CN101343868B - 跨城市管线地下连续墙施工方法 - Google Patents
跨城市管线地下连续墙施工方法 Download PDFInfo
- Publication number
- CN101343868B CN101343868B CN 200810041886 CN200810041886A CN101343868B CN 101343868 B CN101343868 B CN 101343868B CN 200810041886 CN200810041886 CN 200810041886 CN 200810041886 A CN200810041886 A CN 200810041886A CN 101343868 B CN101343868 B CN 101343868B
- Authority
- CN
- China
- Prior art keywords
- pipeline
- mentioned
- city
- underground continuous
- continuous wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200810041886 CN101343868B (zh) | 2008-08-19 | 2008-08-19 | 跨城市管线地下连续墙施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200810041886 CN101343868B (zh) | 2008-08-19 | 2008-08-19 | 跨城市管线地下连续墙施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101343868A CN101343868A (zh) | 2009-01-14 |
CN101343868B true CN101343868B (zh) | 2011-01-12 |
Family
ID=40245975
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200810041886 Active CN101343868B (zh) | 2008-08-19 | 2008-08-19 | 跨城市管线地下连续墙施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101343868B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021203679A1 (zh) * | 2020-04-10 | 2021-10-14 | 深圳市工勘岩土集团有限公司 | 管线地下连续墙成槽综合施工方法 |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102094426B (zh) * | 2011-03-15 | 2012-02-29 | 中铁二十五局集团轨道交通工程有限公司 | 一种重叠既有地下连续墙施工新的地下连续墙的成槽工艺 |
CN103556623B (zh) * | 2013-11-05 | 2015-09-09 | 中国水电顾问集团华东勘测设计研究院有限公司 | 横跨深埋大型市政管线的连续墙施工方法 |
CN103981857B (zh) * | 2014-06-05 | 2015-12-30 | 北京住总集团有限责任公司 | 一种地下连续墙l形钢筋笼的吊装方法 |
CN108222006B (zh) * | 2016-12-15 | 2020-05-05 | 宏润建设集团股份有限公司 | 一种广场地下连续墙施工方法 |
CN108252296A (zh) * | 2018-01-19 | 2018-07-06 | 中铁上海工程局集团有限公司 | 一种地下连续墙管线原位保护施工的方法 |
CN110258518A (zh) * | 2019-06-13 | 2019-09-20 | 广州穗岩土木科技股份有限公司 | 一种跨城市管线地下连续墙施工方法 |
CN111764373A (zh) * | 2020-05-28 | 2020-10-13 | 浙江土工岩土科技有限公司 | 不可拆除地下障碍物情况下地下连续墙施工方法 |
CN113914299A (zh) * | 2021-11-18 | 2022-01-11 | 中铁二局集团有限公司 | 一种穿越基坑管线的地下连续墙施工方法 |
CN116092203B (zh) * | 2022-08-19 | 2023-10-20 | 荣耀终端有限公司 | 基于乘车卡的出行方法、设备及存储介质 |
-
2008
- 2008-08-19 CN CN 200810041886 patent/CN101343868B/zh active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021203679A1 (zh) * | 2020-04-10 | 2021-10-14 | 深圳市工勘岩土集团有限公司 | 管线地下连续墙成槽综合施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101343868A (zh) | 2009-01-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101343868B (zh) | 跨城市管线地下连续墙施工方法 | |
Chen et al. | Long rectangular box jacking project: a case study | |
CN101343869A (zh) | 横跨城市管线地下连续墙的施工方法 | |
CN100497841C (zh) | 支腿式地下连续墙施工工法 | |
CN108442382B (zh) | 横穿深基坑的压力管线原位保护及围护挡土结构及施工方法 | |
CN106381866A (zh) | 一种富水软土地区超深地下连续墙施工方法 | |
CN105951711A (zh) | 海边电站地下连续墙围护施工方法 | |
CN109555116A (zh) | 一种高密度岩溶强烈发育地区全套管灌注桩施工方法 | |
CN106088099B (zh) | 一种地铁基坑锚索处理方法 | |
CN107724383B (zh) | 旋挖灌注桩施工方法 | |
CN104164881A (zh) | 一种桩墙叠合悬臂基坑支护施工方法及结构 | |
CN103015429A (zh) | 长螺旋旋喷搅拌水泥土型钢桩基坑止水支护方法 | |
CN112064751A (zh) | 一种排水管线的深沟槽施工方法 | |
CN104264663A (zh) | 咬合桩硬切削施工工艺 | |
CN101349057A (zh) | 横跨城市管线地下连续墙施工方法 | |
CN111395322A (zh) | 一种喀斯特地貌下旋挖灌注桩施工方法 | |
CN111560958A (zh) | 粉质黏土地层富水深基坑施工工法 | |
CN204174625U (zh) | 一种桩墙叠合悬臂基坑支护结构 | |
CN112281810A (zh) | 一种富水粉细砂层地下连续墙的施工方法 | |
CN112227401A (zh) | 一种水下石质陡坡区填石筑岛施工承台方法 | |
CN101701460A (zh) | 控制基坑施工过程中周围地表沉降的施工方法 | |
CN113216215A (zh) | 一种复杂环境下深沟槽支护逆作施工方法 | |
CN111236262A (zh) | 一种csm+trd地下连续墙综合施工工法 | |
CN207828994U (zh) | 一种排水及回灌施工结构 | |
CN105332382A (zh) | 邻河基坑筑岛围堰粘土止水施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
C41 | Transfer of patent application or patent right or utility model | ||
PB01 | Publication | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20081128 Address after: 17F, Fushan Road, Shanghai, 33 Applicant after: Shanghai construction (Group) General Company Co-applicant after: Shanghai Construction Co., Ltd. Address before: 17F, Fushan Road, Shanghai, 33 Applicant before: Shanghai Construction Co., Ltd. |
|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: SHANGHAI JIANGONG( GROUP ) HEAD COMPANY Free format text: FORMER OWNER: SHANGHAI JIANGONG CO., LTD. Effective date: 20081128 |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |