CN105970961A - 一种灌注桩围护基坑安全截桩方法 - Google Patents

一种灌注桩围护基坑安全截桩方法 Download PDF

Info

Publication number
CN105970961A
CN105970961A CN201610344497.8A CN201610344497A CN105970961A CN 105970961 A CN105970961 A CN 105970961A CN 201610344497 A CN201610344497 A CN 201610344497A CN 105970961 A CN105970961 A CN 105970961A
Authority
CN
China
Prior art keywords
bow member
concrete pile
cast
arch support
bored concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610344497.8A
Other languages
English (en)
Other versions
CN105970961B (zh
Inventor
房敦敏
周垂
周垂一
许满山
陈永红
邵洪泽
刘宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201610344497.8A priority Critical patent/CN105970961B/zh
Publication of CN105970961A publication Critical patent/CN105970961A/zh
Application granted granted Critical
Publication of CN105970961B publication Critical patent/CN105970961B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及一种灌注桩围护基坑安全截桩方法。本发明的目的是提供一种安全可行的灌注桩围护基坑安全截桩方法,确保结构及施工安全。本发明的技术方案是:该方法包括以下步骤:1、先将直径80cm的灌注桩凿除30cm,并立即安装第一榀拱架;2、再将灌注桩凿除30cm,安装第二榀拱架,第一榀拱架与第二榀拱架的中心线间距30cm;3、最后一次将灌注桩全部截断,安装第三榀拱架,第三榀拱架与第二榀拱架中心线间距30cm。在灌注桩和第一榀拱架、第二榀拱架和第三榀拱架之间的缝隙内均布置直径5cm的软胶管,缝隙外侧用水泥砂浆抹平封堵。本发明适用于市政公用、水利水电、道路桥梁、航道码头等基坑围护后再进行隧洞浅埋暗挖施工的工程领域。

Description

一种灌注桩围护基坑安全截桩方法
技术领域
本发明涉及一种灌注桩围护基坑安全截桩方法,尤其是一种自灌注桩围护的基坑进行隧洞浅埋暗挖施工的安全截桩方法。适用于市政公用、水利水电、道路桥梁、航道码头等基坑围护后再进行隧洞浅埋暗挖施工的工程领域。
背景技术
采用浅埋暗挖法穿越道路、管线的隧洞工程施工中,有时为减小施工难度、降低施工风险、确保施工安全,采用道路、管线段浅埋暗挖、其他段明挖的开挖方案。在明挖和浅埋暗挖衔接部位,根据实际场地施工条件,会采用灌注桩进行基坑围护,然后自基坑内进行浅埋暗挖作业的施工方案。
自基坑内进行浅埋暗挖作业,涉及到灌注桩截桩技术,何时截桩、如何截桩对施工安全有重大影响。一般情况下都采取浇筑管棚导向墙、完成管棚等超前支护施工后直接截桩进洞的方案,安全风险较为突出。
发明内容
本发明要解决的技术问题是:针对上述存在的问题,提供一种安全可行的灌注桩围护基坑安全截桩方法,确保结构及施工安全。
本发明所采用的技术方案是:一种灌注桩围护基坑安全截桩方法,其特征在于包括以下步骤:
1、先将直径80cm的灌注桩凿除30cm,并立即安装第一榀拱架,在灌注桩和第一榀拱架之间的缝隙内布置直径5cm的软胶管,将灌注桩和第一榀拱架之间的缝隙外侧用水泥砂浆抹平封堵;
2、再将灌注桩凿除30cm,安装第二榀拱架,第一榀拱架与第二榀拱架的中心线间距30cm,灌注桩和第二榀拱架之间缝隙同样预埋直径5cm的软胶管,缝隙外侧用水泥砂浆封堵;
3、最后一次将灌注桩全部截断,安装第三榀拱架,第三榀拱架与第二榀拱架中心线间距30cm,灌注桩和第三榀拱架之间缝隙同样预埋直径5cm的软胶管,缝隙外侧用水泥砂浆封堵。
所述直径5cm的软胶管上开设有均匀布置的漏浆孔,漏浆孔直径为5mm,孔间距为10cm。
本发明的有益效果是:1、灌注桩分次截断并分次安装钢拱架,使得剩余未截断部分桩体和拱架共同承担上部荷载;2、通过对拱架和桩体间的缝隙进行回填灌浆可以确保上部荷载均匀传递至拱架,进而确保施工安全。
附图说明
图1为本发明的结构布置图。
具体实施方式
本实施例为一种灌注桩围护基坑安全截桩方法,自灌注桩围护的基坑中进行浅埋暗挖作业前,分三次截断灌注桩1,每次截断灌注桩时均立即安装钢拱架支撑,分别为第一榀拱架2-1、第二榀拱架2-2和第三榀拱架2-3,拱架与其上部的灌注桩1之间的缝隙内布置直径5cm的软胶管3(其上开设有均匀布置的漏浆孔3-1),以便后期进行回填灌浆;软胶管3从拱架的左右侧起拱线位置开始布置,向上引至顶拱;每榀拱架安装后,将拱架与灌注桩1之间的缝隙外侧采用水泥砂浆抹平封堵以免漏浆;然后对软胶管3灌注纯水泥浆,确保拱架与上部的灌注桩1之间的缝隙回填密实。
如图1所示,本实施例中灌注桩1的直径为80cm,分三次截断,具体施工方法如下:
1、先将直径80cm的灌注桩1凿除30cm,并立即安装型号为I20a的第一榀拱架2-1,拱架2-1中心线距离灌注桩边缘10cm,在灌注桩1和第一榀拱架2-1之间的缝隙内布置直径5cm的软胶管3,将灌注桩1和第一榀拱架2-1之间的缝隙外侧用水泥砂浆抹平封堵以免漏浆;
2、再将灌注桩1凿除30cm,安装型号为I20a的第二榀拱架2-2,第一榀拱架2-1与第二榀拱架2-2的中心线间距30cm,灌注桩1和第二榀拱架2-2之间缝隙同样预埋直径5cm的软胶管3,缝隙外侧用水泥砂浆封堵以免漏浆;
3、最后一次将灌注桩1全部截断,安装型号为I20a的第三榀拱架2-3,第三榀拱架2-3与第二榀拱架2-2中心线间距30cm,灌注桩1和第三榀拱架2-3之间缝隙同样预埋直径5cm的软胶管3,缝隙外侧用水泥砂浆封堵以免漏浆。
上述步骤中,直径5cm的软胶管3上开设有均匀布置的漏浆孔3-1,漏浆孔3-1直径为5mm,孔间距为10cm。

Claims (1)

1.一种灌注桩围护基坑安全截桩方法,其特征在于包括以下步骤:
1.1、先将直径80cm的灌注桩(1)凿除30cm,并立即安装第一榀拱架(2-1),在灌注桩(1)和第一榀拱架(2-1)之间的缝隙内布置直径5cm的软胶管(3),将灌注桩(1)和第一榀拱架(2-1)之间的缝隙外侧用水泥砂浆抹平封堵;
1.2、再将灌注桩(1)凿除30cm,安装第二榀拱架(2-2),第一榀拱架(2-1)与第二榀拱架(2-2)的中心线间距30cm,灌注桩(1)和第二榀拱架(2-2)之间缝隙同样预埋直径5cm的软胶管(3),缝隙外侧用水泥砂浆封堵;
1.3、最后一次将灌注桩(1)全部截断,安装第三榀拱架(2-3),第三榀拱架(2-3)与第二榀拱架(2-2)中心线间距30cm,灌注桩(1)和第三榀拱架(2-3)之间缝隙同样预埋直径5cm的软胶管(3),缝隙外侧用水泥砂浆封堵。
所述直径5cm的软胶管(3)上开设有均匀布置的漏浆孔(3-1),漏浆孔(3-1)直径为5mm,孔间距为10cm。
CN201610344497.8A 2016-05-20 2016-05-20 一种灌注桩围护基坑安全截桩方法 Active CN105970961B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610344497.8A CN105970961B (zh) 2016-05-20 2016-05-20 一种灌注桩围护基坑安全截桩方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610344497.8A CN105970961B (zh) 2016-05-20 2016-05-20 一种灌注桩围护基坑安全截桩方法

Publications (2)

Publication Number Publication Date
CN105970961A true CN105970961A (zh) 2016-09-28
CN105970961B CN105970961B (zh) 2018-08-07

Family

ID=56956904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610344497.8A Active CN105970961B (zh) 2016-05-20 2016-05-20 一种灌注桩围护基坑安全截桩方法

Country Status (1)

Country Link
CN (1) CN105970961B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206937A (zh) * 2020-02-12 2020-05-29 中铁五局集团有限公司 一种盾构区间拆除侵入主体结构的群桩施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201128916Y (zh) * 2007-07-13 2008-10-08 铁道第二勘察设计院 主动桩基托换结构
CN101634147A (zh) * 2009-07-17 2010-01-27 中冶实久建设有限公司 超高灌注桩桩头的破除方法
CN101936167A (zh) * 2009-06-29 2011-01-05 上海市基础工程公司 桥梁托换结合盾构施工穿越桥梁桩基的施工方法
CN102418531A (zh) * 2011-12-14 2012-04-18 中铁十二局集团有限公司 一种盾构直接截除立交桥群桩掘进施工方法
CN202493274U (zh) * 2012-03-23 2012-10-17 重庆中设工程设计股份有限公司 浅埋暗挖大断面隧道上跨既有隧道结构
JP2015209744A (ja) * 2014-04-30 2015-11-24 大成建設株式会社 杭基礎構造物の免震化改修方法および仮設構造
CN105586969A (zh) * 2014-11-14 2016-05-18 赖文平 钻孔灌注桩桩头分层凿除法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201128916Y (zh) * 2007-07-13 2008-10-08 铁道第二勘察设计院 主动桩基托换结构
CN101936167A (zh) * 2009-06-29 2011-01-05 上海市基础工程公司 桥梁托换结合盾构施工穿越桥梁桩基的施工方法
CN101634147A (zh) * 2009-07-17 2010-01-27 中冶实久建设有限公司 超高灌注桩桩头的破除方法
CN102418531A (zh) * 2011-12-14 2012-04-18 中铁十二局集团有限公司 一种盾构直接截除立交桥群桩掘进施工方法
CN202493274U (zh) * 2012-03-23 2012-10-17 重庆中设工程设计股份有限公司 浅埋暗挖大断面隧道上跨既有隧道结构
JP2015209744A (ja) * 2014-04-30 2015-11-24 大成建設株式会社 杭基礎構造物の免震化改修方法および仮設構造
CN105586969A (zh) * 2014-11-14 2016-05-18 赖文平 钻孔灌注桩桩头分层凿除法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
谢宗林等: "《地铁群洞段及下穿过街通道施工方案》", 《四川建筑》 *
陈志宁: "《软流塑地层条件下浅埋暗挖施工技术探讨》", 《中国安全生产科学技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206937A (zh) * 2020-02-12 2020-05-29 中铁五局集团有限公司 一种盾构区间拆除侵入主体结构的群桩施工方法

Also Published As

Publication number Publication date
CN105970961B (zh) 2018-08-07

Similar Documents

Publication Publication Date Title
US10138616B2 (en) Inverse construction method for deep, large and long pit assembling structure of suspension-type envelope enclosure
CN106284314A (zh) 喀斯特地貌旋挖成孔灌注桩施工方法
CN103726495B (zh) 近海深基坑支护结构及其施工方法
CN101343868B (zh) 跨城市管线地下连续墙施工方法
CN109371980B (zh) 喷锚逆作与冲孔桩组合的深基坑围护施工方法
CN105544603A (zh) 一种用于地下管线加固的施工方法
CN211340827U (zh) 地铁隧道穿越既有桥桩新建桥梁的构造
CN107938680A (zh) 一种基坑开挖安全施工方法
CN105484277A (zh) 一种电梯基坑或集水坑内管井降水施工用构件及施工方法
CN110565686A (zh) 管廊下穿河道的施工方法
CN108755719A (zh) 跨海海底市政隧道围堰明挖施工方法
CN110055929A (zh) 一种管道穿越软基河堤的施工方法
CN110055973A (zh) 施工空间受限时的高铁桥下基坑围护结构与止水方法
CN109594574A (zh) 基于有限空间的大型顶管沉井逆作施工方法
CN105970961A (zh) 一种灌注桩围护基坑安全截桩方法
CN101141054A (zh) 一种防止非开挖水平钻孔后地面沉降的压密注浆方法
CN110512594A (zh) 旋挖钻机遇空洞成孔成桩的简易方法
CN103161469A (zh) 开挖竖井地下修复顶管工具管的方法
CN206829167U (zh) 一种带泄流孔的现浇箱梁支架筏板基础
CN109113092A (zh) 地下大直径管道原位通水保护施工方法
CN212336250U (zh) 顶管接驳导排结构
JP2007032129A (ja) ダム施工方法
JP2018138738A (ja) インバート施工方法
CN106013198A (zh) 基坑围护结构缝隙预处理施工方法
CN206173974U (zh) 顶管施工用小尺寸深基坑支护结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant