CN105983671A - 一种提高连铸连浇成功率的方法 - Google Patents

一种提高连铸连浇成功率的方法 Download PDF

Info

Publication number
CN105983671A
CN105983671A CN201510090424.6A CN201510090424A CN105983671A CN 105983671 A CN105983671 A CN 105983671A CN 201510090424 A CN201510090424 A CN 201510090424A CN 105983671 A CN105983671 A CN 105983671A
Authority
CN
China
Prior art keywords
seedling
theoretical
crystallizer
pulling rate
rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510090424.6A
Other languages
English (en)
Inventor
苏小利
费鹏
王金辉
李金莲
殷东明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN201510090424.6A priority Critical patent/CN105983671A/zh
Publication of CN105983671A publication Critical patent/CN105983671A/zh
Pending legal-status Critical Current

Links

Abstract

一种提高连铸连浇成功率的方法,当上一个浇次的最后一罐钢水罐浇注到钢水剩余7.5~8%时,降拉速到1.2m/min,维持到中间包钢水液位降至340~360mm,按每7~10s降速0.05m/min,将拉速降至0.80m/min,维持1.9~2.1min,再按每7~10s降速0.05m/min,将拉速从0.80m/min降到0.40m/min后,直接进爬行速度0.10m/min,维持2min后,使坯尾距结晶器铜板上沿350~380mm;出苗时间控制在理论出苗时间减去30s到理论出苗时间之间。如果理论出苗时间减去30s后小于30s,则出苗时间按30s到理论出苗时间之间控制。本发明可防止尾坯出结晶器后轧足辊的问题,避免头尾连接处断裂,从而提高连铸连浇的成功率,避免设备损坏和漏钢事故。

Description

一种提高连铸连浇成功率的方法
技术领域
本发明属于炼钢连铸技术领域,尤其涉及一种能够提高连铸连浇成功率的方法。
背景技术
为了提高连铸机的生产效率,通过采取热换中间包技术,即在连铸的一个浇次完成后,铸坯尾部未出结晶器前,进行热换中间包浇注,实现上一浇次尾坯与下一浇次头坯的有效连接,达到连续浇注的目的。
但在连浇过程中,如果操作不当,两个浇次铸坯的头尾连接处出结晶器后往往会出现有液体钢液流出,粘在足辊上而导致设备损坏现象;如果钢液流出较多。则将造成大的漏钢事故。
发明内容
本发明提供一种提高连铸连浇成功率的方法。其目的在于避免两个浇次铸坯头尾连接处出结晶器后钢液流出,提高连铸连浇成功率,减少连浇钢水轧足辊损坏设备,避免漏钢事故。
为此,本发明所采取的解决方案是:
一种提高连铸连浇成功率的方法,其特征在于,通过降低拉速控制尾坯收缩量和延长铸坯连接处在结晶器内的停留时间,提高连铸连浇的成功率,其具体方法为:
(1)当上一个浇次的最后一罐钢水罐浇注到钢水剩余7.5~8%时,开始降拉速到1.2m/min,维持1.2m/min拉速到中间包钢水液位降至340~360mm,再按每7~10s降速0.05m/min,直到将拉速降至0.80m/min;
(2)拉速在0.80m/min维持1.9~2.1min,控制凝固坯壳与结晶器铜板之间缝隙在1~2mm;
(3)按每7~10s降速0.05m/min,将拉速从0.80m/min降到0.40m/min后,直接进爬行速度0.10m/min,维持2~5min后,使坯尾距结晶器铜板上沿350~380mm;
(4)连浇时的出苗时间控制在理论出苗时间减去30s到理论出苗时间之间;如果理论出苗时间减去30s后小于30s,则出苗时间按30s到理论出苗时间之间控制;理论出苗时间=铸坯宽度÷25,单位为s。
本发明的有益效果为:
本发明通过降低拉速,控制尾坯收缩量,既可防止由于尾坯收缩量过大,使浇到坯尾后的新钢水流到凝固坯壳与结晶器铜板缝隙中,出结晶器后轧足辊的问题;又能避免由于尾坯收缩量过小,使新钢水与凝固坯壳之间不能有效焊接,当出结晶器后所受弯曲应力大于连接强度时,头尾连接处断裂,造成漏钢事故的问题,从而提高连铸连浇的成功率,避免设备损坏和漏钢事故。
具体实施方式
本发明提高连铸连浇成功率的方法,主要是通过降低拉速,控制尾坯收缩量,同时控制尾坯在结晶器内的高度位置,延长铸坯连接处在结晶器内的停留时间,提高连铸连浇的成功率。下面以260吨钢水罐、规格200×1280mm结晶器为例,对本发明作进一步说明。
实施例1:
1、当上一个浇次的最后一罐钢水罐浇注到钢水剩余20吨时,开始降拉速到1.2m/min。维持1.2m/min拉速到中间包钢水液位350mm。当中间包钢水液位到达350mm时,按每10s降速0.05m/min,直到将拉速降至0.80m/min。
2、拉速在0.80m/min维持1.9min。按每10s降速0.05m/min,将拉速从0.80m/min降到0.40m/min后,直接进爬行速度0.10m/min,维持3min后,使坯尾距结晶器铜板上沿370mm,凝固坯壳与结晶器铜板之间缝隙在1.8mm。
3、理论出苗时间(s)=1280÷25=51.2s。
4、51.2s-30s=21.2s<30s,所以连浇出苗时间为30s。
实施例2:
1、当上一个浇次的最后一罐钢水罐浇注到钢水剩余20.5吨时,开始降拉速到1.2m/min。维持1.2m/min拉速到中间包钢水液位310mm。当中间包钢水液位到达310mm时,按每7s降速0.05m/min,直到将拉速降至0.80m/min。
2、拉速在0.80m/min维持2.1min。按每7s降速0.05m/min,将拉速从0.80m/min降到0.40m/min后,直接进爬行速度0.10m/min,维持3min后,使坯尾距结晶器铜板上沿370mm,凝固坯壳与结晶器铜板之间缝隙在1.5mm。
3、出苗时间为30s。

Claims (1)

1.一种提高连铸连浇成功率的方法,其特征在于,通过降低拉速控制尾坯收缩量和延长铸坯连接处在结晶器内的停留时间,提高连铸连浇的成功率,其具体方法为:
(1)当上一个浇次的最后一罐钢水罐浇注到钢水剩余7.5~8%时,开始降拉速到1.2m/min,维持1.2m/min拉速到中间包钢水液位降至340~360mm,再按每7~10s降速0.05m/min,直到将拉速降至0.80m/min;
(2)拉速在0.80m/min维持1.9~2.1min,控制凝固坯壳与结晶器铜板之间缝隙在1~2mm;
(3)按每7~10s降速0.05m/min,将拉速从0.80m/min降到0.40m/min后,直接进爬行速度0.10m/min,维持2~5min后,使坯尾距结晶器铜板上沿370~380mm;
(4)连浇时的出苗时间控制在理论出苗时间减去30s到理论出苗时间之间;如果理论出苗时间减去30s后小于30s,则出苗时间按30s到理论出苗时间之间控制;理论出苗时间=铸坯宽度÷25,单位为s。
CN201510090424.6A 2015-02-25 2015-02-25 一种提高连铸连浇成功率的方法 Pending CN105983671A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510090424.6A CN105983671A (zh) 2015-02-25 2015-02-25 一种提高连铸连浇成功率的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510090424.6A CN105983671A (zh) 2015-02-25 2015-02-25 一种提高连铸连浇成功率的方法

Publications (1)

Publication Number Publication Date
CN105983671A true CN105983671A (zh) 2016-10-05

Family

ID=57039226

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510090424.6A Pending CN105983671A (zh) 2015-02-25 2015-02-25 一种提高连铸连浇成功率的方法

Country Status (1)

Country Link
CN (1) CN105983671A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106825474A (zh) * 2016-12-25 2017-06-13 秦皇岛首秦金属材料有限公司 一种特厚板坯尾坯质量控制的方法
CN107900302A (zh) * 2017-10-26 2018-04-13 首钢京唐钢铁联合有限责任公司 一种提高板坯尾坯质量的方法及装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06198400A (ja) * 1992-12-28 1994-07-19 Nippon Steel Corp 連続鋳造中の鋼種変更鋳造方法
CN102218512A (zh) * 2011-06-01 2011-10-19 山西太钢不锈钢股份有限公司 一种结晶器高液位更换中间包的方法
CN102941323A (zh) * 2012-12-12 2013-02-27 济钢集团有限公司 中薄板坯连铸机结晶器低液位快速变更换中间包的方法
CN103170597A (zh) * 2011-12-20 2013-06-26 攀钢集团攀枝花钢钒有限公司 一种钢坯连铸的方法
CN103586435A (zh) * 2013-11-12 2014-02-19 山西太钢不锈钢股份有限公司 一种不锈钢换中包连浇的方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06198400A (ja) * 1992-12-28 1994-07-19 Nippon Steel Corp 連続鋳造中の鋼種変更鋳造方法
CN102218512A (zh) * 2011-06-01 2011-10-19 山西太钢不锈钢股份有限公司 一种结晶器高液位更换中间包的方法
CN103170597A (zh) * 2011-12-20 2013-06-26 攀钢集团攀枝花钢钒有限公司 一种钢坯连铸的方法
CN102941323A (zh) * 2012-12-12 2013-02-27 济钢集团有限公司 中薄板坯连铸机结晶器低液位快速变更换中间包的方法
CN103586435A (zh) * 2013-11-12 2014-02-19 山西太钢不锈钢股份有限公司 一种不锈钢换中包连浇的方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106825474A (zh) * 2016-12-25 2017-06-13 秦皇岛首秦金属材料有限公司 一种特厚板坯尾坯质量控制的方法
CN106825474B (zh) * 2016-12-25 2019-02-22 秦皇岛首秦金属材料有限公司 一种特厚板坯尾坯质量控制的方法
CN107900302A (zh) * 2017-10-26 2018-04-13 首钢京唐钢铁联合有限责任公司 一种提高板坯尾坯质量的方法及装置
CN107900302B (zh) * 2017-10-26 2020-07-17 首钢京唐钢铁联合有限责任公司 一种提高板坯尾坯质量的方法及装置

Similar Documents

Publication Publication Date Title
CN102941323B (zh) 中薄板坯连铸机结晶器低液位快速变更换中间包的方法
CN102218512B (zh) 一种结晶器高液位更换中间包的方法
RU2663661C2 (ru) Способ и установка для изготовления длинных слитков большого диаметра
CN108817341B (zh) 小方坯连铸机降低拉速提高快换成功率的方法
CN106216622A (zh) 一种钢水连铸过程中快速更换中间包的方法
CN103878334B (zh) 一种插入式连铸机自动开浇控制方法
CN108570532B (zh) 一种提高直上钢种质量及塞棒控流时间的方法
CN102248136B (zh) 一种连铸坯开浇防漏钢工艺方法
CN104399929A (zh) 一种减少耐候钢连铸板坯纵裂的方法
CN107282902A (zh) 一种浸入式水口的更换方法
CN103586435A (zh) 一种不锈钢换中包连浇的方法
CN103464699B (zh) 一种提高连铸机中间包热交换成功率的方法
CN104278197A (zh) 一种低硅高钛焊丝用钢的冶炼方法
CN102274955A (zh) 阳极板氮气保护隔氧全程快速冷却浇铸工艺及系统
CN105983671A (zh) 一种提高连铸连浇成功率的方法
CN112658242A (zh) 一种更换浸入式水口减少粘结的方法
CN112808959B (zh) 一种提高成功率的结晶器高液位更换中间包方法
CN114406223B (zh) 一种钢铁企业连铸不停机更换中间包方法
CN108620547B (zh) 连铸开浇的方法
CN204234687U (zh) 一种双流不同断面板坯连铸机
CN105215311A (zh) 一种方坯连铸开浇操作方法
CN112222368A (zh) 一种超厚板坯连铸中间包对接升速操作方法
CN108296463A (zh) 控制连铸中间包过热度的方法
CN104772444B (zh) 减少方坯尾部缩孔的控制方法
CN110976833B (zh) 一种大收缩量钢种热中间包快换冷却装置及快换工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161005

WD01 Invention patent application deemed withdrawn after publication