) * 2020-12-30 2021-02-23 南京信六加科技有限公司 Metal ring forging equipment
CN113427043A (en) * 2020-03-23 2021-09-24 中国石油天然气股份有限公司 Numerical control machining device and numerical control machining method for oil field steam injection sieve tube

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101091984A (en) * 2007-08-03 2007-12-26 攀钢集团攀枝花钢铁研究院 Method for manufacturing stainless steel pipe
EP2048259A1 (en) * 2006-08-01 2009-04-15 Showa Dendo K.K. Process for production of aluminum alloy formings, aluminum alloy formings and production system
CN102699184A (en) * 2012-01-10 2012-10-03 浙江博雷重型机床制造有限公司 Automatic punching equipment for producing screw ground piles
CN105870763A (en) * 2016-06-15 2016-08-17 常州市武进科宇通信设备有限公司 Cable stripping device
CN206029293U (en) * 2016-08-30 2017-03-22 浙江中屹建设集团有限公司 Round steel capsule for building

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2048259A1 (en) * 2006-08-01 2009-04-15 Showa Dendo K.K. Process for production of aluminum alloy formings, aluminum alloy formings and production system
CN101091984A (en) * 2007-08-03 2007-12-26 攀钢集团攀枝花钢铁研究院 Method for manufacturing stainless steel pipe
CN102699184A (en) * 2012-01-10 2012-10-03 浙江博雷重型机床制造有限公司 Automatic punching equipment for producing screw ground piles
CN105870763A (en) * 2016-06-15 2016-08-17 常州市武进科宇通信设备有限公司 Cable stripping device
CN206029293U (en) * 2016-08-30 2017-03-22 浙江中屹建设集团有限公司 Round steel capsule for building

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107263118A (en) * 2017-07-20 2017-10-20 禹州市新光铸造有限公司 A kind of integrated processing device for pipeline
CN110614524A (en) * 2019-10-18 2019-12-27 浙江长兴中磊科技有限公司 Steel rod drilling positioning device
CN110614510A (en) * 2019-10-18 2019-12-27 浙江长兴中磊科技有限公司 Steel rod machining device
CN110614534A (en) * 2019-10-18 2019-12-27 浙江长兴中磊科技有限公司 Steel pipe cooling device
CN113427043A (en) * 2020-03-23 2021-09-24 中国石油天然气股份有限公司 Numerical control machining device and numerical control machining method for oil field steam injection sieve tube
CN113427043B (en) * 2020-03-23 2022-11-01 中国石油天然气股份有限公司 Numerical control machining device and numerical control machining method for oil field steam injection sieve tube
CN111941082A (en) * 2020-07-17 2020-11-17 天津市双兴自动门有限公司 Special machining center device for stand column
CN112045422A (en) * 2020-08-28 2020-12-08 江西江南新材料科技有限公司 Phosphorus copper extruder
CN112387922A (en) * 2020-12-30 2021-02-23 南京信六加科技有限公司 Metal ring forging equipment
CN112387922B (en) * 2020-12-30 2021-07-30 青岛宏达锻压机械有限公司 Metal ring forging equipment

Also Published As

Publication number Publication date
CN106078231B (en) 2018-02-16

Similar Documents

Publication Publication Date Title
CN106078231A (en) A kind of round steel capsule for building
CN206029293U (en) Round steel capsule for building
CN107414182A (en) A kind of horizontal saw mill
CN205254230U (en) Aluminium alloy ex -trusions saw cuts automatic production line
CN205996430U (en) Scaffold cross bar double automatic welding device
CN206215588U (en) A kind of automatic cleaning drying integral machine of CNC fixtures
CN211103134U (en) Spiral pipe chamfering machine
CN106346337A (en) Automatic grinding device and method thereof
CN105750658A (en) Fully automatic numerical control chamfering machine
CN105904601A (en) Single crystal silicon rod single-piece cutting system
CN105269328A (en) Automatic manifold production line
CN105436893B (en) The automatic milling both ends of the surface drill centres machine tool of bearing pin
CN103752861A (en) Tee joint full-automatic feed numerical control machine tool
CN205218067U (en) Automatic lathe of skinning
CN110774005A (en) Sheet steel pipe rolling, welding and polishing equipment
WO2012086446A1 (en) Broaching device
CN209632134U (en) A kind of equipment of automatic processing cushion block
CN104860110B (en) longitudinal automatic plate collecting machine
CN213225068U (en) Billet tube hot piercing production line
CN203095031U (en) Extensible flexible double-column type industrial aluminium profile automatic processing assembly line system
CN110561224A (en) Automatic equipment of polishing of circulation pay-off formula
CN207343920U (en) A kind of horizontal digital-control chamfered edge machining system
CN205600061U (en) Full -automatic numerical control beveler
CN106141869A (en) By the quick polisher of formula with by the quick polishing process of formula
CN115255702A (en) Automatic welding equipment and welding process thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant