CN105970961B - 一种灌注桩围护基坑安全截桩方法 - Google Patents
一种灌注桩围护基坑安全截桩方法 Download PDFInfo
- Publication number
- CN105970961B CN105970961B CN201610344497.8A CN201610344497A CN105970961B CN 105970961 B CN105970961 B CN 105970961B CN 201610344497 A CN201610344497 A CN 201610344497A CN 105970961 B CN105970961 B CN 105970961B
- Authority
- CN
- China
- Prior art keywords
- bored concrete
- concrete pile
- pin
- arches
- pin arches
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明涉及一种灌注桩围护基坑安全截桩方法。本发明的目的是提供一种安全可行的灌注桩围护基坑安全截桩方法,确保结构及施工安全。本发明的技术方案是:该方法包括以下步骤:1、先将直径80cm的灌注桩凿除30cm,并立即安装第一榀拱架;2、再将灌注桩凿除30cm,安装第二榀拱架,第一榀拱架与第二榀拱架的中心线间距30cm;3、最后一次将灌注桩全部截断,安装第三榀拱架,第三榀拱架与第二榀拱架中心线间距30cm。在灌注桩和第一榀拱架、第二榀拱架和第三榀拱架之间的缝隙内均布置直径5cm的软胶管,缝隙外侧用水泥砂浆抹平封堵。本发明适用于市政公用、水利水电、道路桥梁、航道码头等基坑围护后再进行隧洞浅埋暗挖施工的工程领域。
Description
技术领域
本发明涉及一种灌注桩围护基坑安全截桩方法,尤其是一种自灌注桩围护的基坑进行隧洞浅埋暗挖施工的安全截桩方法。适用于市政公用、水利水电、道路桥梁、航道码头等基坑围护后再进行隧洞浅埋暗挖施工的工程领域。
背景技术
采用浅埋暗挖法穿越道路、管线的隧洞工程施工中,有时为减小施工难度、降低施工风险、确保施工安全,采用道路、管线段浅埋暗挖、其他段明挖的开挖方案。在明挖和浅埋暗挖衔接部位,根据实际场地施工条件,会采用灌注桩进行基坑围护,然后自基坑内进行浅埋暗挖作业的施工方案。
自基坑内进行浅埋暗挖作业,涉及到灌注桩截桩技术,何时截桩、如何截桩对施工安全有重大影响。一般情况下都采取浇筑管棚导向墙、完成管棚等超前支护施工后直接截桩进洞的方案,安全风险较为突出。
发明内容
本发明要解决的技术问题是:针对上述存在的问题,提供一种安全可行的灌注桩围护基坑安全截桩方法,确保结构及施工安全。
本发明所采用的技术方案是:一种灌注桩围护基坑安全截桩方法,其特征在于包括以下步骤:
1、先将直径80cm的灌注桩凿除30cm,并立即安装第一榀拱架,在灌注桩和第一榀拱架之间的缝隙内布置直径5cm的软胶管,将灌注桩和第一榀拱架之间的缝隙外侧用水泥砂浆抹平封堵;
2、再将灌注桩凿除30cm,安装第二榀拱架,第一榀拱架与第二榀拱架的中心线间距30cm,灌注桩和第二榀拱架之间缝隙同样预埋直径5cm的软胶管,缝隙外侧用水泥砂浆封堵;
3、最后一次将灌注桩全部截断,安装第三榀拱架,第三榀拱架与第二榀拱架中心线间距30cm,灌注桩和第三榀拱架之间缝隙同样预埋直径5cm的软胶管,缝隙外侧用水泥砂浆封堵。
所述直径5cm的软胶管上开设有均匀布置的漏浆孔,漏浆孔直径为5mm,孔间距为10cm。
本发明的有益效果是:1、灌注桩分次截断并分次安装钢拱架,使得剩余未截断部分桩体和拱架共同承担上部荷载;2、通过对拱架和桩体间的缝隙进行回填灌浆可以确保上部荷载均匀传递至拱架,进而确保施工安全。
附图说明
图1为本发明的结构布置图。
具体实施方式
本实施例为一种灌注桩围护基坑安全截桩方法,自灌注桩围护的基坑中进行浅埋暗挖作业前,分三次截断灌注桩1,每次截断灌注桩时均立即安装钢拱架支撑,分别为第一榀拱架2-1、第二榀拱架2-2和第三榀拱架2-3,拱架与其上部的灌注桩1之间的缝隙内布置直径5cm的软胶管3(其上开设有均匀布置的漏浆孔3-1),以便后期进行回填灌浆;软胶管3从拱架的左右侧起拱线位置开始布置,向上引至顶拱;每榀拱架安装后,将拱架与灌注桩1之间的缝隙外侧采用水泥砂浆抹平封堵以免漏浆;然后对软胶管3灌注纯水泥浆,确保拱架与上部的灌注桩1之间的缝隙回填密实。
如图1所示,本实施例中灌注桩1的直径为80cm,分三次截断,具体施工方法如下:
1、先将直径80cm的灌注桩1凿除30cm,并立即安装型号为I20a的第一榀拱架2-1,拱架2-1中心线距离灌注桩边缘10cm,在灌注桩1和第一榀拱架2-1之间的缝隙内布置直径5cm的软胶管3,将灌注桩1和第一榀拱架2-1之间的缝隙外侧用水泥砂浆抹平封堵以免漏浆;
2、再将灌注桩1凿除30cm,安装型号为I20a的第二榀拱架2-2,第一榀拱架2-1与第二榀拱架2-2的中心线间距30cm,灌注桩1和第二榀拱架2-2之间缝隙同样预埋直径5cm的软胶管3,缝隙外侧用水泥砂浆封堵以免漏浆;
3、最后一次将灌注桩1全部截断,安装型号为I20a的第三榀拱架2-3,第三榀拱架2-3与第二榀拱架2-2中心线间距30cm,灌注桩1和第三榀拱架2-3之间缝隙同样预埋直径5cm的软胶管3,缝隙外侧用水泥砂浆封堵以免漏浆。
上述步骤中,直径5cm的软胶管3上开设有均匀布置的漏浆孔3-1,漏浆孔3-1直径为5mm,孔间距为10cm。
Claims (1)
1.一种灌注桩围护基坑安全截桩方法,其特征在于包括以下步骤:
1.1、先将直径80cm的灌注桩(1)凿除30cm,并立即安装第一榀拱架(2-1),在灌注桩(1)和第一榀拱架(2-1)之间的缝隙内布置直径5cm的软胶管(3),将灌注桩(1)和第一榀拱架(2-1)之间的缝隙外侧用水泥砂浆抹平封堵;
1.2、再将灌注桩(1)凿除30cm,安装第二榀拱架(2-2),第一榀拱架(2-1)与第二榀拱架(2-2)的中心线间距30cm,灌注桩(1)和第二榀拱架(2-2)之间缝隙同样预埋直径5cm的软胶管(3),缝隙外侧用水泥砂浆封堵;
1.3、最后一次将灌注桩(1)全部截断,安装第三榀拱架(2-3),第三榀拱架(2-3)与第二榀拱架(2-2)中心线间距30cm,灌注桩(1)和第三榀拱架(2-3)之间缝隙同样预埋直径5cm的软胶管(3),缝隙外侧用水泥砂浆封堵;
所述直径5cm的软胶管(3)上开设有均匀布置的漏浆孔(3-1),漏浆孔(3-1)直径为5mm,孔间距为10cm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610344497.8A CN105970961B (zh) | 2016-05-20 | 2016-05-20 | 一种灌注桩围护基坑安全截桩方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610344497.8A CN105970961B (zh) | 2016-05-20 | 2016-05-20 | 一种灌注桩围护基坑安全截桩方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105970961A CN105970961A (zh) | 2016-09-28 |
CN105970961B true CN105970961B (zh) | 2018-08-07 |
Family
ID=56956904
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610344497.8A Active CN105970961B (zh) | 2016-05-20 | 2016-05-20 | 一种灌注桩围护基坑安全截桩方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105970961B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111206937A (zh) * | 2020-02-12 | 2020-05-29 | 中铁五局集团有限公司 | 一种盾构区间拆除侵入主体结构的群桩施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201128916Y (zh) * | 2007-07-13 | 2008-10-08 | 铁道第二勘察设计院 | 主动桩基托换结构 |
CN101634147A (zh) * | 2009-07-17 | 2010-01-27 | 中冶实久建设有限公司 | 超高灌注桩桩头的破除方法 |
CN101936167A (zh) * | 2009-06-29 | 2011-01-05 | 上海市基础工程公司 | 桥梁托换结合盾构施工穿越桥梁桩基的施工方法 |
CN102418531A (zh) * | 2011-12-14 | 2012-04-18 | 中铁十二局集团有限公司 | 一种盾构直接截除立交桥群桩掘进施工方法 |
CN202493274U (zh) * | 2012-03-23 | 2012-10-17 | 重庆中设工程设计股份有限公司 | 浅埋暗挖大断面隧道上跨既有隧道结构 |
JP2015209744A (ja) * | 2014-04-30 | 2015-11-24 | 大成建設株式会社 | 杭基礎構造物の免震化改修方法および仮設構造 |
CN105586969A (zh) * | 2014-11-14 | 2016-05-18 | 赖文平 | 钻孔灌注桩桩头分层凿除法 |
-
2016
