CN103464699B - 一种提高连铸机中间包热交换成功率的方法 - Google Patents

一种提高连铸机中间包热交换成功率的方法 Download PDF

Info

Publication number
CN103464699B
CN103464699B CN201310351836.1A CN201310351836A CN103464699B CN 103464699 B CN103464699 B CN 103464699B CN 201310351836 A CN201310351836 A CN 201310351836A CN 103464699 B CN103464699 B CN 103464699B
Authority
CN
China
Prior art keywords
tundish
pulling rate
submersed nozzle
continuous casting
molten steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310351836.1A
Other languages
English (en)
Other versions
CN103464699A (zh
Inventor
吴军
韩彤
陈刚
王会海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Bayi Iron and Steel Co Ltd
Original Assignee
Xinjiang Bayi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Bayi Iron and Steel Co Ltd filed Critical Xinjiang Bayi Iron and Steel Co Ltd
Priority to CN201310351836.1A priority Critical patent/CN103464699B/zh
Publication of CN103464699A publication Critical patent/CN103464699A/zh
Application granted granted Critical
Publication of CN103464699B publication Critical patent/CN103464699B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明提供的一种提高连铸机中间包热交换成功率的方法,1)钢水备包时间5-10min,钢包到达连铸平台温度1590-1600℃;2)测量,当高度在300-500mm时,开动中间包车,连接红热浸入式水口,保证水口底部距结晶器的上口距离为150-180mm;3)向钢包浇注10吨钢水后,向中间包加入150-200kg覆盖剂,其开浇温度>1550℃;4)当钢包浇注20吨钢水时,中间包进行浇注,将中间包钢水注入结晶器;5)拉速,在8min内将拉速降至0.3m/min,保持1min,然后拉速加至正常值0.9m/min,从第一个中间包停浇到第二个中间包起步的时间控制在5min以内。

Description

一种提高连铸机中间包热交换成功率的方法
技术领域
本发明涉及连铸机作业,利用该方法能有效缩短中间包热换时间,对遏制铸坯冷却时间过长,造成的滞坯现象十分有效。
背景技术
连铸机为了降低成本以及提高作业率,在中间包到达使用寿命时,需要进行中间包热换操作,在中间包热换时铸坯拉速是停止的,而铸坯仍旧处于喷淋不断持续冷却状态,如果中包热换时间过长,极可能由于铸坯冷却过度,使铸坯变硬造成滞坯,使生产中断,甚至可能造成冻坯事故。目前炼钢厂连铸机在生产过程中均存在中间包热换操作,但是对于每项操作的控制范围没有做具体的说明。
本发明针对炼钢厂板坯连铸,中间包热换时的拉速,使铸坯接受喷淋不断持续冷却,造成铸坯冷却过度变硬,造成滞坯的生产问题,提供的中间包热换方法,提高了热换成功率与连铸机的作业率,降低了人工劳动强度,为企业的节能降耗起到了积极的示范作用。
发明内容
本发明的目在于:提高连铸机热交换成功率的方法,使中间包热交换时间控制在5分钟以内,降低成本,提高作业率。
本发明的目在是这样实现的:一种提高连铸机中间包热交换成功率的方法,分步骤实施:
步骤1钢包等待时间5-10min,钢包到达连铸平台温度1590-1600℃;
步骤2中间包钢水拉速每隔20秒降一档,在8min内将拉速降至0.3m/min;
步骤3测量中间包液位,当中间包液位高度在300-500mm时,开动备用中间包车到热交换准备区域,在中间包停浇时,将备用中间包车与正在浇注的中间包车向另一侧同时开动;
步骤4当备用的中间包车开到浇注位后,快速安装红热浸入式水口(浸入式水口烘烤时间≥2h),调整中间包车位置,使浸入式水口处于结晶器中间位置,装入盲板后,调整中间包车高度,保证浸入式水口底部距结晶器上口150-180mm;
步骤5当中间包车准备完毕后,钢包打开,浇注10吨钢水后,向中间包加入150-200kg覆盖剂,测量开浇中间包温度,要求>1550℃;
步骤6当钢包浇注20吨时,中间包开始进行浇注,将中间包钢水注入结晶器;
步骤7中间包开浇后,出苗时间控制在80-120s,当结晶器中钢水到达距浸入式水口底部115-125mm,即钢水没过浸入式水口,进行拉速起步操作,起步后拉速为0.3m/min,0.3m/min拉速保持1min,然后拉速加至正常值0.9m/min;从第一个中间包停浇到第二个中间包起步,时间控制在4-5min。
本发明的操作要点:协调好钢水节奏,控制钢水备包时间及到达连铸平台温度,控制速降时间及控制中间包液位高度;向浇注位开动备用中包,在中间包停浇前,将备用中间包与正浇注的中间包相向同时开动,备用的中间包开到浇注位后快速安装浸入式水口并对中,装入盲板后即实施大包开浇;从第一个中间包停浇到更换的中间包开浇拉速,总时间控制在5min以内;该方法尽可能缩短中间包热换时间,避免铸坯由于冷却时间过长造成过度冷却发生滞坯现象,彰显技术进步。
附图说明
以下结合附图对发明作进一步说明。
附图1为大包趋势曲线示意图:
如图所示:钢水备包时间控制为7min,钢包到达连铸平台温度控制在1596℃。
附图2为热交换拉速曲线示意图:
如图所示:中间包热换操作结束,4分40秒将拉速加到0.9m/min,未发生滞坯现象。
附图3为中间包开浇的结构示意图;
如图所示:中间包(到浇注位)--浸入式水口(安装盲板)--结晶器(对准浸入式水口)--大包开浇;其中安装红热浸入式水口,即浸入式水口烘烤时间≥2h;装入盲板后,调整浸入式水口底部距结晶器上口的距离在150-180mm。
具体实施方式
以下结合实施例对发明作进一步说明。
实施例
1)板坯连铸主要设备技术参数,见下表。
2)连铸的核心设备
a、钢包回转台是钢包支承和承运设备,具有回转、升降、称量、锁紧及保温等多种功能,用来接受来自炼钢车间的满包钢水并转运到连铸车间连铸机浇注位置进行浇注,同时将浇注完毕的空钢包返回至接受位置,以便吊车运走,实现多炉连浇。
b、结晶器是连续铸钢中的铸坯成型设备,也是连铸机心脏设备之一,它的功能是将连续不断地注入其内腔的高温钢水通过水冷铜壁强制冷却,导出其热量,使之逐渐凝固成为具有所要求的断面形状和坯壳厚度的铸坯。并使这种芯部仍为液态的铸坯连续不断地从结晶器下口拉出,为其在以后的二次冷却区域内完全凝固创造条件。
C、二冷扇形段区域位于二冷零号扇形段以后,切割前辊道之前,它的主要功能是送装引锭杆,并且支托、冷却、拉、矫板坯,减小坯壳两相界处在钢水静压力作用下产生的鼓肚应变和矫直应变,在结晶器中初步形成的带液芯铸坯经过零号扇形段和二冷扇形段的导向和二次冷却水的作用,使其完全凝固并拉出连铸机。
生产实例
1)生产按GR4132E1计划进行中间包热换,钢水备包时间控制在7min,钢包到达连铸平台温度控制在1596℃,10:01分至10:08分,钢包中间包钢水拉速每隔20秒降一档,铸坯拉速从1.2m/min降低到0.3m/min,使用时间7min,中间包液位高度350mm,在中间包停浇前12秒,将备用中间包与正浇注的中间包相向同时开动,检查中间包塞棒以及中间包烘烤情况,在中间包停浇前10秒,备用的中间包开到浇注位后快速安装浸入式水口并对中,装入盲板后,即实施大包开浇,大包浇注10吨,中包温度为1556℃,浇注90s,向中间包加入覆盖剂180kg,大包浇注20吨后中包开浇,出苗时间90s,起步后保持0.3m/min,1分30秒,然后逐步将拉速加至正常值0.9m/min;中间包热换操作结束,中间包热换时间共4分34秒,4分40秒后将拉速加到正常拉速0.9m/min。
2)生产按GR4161E1计划进行中间包热换,协调好钢水节奏,钢水备包时间控制8min,钢包到达连铸平台温度控制在1600℃;5:23分至5:31分,钢包中间包钢水拉速每隔20秒降一档,铸坯拉速从1.15m/min降低到0.3m/min,中间包液位高度在330mm,向浇注位开动备用中包,检查中间包塞棒以及中间包烘烤情况,在中间包停浇前10秒,将备用中间包与正浇注的中间包相向同时开动,备用的中间包开到浇注位后快速安装浸入式水口并对中,装入盲板后,即实施大包开浇,大包浇注12吨,中包温度为1560℃,浇注80s,向中间包加入覆盖剂150kg大包浇注20吨后中包开浇,出苗时间在100s,起步后保持0.3m/min,1分30秒,然后逐步将拉速加至正常值0.9m/min;中间包热换操作结束,中间包热换时间共4分50秒,5分30秒后将拉速加到正常拉速0.9m/min。
3)生产按GU5832A1计划进行中间包热换,协调好钢水节奏,钢水备包时间控制8min,钢包到达连铸平台温度控制在1595℃;15:15分至15:24分,钢包中间包钢水拉速每隔20秒降一档,铸坯拉速从1.15m/min降低到0.3m/min,中间包液位高度在380mm,向浇注位开动备用中包,检查中间包塞棒以及中间包烘烤情况,在中间包停浇前15秒,将备用中间包与正浇注的中间包相向同时开动,备用的中间包开到浇注位后快速安装浸入式水口并对中,装入盲板后,即实施大包开浇,大包浇注15吨,中包温度为1556℃,浇注120s,向中间包加入覆盖剂200kg大包浇注23吨后中包开浇,出苗时间在85s,起步后保持0.3m/min,1分10秒,然后逐步将拉速加至正常值0.9m/min;中间包热换操作结束,中间包热换时间共4分25秒,4分30秒后将拉速加到正常拉速0.9m/min。

Claims (1)

1.一种提高连铸机中间包热交换成功率的方法,其特征在于:分步骤实施:
步骤1钢包备包时间5-10min,控制连铸平台温度1590-1600℃;
步骤2中间包钢水拉速,每隔20s降一档,在8min内,拉速降至0.3m/min;
步骤3测量中间包液位在300-500mm时,开动备用包车,在中间包停浇时,将备用包车与正在浇注的包车向另一侧同时开动;
步骤4备用中间包车到达浇注位,即安装红热浸入式水口,调整中间包车位置,使浸入式水口处于结晶器中间位置,装入盲板后,调整中间包车高度,保证浸入式水口底部距结晶器上口的距离在150-180mm;其中红热浸入式水口的烘烤时间≥2h;
步骤5中间包包车准备完毕,钢包打开,浇注10吨钢水,向中间包加入150-200kg覆盖剂,测量其开浇温度为>1550℃;
步骤6当钢包浇注20吨时,中间包开始进行浇注,将中间包钢水注入结晶器;
步骤7中间包开浇后,出苗时间控制在80-120s,当结晶器中钢水到达距浸入式水口底部115-125mm时,即钢水没过浸入式水口,实施起步拉速0.3m/min,保持1min,然后拉速加至正常值0.9m/min;从第一个中间包停浇到第二个中间包起步,时间控制在4-5min。
CN201310351836.1A 2013-08-13 2013-08-13 一种提高连铸机中间包热交换成功率的方法 Active CN103464699B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310351836.1A CN103464699B (zh) 2013-08-13 2013-08-13 一种提高连铸机中间包热交换成功率的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310351836.1A CN103464699B (zh) 2013-08-13 2013-08-13 一种提高连铸机中间包热交换成功率的方法

Publications (2)

Publication Number Publication Date
CN103464699A CN103464699A (zh) 2013-12-25
CN103464699B true CN103464699B (zh) 2016-01-20

Family

ID=49789864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310351836.1A Active CN103464699B (zh) 2013-08-13 2013-08-13 一种提高连铸机中间包热交换成功率的方法

Country Status (1)

Country Link
CN (1) CN103464699B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106216622A (zh) * 2016-08-29 2016-12-14 山东钢铁股份有限公司 一种钢水连铸过程中快速更换中间包的方法
CN108284210A (zh) * 2017-09-21 2018-07-17 新疆八钢铁股份有限公司 提高连铸中间包快换成功率的方法
CN110640106B (zh) * 2019-09-12 2021-07-13 山东钢铁股份有限公司 一种减少宽厚板连铸坯表面纵裂纹的开浇方法
CN111112565B (zh) * 2020-01-15 2021-11-05 首钢京唐钢铁联合有限责任公司 一种包晶钢钢种中间包快换方法
CN112222368A (zh) * 2020-09-11 2021-01-15 南京钢铁股份有限公司 一种超厚板坯连铸中间包对接升速操作方法
CN113579184A (zh) * 2021-07-28 2021-11-02 北京首钢股份有限公司 一种板坯中间包开浇方法及装置

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4600047A (en) * 1984-03-29 1986-07-15 Sumitomo Metal Industries, Ltd. Process for controlling the molten metal level in continuous thin slab casting
EP1066898A1 (de) * 1999-07-06 2001-01-10 SMS Demag AG Verfahren und System zur Schmelzenführung in einer Stranggiessmaschine
CN102218512A (zh) * 2011-06-01 2011-10-19 山西太钢不锈钢股份有限公司 一种结晶器高液位更换中间包的方法
CN102397998A (zh) * 2010-09-08 2012-04-04 鞍钢股份有限公司 一种降低钢水二次氧化的方法
CN102941323A (zh) * 2012-12-12 2013-02-27 济钢集团有限公司 中薄板坯连铸机结晶器低液位快速变更换中间包的方法
CN103170597A (zh) * 2011-12-20 2013-06-26 攀钢集团攀枝花钢钒有限公司 一种钢坯连铸的方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4600047A (en) * 1984-03-29 1986-07-15 Sumitomo Metal Industries, Ltd. Process for controlling the molten metal level in continuous thin slab casting
EP1066898A1 (de) * 1999-07-06 2001-01-10 SMS Demag AG Verfahren und System zur Schmelzenführung in einer Stranggiessmaschine
CN102397998A (zh) * 2010-09-08 2012-04-04 鞍钢股份有限公司 一种降低钢水二次氧化的方法
CN102218512A (zh) * 2011-06-01 2011-10-19 山西太钢不锈钢股份有限公司 一种结晶器高液位更换中间包的方法
CN103170597A (zh) * 2011-12-20 2013-06-26 攀钢集团攀枝花钢钒有限公司 一种钢坯连铸的方法
CN102941323A (zh) * 2012-12-12 2013-02-27 济钢集团有限公司 中薄板坯连铸机结晶器低液位快速变更换中间包的方法

Also Published As

Publication number Publication date
CN103464699A (zh) 2013-12-25

Similar Documents

Publication Publication Date Title
CN103464699B (zh) 一种提高连铸机中间包热交换成功率的方法
CN102941323B (zh) 中薄板坯连铸机结晶器低液位快速变更换中间包的方法
CN108284210A (zh) 提高连铸中间包快换成功率的方法
CN105251946B (zh) 一种锚爪的铸造装置及铸造方法
KR101965038B1 (ko) 큰 단면을 갖는 긴 주괴의 생산을 위한 방법 및 플랜트
CN108907130B (zh) 一种薄板坯连铸机自动开浇的方法
CN104070145A (zh) 一种大高径比圆形铸坯的制造工装和高效制备方法
CN102886501B (zh) 一种宽厚板轧机用宽厚板坯高效制备工装和制备方法
CN113210577A (zh) 一种提升板坯宽断面换中包成功率的方法及其制造方法
CN108080593A (zh) 控制高拉速薄板坯连铸液位波动的方法
CN109304432A (zh) 一种超薄大规格含铝钢异型坯的单点非平衡保护浇铸装置及使用方法
CN104259413A (zh) 一种生产大规格椭圆坯的连铸系统及连铸工艺
CN112808959B (zh) 一种提高成功率的结晶器高液位更换中间包方法
CN109420747B (zh) 一种高收得率的板坯连铸机自动封顶工艺
CN103962525B (zh) 一种抑制板坯晶界裂纹的冷却方法
CN106475541A (zh) 防止连铸连浇坯漏钢的方法及装置
CN101508018A (zh) 一种通过多包合浇抑制大型钢锭偏析的方法
CN102161080A (zh) 一种宽厚板轧机用高致密宽厚板坯的制造工装和方法
CN105215311A (zh) 一种方坯连铸开浇操作方法
CN104646642A (zh) 控制无取向硅钢连铸板坯宽度尺寸的方法
CN112222368A (zh) 一种超厚板坯连铸中间包对接升速操作方法
CN104249142B (zh) 纯净化均质化致密化细晶化钢铁大铸坯的压力铸造方法
CN105251954A (zh) 一种钢锭浇注模具及浇注方法
CN104439147A (zh) 一种铸件缩孔的处理方法
CN204209084U (zh) 一种生产大规格椭圆坯的连铸系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant