CN203625883U - 一种用于基坑施工的携管钢板支护桩 - Google Patents
一种用于基坑施工的携管钢板支护桩 Download PDFInfo
- Publication number
- CN203625883U CN203625883U CN201320578723.0U CN201320578723U CN203625883U CN 203625883 U CN203625883 U CN 203625883U CN 201320578723 U CN201320578723 U CN 201320578723U CN 203625883 U CN203625883 U CN 203625883U
- Authority
- CN
- China
- Prior art keywords
- pile
- pipes
- steel sheet
- foundation pit
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 45
- 239000010959 steel Substances 0.000 title claims abstract description 45
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 239000002002 slurry Substances 0.000 claims abstract description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 3
- 239000004568 cement Substances 0.000 abstract description 2
- 238000000034 method Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 abstract 2
- 230000002411 adverse Effects 0.000 abstract 1
- 230000002093 peripheral effect Effects 0.000 abstract 1
- 238000009991 scouring Methods 0.000 abstract 1
- 230000015572 biosynthetic process Effects 0.000 description 4
- 230000003068 static effect Effects 0.000 description 2
- 239000004927 clay Substances 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000009931 harmful effect Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本实用新型一种用于基坑施工的携管钢板支护桩,属市政工程和建筑工程基坑支护设施领域,本实用新型支护桩,由桩板和桩管组成,桩板由竖直三面钢板组成,两侧面钢板与中间钢板呈对称夹角连接一体,在两侧面钢板与中间钢板的两个夹角处,各竖直设置一个通长桩管,桩管的上端口通过注浆管与注浆机连接,在沉桩过程中,通过注浆机将高压水流从桩管上端入口注入,在其下端出口对坚硬地层形成强有力的冲刷,有效减小了坚硬地层的阻力, 当基坑回填后拔出支护桩时,通过注浆机使桩管下端出口射出的水泥浆,能即时、完好地填充了支护桩拔出后留下的空隙,因此,避免坚硬地层钢板桩难以压入以及拔桩时对基坑周边路面、建筑物、地下管线的不良影响的问题。
Description
技术领域
本实用新型一种用于基坑施工的携管钢板支护桩,属市政工程和建筑工程基坑支护设施领域。
背景技术
目前,在市政工程和建筑工程基坑施工中,对于管道和箱涵基坑,通常是根据基坑周边环境和工程地质条件选择不同的支护设施。由于市政管道和箱涵基坑,其埋深通常达到5.0m以上,并且其周边环境复杂,因此经常采用拉森钢板桩或普通槽钢钢板桩进行支护。由于钢板桩可以循环使用,节约资源,经济环保,因此目前在市政工程和建筑工程管道和箱涵基坑支护中广泛使用,同时在使用过程中发现存在以下两个比较突出的问题:
(1)对于地层中分布有老粘土或风化岩石等较为坚硬地质条件的地层,无论采用振动的方式还是静压的方式,拉森钢板桩或普通槽钢钢板桩均难以压入。
(2)管道和箱涵基坑回填后,采用振动的方式或静压的方式拔出钢板桩时,由于钢板桩空隙的存在极易导致基坑周边路面开裂、建筑物倾斜以及地下管线移位等不利现象。
因此需要寻求能克服上述问题的用于基坑施工的支护桩。
实用新型内容
本实用新型的目的是提供一种用于基坑支护的携管钢板桩,使在市政管道和箱涵基坑施工中,避免坚硬地层钢板桩难以压入以及拔桩时基坑周边路面、建筑物、地下管线的不良影响。
本实用新型的目的是通过如下技术方案实现的:
本实用新型一种用于基坑施工的携管钢板支护桩,由桩板和桩管组成,桩板由竖直三面钢板组成,两侧面钢板与中间钢板呈对称夹角连接一体,在两侧面钢板与中间钢板的两个夹角处,各竖直设置一个通长桩管,桩管的上端口通过注浆管与注浆机连接。
所述桩管的下端口与桩板下边在同一水平面。
本实用新型一种用于基坑施工的携管钢板支护桩,由桩板和桩管组成,其结构科学简捷,一方面,在沉桩过程中,通过注浆机C注浆管F,将高压水流从桩管G上端入口Ga注入,在其下端出口Gb对坚硬地层形成强有力的冲刷,有效减小了坚硬地层的阻力,确保沉桩顺利高效进行; 另一方面,当基坑回填后拔出支护桩时,通过注浆机C注浆管F注射有压水泥浆,使桩管G下端出口Gb射出的水泥浆,即时、完好地填充了支护桩拔出后留下的空隙,因此,本设计支护桩避免坚硬地层钢板桩难以压入以及拔桩时对基坑周边路面、建筑物、地下管线的不良影响的问题。
附图说明
图1:本实用新型平面示意图;
图2:本实用新型纵向剖面示意图。
具体实施方式
现结合附图进一步说明本实用新型是如何实施的:
本实用新型一种用于基坑施工的携管钢板支护桩,由桩板和桩管组成,桩板E由竖直三面钢板组成,两侧面钢板与中间钢板呈对称夹角连接一体,在两侧面钢板与中间钢板的两个夹角处,各竖直设置一个通长桩管G,所述桩管G的上端口Ga通过注浆管F与注浆机C连接,其下端口Ga与桩板下边在同一水平面。
Claims (2)
1.一种用于基坑施工的携管钢板支护桩,其特征在于,由桩板和桩管组成,所述桩板由竖直三面钢板组成,两侧面钢板与中间钢板呈对称夹角连接一体,在两侧面钢板与中间钢板的两个夹角处,各竖直设置一个通长桩管,桩管的上端口通过注浆管与注浆机连接。
2.根据权利要求1所述的一种用于基坑施工的携管钢板支护桩,其特征在于,桩管的下端口与桩板下边在同一水平面。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320578723.0U CN203625883U (zh) | 2013-09-18 | 2013-09-18 | 一种用于基坑施工的携管钢板支护桩 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320578723.0U CN203625883U (zh) | 2013-09-18 | 2013-09-18 | 一种用于基坑施工的携管钢板支护桩 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203625883U true CN203625883U (zh) | 2014-06-04 |
Family
ID=50812375
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320578723.0U Expired - Fee Related CN203625883U (zh) | 2013-09-18 | 2013-09-18 | 一种用于基坑施工的携管钢板支护桩 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203625883U (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106223342A (zh) * | 2015-12-24 | 2016-12-14 | 中国石油化工股份有限公司 | 抢修作业坑快速支护装置与使用方法 |
CN108643166A (zh) * | 2018-05-22 | 2018-10-12 | 江苏地基工程有限公司 | 一种削弱打拔钢板桩土层振动的施工方法 |
CN108978635A (zh) * | 2018-07-05 | 2018-12-11 | 南京工业大学 | 一种同步注浆钢板桩及使用方法 |
CN113737796A (zh) * | 2021-09-07 | 2021-12-03 | 江苏兴宇建设集团有限公司 | 钢板桩高压水冲辅助打桩与拔桩同步注浆施工工法 |
-
2013
- 2013-09-18 CN CN201320578723.0U patent/CN203625883U/zh not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106223342A (zh) * | 2015-12-24 | 2016-12-14 | 中国石油化工股份有限公司 | 抢修作业坑快速支护装置与使用方法 |
CN106223342B (zh) * | 2015-12-24 | 2018-06-26 | 中国石油化工股份有限公司 | 抢修作业坑快速支护装置与使用方法 |
CN108643166A (zh) * | 2018-05-22 | 2018-10-12 | 江苏地基工程有限公司 | 一种削弱打拔钢板桩土层振动的施工方法 |
CN108643166B (zh) * | 2018-05-22 | 2021-03-30 | 江苏地基工程有限公司 | 一种削弱打拔钢板桩土层振动的施工方法 |
CN108978635A (zh) * | 2018-07-05 | 2018-12-11 | 南京工业大学 | 一种同步注浆钢板桩及使用方法 |
CN113737796A (zh) * | 2021-09-07 | 2021-12-03 | 江苏兴宇建设集团有限公司 | 钢板桩高压水冲辅助打桩与拔桩同步注浆施工工法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106950070B (zh) | 用于矩形顶管顶进施工全过程模拟的试验装置 | |
CN204112308U (zh) | 一种基于大卵石、高渗透系数地层的简易袖阀注浆装置 | |
CN103573274B (zh) | 软土地基盾构隧道沉降控制钢套管注浆加固装置 | |
CN102852159B (zh) | 一种挡墙施工方法 | |
CN103981898A (zh) | 一种整体明挖节点逆作的地下工程施工方法 | |
CN103114609B (zh) | 新、旧地下连续墙的连接装置及施工方法 | |
CN103696416B (zh) | 一种地基处理方法 | |
CN203625883U (zh) | 一种用于基坑施工的携管钢板支护桩 | |
CN103742157A (zh) | 用顶管法在地下新建地下空间的方法 | |
CN104963705A (zh) | 一种地下空间暗挖构筑方法 | |
CN103321233B (zh) | 滑坡深层排水及滑坡体内地下水资源回收装置的制作方法 | |
CN204780938U (zh) | 一种新型的可回收拉锚式双排桩支护结构 | |
CN203161244U (zh) | 既有地铁暗挖区间隧道保护结构 | |
CN206204972U (zh) | 一种兼作井点降水的预制管桩 | |
CN203939036U (zh) | 一种适用于河道的钢板桩围堰结构 | |
CN203716046U (zh) | 一种基坑土方运输钢栈桥 | |
CN105040705A (zh) | 多溶洞地质条件下地基基础处理施工工艺 | |
CN105569063A (zh) | 地下室挡土墙周边地下水的收集利用方法及集水结构 | |
CN105065040A (zh) | 一种顶板预制的地下空间暗挖构筑方法 | |
CN203320538U (zh) | 滑坡深层排水及滑坡内地下水资源回收装置 | |
CN202706049U (zh) | 一种钢筋混凝土水池沉井 | |
CN202247924U (zh) | 顶管施工拼装式钢结构沉井 | |
CN105586978A (zh) | 基于砾石的换土搅拌止水帷幕施工方法 | |
CN107905242A (zh) | 一种瘦断面折线型围堰结构及施工方法 | |
CN203924005U (zh) | 水域泥炭质土层中的填土筑坝结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140604 |