- 2016-05-20 CN CN201610344497.8A patent/CN105970961B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201128916Y (zh) * | 2007-07-13 | 2008-10-08 | 铁道第二勘察设计院 | 主动桩基托换结构 |
CN101936167A (zh) * | 2009-06-29 | 2011-01-05 | 上海市基础工程公司 | 桥梁托换结合盾构施工穿越桥梁桩基的施工方法 |
CN101634147A (zh) * | 2009-07-17 | 2010-01-27 | 中冶实久建设有限公司 | 超高灌注桩桩头的破除方法 |
CN102418531A (zh) * | 2011-12-14 | 2012-04-18 | 中铁十二局集团有限公司 | 一种盾构直接截除立交桥群桩掘进施工方法 |
CN202493274U (zh) * | 2012-03-23 | 2012-10-17 | 重庆中设工程设计股份有限公司 | 浅埋暗挖大断面隧道上跨既有隧道结构 |
JP2015209744A (ja) * | 2014-04-30 | 2015-11-24 | 大成建設株式会社 | 杭基礎構造物の免震化改修方法および仮設構造 |
CN105586969A (zh) * | 2014-11-14 | 2016-05-18 | 赖文平 | 钻孔灌注桩桩头分层凿除法 |
Non-Patent Citations (2)
Title |
---|
《地铁群洞段及下穿过街通道施工方案》;谢宗林等;《四川建筑》;20130228;第33卷(第1期);第90-93页 * |
《软流塑地层条件下浅埋暗挖施工技术探讨》;陈志宁;《中国安全生产科学技术》;20080430;第4卷(第2期);第91-94页 * |
Also Published As
Publication number | Publication date |
---|---|
CN105970961A (zh) | 2016-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109723065B (zh) | 加固装置及富水砂砾地层中深基坑局部冷冻加固施工方法 | |
CN103981898B (zh) | 一种整体明挖节点逆作的地下工程施工方法 | |
CN103469817B (zh) | 一种既有地铁车站主体结构扩建施工方法 | |
CN108547639B (zh) | 隧道临近既有构筑物的超前同孔多导管分层注浆施工方法 | |
CN106437798B (zh) | 一种穿过盾构掘进断面的锚索群的预处理方法 | |
CN104652418B (zh) | 连续墙地下管线位置施工方法 | |
CN105951711A (zh) | 海边电站地下连续墙围护施工方法 | |
CN103485790A (zh) | 一种管幕-支护结构组合体系浅埋暗挖法 | |
CN205711788U (zh) | 一种地下管道保护涵 | |
CN102828517B (zh) | 一种车站出入口基坑开挖分层控制的施工方法 | |
CN103726495B (zh) | 近海深基坑支护结构及其施工方法 | |
CN211340827U (zh) | 地铁隧道穿越既有桥桩新建桥梁的构造 | |
CN100510281C (zh) | 超大直径、超埋深度调蓄池的半逆作施工方法 | |
CN108930275A (zh) | 一种永临结合顺逆结合的超深竖井快速施工方法 | |
CN105544603A (zh) | 一种用于地下管线加固的施工方法 | |
CN106499199A (zh) | 临近地铁超深基坑中隔墙临时换撑及其施工方法 | |
CN107653878A (zh) | 钻孔灌注桩可重复使用纵向分离式钢护筒施工工法 | |
CN103147444A (zh) | 可随挖随护基坑围护结构及基坑开挖方法 | |
CN106812131A (zh) | 一种永久板桩地下结构及其施工方法 | |
CN110206071A (zh) | 一种地下连续墙接缝加固方法与装置 | |
CN105970961B (zh) | 一种灌注桩围护基坑安全截桩方法 | |
CN104074195B (zh) | 一种通过水平注浆控制基坑外地面沉降的方法 | |
CN109610473A (zh) | 一种市政大型池体构筑物基坑支护体系的施工方法 | |
JP2009068213A (ja) | ケーソンを用いた地下構造物の構築方法および止水装置付ケーソン | |
CN107642101A (zh) | 一种岩石河床钢围堰封底堵漏及防排水施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |