- CN105951537B CN105951537B CN201610284837.2A CN201610284837A CN105951537B CN 105951537 B CN105951537 B CN 105951537B CN 201610284837 A CN201610284837 A CN 201610284837A CN 105951537 B CN105951537 B CN 105951537B
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- junction girder
- turnout junction
- low
- raft plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2/00—General structure of permanent way
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Foundations (AREA)
Abstract
Circuit rib post distributing track switch foundation structure is put the invention discloses a kind of medium-and low-speed maglev is low, including switch area basement process Reinforced Concrete Raft plate, armored concrete turnout junction girder bar shaped rib column foundation, reinforced concrete bored pile, steel plate and pre-embedded bolt, the switch area basement process Reinforced Concrete Raft plate level is set, and its bottom face arranges many reinforced concrete bored piles;Reinforced concrete bored pile stretches into supporting course after passing through soft stratum, to reduce deformation of the turnout junction girder in rotation process.Present invention ensures that turnout junction girder in rotation process not because foundation insufficient rigidity produce excessive deformation, meet requirement of the turnout junction girder to underlying strength and stability.
Description
Technical field
Line area is put the invention belongs to medium-and low-speed maglev traffic engineering is low, more particularly, to a kind of medium-and low-speed maglev
It is low to put circuit rib post distributing track switch foundation structure.
Background technology
Middle low speed magnetic suspension track traffic belongs to a kind of novel traffic mode, and current achievement in research both domestic and external is less, entirely
The circuit that the world opens operation is even more a small number of.Only in March, 2005, Japan built the middle low speed magnetic suspension railway business opened at present
The middle low speed magnetic suspension railway business operating line that industry runs line-the East Hillside Line and in June, 2014, South Korea opened.And in China
Low speed magnetic suspension traffic only has National University of Defense technology's test wire, Green City Mountain test wire, Tangshan experiment line at present, but without input fortune
Battalion, and based on elevated structure, rarely seen research and application about rolling stock section's switch area basis.
In wheel rail high speed railway, train lane change is realized by switch machine in rolling stock section, and train passes through Shi Dui roads at a high speed
The impact of trouble is larger, track switch is arranged in soil rigidity relatively uniform position during design and track switch is rushed with reducing as far as possible
Hit, so as to reduce maintenance.It is different from wheel track railway switch, the middle low speed magnetic suspension side of embracing rail operation special due to taking
Formula, magnetic-levitation train lane change is real by the low circuit support rail beam drop-over of putting connected after turnout junction girder unitary rotation certain angle and with it
It is existing.Compared to wheel rail railway, turnout junction girder, which is realized, rotates the fundamental importance that the complicated loads such as pressure, drawing, curved, torsion are undertaken to it more
Height, turnout junction girder rotate easily make turnout junction girder infrastructure produce inhomogeneous deformation, when serious influence magnetic-levitation train comfortableness and
Normal lane change.
The content of the invention
For the disadvantages described above or Improvement requirement of prior art, circuit rib is put the invention provides a kind of medium-and low-speed maglev is low
Post distributing track switch foundation structure, the structure should meet turnout junction girder in rotation process not because foundation insufficient rigidity is produced
Excessive deformation is to meet the low intensity for putting circuit turnout junction girder basis of magnetic floating traffic engineering truck section, long-time stability requirement, simultaneously
Also to meet the low circuit foundation treatment mode of putting in turnout junction girder basis and can ensure that rigidity and sedimentation meet requirement, good economy performance and construction
Quality controllability is strong.
To achieve the above object, it is proposed, according to the invention, put circuit track switch foundation structure there is provided a kind of medium-and low-speed maglev is low, its
It is characterised by, including switch area basement process Reinforced Concrete Raft plate, armored concrete turnout junction girder bar shaped rib column foundation, reinforcing bar are mixed
Solidifying earth boring auger hole pouring pile, steel plate and pre-embedded bolt, wherein,
The switch area basement process Reinforced Concrete Raft plate level is set, and its bottom face arranges many reinforced concretes
Multiple armored concrete turnout junction girder bar shaped rib column foundations, the reinforcing bar are fixedly installed on earth boring auger hole pouring pile, its top end face
Concrete turnout junction girder bar shaped rib column foundation, reinforced concrete bored pile and Reinforced Concrete Raft plate collectively form rigid load
Structure, to undertake pressure, pulling force, moment of flexure and the moment of torsion of turnout junction girder transmission;
The reinforced concrete bored pile stretches into supporting course after passing through soft stratum, is being rotated with reducing turnout junction girder
Deformation in journey;
The quantity of the steel plate is multiple, and each steel plate is fixedly mounted on one by multiple pre-embedded bolts respectively
The top of armored concrete turnout junction girder bar shaped rib column foundation, for connection turnout beam.
Preferably, the transition section structure includes two blocks of switch area basement process Reinforced Concrete Raft plates, and by this two
The middle Reinforced Concrete Raft plate that block switch area basement process Reinforced Concrete Raft plate links together, the middle reinforced concrete
The thickness of native raft plate is less than the thickness of each switch area basement process Reinforced Concrete Raft plate, and the middle reinforcing bar is mixed
The bottom face of solidifying soil raft plate has extended downwardly middle reinforced concrete bored pile, and its top end face is provided with reinforced concrete dirt road
Trouble beam bar shaped rib column foundation, the top end face of the armored concrete turnout junction girder bar shaped rib column foundation is connected with steel by pre-embedded bolt
Plate.
Preferably, the length of the middle reinforced concrete bored pile on the middle Reinforced Concrete Raft plate is not more than
The length of reinforced concrete bored pile on the switch area basement process Reinforced Concrete Raft plate.
In general, by the contemplated above technical scheme of the present invention compared with prior art, it can obtain down and show
Beneficial effect:
(1) armored concrete turnout junction girder bar shaped rib column foundation bottom ground of the invention uses the steel of intensity and good integrity
Reinforced concrete cast-in-situ bored pile+Reinforced Concrete Raft plate structural strengthening, reinforced concrete bored pile, Reinforced Concrete Raft
It is rigidly connected between plate, armored concrete turnout junction girder bar shaped rib column foundation, pressure, drawing, curved, torsion to undertake turnout junction girder transmission etc.
Complicated Loads, at the same the size and arrangement of reinforcement of bar shaped rib column foundation rotated according to turnout junction girder, slide and the requirement of load etc. come
It is determined that, pile foundation stretches into reliable supporting course through soft stratum, it is ensured that turnout junction girder is in rotation process not because of foundation rigidity
Deficiency produces excessive deformation, meets requirement of the turnout junction girder to underlying strength and stability.
(2) present invention is reinforced using reinforced concrete bored pile with Reinforced Concrete Raft plate, according to top turnout junction girder
It is thick that the difference condition of pressure, drawing, curved, torsion that bar shaped rib column foundation is born etc. can carry out subregion to lower rebar concrete raft plate
Degree design sets build joint to disconnect in appropriate position simultaneously, and the stake progress of the reinforced concrete bored pile to its underpart
Row adjustment, so both can ensure that rigidity and sedimentation were met and had required, and reduced settlement difference and temperature stress, and compared to all using same
The Reinforced Concrete Raft plate of sample thickness and the long reinforced concrete bored pile economy of same stake are more preferable.
Brief description of the drawings
Fig. 1 is the schematic longitudinal section of the present invention;
Fig. 2 is the structural representation of the present invention;
Fig. 3 is structure chart of the pre-embedded bolt on turnout junction girder bar shaped rib column foundation in the present invention.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.As long as in addition, technical characteristic involved in each embodiment of invention described below
Not constituting conflict each other can just be mutually combined.
1~Fig. 3 of reference picture, a kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure, it is characterised in that
Including switch area basement process Reinforced Concrete Raft plate 2, armored concrete turnout junction girder bar shaped rib column foundation 1, reinforced concrete drill
Hole pouring pile 3, steel plate and pre-embedded bolt 4, wherein,
The switch area basement process Reinforced Concrete Raft plate 2 is horizontally disposed with, and its bottom face arranges that many reinforcing bars are mixed
Multiple armored concrete turnout junction girder bar shaped rib column foundations 1 are fixedly installed on solidifying earth boring auger hole pouring pile 3, its top end face, it is described
Armored concrete turnout junction girder bar shaped rib column foundation 1, reinforced concrete bored pile 3 and Reinforced Concrete Raft plate 2 are collectively formed
Rigid load-carrying construction, to undertake pressure, pulling force, moment of flexure and the moment of torsion of turnout junction girder transmission;
The reinforced concrete bored pile 3 stretches into supporting course 6 after passing through soft stratum 5, is being turned with reducing turnout junction girder
Deformation during dynamic;
The quantity of the steel plate is multiple, and each steel plate is fixedly mounted on by multiple pre-embedded bolts 4 respectively
The top of one armored concrete turnout junction girder bar shaped rib column foundation 1, for connection turnout beam.
Further, the transition section structure includes two blocks of switch area basement process Reinforced Concrete Raft plates 2, and by this two
The middle Reinforced Concrete Raft plate that block switch area basement process Reinforced Concrete Raft plate 2 links together, the middle reinforcing bar is mixed
The thickness of solidifying soil raft plate is less than the thickness of each switch area basement process Reinforced Concrete Raft plate 2, and the middle steel
The bottom face of reinforced concrete raft plate has extended downwardly middle reinforced concrete bored pile 3, and its top end face is provided with reinforcing bar and mixed
Solidifying soil turnout junction girder bar shaped rib column foundation 1, the top end face of the armored concrete turnout junction girder bar shaped rib column foundation 1 passes through pre-embedded bolt
4 are connected with steel plate.
Further, the length of the middle reinforced concrete bored pile 3 on the middle Reinforced Concrete Raft plate is little
In the length of the reinforced concrete bored pile 3 on the switch area basement process Reinforced Concrete Raft plate 2.
The bottom ground of structure reinforcing bars concrete turnout junction girder bar shaped rib column foundation 1 is mixed using the reinforcing bar of intensity and good integrity
Solidifying earth boring auger hole pouring pile 3 is reinforced with Reinforced Concrete Raft plate 2, reinforced concrete bored pile 3, Reinforced Concrete Raft plate 2, steel
Using being rigidly connected between reinforced concrete turnout junction girder bar shaped rib column foundation 1, pressure, drawing, curved, torsion to undertake turnout junction girder transmission etc.
Complicated Loads, at the same the size and arrangement of reinforcement of bar shaped rib column foundation 1 rotated according to turnout junction girder, slide and the requirement of load etc. come
It is determined that, reinforced concrete bored pile 3 stretches into reliable supporting course 6 through soft stratum 5, it is ensured that turnout junction girder is in rotation process
Not because foundation insufficient rigidity produces excessive deformation, requirement of the turnout junction girder to underlying strength and stability is met.Secondly, track switch
The low circuit ground of putting of beam is reinforced using reinforced concrete bored pile 3 with Reinforced Concrete Raft plate 2, according to top turnout junction girder bar
It is thick that the difference condition of pressure, drawing, curved, torsion that shape rib column foundation 1 is born etc. can carry out subregion to lower rebar concrete raft plate 2
Degree design sets build joint to disconnect in appropriate position simultaneously, and long to the stake of the reinforced concrete bored pile 3 of its underpart
It is adjusted, had so both can ensure that rigidity and sedimentation were met and required, and reduced settlement difference and temperature stress, and compared to all uses
The Reinforced Concrete Raft plate of same thickness and the long reinforced concrete bored pile economy of same stake are more preferable.
Its specific implementation process is as follows:
(1) compacting leveling, construction switch area reinforced concrete bored pile and Reinforced Concrete Raft plate are carried out to place,
Reinforced concrete bored pile reinforcing bar is connected cast with raft plate, cuts reinforced concrete bored pile top concrete, protects
Stay the reinforcing bar being connected with raft plate.
(2) colligation raft slab muscle, pours assembling reinforcement concrete turnout junction girder bar shaped rib column foundation before raft board concrete
Reinforcing bar, and formwork erection poured to strip footing bottom surface above certain altitude, while setting construction joint to ensure its bonding strength, and is avoided
Secondary be cast at raft plate and bar shaped rib column foundation contact surface forms unfavorable structural plane
(3) pre-embedded bolt, pours strip footing concrete, treats that switch area Reinforced Concrete Raft plate, bar shaped rib column foundation reach
To after intensity requirement, form removal.
(4) turnout junction girder lifting is carried out, you can.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, it is not used to
The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the invention etc., it all should include
Within protection scope of the present invention.
Claims (3)
1. a kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure, it is characterised in that including switch area ground
Handle Reinforced Concrete Raft plate, armored concrete turnout junction girder bar shaped rib column foundation, reinforced concrete bored pile, steel plate and pre-
Bolt is buried, wherein,
The switch area basement process Reinforced Concrete Raft plate level is set, and its bottom face arranges many reinforced concrete drills
Multiple armored concrete turnout junction girder bar shaped rib column foundations, the reinforced concrete are fixedly installed on hole pouring pile, its top end face
Native turnout junction girder bar shaped rib column foundation, reinforced concrete bored pile and Reinforced Concrete Raft plate collectively form rigid load knot
Structure, to undertake pressure, pulling force, moment of flexure and the moment of torsion of turnout junction girder transmission;
The reinforced concrete bored pile stretches into supporting course after passing through soft stratum, to reduce turnout junction girder in rotation process
Deformation;
The quantity of the steel plate is multiple, and each steel plate is fixedly mounted on a reinforcing bar by multiple pre-embedded bolts respectively
The top of concrete turnout junction girder bar shaped rib column foundation, for connection turnout beam.
2. a kind of medium-and low-speed maglev according to claim 1 is low to put circuit rib post distributing track switch foundation structure, its feature
It is, the track switch foundation structure includes two blocks of switch area basement process Reinforced Concrete Raft plates, and by this two pieces of switch areas
The middle Reinforced Concrete Raft plate that basement process Reinforced Concrete Raft plate links together, the middle Reinforced Concrete Raft plate
Thickness is less than the thickness of each switch area basement process Reinforced Concrete Raft plate, and the middle Reinforced Concrete Raft plate
Bottom face arrangement reinforced concrete bored pile, its top end face is provided with armored concrete turnout junction girder bar shaped rib column foundation,
The top end face of the armored concrete turnout junction girder bar shaped rib column foundation is connected with steel plate by pre-embedded bolt.
3. a kind of medium-and low-speed maglev according to claim 2 is low to put circuit rib post distributing track switch foundation structure, its feature
It is, the length of the middle reinforced concrete bored pile on the middle Reinforced Concrete Raft plate is not more than the switch area
The length of reinforced concrete bored pile on basement process Reinforced Concrete Raft plate.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610284837.2A CN105951537B (en) | 2016-04-29 | 2016-04-29 | A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure |
PCT/CN2017/077334 WO2017185905A1 (en) | 2016-04-29 | 2017-03-20 | Ribbed column distributed turnout foundation structure for low-set mid-to-low speed magnetic levitation line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610284837.2A CN105951537B (en) | 2016-04-29 | 2016-04-29 | A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105951537A CN105951537A (en) | 2016-09-21 |
CN105951537B true CN105951537B (en) | 2017-10-03 |
Family
ID=56913130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610284837.2A Active CN105951537B (en) | 2016-04-29 | 2016-04-29 | A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN105951537B (en) |
WO (1) | WO2017185905A1 (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105951537B (en) * | 2016-04-29 | 2017-10-03 | 中铁第四勘察设计院集团有限公司 | A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure |
CN108459154B (en) * | 2018-05-16 | 2023-11-03 | 山东省公路桥梁建设有限公司 | Concrete wet joint test bed with constraint function and test method |
CN110258221A (en) * | 2019-06-24 | 2019-09-20 | 中铁第四勘察设计院集团有限公司 | A kind of box frame roadbed |
CN113089710B (en) * | 2021-04-21 | 2024-06-28 | 中国五冶集团有限公司 | Raft steel bar concrete structure construction appurtenance |
CN115467194B (en) * | 2021-11-09 | 2024-08-23 | 中铁二院工程集团有限责任公司 | Roadbed of magnetic levitation track turnout area, magnetic levitation track roadbed and construction method |
CN114753401B (en) * | 2022-04-08 | 2023-05-26 | 中铁十九局集团第五工程有限公司 | Construction method for tunnel bottom karst cave treatment |
CN115506362B (en) * | 2022-09-02 | 2023-07-25 | 中国建筑第二工程局有限公司 | Mucky soil deep and shallow foundation pit supporting structure and construction method thereof |
CN115478553A (en) * | 2022-09-23 | 2022-12-16 | 中国五冶集团有限公司 | Raft plate pours shaping and uses support frame |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005273296A (en) * | 2004-03-25 | 2005-10-06 | Geotop Corp | Foundation structure |
CN1876970A (en) * | 2005-06-10 | 2006-12-13 | 李仁平 | Long and short piles square units combination type combined pile foundation |
JP4445341B2 (en) * | 2004-08-04 | 2010-04-07 | 中村物産有限会社 | Building foundation and its construction method |
CN201713742U (en) * | 2010-05-14 | 2011-01-19 | 中铁第一勘察设计院集团有限公司 | Buried type continuous pile-board structure |
CN202595756U (en) * | 2012-03-31 | 2012-12-12 | 上海市电力公司 | Piled raft foundation structure of narrow-base power transmission tower |
CN203795451U (en) * | 2014-02-19 | 2014-08-27 | 中铁第四勘察设计院集团有限公司 | Strengthening and reinforcing structure for defect precast driven pile foundation |
CN104480810A (en) * | 2014-12-11 | 2015-04-01 | 中铁第四勘察设计院集团有限公司 | Medium-and-low speed magnetic levitation railway low route continuous framework type bearing rail beam structure and construction method |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105951537B (en) * | 2016-04-29 | 2017-10-03 | 中铁第四勘察设计院集团有限公司 | A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure |
CN205617160U (en) * | 2016-04-29 | 2016-10-05 | 中铁第四勘察设计院集团有限公司 | Low distributed switch foundation structure of circuit rib post that puts of moderate -low speed magnetic levitation |
-
2016
- 2016-04-29 CN CN201610284837.2A patent/CN105951537B/en active Active
-
2017
- 2017-03-20 WO PCT/CN2017/077334 patent/WO2017185905A1/en active Application Filing
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005273296A (en) * | 2004-03-25 | 2005-10-06 | Geotop Corp | Foundation structure |
JP4445341B2 (en) * | 2004-08-04 | 2010-04-07 | 中村物産有限会社 | Building foundation and its construction method |
CN1876970A (en) * | 2005-06-10 | 2006-12-13 | 李仁平 | Long and short piles square units combination type combined pile foundation |
CN201713742U (en) * | 2010-05-14 | 2011-01-19 | 中铁第一勘察设计院集团有限公司 | Buried type continuous pile-board structure |
CN202595756U (en) * | 2012-03-31 | 2012-12-12 | 上海市电力公司 | Piled raft foundation structure of narrow-base power transmission tower |
CN203795451U (en) * | 2014-02-19 | 2014-08-27 | 中铁第四勘察设计院集团有限公司 | Strengthening and reinforcing structure for defect precast driven pile foundation |
CN104480810A (en) * | 2014-12-11 | 2015-04-01 | 中铁第四勘察设计院集团有限公司 | Medium-and-low speed magnetic levitation railway low route continuous framework type bearing rail beam structure and construction method |
Also Published As
Publication number | Publication date |
---|---|
WO2017185905A1 (en) | 2017-11-02 |
CN105951537A (en) | 2016-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105951537B (en) | A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure | |
CN105887587B (en) | A kind of low circuit switch area of putting of medium-and low-speed maglev is with non-switch area transition section structure | |
CN201850505U (en) | Rigid-flexible transition structure capable of preventing bumping at bridge-head | |
CN204000469U (en) | A kind of pile formula box road structure | |
CN106835880A (en) | Highway lateral support type peg board formula is without earth roadbed | |
CN206941325U (en) | The newly-built peg board formula roadbed of girder construction system in length and breadth | |
CN105672144B (en) | A kind of medium-small span bridges are reinforced with spelling wide structure and its construction method | |
CN106400636A (en) | Control method for multilayer road soft soil roadbed differential settlement | |
CN105133493B (en) | Embedded track structure suitable for middle-span and small-span bridge and construction method | |
CN101240548A (en) | Two-stage stack-type cantilevered L-shaped blank wall and construction method thereof | |
CN210262769U (en) | Hollow slab bridge reinforcing and widening structure | |
CN207793771U (en) | Middle low speed magnetic suspension traffic engineering is low to set circuit support rail beam | |
CN110144784A (en) | The town road and its construction method constructed based on prestressed concrete plate stake | |
CN205617160U (en) | Low distributed switch foundation structure of circuit rib post that puts of moderate -low speed magnetic levitation | |
CN205557205U (en) | Low circuit switch area NOT AND switch area changeover portion structure of putting of moderate -low speed magnetic levitation | |
CN206157496U (en) | Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling | |
CN206157483U (en) | Moderate -low speed magnetic levitation traffic engineering double -line location supporting beam of pile foundation formula support rail girder construction of filling | |
CN110080044A (en) | A kind of vertical lattice type prefabricated assembled segment and its assembled high-speed rail roadbed | |
CN106283952B (en) | Medium-and low-speed maglev two-wire excavation location pile foundation joist framing type support rail girder construction | |
CN201962697U (en) | Frame retaining wall with composite structure | |
CN209066196U (en) | Railway high-filled embankment box-structure | |
CN204780566U (en) | Eliminate either end of a bridge and jump bridge ground connection segment structure of car | |
CN106400615A (en) | Medium-low-speed magnetic levitation single line excavation section independent pier column type bearing rail beam transition section structure | |
CN206219896U (en) | Medium-and low-speed maglev traffic engineering two-wire excavation location pile foundation joist type support rail girder construction | |
CN202227268U (en) | Concrete box beam structure capable of widening steel cantilever beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |