CN103556623B - 横跨深埋大型市政管线的连续墙施工方法 - Google Patents

横跨深埋大型市政管线的连续墙施工方法 Download PDF

Info

Publication number
CN103556623B
CN103556623B CN201310537453.3A CN201310537453A CN103556623B CN 103556623 B CN103556623 B CN 103556623B CN 201310537453 A CN201310537453 A CN 201310537453A CN 103556623 B CN103556623 B CN 103556623B
Authority
CN
China
Prior art keywords
municipal pipeline
pipeline
steel pile
pile casting
diaphragm wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310537453.3A
Other languages
English (en)
Other versions
CN103556623A (zh
Inventor
彭孔曙
臧延伟
吴向
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN201310537453.3A priority Critical patent/CN103556623B/zh
Publication of CN103556623A publication Critical patent/CN103556623A/zh
Application granted granted Critical
Publication of CN103556623B publication Critical patent/CN103556623B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明涉及一种横跨深埋大型市政管线的连续墙施工方法。本发明的目的是提供一种横跨深埋大型市政管线的连续墙施工方法。本发明的技术方案是:a关闭市政管线中穿越拟施工连续墙段前后闸门,抽空该段内水或使管线内水处于非流动状态;b采用钢护筒护壁,钻孔至市政管线顶部;c将市政管线冲破,形成连通钢护筒与市政管线的通孔;d市政管线内、通孔的远离拟施工连续墙一侧采用袋装水泥进行封堵;e采用水冲法将两端已封堵的市政管线内部空间填实;f用砂土将钢护筒填实,然后拔出钢护筒;g连续墙按常规泥浆护壁进行成槽,至市政管线上部时,改用冲击钻机将连续墙部位的市政管线及其内部水泥土冲破;h采用连续墙的常规施工方法完成后续施工。

Description

横跨深埋大型市政管线的连续墙施工方法
技术领域
本发明涉及一种横跨深埋大型市政管线的连续墙施工方法。适用于市政、工民建工程。
背景技术
随着近年来城市轨道交通及大型地下空间开发等工程越来越多,而这些项目多位于市中心,在建设过程中经常出现围护结构与现状管线冲突问题(见图1、图2),一些浅埋管线改迁较为方便,但一些深埋大型管线(埋深8m以上、管径800mm以上),往往进行改迁很难,而不提前进行改迁的话,后续连续墙施工时,连续墙护壁用的泥浆会从管线中大量流失、无法完成成槽。
发明内容
本发明要解决的技术问题是:针对上述存在的问题,提供一种成本较低、工期较短、风险较低的横跨深埋大型市政管线的连续墙施工方法。
本发明所采用的技术方案是:一种横跨深埋大型市政管线的连续墙施工方法,其特征在于:
a.关闭市政管线中穿越拟施工连续墙段前后的闸门,抽空该段市政管线内水或使管线内水处于非流动状态;
b.在连续墙两侧、市政管线上方,采用钢护筒护壁,钻孔至市政管线顶部,钢护筒与市政管线搭接;
c.采用冲击钻机将市政管线上对应钢护筒部位冲破,形成连通钢护筒与市政管线的通孔;
d.市政管线内、通孔的远离拟施工连续墙一侧采用袋装水泥进行封堵;
e.采用水冲法将两端已封堵的市政管线内部空间填实,水冲过程中掺约15%水泥,形成水泥土;
f.用砂土将钢护筒填实,然后拔出钢护筒;
g.连续墙按常规泥浆护壁进行成槽,成槽至市政管线上部时,改用冲击钻机将连续墙部位的市政管线及其内部水泥土冲破;
h.清除障碍物后采用连续墙的常规施工方法完成后续施工。
在步骤b中,钢护筒与市政管线拟搭接部位土层采取高压旋喷或注浆措施对该部位进行土体加固,并配合降水措施。
本发明的有益效果是:1、解决连续墙遇到深埋大型市政管线时护壁泥浆会大量流失而无法完成成槽问题;2、施工可操作性强,风险低;3、相比传统通过明挖法先拆除现状管线的费用及工期均大大降低(费用可节省60%以上,工期可节省50%以上)。4、本发明也适用于钻孔桩等需泥浆护壁设备遇到类似情况时的施工方法。
附图说明
图1为市政管线与连续墙平面关系图。
图2为市政管线与连续墙竖向关系图。
图3为实施例中钢护筒钻孔桩平面布置图。
图4为图3的A-A剖视图。(袋装水泥封堵完成后)
图5为实施例中钢护筒拔出状态的结构示意图。
具体实施方式
本实施例为一种横跨深埋大型市政管线的连续墙施工方法,以避免连续墙施工时,连续墙护壁用的泥浆会从管线中大量流失的问题,施工方便、成本较低。本实施例的具体施工方法如下:
a.施工前找到并关闭市政管线1中穿越拟施工连续墙2段的前后闸门,抽空该段市政管线内水或使管线内水处于非流动状态;
b.如图3所示,在连续墙2的两侧且市政管线1正上方位置采用钢护筒3护壁,钻孔至市政管线1的顶部,钢护筒3与市政管线1搭接(若钢护筒3与市政管线1搭接部位分布有透水性土层,则须提前采取高压旋喷或注浆等措施对该部位进行土体加固并配有降水措施);
c.采用冲击钻机将市政管线1上对应钢护筒3部位冲破,从而形成连通钢护筒3与市政管线1的通孔1-1;
d.以钢护筒3为施工通道,分别在市政管线1内且位于通孔1-1的远离拟施工连续墙2的一侧采用袋装水泥4进行封堵,见图4;
e.以钢护筒3为施工通道,采用水冲法将两端已被袋装水泥4封堵的市政管线1内部空间填实,水冲过程中掺约15%水泥,形成水泥土5;
f.如图5所示,用砂土6将钢护筒3填实,然后将钢护筒3拔出;
g.连续墙2按常规泥浆护壁进行成槽,成槽至市政管线1上部时,改用冲击钻机将连续墙部位的市政管线1及其内部水泥土5冲破;
h.清除完步骤g所产生的障碍物后,采用连续墙的常规施工方法完成后续施工。

Claims (2)

1.一种横跨深埋大型市政管线的连续墙施工方法,其特征在于:
a.关闭市政管线(1)中穿越拟施工连续墙(2)段前后的闸门,抽空该段市政管线内水或使管线内水处于非流动状态;
b.在连续墙(2)两侧、市政管线(1)上方,采用钢护筒(3)护壁,钻孔至市政管线(1)顶部,钢护筒(3)与市政管线(1)搭接;
c.采用冲击钻机将市政管线(1)上对应钢护筒(3)部位冲破,形成连通钢护筒(3)与市政管线(1)的通孔(1-1);
d.市政管线(1)内、通孔(1-1)的远离拟施工连续墙(2)一侧采用袋装水泥(4)进行封堵;
e.采用水冲法将两端已封堵的市政管线(1)内部空间填实,水冲过程中掺15%水泥,形成水泥土(5);
f.用砂土(6)将钢护筒(3)填实,然后拔出钢护筒(3);
g.连续墙(2)按常规泥浆护壁进行成槽,成槽至市政管线(1)上部时,改用冲击钻机将连续墙部位的市政管线(1)及其内部水泥土(5)冲破;
h.清除障碍物后采用连续墙的常规施工方法完成后续施工。
2.根据权利要求1所述的横跨深埋大型市政管线的连续墙施工方法,其特征在于:在步骤b中,钢护筒(3)与市政管线(1)拟搭接部位土层采取高压旋喷或注浆措施对该部位进行土体加固,并配合降水措施。
CN201310537453.3A 2013-11-05 2013-11-05 横跨深埋大型市政管线的连续墙施工方法 Active CN103556623B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310537453.3A CN103556623B (zh) 2013-11-05 2013-11-05 横跨深埋大型市政管线的连续墙施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310537453.3A CN103556623B (zh) 2013-11-05 2013-11-05 横跨深埋大型市政管线的连续墙施工方法

Publications (2)

Publication Number Publication Date
CN103556623A CN103556623A (zh) 2014-02-05
CN103556623B true CN103556623B (zh) 2015-09-09

Family

ID=50010960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310537453.3A Active CN103556623B (zh) 2013-11-05 2013-11-05 横跨深埋大型市政管线的连续墙施工方法

Country Status (1)

Country Link
CN (1) CN103556623B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672251B (zh) * 2016-02-01 2017-11-24 中铁十六局集团北京轨道交通工程建设有限公司 一种骑跨现有污水管的地下连续墙槽段施工方法
CN105735244B (zh) * 2016-02-01 2017-10-31 上海交通大学 一种骑跨现有污水管的地下连续墙槽段设计施工方法
CN109024596A (zh) * 2018-08-07 2018-12-18 中铁上海工程局集团有限公司 一种穿越废弃混凝土管道钻孔桩施工工艺
CN110004916B (zh) * 2019-04-18 2023-12-19 中铁第四勘察设计院集团有限公司 适用于地下连续墙施工的深埋污水管清障结构及清障方法
CN110878553B (zh) * 2019-12-05 2021-03-23 广东泓森建设有限公司 横跨深埋大型市政管线的连续墙施工方法
CN113279442B (zh) * 2021-05-09 2022-10-25 苏州中车建设工程有限公司 地下连续墙成槽的高压泥浆护壁施工装置
CN113756294A (zh) * 2021-10-22 2021-12-07 中铁六局集团有限公司 针对桩基础施工与地下管线冲突的处理方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08311864A (ja) * 1995-05-22 1996-11-26 Shimizu Corp 土留壁およびその構築方法
JP2001295269A (ja) * 2000-04-14 2001-10-26 Ohbayashi Corp フラットパネルおよびその施工方法
CN101343869A (zh) * 2008-08-19 2009-01-14 上海建工股份有限公司 横跨城市管线地下连续墙的施工方法
CN101343868A (zh) * 2008-08-19 2009-01-14 上海建工股份有限公司 跨城市管线地下连续墙施工方法
CN101591909A (zh) * 2008-05-29 2009-12-02 上海市机械施工有限公司 一种在城市建设中在地下管线下的地下连续墙施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08311864A (ja) * 1995-05-22 1996-11-26 Shimizu Corp 土留壁およびその構築方法
JP2001295269A (ja) * 2000-04-14 2001-10-26 Ohbayashi Corp フラットパネルおよびその施工方法
CN101591909A (zh) * 2008-05-29 2009-12-02 上海市机械施工有限公司 一种在城市建设中在地下管线下的地下连续墙施工方法
CN101343869A (zh) * 2008-08-19 2009-01-14 上海建工股份有限公司 横跨城市管线地下连续墙的施工方法
CN101343868A (zh) * 2008-08-19 2009-01-14 上海建工股份有限公司 跨城市管线地下连续墙施工方法

Also Published As

Publication number Publication date
CN103556623A (zh) 2014-02-05

Similar Documents

Publication Publication Date Title
CN103556623B (zh) 横跨深埋大型市政管线的连续墙施工方法
WO2018214659A1 (zh) 一种废弃矿井井下瓦斯治理新工艺
CN204112308U (zh) 一种基于大卵石、高渗透系数地层的简易袖阀注浆装置
CN204266220U (zh) 一种基坑内降水井的封堵装置
CN103469817B (zh) 一种既有地铁车站主体结构扩建施工方法
CN104099943B (zh) 地下连续墙与废弃地下人防工程交会处理方法
CN105040775B (zh) 深层承压自流井封堵系统与方法
CN104404983B (zh) 一种用于顶管施工的骑马井装置及其施工方法
CN103485790A (zh) 一种管幕-支护结构组合体系浅埋暗挖法
CN106869946B (zh) 一种砂卵石地层暗挖地铁车站造底冻结施工方法
CN204228155U (zh) 一种浅埋暗挖隧道施工用地表沉降监测点埋设结构
CN104481555A (zh) 一种穿过软弱围岩进行钻注注浆施工的方法
CN203625883U (zh) 一种用于基坑施工的携管钢板支护桩
CN105569062A (zh) 渗透弱化减排降水法
CN107227740A (zh) 地下连续墙施工中石灰岩溶洞槽壁封闭的施工方法
CN104747197B (zh) 一种土压平衡盾构机土仓泥饼探测装置
CN204551510U (zh) 一种填方路基集水降压井降排水结构
CN204186396U (zh) 一种盾构隧道周围地层加固通道构造
CN203175568U (zh) 电缆隧道用顶管掘进机内部进排泥控制机构
CN106545070B (zh) 既有检查井中采用顶管增设管道时的导流方法
CN204941551U (zh) 一种曲线顶管支护结构扩建盾构施工的地铁车站
CN204609897U (zh) 一种管幕冻结法支护结构
CN203835412U (zh) 一种水下巷道渗漏处理的结构
CN107975376A (zh) 隧道盾构顶管与竖向管道连接结构及施工方法
Wang et al. Numerical simulation of foundation pit dewatering using horizontal seepage reducing body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant