CN105951537B - A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure - Google Patents

A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure Download PDF

Info

Publication number
CN105951537B
CN105951537B CN201610284837.2A CN201610284837A CN105951537B CN 105951537 B CN105951537 B CN 105951537B CN 201610284837 A CN201610284837 A CN 201610284837A CN 105951537 B CN105951537 B CN 105951537B
Authority
CN
China
Prior art keywords
reinforced concrete
junction girder
turnout junction
low
raft plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610284837.2A
Other languages
Chinese (zh)
Other versions
CN105951537A (en
Inventor
郭建湖
姜鹰
李小和
赵新益
姚洪锡
李巍
王勇刚
杨辉建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201610284837.2A priority Critical patent/CN105951537B/en
Publication of CN105951537A publication Critical patent/CN105951537A/en
Priority to PCT/CN2017/077334 priority patent/WO2017185905A1/en
Application granted granted Critical
Publication of CN105951537B publication Critical patent/CN105951537B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Foundations (AREA)

Abstract

Circuit rib post distributing track switch foundation structure is put the invention discloses a kind of medium-and low-speed maglev is low, including switch area basement process Reinforced Concrete Raft plate, armored concrete turnout junction girder bar shaped rib column foundation, reinforced concrete bored pile, steel plate and pre-embedded bolt, the switch area basement process Reinforced Concrete Raft plate level is set, and its bottom face arranges many reinforced concrete bored piles;Reinforced concrete bored pile stretches into supporting course after passing through soft stratum, to reduce deformation of the turnout junction girder in rotation process.Present invention ensures that turnout junction girder in rotation process not because foundation insufficient rigidity produce excessive deformation, meet requirement of the turnout junction girder to underlying strength and stability.

Description

A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure
Technical field
Line area is put the invention belongs to medium-and low-speed maglev traffic engineering is low, more particularly, to a kind of medium-and low-speed maglev It is low to put circuit rib post distributing track switch foundation structure.
Background technology
Middle low speed magnetic suspension track traffic belongs to a kind of novel traffic mode, and current achievement in research both domestic and external is less, entirely The circuit that the world opens operation is even more a small number of.Only in March, 2005, Japan built the middle low speed magnetic suspension railway business opened at present The middle low speed magnetic suspension railway business operating line that industry runs line-the East Hillside Line and in June, 2014, South Korea opened.And in China Low speed magnetic suspension traffic only has National University of Defense technology's test wire, Green City Mountain test wire, Tangshan experiment line at present, but without input fortune Battalion, and based on elevated structure, rarely seen research and application about rolling stock section's switch area basis.
In wheel rail high speed railway, train lane change is realized by switch machine in rolling stock section, and train passes through Shi Dui roads at a high speed The impact of trouble is larger, track switch is arranged in soil rigidity relatively uniform position during design and track switch is rushed with reducing as far as possible Hit, so as to reduce maintenance.It is different from wheel track railway switch, the middle low speed magnetic suspension side of embracing rail operation special due to taking Formula, magnetic-levitation train lane change is real by the low circuit support rail beam drop-over of putting connected after turnout junction girder unitary rotation certain angle and with it It is existing.Compared to wheel rail railway, turnout junction girder, which is realized, rotates the fundamental importance that the complicated loads such as pressure, drawing, curved, torsion are undertaken to it more Height, turnout junction girder rotate easily make turnout junction girder infrastructure produce inhomogeneous deformation, when serious influence magnetic-levitation train comfortableness and Normal lane change.
The content of the invention
For the disadvantages described above or Improvement requirement of prior art, circuit rib is put the invention provides a kind of medium-and low-speed maglev is low Post distributing track switch foundation structure, the structure should meet turnout junction girder in rotation process not because foundation insufficient rigidity is produced Excessive deformation is to meet the low intensity for putting circuit turnout junction girder basis of magnetic floating traffic engineering truck section, long-time stability requirement, simultaneously Also to meet the low circuit foundation treatment mode of putting in turnout junction girder basis and can ensure that rigidity and sedimentation meet requirement, good economy performance and construction Quality controllability is strong.
To achieve the above object, it is proposed, according to the invention, put circuit track switch foundation structure there is provided a kind of medium-and low-speed maglev is low, its It is characterised by, including switch area basement process Reinforced Concrete Raft plate, armored concrete turnout junction girder bar shaped rib column foundation, reinforcing bar are mixed Solidifying earth boring auger hole pouring pile, steel plate and pre-embedded bolt, wherein,
The switch area basement process Reinforced Concrete Raft plate level is set, and its bottom face arranges many reinforced concretes Multiple armored concrete turnout junction girder bar shaped rib column foundations, the reinforcing bar are fixedly installed on earth boring auger hole pouring pile, its top end face Concrete turnout junction girder bar shaped rib column foundation, reinforced concrete bored pile and Reinforced Concrete Raft plate collectively form rigid load Structure, to undertake pressure, pulling force, moment of flexure and the moment of torsion of turnout junction girder transmission;
The reinforced concrete bored pile stretches into supporting course after passing through soft stratum, is being rotated with reducing turnout junction girder Deformation in journey;
The quantity of the steel plate is multiple, and each steel plate is fixedly mounted on one by multiple pre-embedded bolts respectively The top of armored concrete turnout junction girder bar shaped rib column foundation, for connection turnout beam.
Preferably, the transition section structure includes two blocks of switch area basement process Reinforced Concrete Raft plates, and by this two The middle Reinforced Concrete Raft plate that block switch area basement process Reinforced Concrete Raft plate links together, the middle reinforced concrete The thickness of native raft plate is less than the thickness of each switch area basement process Reinforced Concrete Raft plate, and the middle reinforcing bar is mixed The bottom face of solidifying soil raft plate has extended downwardly middle reinforced concrete bored pile, and its top end face is provided with reinforced concrete dirt road Trouble beam bar shaped rib column foundation, the top end face of the armored concrete turnout junction girder bar shaped rib column foundation is connected with steel by pre-embedded bolt Plate.
Preferably, the length of the middle reinforced concrete bored pile on the middle Reinforced Concrete Raft plate is not more than The length of reinforced concrete bored pile on the switch area basement process Reinforced Concrete Raft plate.
In general, by the contemplated above technical scheme of the present invention compared with prior art, it can obtain down and show Beneficial effect:
(1) armored concrete turnout junction girder bar shaped rib column foundation bottom ground of the invention uses the steel of intensity and good integrity Reinforced concrete cast-in-situ bored pile+Reinforced Concrete Raft plate structural strengthening, reinforced concrete bored pile, Reinforced Concrete Raft It is rigidly connected between plate, armored concrete turnout junction girder bar shaped rib column foundation, pressure, drawing, curved, torsion to undertake turnout junction girder transmission etc. Complicated Loads, at the same the size and arrangement of reinforcement of bar shaped rib column foundation rotated according to turnout junction girder, slide and the requirement of load etc. come It is determined that, pile foundation stretches into reliable supporting course through soft stratum, it is ensured that turnout junction girder is in rotation process not because of foundation rigidity Deficiency produces excessive deformation, meets requirement of the turnout junction girder to underlying strength and stability.
(2) present invention is reinforced using reinforced concrete bored pile with Reinforced Concrete Raft plate, according to top turnout junction girder It is thick that the difference condition of pressure, drawing, curved, torsion that bar shaped rib column foundation is born etc. can carry out subregion to lower rebar concrete raft plate Degree design sets build joint to disconnect in appropriate position simultaneously, and the stake progress of the reinforced concrete bored pile to its underpart Row adjustment, so both can ensure that rigidity and sedimentation were met and had required, and reduced settlement difference and temperature stress, and compared to all using same The Reinforced Concrete Raft plate of sample thickness and the long reinforced concrete bored pile economy of same stake are more preferable.
Brief description of the drawings
Fig. 1 is the schematic longitudinal section of the present invention;
Fig. 2 is the structural representation of the present invention;
Fig. 3 is structure chart of the pre-embedded bolt on turnout junction girder bar shaped rib column foundation in the present invention.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.As long as in addition, technical characteristic involved in each embodiment of invention described below Not constituting conflict each other can just be mutually combined.
1~Fig. 3 of reference picture, a kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure, it is characterised in that Including switch area basement process Reinforced Concrete Raft plate 2, armored concrete turnout junction girder bar shaped rib column foundation 1, reinforced concrete drill Hole pouring pile 3, steel plate and pre-embedded bolt 4, wherein,
The switch area basement process Reinforced Concrete Raft plate 2 is horizontally disposed with, and its bottom face arranges that many reinforcing bars are mixed Multiple armored concrete turnout junction girder bar shaped rib column foundations 1 are fixedly installed on solidifying earth boring auger hole pouring pile 3, its top end face, it is described Armored concrete turnout junction girder bar shaped rib column foundation 1, reinforced concrete bored pile 3 and Reinforced Concrete Raft plate 2 are collectively formed Rigid load-carrying construction, to undertake pressure, pulling force, moment of flexure and the moment of torsion of turnout junction girder transmission;
The reinforced concrete bored pile 3 stretches into supporting course 6 after passing through soft stratum 5, is being turned with reducing turnout junction girder Deformation during dynamic;
The quantity of the steel plate is multiple, and each steel plate is fixedly mounted on by multiple pre-embedded bolts 4 respectively The top of one armored concrete turnout junction girder bar shaped rib column foundation 1, for connection turnout beam.
Further, the transition section structure includes two blocks of switch area basement process Reinforced Concrete Raft plates 2, and by this two The middle Reinforced Concrete Raft plate that block switch area basement process Reinforced Concrete Raft plate 2 links together, the middle reinforcing bar is mixed The thickness of solidifying soil raft plate is less than the thickness of each switch area basement process Reinforced Concrete Raft plate 2, and the middle steel The bottom face of reinforced concrete raft plate has extended downwardly middle reinforced concrete bored pile 3, and its top end face is provided with reinforcing bar and mixed Solidifying soil turnout junction girder bar shaped rib column foundation 1, the top end face of the armored concrete turnout junction girder bar shaped rib column foundation 1 passes through pre-embedded bolt 4 are connected with steel plate.
Further, the length of the middle reinforced concrete bored pile 3 on the middle Reinforced Concrete Raft plate is little In the length of the reinforced concrete bored pile 3 on the switch area basement process Reinforced Concrete Raft plate 2.
The bottom ground of structure reinforcing bars concrete turnout junction girder bar shaped rib column foundation 1 is mixed using the reinforcing bar of intensity and good integrity Solidifying earth boring auger hole pouring pile 3 is reinforced with Reinforced Concrete Raft plate 2, reinforced concrete bored pile 3, Reinforced Concrete Raft plate 2, steel Using being rigidly connected between reinforced concrete turnout junction girder bar shaped rib column foundation 1, pressure, drawing, curved, torsion to undertake turnout junction girder transmission etc. Complicated Loads, at the same the size and arrangement of reinforcement of bar shaped rib column foundation 1 rotated according to turnout junction girder, slide and the requirement of load etc. come It is determined that, reinforced concrete bored pile 3 stretches into reliable supporting course 6 through soft stratum 5, it is ensured that turnout junction girder is in rotation process Not because foundation insufficient rigidity produces excessive deformation, requirement of the turnout junction girder to underlying strength and stability is met.Secondly, track switch The low circuit ground of putting of beam is reinforced using reinforced concrete bored pile 3 with Reinforced Concrete Raft plate 2, according to top turnout junction girder bar It is thick that the difference condition of pressure, drawing, curved, torsion that shape rib column foundation 1 is born etc. can carry out subregion to lower rebar concrete raft plate 2 Degree design sets build joint to disconnect in appropriate position simultaneously, and long to the stake of the reinforced concrete bored pile 3 of its underpart It is adjusted, had so both can ensure that rigidity and sedimentation were met and required, and reduced settlement difference and temperature stress, and compared to all uses The Reinforced Concrete Raft plate of same thickness and the long reinforced concrete bored pile economy of same stake are more preferable.
Its specific implementation process is as follows:
(1) compacting leveling, construction switch area reinforced concrete bored pile and Reinforced Concrete Raft plate are carried out to place, Reinforced concrete bored pile reinforcing bar is connected cast with raft plate, cuts reinforced concrete bored pile top concrete, protects Stay the reinforcing bar being connected with raft plate.
(2) colligation raft slab muscle, pours assembling reinforcement concrete turnout junction girder bar shaped rib column foundation before raft board concrete Reinforcing bar, and formwork erection poured to strip footing bottom surface above certain altitude, while setting construction joint to ensure its bonding strength, and is avoided Secondary be cast at raft plate and bar shaped rib column foundation contact surface forms unfavorable structural plane
(3) pre-embedded bolt, pours strip footing concrete, treats that switch area Reinforced Concrete Raft plate, bar shaped rib column foundation reach To after intensity requirement, form removal.
(4) turnout junction girder lifting is carried out, you can.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, it is not used to The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the invention etc., it all should include Within protection scope of the present invention.

Claims (3)

1. a kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure, it is characterised in that including switch area ground Handle Reinforced Concrete Raft plate, armored concrete turnout junction girder bar shaped rib column foundation, reinforced concrete bored pile, steel plate and pre- Bolt is buried, wherein,
The switch area basement process Reinforced Concrete Raft plate level is set, and its bottom face arranges many reinforced concrete drills Multiple armored concrete turnout junction girder bar shaped rib column foundations, the reinforced concrete are fixedly installed on hole pouring pile, its top end face Native turnout junction girder bar shaped rib column foundation, reinforced concrete bored pile and Reinforced Concrete Raft plate collectively form rigid load knot Structure, to undertake pressure, pulling force, moment of flexure and the moment of torsion of turnout junction girder transmission;
The reinforced concrete bored pile stretches into supporting course after passing through soft stratum, to reduce turnout junction girder in rotation process Deformation;
The quantity of the steel plate is multiple, and each steel plate is fixedly mounted on a reinforcing bar by multiple pre-embedded bolts respectively The top of concrete turnout junction girder bar shaped rib column foundation, for connection turnout beam.
2. a kind of medium-and low-speed maglev according to claim 1 is low to put circuit rib post distributing track switch foundation structure, its feature It is, the track switch foundation structure includes two blocks of switch area basement process Reinforced Concrete Raft plates, and by this two pieces of switch areas The middle Reinforced Concrete Raft plate that basement process Reinforced Concrete Raft plate links together, the middle Reinforced Concrete Raft plate Thickness is less than the thickness of each switch area basement process Reinforced Concrete Raft plate, and the middle Reinforced Concrete Raft plate Bottom face arrangement reinforced concrete bored pile, its top end face is provided with armored concrete turnout junction girder bar shaped rib column foundation, The top end face of the armored concrete turnout junction girder bar shaped rib column foundation is connected with steel plate by pre-embedded bolt.
3. a kind of medium-and low-speed maglev according to claim 2 is low to put circuit rib post distributing track switch foundation structure, its feature It is, the length of the middle reinforced concrete bored pile on the middle Reinforced Concrete Raft plate is not more than the switch area The length of reinforced concrete bored pile on basement process Reinforced Concrete Raft plate.
CN201610284837.2A 2016-04-29 2016-04-29 A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure Active CN105951537B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610284837.2A CN105951537B (en) 2016-04-29 2016-04-29 A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure
PCT/CN2017/077334 WO2017185905A1 (en) 2016-04-29 2017-03-20 Ribbed column distributed turnout foundation structure for low-set mid-to-low speed magnetic levitation line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610284837.2A CN105951537B (en) 2016-04-29 2016-04-29 A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure

Publications (2)

Publication Number Publication Date
CN105951537A CN105951537A (en) 2016-09-21
CN105951537B true CN105951537B (en) 2017-10-03

Family

ID=56913130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610284837.2A Active CN105951537B (en) 2016-04-29 2016-04-29 A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure

Country Status (2)

Country Link
CN (1) CN105951537B (en)
WO (1) WO2017185905A1 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951537B (en) * 2016-04-29 2017-10-03 中铁第四勘察设计院集团有限公司 A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure
CN108459154B (en) * 2018-05-16 2023-11-03 山东省公路桥梁建设有限公司 Concrete wet joint test bed with constraint function and test method
CN110258221A (en) * 2019-06-24 2019-09-20 中铁第四勘察设计院集团有限公司 A kind of box frame roadbed
CN113089710B (en) * 2021-04-21 2024-06-28 中国五冶集团有限公司 Raft steel bar concrete structure construction appurtenance
CN115467194B (en) * 2021-11-09 2024-08-23 中铁二院工程集团有限责任公司 Roadbed of magnetic levitation track turnout area, magnetic levitation track roadbed and construction method
CN114753401B (en) * 2022-04-08 2023-05-26 中铁十九局集团第五工程有限公司 Construction method for tunnel bottom karst cave treatment
CN115506362B (en) * 2022-09-02 2023-07-25 中国建筑第二工程局有限公司 Mucky soil deep and shallow foundation pit supporting structure and construction method thereof
CN115478553A (en) * 2022-09-23 2022-12-16 中国五冶集团有限公司 Raft plate pours shaping and uses support frame

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005273296A (en) * 2004-03-25 2005-10-06 Geotop Corp Foundation structure
CN1876970A (en) * 2005-06-10 2006-12-13 李仁平 Long and short piles square units combination type combined pile foundation
JP4445341B2 (en) * 2004-08-04 2010-04-07 中村物産有限会社 Building foundation and its construction method
CN201713742U (en) * 2010-05-14 2011-01-19 中铁第一勘察设计院集团有限公司 Buried type continuous pile-board structure
CN202595756U (en) * 2012-03-31 2012-12-12 上海市电力公司 Piled raft foundation structure of narrow-base power transmission tower
CN203795451U (en) * 2014-02-19 2014-08-27 中铁第四勘察设计院集团有限公司 Strengthening and reinforcing structure for defect precast driven pile foundation
CN104480810A (en) * 2014-12-11 2015-04-01 中铁第四勘察设计院集团有限公司 Medium-and-low speed magnetic levitation railway low route continuous framework type bearing rail beam structure and construction method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951537B (en) * 2016-04-29 2017-10-03 中铁第四勘察设计院集团有限公司 A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure
CN205617160U (en) * 2016-04-29 2016-10-05 中铁第四勘察设计院集团有限公司 Low distributed switch foundation structure of circuit rib post that puts of moderate -low speed magnetic levitation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005273296A (en) * 2004-03-25 2005-10-06 Geotop Corp Foundation structure
JP4445341B2 (en) * 2004-08-04 2010-04-07 中村物産有限会社 Building foundation and its construction method
CN1876970A (en) * 2005-06-10 2006-12-13 李仁平 Long and short piles square units combination type combined pile foundation
CN201713742U (en) * 2010-05-14 2011-01-19 中铁第一勘察设计院集团有限公司 Buried type continuous pile-board structure
CN202595756U (en) * 2012-03-31 2012-12-12 上海市电力公司 Piled raft foundation structure of narrow-base power transmission tower
CN203795451U (en) * 2014-02-19 2014-08-27 中铁第四勘察设计院集团有限公司 Strengthening and reinforcing structure for defect precast driven pile foundation
CN104480810A (en) * 2014-12-11 2015-04-01 中铁第四勘察设计院集团有限公司 Medium-and-low speed magnetic levitation railway low route continuous framework type bearing rail beam structure and construction method

Also Published As

Publication number Publication date
WO2017185905A1 (en) 2017-11-02
CN105951537A (en) 2016-09-21

Similar Documents

Publication Publication Date Title
CN105951537B (en) A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure
CN105887587B (en) A kind of low circuit switch area of putting of medium-and low-speed maglev is with non-switch area transition section structure
CN201850505U (en) Rigid-flexible transition structure capable of preventing bumping at bridge-head
CN204000469U (en) A kind of pile formula box road structure
CN106835880A (en) Highway lateral support type peg board formula is without earth roadbed
CN206941325U (en) The newly-built peg board formula roadbed of girder construction system in length and breadth
CN105672144B (en) A kind of medium-small span bridges are reinforced with spelling wide structure and its construction method
CN106400636A (en) Control method for multilayer road soft soil roadbed differential settlement
CN105133493B (en) Embedded track structure suitable for middle-span and small-span bridge and construction method
CN101240548A (en) Two-stage stack-type cantilevered L-shaped blank wall and construction method thereof
CN210262769U (en) Hollow slab bridge reinforcing and widening structure
CN207793771U (en) Middle low speed magnetic suspension traffic engineering is low to set circuit support rail beam
CN110144784A (en) The town road and its construction method constructed based on prestressed concrete plate stake
CN205617160U (en) Low distributed switch foundation structure of circuit rib post that puts of moderate -low speed magnetic levitation
CN205557205U (en) Low circuit switch area NOT AND switch area changeover portion structure of putting of moderate -low speed magnetic levitation
CN206157496U (en) Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling
CN206157483U (en) Moderate -low speed magnetic levitation traffic engineering double -line location supporting beam of pile foundation formula support rail girder construction of filling
CN110080044A (en) A kind of vertical lattice type prefabricated assembled segment and its assembled high-speed rail roadbed
CN106283952B (en) Medium-and low-speed maglev two-wire excavation location pile foundation joist framing type support rail girder construction
CN201962697U (en) Frame retaining wall with composite structure
CN209066196U (en) Railway high-filled embankment box-structure
CN204780566U (en) Eliminate either end of a bridge and jump bridge ground connection segment structure of car
CN106400615A (en) Medium-low-speed magnetic levitation single line excavation section independent pier column type bearing rail beam transition section structure
CN206219896U (en) Medium-and low-speed maglev traffic engineering two-wire excavation location pile foundation joist type support rail girder construction
CN202227268U (en) Concrete box beam structure capable of widening steel cantilever beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant